BIM4NR CAD Technical Specification and Guidance
CAD Title Blocks, Tagsets and Borders
Original Document Ref: N/A
Version: 2.0
Transitional Ref: BIM4NR-007
April 2021
BIM4IP-NWR-CRE-PDC-000001 version 1.0
Network Rail Infrastructure Projects - Strictly Private and Confidential
March 2020
OFFICIAL
TRANSITIONAL DOCUMENT: This document is in the process of being updated.
This document was produced by the BIM4NR (formerly BIM4IP) Change Programme to enable NR
Infrastructure Projects to effectively implement Building Information Modelling (BIM) according to
BS1192 suite of standards using Governance of Railway Investment Projects (GRIP) stages.
Since publication: the operating model used by Network Rail has transformed into a devolved
organisation of 5 regions supported by services and functions; the BS1192 suite of standards are being
superseded by the ISO19650 suite; and GRIP stages are being replaced by Project Acceleration in a
Controlled Environment (PACE) Phases.
For inflight projects using these materials following the GRIP Stages no change is needed and this
document can be used as is.
For new projects using PACE and/or ISO19650 this material can be used as reference in conjunction
with advice from the NR Regional BIM Lead (https://nrbimportal.co.uk/contact-us/).
Supply
Copies of this document are available electronically via the BIM4NRP Delivery Group.
Control
This document shall be deemed uncontrolled once printed.
Suitability
Issued for Review.
Version History
Issue Date Amendments and summary of changes
1.0 March 2020 First issue
2.0 April 2021 Interim update to reflect organisational and standards transition
BIM4IP-NWR-CRE-PDC-000001 version 1.0
Network Rail Infrastructure Projects - Strictly Private and Confidential
March 2020
OFFICIAL
Contents
SUPPLY ............................................................................................................................................................................. 2
CONTROL .......................................................................................................................................................................... 2
SUITABILITY ....................................................................................................................................................................... 2
VERSION HISTORY ............................................................................................................................................................... 2
PURPOSE OF THIS DOCUMENT ........................................................................................................................... 1
TERMS AND DEFINITIONS .................................................................................................................................. 2
REFERENCE DOCUMENTATION .......................................................................................................................... 3
SCOPE ................................................................................................................................................................ 4
4.1 WHO THIS DOCUMENT IS FOR? ................................................................................................................................. 4
4.1.1 Administrators .............................................................................................................................................. 4
4.1.2 Project Information Managers ..................................................................................................................... 4
4.2 CHANGE CONTROL ................................................................................................................................................. 4
4.3 CAD FORMATS ..................................................................................................................................................... 4
USING THE NR CAD TITLE BLOCKS, TAGSETS AND BORDERS .............................................................................. 5
5.1 OBTAINING THE BIM4NR CAD RESOURCES ............................................................................................................... 5
5.1.1 Master Source .............................................................................................................................................. 5
5.1.2 Files .............................................................................................................................................................. 5
5.2 CHANGE REQUESTS ................................................................................................................................................ 5
5.3 IMPLEMENTING AND MANAGING CAD RESOURCES ...................................................................................................... 5
5.4 CREATING A DRAWING AND ADDING A TITLEBLOCK ....................................................................................................... 6
5.5 TITLEBLOCKS ......................................................................................................................................................... 6
