Page 1: BIM4NR CAD Technical Specification and Guidance

OFFICIAL

BIM4NR CAD Technical Specification and Guidance

CAD Title Blocks, Tagsets and Borders

Original Document Ref: N/A

Version: 2.0

Transitional Ref: BIM4NR-007

April 2021

Page 2: BIM4NR CAD Technical Specification and Guidance

BIM4IP-NWR-CRE-PDC-000001 version 1.0

Network Rail Infrastructure Projects - Strictly Private and Confidential

March 2020

OFFICIAL

TRANSITIONAL DOCUMENT: This document is in the process of being updated.

This document was produced by the BIM4NR (formerly BIM4IP) Change Programme to enable NR

Infrastructure Projects to effectively implement Building Information Modelling (BIM) according to

BS1192 suite of standards using Governance of Railway Investment Projects (GRIP) stages.

Since publication: the operating model used by Network Rail has transformed into a devolved

organisation of 5 regions supported by services and functions; the BS1192 suite of standards are being

superseded by the ISO19650 suite; and GRIP stages are being replaced by Project Acceleration in a

Controlled Environment (PACE) Phases.

For inflight projects using these materials following the GRIP Stages no change is needed and this

document can be used as is.

For new projects using PACE and/or ISO19650 this material can be used as reference in conjunction

with advice from the NR Regional BIM Lead (https://nrbimportal.co.uk/contact-us/).

Supply

Copies of this document are available electronically via the BIM4NRP Delivery Group.

Control

This document shall be deemed uncontrolled once printed.

Suitability

Issued for Review.

Version History

Issue Date Amendments and summary of changes

1.0 March 2020 First issue

2.0 April 2021 Interim update to reflect organisational and standards transition

Page 3: BIM4NR CAD Technical Specification and Guidance

BIM4IP-NWR-CRE-PDC-000001 version 1.0

Network Rail Infrastructure Projects - Strictly Private and Confidential

March 2020

OFFICIAL

Contents

SUPPLY ............................................................................................................................................................................. 2

CONTROL .......................................................................................................................................................................... 2

SUITABILITY ....................................................................................................................................................................... 2

VERSION HISTORY ............................................................................................................................................................... 2

PURPOSE OF THIS DOCUMENT ........................................................................................................................... 1

TERMS AND DEFINITIONS .................................................................................................................................. 2

REFERENCE DOCUMENTATION .......................................................................................................................... 3

SCOPE ................................................................................................................................................................ 4

4.1 WHO THIS DOCUMENT IS FOR? ................................................................................................................................. 4

4.1.1 Administrators .............................................................................................................................................. 4

4.1.2 Project Information Managers ..................................................................................................................... 4

4.2 CHANGE CONTROL ................................................................................................................................................. 4

4.3 CAD FORMATS ..................................................................................................................................................... 4

USING THE NR CAD TITLE BLOCKS, TAGSETS AND BORDERS .............................................................................. 5

5.1 OBTAINING THE BIM4NR CAD RESOURCES ............................................................................................................... 5

5.1.1 Master Source .............................................................................................................................................. 5

5.1.2 Files .............................................................................................................................................................. 5

5.2 CHANGE REQUESTS ................................................................................................................................................ 5

5.3 IMPLEMENTING AND MANAGING CAD RESOURCES ...................................................................................................... 5

5.4 CREATING A DRAWING AND ADDING A TITLEBLOCK ....................................................................................................... 6

5.5 TITLEBLOCKS ......................................................................................................................................................... 6

5.5.1 Reference No ................................................................................................................................................ 6

5.5.2 Approvals Box ............................................................................................................................................... 7

5.5.3 Scale and Survey Information ....................................................................................................................... 7

5.5.4 Title ............................................................................................................................................................... 7

5.5.5 Grip Stage, Level of Development, Contract Number and Name ................................................................. 8

5.5.6 Standard Title Block (A0-A1) ........................................................................................................................ 8

