Page 1: BIDDERS’ CONFERENCE IT-3976
Page 2: BIDDERS’ CONFERENCE IT-3976

2

BIDDERS’ CONFERENCE IT-3976Provision of Specialized EOT Crane Maintenance

Services on the CERN Site

May 5th 2014 Handling Engineering Group

Introduction to CERN and to the Handling Engineering Group

Page 3: BIDDERS’ CONFERENCE IT-3976

Handling Engineering Group 3

CERN is a Global Lab

May 5th 2014

CERN was founded in 1954 as a Peace Initiative by 12 European StatesToday it counts 21 Member States : Austria, Belgium, Bulgaria, the Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Israel, Italy, the Netherlands, Norway, Poland, Portugal, Slovakia, Spain, Sweden, Switzerland and the United Kingdom

2300 staffphysicists, engineers, technicians, administrative personnel

1000 personnel on contract11000 users

who represent more than half of the living particle physicists originating from 500 universities and institutes and of more than 80 nationalities

Page 4: BIDDERS’ CONFERENCE IT-3976

Handling Engineering Group 4

The Mission of CERN

May 5th 2014

Push forward the frontiers of knowledge

e.g. the secrets of the Big Bang … what was the matter like within the first moments of the Universe’s existence?

Develop new technologies for accelerators and detectors

Information technology - the Web and the GRIDMedicine - diagnosis and therapy

Train the scientists and the engineers of tomorrow

Unite people from different countries and cultures

Page 5: BIDDERS’ CONFERENCE IT-3976

Handling Engineering Group 5

CERN Accelerator Complex

May 5th 2014

Page 6: BIDDERS’ CONFERENCE IT-3976

Handling Engineering Group 6

The LHCA collider situated in an underground 27 km in an almost circular tunnel designed to accelerate two proton beams to 7 TeV

May 5th 2014

1982 : First studies1994 : Project Approved by the CERN Council1996 : Final Decision and start of the construction2004 : Installation Starts2006 : Hardware Commissioning Starts2008 : End of Hardware Commissioning2009-2030: Physics

10 GJ = 55 km/h

+ th

an 2

5 ye

ars

Page 7: BIDDERS’ CONFERENCE IT-3976

Handling Engineering Group 7

The 1st Long Shutdown (LS1)

May 5th 2014

PhysicsBeam commissioning

ShutdownPowering tests

F M A M J J A S O N D J F J FM A M J J A S O N D2013 2014 2015

M A

LHCSPSPS

PS Booster

5th May

15 dipole magnets replaced4 quadripole magnets replaced

10.200 orbital welds in stainless steel pipes

300.000 electrical resistance measurements

15 dipole magnets replaced

15 dipole magnets replaced

Page 8: BIDDERS’ CONFERENCE IT-3976

Handling Engineering Group 8

Future accelerator ???

May 5th 2014

16 T 100 TeV in 100 km20 T 100 TeV in 80 km

80-100 km tunnel infrastructure in Geneva area – design driven by pp-collider requirements

with possibility of e+-e- (TLEP) and p-e (VLHeC)

Page 9: BIDDERS’ CONFERENCE IT-3976

Handling Engineering Group 9

The structure of CERN

May 5th 2014

Depa

rtme

nts

Sect

ors

Rolf-Dieter HeuerGeneral Director

Rudiger VossInternational Relations

Director’s OfficeCommunicationJuridical ServicesVIP officeInternal AuditEtc..

Sigurd LettowGeneral Infrastructure

and administration

Sergio BertolucciResearch and IT

Frédérick BordryAccelerators and

Technology

Beams (BE)Paul Collier

Engineering (EN)Roberto Saban

Technology (TE)José Miguel Jiménez

Information Tech.(IT)Frédéric Hemmer

Physics (PH)Livio Mapelli

Finance, procurement and knowledge

transfer (FP)Thierry Lagrange

General Services (GS)Lluis Miralles Verge

Human Resources(HR)Anne-Sylvie Catherin

Page 10: BIDDERS’ CONFERENCE IT-3976

Handling Engineering Group 10

EN Department

May 5th 2014

Head of Department’s Office (EN-HDO)R. Saban

Cooling & Ventilation (EN-CV)M. Nonis

Electrical Engineering (EN-EL)F. Duval

Handlling Engineering (EN-HE)I. Rühl

Machines & Experimental Facilities (EN-MEF)S. Baird

Sources, Targets & Interactions (EN-STI)R. Losito

General Management & Secretariats

(EN-GMS)S. Prodon

Industrial Controls & Engineering

(EN-ICE)Ph. Gayet

Mechanical & Materials Engineering (EN-MME)F. Bertinelli

61

67 11

27 32

7652

37

5

Operation Infrastructure Accelerators Experimental

Areas Projects

Consolidation Upgrades New facilities Design &

Manufacturing Studies

Department Head: R. SabanDeputy: S. Baird

Page 11: BIDDERS’ CONFERENCE IT-3976

Handling Engineering Group 11

Handling Engineering Group

Provides transport and handling services for the technical infrastructure of CERN, accelerators and experiments.

May 5th 2014

Handling Engineering group (EN-HE)

Ingo Rühl

Heavy Handling (EN-HH)

Caterina Bertone

Handling Engineering (EN-HE)

Helder Lourenço

Lift Maintenance (EN-LM)

Damien Lafarge

Page 12: BIDDERS’ CONFERENCE IT-3976

Handling Engineering Group 12

Handling Maintenance Section

May 5th 2014

HM - Handling Maintenance Section leader: Helder LOURENÇO

EOT cranesAnna Kertesz

Gilles Roche

Jean-Pierre Granchelli

Oliver Böttcher

Roberto Rinaldesi

Industrial trucks

Bruno Feral

Jean-Maurice Chevalley

Thomas Fabry

Documentation

Cathelijne Hazelaar-Bal

Joaquim Silvestre

Responsible for the design, the tendering/procurement, the installation, the commissioning, the operation, the maintenance and decommissioning of standard industrial and custom built transport and handling equipment.

Page 13: BIDDERS’ CONFERENCE IT-3976

13May 5th 2014 Handling Engineering Group

EN-HE Transport and Handling Equipment

Lifting Equipment

Electric Tractors

Special Vehicles

About 4000 assets in Total

1650 Assets

Page 14: BIDDERS’ CONFERENCE IT-3976

14May 5th 2014 Handling Engineering Group

EN-HE Lifting Equipment

About 4000 assets in Total 346 Overhead Cranes

900 Electrical and Mechanical Hoists

2000 Lifting Beams

Page 15: BIDDERS’ CONFERENCE IT-3976

15May 5th 2014 Handling Engineering Group

EN-HE Equipment

About 5000 assets

Page 16: BIDDERS’ CONFERENCE IT-3976