5.5.1 Reference No ................................................................................................................................................ 6
5.5.2 Approvals Box ............................................................................................................................................... 7
5.5.3 Scale and Survey Information ....................................................................................................................... 7
5.5.4 Title ............................................................................................................................................................... 7
5.5.5 Grip Stage, Level of Development, Contract Number and Name ................................................................. 8
5.5.6 Standard Title Block (A0-A1) ........................................................................................................................ 8
5.5.7 Standard Titleblocks (Horizontal) for A3 and A4 Sheets ............................................................................... 9
5.5.8 Tagsets ....................................................................................................................................................... 10
5.6 MIGRATING TO THE NR CAD BORDERS AND TITLEBLOCKS ........................................................................................... 14
5.6.1 Attribute Exchange ..................................................................................................................................... 14
BIM4IP-NWR-CRE-PDC-000001 version 1.0
Network Rail Infrastructure Projects - Strictly Private and Confidential
March 2020
OFFICIAL
Purpose of this document
To provide the technical specifications for the NR CAD Resource Files in the following areas;
■ Deploying them on a Region, Programme/Portfolio, Function or Project
■ How the Resource files are composed
■ Using them in CAD Files
■ How to request Changes and Updates
BIM4IP-NWR-CRE-PDC-000001 version 1.0
Network Rail Infrastructure Projects - Strictly Private and Confidential
March 2020
OFFICIAL
Terms and Definitions
See Terms, Abbreviations and Definitions Document NR-IP-EN(SE)-3509
BIM4IP-NWR-CRE-PDC-000001 version 1.0
Network Rail Infrastructure Projects - Strictly Private and Confidential
March 2020
OFFICIAL
Reference Documentation
Reference Number
Title Relevant Content Owning Profession
NR-IP-EN-1832 NR Engineering Governance and Operating Model
Head of Engineering
BIM4IP-NWR-CRE-PDC-000001 version 1.0
Network Rail Infrastructure Projects - Strictly Private and Confidential
March 2020
OFFICIAL
Scope
4.1 Who this document is for?
4.1.1 Administrators
The application and use of the NR Titleblocks by users and administrators setting up
applications or systems that provide Titleblock exchange capability. Includes any attributes
in the system that relate to the attributes in the CAD Titleblocks. Including attribute field
lengths.
4.1.2 Project Information Managers
To provide information on what CAD resources are available and how to use them and how
they are governed with regards to change, what is allowed and what is not when it comes to
using the resources contained within.
4.2 Change Control
The CAD Resources shall be governed by change control at all times, no unauthorised
changes shall be allowed, and all changes shall be implemented and managed by the
Principle Engineer for BIM
4.3 CAD Formats
The document covers Bentley Dgn formats only.
Use of any other formats shall adapt and apply the requirements as specified in this
document.
BIM4IP-NWR-CRE-PDC-000001 version 1.0
Network Rail Infrastructure Projects - Strictly Private and Confidential
March 2020
OFFICIAL
Using the NR CAD Title Blocks, Tagsets and Borders
The NR Titleblocks are mandated.
All Title Blocks, Tagsets and Borders are under change control by the Principle Engineer
(BIM).
No changes, adjustments or modifications shall be made to the Title Blocks, Tagsets or
Borders.
Where changes, modifications or updates are required, a Change Request shall be
submitted and where the change is approved the Principle Engineer (BIM) shall implement
the request and re-issue the Title blocks, tagsets and boders as appropriate.
All changes to the Title Blocks shall be recorded in the Title Sheet of the model.
5.1 Obtaining the BIM4NR CAD Resources
5.1.1 Master Source
To be determined
5.1.2 Files
NOTE: The following are links are temporary links to the BIM4NR PoC CDE system
NR - Title Blocks and Tagsets.cel (cell librabry of all titleblocks, including tags)
Borders (various sizes of frames)
BIM4NR_BorderSeed.dgn (includes sheets for all drawing sizes that references the
appropriate drawing frames included the borders folder)
CAD Seed files containing;
● BIM4NR_DrawingFileSeed.dgn
● BIM4NR_ModelFile3DSeed.dgn
NRBorderHelpFile.wmv (video help file)
5.2 Change Requests
To be determined
5.3 Implementing and managing CAD Resources
NOTE: CAD resources shall only be implemented and managed by the Project Information
Manager (PIM) for the CDE.
In the System Workspace folder or Common Resources folder of ProjectWise, add the files
into the appropriate folders described in the table below.