5.5.7 Standard Titleblocks (Horizontal) for A3 and A4 Sheets ............................................................................... 9

5.5.8 Tagsets ....................................................................................................................................................... 10

5.6 MIGRATING TO THE NR CAD BORDERS AND TITLEBLOCKS ........................................................................................... 14

5.6.1 Attribute Exchange ..................................................................................................................................... 14

Page 4: BIM4NR CAD Technical Specification and Guidance

BIM4IP-NWR-CRE-PDC-000001 version 1.0

Network Rail Infrastructure Projects - Strictly Private and Confidential

March 2020

OFFICIAL

Purpose of this document

To provide the technical specifications for the NR CAD Resource Files in the following areas;

■ Deploying them on a Region, Programme/Portfolio, Function or Project

■ How the Resource files are composed

■ Using them in CAD Files

■ How to request Changes and Updates

Page 5: BIM4NR CAD Technical Specification and Guidance

BIM4IP-NWR-CRE-PDC-000001 version 1.0

Network Rail Infrastructure Projects - Strictly Private and Confidential

March 2020

OFFICIAL

Terms and Definitions

See Terms, Abbreviations and Definitions Document NR-IP-EN(SE)-3509

Page 6: BIM4NR CAD Technical Specification and Guidance

BIM4IP-NWR-CRE-PDC-000001 version 1.0

Network Rail Infrastructure Projects - Strictly Private and Confidential

March 2020

OFFICIAL

Reference Documentation

Reference Number

Title Relevant Content Owning Profession

NR-IP-EN-1832 NR Engineering Governance and Operating Model

Head of Engineering

Page 7: BIM4NR CAD Technical Specification and Guidance

BIM4IP-NWR-CRE-PDC-000001 version 1.0

Network Rail Infrastructure Projects - Strictly Private and Confidential

March 2020

OFFICIAL

Scope

4.1 Who this document is for?

4.1.1 Administrators

The application and use of the NR Titleblocks by users and administrators setting up

applications or systems that provide Titleblock exchange capability. Includes any attributes

in the system that relate to the attributes in the CAD Titleblocks. Including attribute field

lengths.

4.1.2 Project Information Managers

To provide information on what CAD resources are available and how to use them and how

they are governed with regards to change, what is allowed and what is not when it comes to

using the resources contained within.

4.2 Change Control

The CAD Resources shall be governed by change control at all times, no unauthorised

changes shall be allowed, and all changes shall be implemented and managed by the

Principle Engineer for BIM

4.3 CAD Formats

The document covers Bentley Dgn formats only.

Use of any other formats shall adapt and apply the requirements as specified in this

document.

Page 8: BIM4NR CAD Technical Specification and Guidance

BIM4IP-NWR-CRE-PDC-000001 version 1.0

Network Rail Infrastructure Projects - Strictly Private and Confidential

March 2020

OFFICIAL

Using the NR CAD Title Blocks, Tagsets and Borders

The NR Titleblocks are mandated.

All Title Blocks, Tagsets and Borders are under change control by the Principle Engineer

(BIM).

No changes, adjustments or modifications shall be made to the Title Blocks, Tagsets or

Borders.

Where changes, modifications or updates are required, a Change Request shall be

submitted and where the change is approved the Principle Engineer (BIM) shall implement

the request and re-issue the Title blocks, tagsets and boders as appropriate.

All changes to the Title Blocks shall be recorded in the Title Sheet of the model.

5.1 Obtaining the BIM4NR CAD Resources

5.1.1 Master Source

To be determined

5.1.2 Files

NOTE: The following are links are temporary links to the BIM4NR PoC CDE system

NR - Title Blocks and Tagsets.cel (cell librabry of all titleblocks, including tags)

Borders (various sizes of frames)

BIM4NR_BorderSeed.dgn (includes sheets for all drawing sizes that references the

appropriate drawing frames included the borders folder)

CAD Seed files containing;

● BIM4NR_DrawingFileSeed.dgn

● BIM4NR_ModelFile3DSeed.dgn

NRBorderHelpFile.wmv (video help file)

5.2 Change Requests

To be determined

5.3 Implementing and managing CAD Resources

NOTE: CAD resources shall only be implemented and managed by the Project Information

Manager (PIM) for the CDE.

