Feasibility Study
for
Big Brothers, Big Sisters Community Mentoring Center
Laramie, Wyoming
June 10, 2013
Malone Belton Abel P.C. Architecture, Structural Engineering, Planning, Interior Design
Sheridan and Laramie, Wyoming
Big Brothers, Big Sisters Community Mentoring Center
1. EXECUTIVE SUMMARY
2. PROJECT COST ESTIMATE
3. ARCHITECTURAL SCHEMATIC DESIGN DRAWINGS
4. MECHANICAL AND ELECTRICAL SYSTEMS EVALUATION
1. EXECUTIVE SUMMARY
Greater Wyoming Big Brothers/Big Sisters Community Mentoring Center
Executive Summary
The following is an executive summary prepared by Malone Belton Abel, PC for Greater Wyoming Big Brothers/Big Sisters in Laramie, Wyoming. The project consists of the rehabilitation of the existing Nellie Iles School building located at 518 East Ord Street in Laramie, WY. The Nellie Iles School Building was built in 1920 and underwent major modifications and additions in 1938, 1961, and 1986. It currently contains 11,780 SF of floor area on a walk-up Main Floor and 4,630 SF in the Basement. The building is in good condition structurally and architecturally, as it was built well to start with and has been consistently occupied and well maintained to this day. The building is historically significant, and all modifications will be done in accordance with proper historic renovation guidelines and the concurrence of the Wyoming State Historical Preservation Office (SHPO). The mechanical and electrical systems were robust and well designed in their day, but now require replacement because they are antiquated and not up to current codes. Although this study did not include a full asbestos survey, it is believed that asbestos in the building is relatively limited, and funds have been included in the cost estimate for both survey and removal of this material. From an energy standpoint, an entirely new heating system in conjunction with proper insulation in the attic will vastly improve the building’s efficiency and save thousands of dollars per year in utility bills. The proposed rehabilitation will bring the facility into compliance with current Americans with Disabilities Act (ADA) standards; will improve monitoring of the youth who use the facility; and will bring safety, security, and functionality to appropriate standards that are difficult to achieve in the present building. Improvements to the activity areas such as the gym and the 'Hub' will appeal to the youth using the facility, resulting in increased retention. Healthy meals and snacks can be prepared for the children in the new kitchen. Office renovations will create a more comfortable and quiet working environment for employees. Mechanical upgrades will result in a more comfortable and healthy indoor environment. Reconfiguration of the current office area in the portion of the building built in 1920 will provide an improved reception/waiting area, a hydraulic wheelchair lift for ADA access, a copy/work room, 11 private offices, an open office area, and a training room. Present-day privacy requirements are difficult to achieve in the existing open-office layout.
Renovation of the current activity areas in the portion of the building built in 1938 will consist of restroom renovations to comply with ADA requirements, demolition of existing platform in the gym resulting in a larger play area with basketball hoops, creation of a new kitchen area with range and serving counter, and the addition of a multi-level play structure in the 'Hub' area. A new central desk associated with the Hub will be positioned so staff will have a dramatically increased ability to monitor all the youth groups using the area. Rehabilitation of the 1920s basement area will provide new ADA complaint restrooms, a conference room with multimedia capability, improved storage area, and mechanical space. Structural cast-in-place concrete walls within the basement in conjunction with low basement ceilings, limit the usefulness of the entire basement; however, these new rooms are planned where they can be incorporated at reasonable expense. Proposed exterior modifications include renovation of the Main Entry area stair and ramp to improve accessibility, repairs to roof tile system that will bring the entire roof into a warrantied condition, repairs to flashing, and improved drainage. Improvements will be performed in phases as funds become available, and the phases will be coordinated to limit disruption of daily operations. For example: roof repair, which is needed to maintain the building’s integrity, will be accomplished first with full building occupancy. Other phases will be accomplished with partial occupancy as efficiency of construction warrants. Costs per phase have been estimated as follows:
• Phase I – Roofing and Down Spouts. Includes: Removal and reinstallation of new tiles as needed. Repairing gutters and down spouts to improve drainage: $213,078
• Phase II – Renovation of 1920 portion (main floor and basement). Includes: Demolition, new walls, stairs, lift, casework and doors: $147,500
• Phase III – Renovation of 1938, 1961, 1986, portion. Includes: Demolition, new walls, stairs, lift, casework, doors, windows, appliances, finishes, exterior improvements, mechanical, and electrical: $1,082,502
• Phase IV – Site work and exterior repair. Includes: Stair and ramp upgrades and brick re- pointing: $47,000
Structural Evaluation Based on a visual inspection, the building is for the most part in good structural condition. There is isolated cracking of the exterior brick and interior wall and ceiling finishes throughout the building. The cracks in the exterior brick and mortar are minor and appear likely due to limited foundation settlement or movement caused by thermal forces or moisture intrusion. The most noticeable area of settlement is at the southwest corner of the original 1920 building. It appears that excessive moisture from a roof downspout and inadequate surface drainage in the area has caused the foundation to settle. There is also evidence that moisture has penetrated the
foundation and damaged interior finishes in this area of the basement. The drainage issues in this area must be corrected to prevent further foundation movement and damage. Cracking of the interior surfaces mostly occurs on or near the exterior walls. The crack widths are small and given the age of the building, the amount of cracking is not unusual. The roof and floor framing appear in generally good condition. The only roof framing exposed to view is in the attic of the original 1920 building and in the gymnasium. The wood framing in both locations appear in good structural condition. There is evidence of various roof leaks; however, the framing appears free of rot or deterioration in these areas. The floor framing has several soft spots, primarily in the 1920 building and at the northeast corner of the gymnasium. These areas will require selective removal and repair to the framing members and flooring.
1. PROJECT COST ESTIMATE
6-10-13
Big Brothers/Big Sisters Remodel
The following estimate is based on the Schematic plans by Malone Belton Abel and inspection of the existing facility. The estimate is based on historical numbers as well as the recently refurbished Lincoln Community Center. This estimate is based on a Construction Manager at Risk method.
Description Units Cost PRE-CONSTRUCTION Construction Manager, Project Manager, Estimator, Secretarial, Postage, and CM Fee
1 ls $9,295
CONSTRUCTION Construction Manager, Project Manager, Superintendent, Layout, Job Sign, Field Telephone, Field Office Equipment, Building Permit, Temporary Utilities, Safety, Dumpsters, Fork Lift Rental, Warranty Coordination, and CM Fee
1 ls $149,064
HAZARDOUS MATERIAL REMOVAL (ALLOWANCE) Asbestos, Lead Base Paint and Chalk Boards
1 ls $27,500
BUILDING DEMOLITION Remove Plaster Walls, Remove Doors and Frames, Cut Openings in Existing Walls, Remove Interior Stairs and Handrails, Remove Masonry Bearing Walls, Shoring, Remove Gym Platform, Remove Guardrail, Patch Floors, Patch Ceilings, Remove Flooring, Ceilings, existing Lift, Misc. Cut and Patch, and Saw Cut existing concrete floor and patch.
1 ls $15,000
LANDSCAPING (ALLOWANCE) 1 ls $10,000 SITE EXCAVATION AND REMOVAL Saw Cut and Removal of Asphalt, Remove Existing Concrete Stairs and Railing, Structural Fill, Gravel Under Slabs, Asphalt Patch Back and Resealing of existing Asphalt, Testing, and Excavate for New Ramp and Stairs.