Document Appropraite folder Alternative Location
BIM4IP-NWR-CRE-PDC-000001 version 1.0
Network Rail Infrastructure Projects - Strictly Private and Confidential
March 2020
OFFICIAL
Drawing frames (various files) Borders N/A
BIM4NR_BorderSeed.dgn Borders N/A
CAD Seedfiles;
BIM4NR_DrawingFileSeed.dgn
BIM4NR_ModelFile3DSeed.dgn
CAD Seed Files Seed Files
NR - Title Blocks and
Tagsets.cel
Cells Cell Libraries
When implementing the CAD resources the reference links will be broken and a “scan
referencees” action will need to be applied.
The filess shall be checked that the references were found and work as designed (See
below)
5.4 Creating a Drawing and adding a titleblock
The following diagram describes the process of creating a drawing and adding a titleblock
using the BIM4NR Cad resources. An guidance video can be found here
NRBorderHelpFile.wmv
● Create a drawing using the BIM4NR_DrawingFileSeed.dgn seed file.
● In the drawing sheet, open up references and double click the
BIM4NR_BorderSeed.dgn reference from the reference manager
● In the reference setting dialogue change the model drop down to the appropriate
drawing size
● Click OK
● End
5.5 Titleblocks
The Title Block Cell library has been complied so that the titleblocks can be updated for all
sheet sizes and therefore making any changes, such as logo updates, more efficient. See
diagram below and following sections for detail on the parts of the title block.
Each cell is for the approved NR Drawing Sizes as specified in the NR CAD Procedure and
are applied to the appropriate Drawing sizes.
To achieve this the titleblocks have been split into the key parts as shown in the figures
below.
5.5.1 Reference No
BIM4IP-NWR-CRE-PDC-000001 version 1.0
Network Rail Infrastructure Projects - Strictly Private and Confidential
March 2020
OFFICIAL
Model Name: zz Titleblock Reference
Shows the document reference for the drawing or model
5.5.2 Approvals Box
Model Name: zz Titleblock Approvals
5.5.3 Scale and Survey Information
Model Name: zz Titleblock Scale/Survey
5.5.4 Title
Model Name: zz-Titleblock Title
BIM4IP-NWR-CRE-PDC-000001 version 1.0
Network Rail Infrastructure Projects - Strictly Private and Confidential
March 2020
OFFICIAL
5.5.5 Grip Stage, Level of Development, Contract Number and Name
Model Name: zz Titleblock GRIPetc
5.5.6 Standard Title Block (A0-A1)
Model Name: zz Titleblock Standard
This model is made up of referenced parts for the titleblock defined above.
BIM4IP-NWR-CRE-PDC-000001 version 1.0
Network Rail Infrastructure Projects - Strictly Private and Confidential
March 2020
OFFICIAL
Figure 5.1 Titleblock sections for A0, A1, A2 & A4 Vertical Titleblocks
5.5.7 Standard Titleblocks (Horizontal) for A3 and A4 Sheets
Model Name: zzTitleblockStandardHorizontalA3
BIM4IP-NWR-CRE-PDC-000001 version 1.0
Network Rail Infrastructure Projects - Strictly Private and Confidential
March 2020
OFFICIAL
Figure 5.2 A3 Horizontal Landscape Titleblock
Figure 5.3 A4 Portrait Horizontal Titleblock