In the System Workspace folder or Common Resources folder of ProjectWise, add the files

into the appropriate folders described in the table below.

Document Appropraite folder Alternative Location

Page 9: BIM4NR CAD Technical Specification and Guidance

BIM4IP-NWR-CRE-PDC-000001 version 1.0

Network Rail Infrastructure Projects - Strictly Private and Confidential

March 2020

OFFICIAL

Drawing frames (various files) Borders N/A

BIM4NR_BorderSeed.dgn Borders N/A

CAD Seedfiles;

BIM4NR_DrawingFileSeed.dgn

BIM4NR_ModelFile3DSeed.dgn

CAD Seed Files Seed Files

NR - Title Blocks and

Tagsets.cel

Cells Cell Libraries

When implementing the CAD resources the reference links will be broken and a “scan

referencees” action will need to be applied.

The filess shall be checked that the references were found and work as designed (See

below)

5.4 Creating a Drawing and adding a titleblock

The following diagram describes the process of creating a drawing and adding a titleblock

using the BIM4NR Cad resources. An guidance video can be found here

NRBorderHelpFile.wmv

● Create a drawing using the BIM4NR_DrawingFileSeed.dgn seed file.

● In the drawing sheet, open up references and double click the

BIM4NR_BorderSeed.dgn reference from the reference manager

● In the reference setting dialogue change the model drop down to the appropriate

drawing size

● Click OK

● End

5.5 Titleblocks

The Title Block Cell library has been complied so that the titleblocks can be updated for all

sheet sizes and therefore making any changes, such as logo updates, more efficient. See

diagram below and following sections for detail on the parts of the title block.

Each cell is for the approved NR Drawing Sizes as specified in the NR CAD Procedure and

are applied to the appropriate Drawing sizes.

To achieve this the titleblocks have been split into the key parts as shown in the figures

below.

5.5.1 Reference No

Page 10: BIM4NR CAD Technical Specification and Guidance

BIM4IP-NWR-CRE-PDC-000001 version 1.0

Network Rail Infrastructure Projects - Strictly Private and Confidential

March 2020

OFFICIAL

Model Name: zz Titleblock Reference

Shows the document reference for the drawing or model

5.5.2 Approvals Box

Model Name: zz Titleblock Approvals

5.5.3 Scale and Survey Information

Model Name: zz Titleblock Scale/Survey

5.5.4 Title

Model Name: zz-Titleblock Title

Page 11: BIM4NR CAD Technical Specification and Guidance

BIM4IP-NWR-CRE-PDC-000001 version 1.0

Network Rail Infrastructure Projects - Strictly Private and Confidential

March 2020

OFFICIAL

5.5.5 Grip Stage, Level of Development, Contract Number and Name

Model Name: zz Titleblock GRIPetc

5.5.6 Standard Title Block (A0-A1)

Model Name: zz Titleblock Standard

This model is made up of referenced parts for the titleblock defined above.

Page 12: BIM4NR CAD Technical Specification and Guidance

BIM4IP-NWR-CRE-PDC-000001 version 1.0

Network Rail Infrastructure Projects - Strictly Private and Confidential

March 2020

OFFICIAL

Figure 5.1 Titleblock sections for A0, A1, A2 & A4 Vertical Titleblocks

5.5.7 Standard Titleblocks (Horizontal) for A3 and A4 Sheets

Model Name: zzTitleblockStandardHorizontalA3

Page 13: BIM4NR CAD Technical Specification and Guidance

BIM4IP-NWR-CRE-PDC-000001 version 1.0

Network Rail Infrastructure Projects - Strictly Private and Confidential

March 2020

OFFICIAL

Figure 5.2 A3 Horizontal Landscape Titleblock

Figure 5.3 A4 Portrait Horizontal Titleblock

The Titleblock cell library references sections of the titleblock prefixed “zz”, this includes

compiled titleblocks for

5.5.8 Tagsets

The NR Tagsets are embedded in the titleblock cells found in the approved NR - Title Blocks

and Tagsets.cel

The following table describes the Tags within the titleblock cells;