1 ls $26,000
CONCRETE AND FORMWORK Including Stairs, Slabs, Finish of Exposed Walls, Handi-cap Inserts and Testing
1 ls $7,500
MASONRY Fire Place Hearth, Masonry Wall Infill, Masonry Bathroom Walls, and Re-pointing Exterior
1 ls $15,000
STEEL Guard and Handrails, Steel Stairs, Support Beam and Columns
1 ls $14,000
CARPENTRY, CABINETS AND COUNTER TOPS Blocking, Cabinets, Countertops, Adjustable Shelving, Trim, Seating, Platforms and Ramps
1 ls $30,000
HISTORIC WINDOW RESTORATION Repair existing windows
1 ls $5,000
INSULATION Sound Batts and Blown in Insulation
1 ls $12,500
ROOFING AND DOWN SPOUTS Remove, Reinstall, New Tile Where needed, Gutters and Down spouts
1 ls $160,000
HOLLOW METAL, WOOD DOORS, FRAMES, HARDWARE
1 ls $15,000
GLASS AND GLAZING Interior and Exterior
1 ls $5,000
METAL FRAMING AND DRYWALL Framing, Drywall and Plaster Patch
1 ls $35,000
PAINTING AND CAULKING 1 ls $28,000 FLOORING AND BASE New Flooring, Base, and Wood Floor Patch and Re- finish
1 ls $42,000
ACOUSTICAL CEILINGS 1 ls $12,000 SPECIALTIES Shelf and Coat Rack, Grab Bars, TP Holders, Mirrors, Soap Dispensers, Waste Receptacles, Gas Fire Place, Toilet Partitions, Projection Screen, Basket Ball Hoops, and Fire Ext.
1 ls $5,000
HOISTING EQUIPMNET 1 ls $25,000 MECHANICAL 1 ls $500,000 ELECTRICAL 1 ls $123,000
SUB-TOTAL $1,270,859 6% ARCHITECTURAL AND CONSTRUCTION CONTINGENCY
1 ls $76,251
2.25% BOND & INSURANCE 1 ls $28,594 Total Construction $1,375,705
Architectural/Engineering Fees 9% 1 ls $114,377 TOTAL PROJECT $1,490,082
2. ARCHITECTURAL SCHEMATIC DESIGN DRAWINGS
UP
UP UP
LIFT
DN
DN
DN
DN
01
01
01
01
03
03
03
03
03
03
03
03
0303
0303
03
03
03
0303
05
03
03
03
03 03
03
03
07
07
07
07
07
07
07
0309
03
02
02
02 0404
04 10
02
02
06
06
06
06
02
06
06
06
06
02
02
0202
06
06
06
06
06
06
06
06 06
02
02
02
02
02
06
0606
06
12
02
0601
01
01
01
01
06
06
06
02
0303 03
03
07
0703
03
03
03
06
06
02
04 10
MALONE BELTON ABELARCHITECTURE - ENGINEERING - PLANNING - INTERIOR DESIGNsheridan and laramie, wyoming (307) 674-4476
NELLIE ILES RENOVATION1234
D102/15/13
1/8" = 1'-0"1 DEMOLITION PLAN - MAIN FLOOR
1/8" = 1'-0"2 DEMOLITION PLAN - BASEMENT
DEMOLITION NOTESKEYNOTE KEYNOTE TEXT
01 EXISTING PLUMBING FIXTURE TO BE REMOVED.02 DEMO OPENING IN EXISTING WALL.03 EXISTING DOOR TO BE REMOVED. GC TO DISPOSE.04 EXISTING STAIR AND HANDRAIL TO BE DEMOLISHED. GC TO DISPOSE.05 EXISTING MASONRY BEARING WALL TO BE REMOVED (SEE PLAN FOR EXTENT).06 EXISTING PARTITION WALL TO BE REMOVED (SEE PLAN FOR EXTENT).07 EXISTING DOOR TO REMAIN.09 EXISTING PLATFORM TO BE REMOVED. GC TO DISPOSE.10 EXISTING STAIR AND HANDRAIL TO REMAIN.11 EXISTING GUARDRAIL REMOVE AND SALVAGE PER OWNER DIRECTION.12 EXISTING EXTERIOR CONC. STAIR AND LANDING TO BE REMOVED. GC TO DISPOSE.
0' 4' 8' 16' 32'
