  • Page 1 of 1/boq(1) rev1

    ITEM NO. QUANTITY UNIT

    1

    Part-A FACILITIES FOR THE ENGINEER

    A.1.1 (8) Prov. of Field Office for the Engr (Rental Basis)

    per month 8.50 month

    A.1.2 (4) Prov. Of 4x2 Pick Up Type Service Vehicle for Engineer

    per month 0.50 month

    Part-B OTHER GENERAL REQUIREMENTS

    B.5 Project Billboard/Signboard

    per ea. 3.00 ea

    B.7 Occupational Safety and Health Program

    per month 8.50 month

    B.9 Mobilization / Demobilization

    per l.s. 1.00 l.s.

    B.17 Temporary Diversion of Waterways

    per l.s. 1.00 l.s.

    Part IA EARTHWORKS

    1700(1) Clearing and Grubbing

    per sq.m. 3,092.00 sq.m.

    1701(b) Channel Excavation

    per cu.m. 42,125.59 cu.m.

    1702(1)a Structure Excavation

    per cu.m. 1,277.00 cu.m.

    1702(5)b Shoring, Cribbing & Related works

    per l.s. 1.00 l.s.

    1705 Fill and Backfill (gravelfill)

    per cu.m. 1,445.30 cu.m.

    PART IB BANK & SLOPE PROTECTION WORKS

    1710(1)b Riprap Class B

    per cu.m. 14,452.11 cu.m.

    1710(1)a Riprap Class A

    per cu.m. 2,106.00 cu.m.

    1712(2) Concrete Slope Protection

    per cu.m. 2,459.20 cu.m.

    1717(2)a2 Steel Sheet Piles

    per l.m. 5,370.00 l.m.

    TOTAL AMOUNT IN FIGURES SUB TOTAL - 1

    Total Amount in Words

    CONTRACTOR:

    SIGNATURE:

    19FA0099 - CLUSTER 54 REHABILITATION/IMPROVEMENT OF SOA FLOOD CONTROL (UPSTREAM), MALINAO, ALBAY AND

    CONSTRUCTION OF BALZA RIVER FLOOD CONTROL STRUCTURE, BRGY. BALZA, MALINAO, ALBAY

    Republic of the Philippines

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    Office of the District Engineer

    Albay 1st District Engineering Office

    Airport Site, Legazpi City

    REHABILITATION/IMPROVEMENT OF SOA FLOOD CONTROL (UPSTREAM), MALINAO, ALBAY

    BILL OF QUANTITIES

    DESCRIPTION UNIT COST TOTAL

  • Page 1 of 1/boq(2) rev1

    ITEM NO. QUANTITY UNIT

    1 CONSTRUCTION OF BALZA RIVER FLOOD CONTROL STRUCTURE, BRGY. BALZA, MALINAO, ALBAY

    Part-A FACILITIES FOR THE ENGINEER

    A.1.1 (8) Prov. of Field Office for the Engr (Rental Basis)

    per month 2.50 month

    Part-B OTHER GENERAL REQUIREMENTS

    B.5 Project Billboard/Signboard

    per ea. 3.00 ea

    B.7 Occupational Safety and Health Program

    per month 2.50 month

    B.9 Mobilization / Demobilization

    per l.s. 1.00 l.s.

    B.17 Temporary Diversion of Waterways

    per l.s. 1.00 l.s.

    Part IA EARTHWORKS

    1701(b) Channel Excavation

    per cu.m. 6,956.95 cu.m.

    1702(1)a Structure Excavation

    per cu.m. 120.00 cu.m.

    1702(5)b Shoring, Cribbing & Related works

    per l.s. 1.00 l.s.

    1702(3) Foundation Fill

    per cu.m. 28.00 cu.m.

    PART IB BANK & SLOPE PROTECTION WORKS

    1710(1)b Riprap Class B

    per cu.m. 736.16 cu.m.

    1710(1)a Riprap Class A

    per cu.m. 99.00 cu.m.

    1712(2) Concrete Slope Protection

    per cu.m. 154.88 cu.m.

    1717(2)a2 Steel Sheet Piles

    per l.m. 495.00 l.m.

    1718(1) Pipe Culverts ( 1070mmØ ) 42"Ø

    per l.m. 16.00 l.m.

    TOTAL AMOUNT IN FIGURES SUB TOTAL - 2

    TOTAL

    Total Amount in Words

    CONTRACTOR:

    SIGNATURE:

    19FA0099 - CLUSTER 54 REHABILITATION/IMPROVEMENT OF SOA FLOOD CONTROL (UPSTREAM), MALINAO, ALBAY AND

    CONSTRUCTION OF BALZA RIVER FLOOD CONTROL STRUCTURE, BRGY. BALZA, MALINAO, ALBAY

    Republic of the Philippines

    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

    Office of the District Engineer

    Albay 1st District Engineering Office

    Airport Site, Legazpi City

    BILL OF QUANTITIES

    DESCRIPTION UNIT COST TOTAL