Tag Name

Description Displayed

Default Text Colour

Max Tag Length

A0-A1 Text Size

A2-A3 Text Size

A4 Text Size

Approved by

TRUE Approved by 0 18 2.5mm

Approved by eSign

TRUE Approved by eSign

105 21 2.2mm

Approved Date

TRUE Approved Date

0 dd/mm/yyyy

2.5mm

Asset or AltReference

TRUE Asset (or Alternative) Reference

0 32 2.5mm

AssetSub FALSE Sub-Asset 0 n/a n/a

Authorised by

TRUE Authorised by 0 18 2.5mm

Authorised by eSign

TRUE Authorised by eSign

105 21 2.2mm

Authorised Date

TRUE Authorised Date

0 dd/mm/yyyy

2.5mm

Checked TRUE Checked by 0 18 2.5mm

Page 14: BIM4NR CAD Technical Specification and Guidance

BIM4IP-NWR-CRE-PDC-000001 version 1.0

Network Rail Infrastructure Projects - Strictly Private and Confidential

March 2020

OFFICIAL

by

Checked by eSign

TRUE Checked by eSign

105 21 2.2mm

Checked Date

TRUE Checked Date 0 dd/mm/yyyy

2.5mm

Contract Number

TRUE Contract Number

0 10 2.5mm

Contract Phase

TRUE Contract Phase

0 29 2.5mm

Contract Title

Now replaced by Project, Contract or Function

FALSE Contract Title 0 n/a n/a

Designed by

TRUE Designed by 0 18 2.5mm

Designed by eSign

TRUE Designed by eSign

105 21 2.2mm

Designed Date

TRUE Designed Date

0 dd/mm/yyyy

2.5mm

Doc Sub Type

FALSE Doc Sub Type 0 n/a n/a

Document Type

TRUE Document Type

0 19 2.5mm

DrawingNo vertical

TRUE Drawing Number

0 22 2.5mm

Drawn by

TRUE Drawn by 0 18 2.5mm

Drawn by eSign

TRUE Drawn by eSign

0 21 2.2mm

Drawn Date

TRUE Drawn Date 0 dd/mm/yyyy

2.5mm

ELR TRUE ELR 0 6 2.5mm

Grip Stage

TRUE GripNo. 0 6 2.5mm

GUID TRUE GUID 0 not limited

2.5mm

Level of Detail

TRUE Level of Detail 0 19 2.5mm

Level of Development

TRUE Level of Development

0 29 2.5mm

Level of Information

TRUE Level of Information

0 19 2.5mm

Location FALSE Location 0 n/a n/a

Location TRUE Location/Leve 0 19 2.5m

Page 15: BIM4NR CAD Technical Specification and Guidance

BIM4IP-NWR-CRE-PDC-000001 version 1.0

Network Rail Infrastructure Projects - Strictly Private and Confidential

March 2020

OFFICIAL

Level l m

Miles From

TRUE Miles From 0 8 2.5mm

Miles To TRUE MilesTo 0 8 2.5mm

Originator

TRUE Originator 0 20 5mm

Phasing Code for Project, Contract or Function

FALSE Phasing 0 n/a n/a

Proj Con Funct Code

Name of Project, Contract or Function

FALSE Project, Contract or Function Code

0 n/a n/a

Project Contract or Function

TRUE Project, Contract or Function

0 20 5mm

R1 TRUE R1 0 6 2.5mm

R1Ap TRUE R1Ap 0 6 2.5mm