330 SFTRAINING
128 SFOFFICE
195 SFOFFICE
128 SFCOPY/WORK
141 SFOFFICE
122 SFOFFICE
416 SF
OPENOFFICE
123 SFOFFICE
158 SFOFFICE
156 SFOFFICE
307 SFKITCHEN
473 SF
BB/BSMULTIFUNCTION
395 SFP.Y./DIVERSION
54 SF
MENSRR
55 SF
WOMENSRR
2244 SFGYM/MULTIPURPOSE
46 SFMEN RR
46 SF
WOMENRR
183 SF
MULTIPURPOSESTORAGE
1623 SF
THEHUB
35 SFJAN
12 SFSTOR.
39 SF
RECEPTION/CHECK-IN
139 SFOFFICE
93 SFOFFICE
87 SFOFFICE
130 SFOFFICE
107 SF
RISERSTORAGE
153 SFRECEPTION
LIFT
DN
DN
DN
DN
P2
P3
P4 BASEMENT
93 SFOFFICE
267 SF
OFFICECOMMONS
139 SFOFFICE
114 SFOFFICE
MALONE BELTON ABELARCHITECTURE - ENGINEERING - PLANNING - INTERIOR DESIGNsheridan and laramie, wyoming (307) 674-4476
NELLIE ILES RENOVATION1234
P102/15/13
1/8" = 1'-0"1 OVERALL PLAN
DN
UP UP
DN
330 SFTRAINING
128 SFOFFICE
195 SFOFFICE
128 SFCOPY/WORK
141 SFOFFICE
122 SFOFFICE
416 SF
OPENOFFICE
123 SFOFFICE
158 SFOFFICE
156 SFOFFICE
12 SFSTOR.
COAT
139 SFOFFICE
LIFT
COAT
46 SFMEN RR
46 SF
WOMENRR
COPIER
93 SFOFFICE
WAITING
WAITING
RAMP
RAMP
STAIR UP
UP
UP
93 SFOFFICE
267 SF
OFFICECOMMONS
114 SFOFFICE
114 SFOFFICE
12 SFSTOR.
153 SFRECEPTION
(19'-0" x 21'-0")
(12'-0" x 7'-8") (12'-0" x 7'-8")(12'-0" x 11'-9")
(7'-3" x 15'-8")
(7'-10" x 15'-8")
(10'-0" x 15'-8")
(9'-6" x 29'-0")
(7'-0" x 13'-0")
(10'-0" x 14'-0")
(15'-6" x 21'-0")
(16'-6" x 7'-8")
(16'-6" x 11'-9")
(16'-6" x 7'-8")
(7'-3" x 15'-8")
(7'-10" x 15'-8")
(10'-0" x 15'-8")
MALONE BELTON ABELARCHITECTURE - ENGINEERING - PLANNING - INTERIOR DESIGNsheridan and laramie, wyoming (307) 674-4476
NELLIE ILES RENOVATION1234
P202/15/13
1/4" = 1'-0"1 MAIN LEVEL FLOOR PLAN
DWW/D
307 SFKITCHEN
473 SF
BB/BSMULTIFUNCTION
395 SFP.Y./DIVERSION
54 SF
MENSRR
55 SF
WOMENSRR
2244 SFGYM/MULTIPURPOSE
46 SFMEN RR
46 SF
WOMENRR
183 SF
MULTIPURPOSESTORAGE
1623 SF
THEHUB
35 SFJAN
REF.
39 SF
RECEPTION/CHECK-IN
ADJ. SHELVES
MOPSINK
87 SFOFFICE
107 SF
RISERSTORAGE
CART
130 SFOFFICE
ISLAND
CASEWORK
RANGE WITHHOOD
OH DOOR
FLUSH WINDOW
FLUSH WINDOW
ARCHED OPENINGS
+ 39.875"
+ 29.875"
+ 20"
CEILING CLOUD (ABOVE)
CEILING CLOUD (ABOVE)
UP
UP
UP
UP
UP10" SEATINGSTEPS
STAIR UP
STAIR UP
STAIR UP
139 SFOFFICE
BASKETBALL HOOP(ABOVE)
BASKETBALL HOOP(ABOVE)
FLUSH WINDOW
FLUSH WINDOW
CEILING CLOUD (ABOVE)
CORNER FIREPLACEWITH HEARTH
LOW CABINETS, TYP.
