bim 2010 nmifma

49
Mathew Miller

Upload: ryanzll

Post on 08-Aug-2015

28 views

Category:

Design


0 download

TRANSCRIPT

Mathew Miller

SMPC Architects Associate – BIM Manager

Construction Specifications Institute- CSI US National CAD Standard- NCS

UDS Task Team - Chair

National Building Information Modeling Standard -NBIMS Testing task Team Models and Implementation Guidance task

team

505 BIM Users Group

Which is more BIMed

Manufacture Model Color Link to specification LEED Information

Building Information Modeling

What BIM is about Emerging Standards How communication is improving What BIM is doing in New Mexico Next steps to adopting BIM

BIM is not SoftwareBIM is not Software

7

Tool not BIM

BIM Tool

Autodesk Revit Autocad Navisworks

Graphisoft Archicad

Bently Bently Arcitecture RAM Steel

Onuma OPS

Google Sketchup

BIM is a Methodology

BIM is a methodology of gathering and maintaining information about a building for quick decision making throughout the life cycle or facility cycle of the building.

BIM Focus

Communication Facility Cycle

Facility Cycle

Pre design Design Construction Operation

Who uses the information from BIM? Architect Contractor

The AEC

Who uses the information from BIM? Owners Planners Realtors Appraisers Mortgage Bankers Designers Engineers Cost & Quantity Estimators Specifiers Contracts & Lawyers Construction Contractors Sub-Contractors Fabricators Code Officials

Facility Managers Maintenance & Sustainment Renovation & Restoration Disposal & Recycling Scoping,

Testing, Simulation Safety & Occupational Health Environmental & NEPA Plant Operations Energy, LEED Space & Security Network Managers CIO’s Risk Management Occupant Support First Responders

What is information Modeling?

3d Model Energy Model 4d Model - time 5d Model - time and cost Business Model Financial Model Safety plan Maintenance plan

What is information Modeling?

AECO Types of Models Design Models

Architecture Civil Structural Mechanical Plumbing Electrical

Construction Document Models Architecture Civil Structural Mechanical Plumbing Electrical Specification

LEED Models Energy Day lighting

Contractor Models Architecture Civil Structural Mechanical Plumbing Electrical Shop drawing Material literature

Facility Management Models

Standards

National BIM Standard UK BIM Standard GSA - 3D-4D Building Information

Modeling AGC - The Contractors Guide to BIM U.S. National CAD Standard

National BIM Standard

Tracks the maturity of a model States that all 2d output of a model needs to be

National CAD Standard compliant

AGC BIM Addendum (Consensus Docs)

Guidelines for the development and use of the models

Guidelines for Information Management Guidelines for a BIM Execution Plan

Project Participants Models to be used & content Contract & Record Documents Areas of the project Schedule (delivery and updates) Protocols for submission Coordinate system & dimension accuracy File format, naming, structure Software to be used

AIA E202- BIM Protocol Exhibit Protocols

Coordination and Conflicts Model Ownership & Requirements File Formats Responsibilities Cost Estimating Scheduling

Level of Development (LOD)-defines content requirements and authorized use(s) Level 100-”used for understanding the requirements ” (Programming) Level 200-”elements modeled as generalized assemblies”

(Schematic Design) Level 300- “elements modeled as specific assemblies” (Construction

Documents) Level 400-”fabrication, assembly and detailing information

(Construction) Level 500 -”elements modeled as constructed” (O&M)

Communication

Every one in different silos

Integrated Project Delivery

Owner Designer

Contractor

BIMStorm

BIMStorm LA 24 hour period 133 designers 11 countries

Online charrette Online charrette 55 million SF55 million SF

IFC - Industry Foundation ClassIFC - Industry Foundation Class

32

NMT-Kelly Hall

Duct near Grid D4 appears to be going through a beam

Move unit so that coresponding duct work does not go through the ceiling of the 2nd floor corridor or Director’s office

Los Alamos National Bank Santa Fe

Los Alamos National Bank Santa Fe Cost analysis Energy analysis Paperless submittals System coordination

IBL –Sandia National Laboratory

Facility Management

Facility Management

Facility Data that Could Be Included in BIM Planning scenarios and site information

Architectural Program

Floor plans

Space Functions

Classified areas, vaults etc.

Area calculations

Specifications

Contract documents

Legal description

Change orders

Supporting documentation for litigation

Shop drawings

Procurement documents

Progress photographs

Alarm diagrams

Warranty data

Cost Estimates

Invoices

Purchases requests

Organizational occupants

Personnel lists

Seating plans

Handicap designation

Network diagrams

Hazardous materials

Operating manuals

Maintenance records

Inspection records

Electronic 3d model

Simulations

Continuation of operations plan

Disaster Recovery Plans

Contingency plans

Furniture inventory

AIA E202- BIM Protocol Exhibit Level of Development

Level 100- (Programming) Level 200- (Schematic Design) Level 300- (Construction Documents) Level 400- (Construction) Level 500 -(As-builts)

BIM Execution Plan

Set clear goals & objectives across organization & teams

Increase accountability and productivity Standardize your communication methods Define roles and responsibilities Bind all parties early in the RFP process Control your project costs, schedule,

scope and quality

Facility Data that Could Be Included in BIM Planning scenarios and site information

Architectural Program

Floor plans

Space Functions

Classified areas, vaults etc.

Area calculations

Specifications

Contract documents

Legal description

Change orders

Supporting documentation for litigation

Shop drawings

Procurement documents

Progress photographs

Alarm diagrams

Warranty data

Cost Estimates

Invoices

Purchases requests

Organizational occupants

Personnel lists

Seating plans

Handicap designation

Network diagrams

Hazardous materials

Operating manuals

Maintenance records

Inspection records

Electronic 3d model

Simulations

Continuation of operations plan

Disaster Recovery Plans

Contingency plans

Furniture inventory

Building Information Modeling

Questions?

Mathew Miller