R1Ch TRUE R1Ch 0 6 2.5mm

R1Date TRUE R1Date 0 dd/mm/yy

2.5mm

R1Description

TRUE R1Description 0 28 2.5mm

R1Dr TRUE R1Dr 0 6 2.5mm

R2 TRUE R2 0 6 2.5mm

R2Ap TRUE R2Ap 0 6 2.5mm

R2Ch TRUE R2Ch 0 6 2.5mm

R2Date TRUE R2Date 0 dd/mm/yy

2.5mm

R2Description

TRUE R2Description 0 28 2.5mm

R2Dr TRUE R2Dr 0 6 2.5mm

R3 TRUE R3 0 6 2.5mm

R3Ap TRUE R3Ap 0 6 2.5mm

R3Ch TRUE R3Ch 0 6 2.5mm

R3Date TRUE R3Date 0 dd/mm/yy

2.5mm

R3Description

TRUE R3Description 0 28 2.5mm

R3Dr TRUE R3Dr 0 6 2.5mm

Page 16: BIM4NR CAD Technical Specification and Guidance

BIM4IP-NWR-CRE-PDC-000001 version 1.0

Network Rail Infrastructure Projects - Strictly Private and Confidential

March 2020

OFFICIAL

R4 TRUE R4 0 6 2.5mm

R4Ap TRUE R4Ap 0 6 2.5mm

R4Ch TRUE R4Ch 0 6 2.5mm

R4Date TRUE R4Date 0 dd/mm/yy

2.5mm

R4Description

TRUE R4Description 0 28 2.5mm

R4Dr TRUE R4Dr 0 6 2.5mm

Reference No

Replaces Drawing and Model Number

TRUE Reference Number

0 36 2.2mm

Region Programme

TRUE Region or Programme

0 20 5mm

Rev TRUE Rev 0 7 3.5mm

Rev Vertical

TRUE RevV 0 7 2.5mm

Role FALSE Role 0 n/a n/a

Role_Discipline

TRUE Role/Discipline

0 19 2.5mm

RoleSub FALSE Sub Role 0 n/a n/a

Scale TRUE Scale 0 18 2.5mm

Sht TRUE Sht 0 3 2.5mm

ShtTot TRUE ShtTot 0 3 2.5mm

Suitability

TRUE Suitability 3 18 5mm

Suitability Code

TRUE Suitability Code

3 3 5mm

Survey Grid

TRUE Survey Grid 0 38 2.5mm

Title Line 1

TRUE Title Line 1 0 20 5mm

Title Line 2

TRUE Title Line 2 0 20 5mm

Title Line 3

TRUE Title Line 3 0 20 5mm

Title Line 4

TRUE Title Line 4 0 20 5mm

Volume System

TRUE Volume/System

0 19 2.5mm

Withdrawn By

TRUE Withdrawn By

3 18 2.5mm

Withdrawn by

TRUE Withdrawn by eSign

3 21 2.2mm

Page 17: BIM4NR CAD Technical Specification and Guidance

BIM4IP-NWR-CRE-PDC-000001 version 1.0

Network Rail Infrastructure Projects - Strictly Private and Confidential

March 2020

OFFICIAL

eSign

Withdrawn Date

TRUE Withdrawn Date

3 dd/mm/yyyy

2.5mm

0

0

0

Table 5.1 NR Titleblock Tagets

5.6 Migrating to the NR CAD Borders and Titleblocks

5.6.1 Attribute Exchange

Tagsets can be updated using the CDE attributes using Attribute Exchange rules.

Column 1 defines the Tag name to be used in the defined rules.

Contact RSIT Support for setting up rules for your CDE

NOTE: Rules can be setup to axchange attributes to multiple Tagsets, therefore the CDE

can move to the Approved Titleblocks and CAD Resource files without disrupting the use

exchange to previous NR titleblocks