+ 10"
ICE MACHINE
SEATING
SEATING
SEATING
PING PONGTABLE
30" HT. PONYWALL
42" HT. PONYWALL
+ 20"
(21'-0" x 18'-0")
(10'-0" x 8'-7")
(21'-0" x 5'-0")
(61'-6" x 35'-0")
(10'-6" x 9'-0" FIREPLACE)
(21'-0" x 19'-0")
(10'-6" x 13'-3")
(9'-9" x 13'-3")
(19'-0" x 11'-0")
(13'-0" x 23'-0")
(46'-9" x 35'-5")
(11'-6" x 9'-6")
(7'-7" x 20'-6")
(11'-0" x 11'-0")
MALONE BELTON ABELARCHITECTURE - ENGINEERING - PLANNING - INTERIOR DESIGNsheridan and laramie, wyoming (307) 674-4476
NELLIE ILES RENOVATION1234
P302/15/13
1/4" = 1'-0"1 MAIN LEVEL FLOOR PLAN
UP
DN
UP
531 SFHVAC./ELEC.
342 SF
KAYAKSTORAGE
299 SF
EMPLOYEELOUNGE/SMALLMTG.
566 SF
CONFERENCEROOM
LIFT
116 SF
WOM.RR
106 SFMEN. RR
976 SFSTORAGE
423 SFSTORAGE
WET BAR
67 SFIT
22 SFSTOR.
RETRACTABLESCREEN
CRAWLSPACEBELOW LANDING
VIDEOMONITOR TOMAIN ENTRY
203 SF
SECURESTORAGE
(26'-0" x 21'-6")
(23'-6" x 12'-0")
(27'-0" x 11'-0") (26'-0" x 21'-6")
(19'-6" x 21'-6")
(12'-0" x 17'-0")
(21'-6" x 26'-0")
(18'-10" x 15'-0")
CRAWLSPACEBELOW LANDING
MALONE BELTON ABELARCHITECTURE - ENGINEERING - PLANNING - INTERIOR DESIGNsheridan and laramie, wyoming (307) 674-4476
NELLIE ILES RENOVATION1234
P402/15/13
1/4" = 1'-0"1 BASEMENT
P6
1
P7
P7
P6 2
2
1
E. O
RD
ST
.
S. 6TH ST.
E. R
US
SE
LL S
T.
SID
EW
ALK
(5
'-0")
SID
EW
ALK
(5
'-0")
SIDEWALK (5'-0")
ALLEY
30 PARKING SPACES (9'-0" X 18'-0")
12 PARKING SPACES (9'-0" X 18'-0")
HC HC
HC
HC
GRASS(EXIST)
GRASS(EXIST)
GRASS
GRASS
GRASS
TERRACE
GRASS(EXIST)
UP
RAMP
GRASS(EXIST)
STAIR
TREE(EXIST)
TREE(EXIST)
UP
RAMP
RAMP
UP
UP RAMP
MALONE BELTON ABELARCHITECTURE - ENGINEERING - PLANNING - INTERIOR DESIGNsheridan and laramie, wyoming (307) 674-4476
NELLIE ILES RENOVATION1234
P502/15/13
1" = 10'-0"1 SITE
MALONE BELTON ABELARCHITECTURE - ENGINEERING - PLANNING - INTERIOR DESIGNsheridan and laramie, wyoming (307) 674-4476
NELLIE ILES RENOVATION1234
P602/15/13
1/8" = 1'-0"1 EAST ELEVATION
1/8" = 1'-0"2 NORTH ELEVATION
MALONE BELTON ABELARCHITECTURE - ENGINEERING - PLANNING - INTERIOR DESIGNsheridan and laramie, wyoming (307) 674-4476
NELLIE ILES RENOVATION1234
P702/15/13
1/8" = 1'-0"1 SOUTH ELEVATION
1/8" = 1'-0"2 WEST ELEVATION
MALONE BELTON ABELARCHITECTURE - ENGINEERING - PLANNING - INTERIOR DESIGNsheridan and laramie, wyoming (307) 674-4476
NELLIE ILES RENOVATION1234
P802/15/13
12" = 1'-0"1 INTERIOR PERSPECTIVE -THE HUB
MALONE BELTON ABELARCHITECTURE - ENGINEERING - PLANNING - INTERIOR DESIGNsheridan and laramie, wyoming (307) 674-4476
NELLIE ILES RENOVATION1234
P902/15/13
1" = 1'-0"1 INTERIOR PERSPECTIVE - THE HUB
.
3. MECHANICAL AND ELECTRICAL SYSTEMS EVALUATION