The Titleblock cell library references sections of the titleblock prefixed “zz”, this includes
compiled titleblocks for
5.5.8 Tagsets
The NR Tagsets are embedded in the titleblock cells found in the approved NR - Title Blocks
and Tagsets.cel
The following table describes the Tags within the titleblock cells;
Tag Name
Description Displayed
Default Text Colour
Max Tag Length
A0-A1 Text Size
A2-A3 Text Size
A4 Text Size
Approved by
TRUE Approved by 0 18 2.5mm
Approved by eSign
TRUE Approved by eSign
105 21 2.2mm
Approved Date
TRUE Approved Date
0 dd/mm/yyyy
2.5mm
Asset or AltReference
TRUE Asset (or Alternative) Reference
0 32 2.5mm
AssetSub FALSE Sub-Asset 0 n/a n/a
Authorised by
TRUE Authorised by 0 18 2.5mm
Authorised by eSign
TRUE Authorised by eSign
105 21 2.2mm
Authorised Date
TRUE Authorised Date
0 dd/mm/yyyy
2.5mm
Checked TRUE Checked by 0 18 2.5mm
BIM4IP-NWR-CRE-PDC-000001 version 1.0
Network Rail Infrastructure Projects - Strictly Private and Confidential
March 2020
OFFICIAL
by
Checked by eSign
TRUE Checked by eSign
105 21 2.2mm
Checked Date
TRUE Checked Date 0 dd/mm/yyyy
2.5mm
Contract Number
TRUE Contract Number
0 10 2.5mm
Contract Phase
TRUE Contract Phase
0 29 2.5mm
Contract Title
Now replaced by Project, Contract or Function
FALSE Contract Title 0 n/a n/a
Designed by
TRUE Designed by 0 18 2.5mm
Designed by eSign
TRUE Designed by eSign
105 21 2.2mm
Designed Date
TRUE Designed Date
0 dd/mm/yyyy
2.5mm
Doc Sub Type
FALSE Doc Sub Type 0 n/a n/a
Document Type
TRUE Document Type
0 19 2.5mm
DrawingNo vertical
TRUE Drawing Number
0 22 2.5mm
Drawn by
TRUE Drawn by 0 18 2.5mm
Drawn by eSign
TRUE Drawn by eSign
0 21 2.2mm
Drawn Date
TRUE Drawn Date 0 dd/mm/yyyy
2.5mm
ELR TRUE ELR 0 6 2.5mm
Grip Stage
TRUE GripNo. 0 6 2.5mm
GUID TRUE GUID 0 not limited
2.5mm
Level of Detail
TRUE Level of Detail 0 19 2.5mm
Level of Development
TRUE Level of Development
0 29 2.5mm
Level of Information
TRUE Level of Information
0 19 2.5mm
Location FALSE Location 0 n/a n/a
Location TRUE Location/Leve 0 19 2.5m
BIM4IP-NWR-CRE-PDC-000001 version 1.0
Network Rail Infrastructure Projects - Strictly Private and Confidential
March 2020
OFFICIAL
Level l m
Miles From
TRUE Miles From 0 8 2.5mm
Miles To TRUE MilesTo 0 8 2.5mm
Originator
TRUE Originator 0 20 5mm
Phasing Code for Project, Contract or Function
FALSE Phasing 0 n/a n/a
Proj Con Funct Code
Name of Project, Contract or Function
FALSE Project, Contract or Function Code
0 n/a n/a
Project Contract or Function
TRUE Project, Contract or Function
0 20 5mm
R1 TRUE R1 0 6 2.5mm
R1Ap TRUE R1Ap 0 6 2.5mm
R1Ch TRUE R1Ch 0 6 2.5mm
R1Date TRUE R1Date 0 dd/mm/yy
2.5mm
R1Description
TRUE R1Description 0 28 2.5mm
R1Dr TRUE R1Dr 0 6 2.5mm
R2 TRUE R2 0 6 2.5mm
R2Ap TRUE R2Ap 0 6 2.5mm
R2Ch TRUE R2Ch 0 6 2.5mm
R2Date TRUE R2Date 0 dd/mm/yy
2.5mm
R2Description
TRUE R2Description 0 28 2.5mm
R2Dr TRUE R2Dr 0 6 2.5mm
R3 TRUE R3 0 6 2.5mm
R3Ap TRUE R3Ap 0 6 2.5mm
R3Ch TRUE R3Ch 0 6 2.5mm
R3Date TRUE R3Date 0 dd/mm/yy
2.5mm
R3Description
TRUE R3Description 0 28 2.5mm
R3Dr TRUE R3Dr 0 6 2.5mm
BIM4IP-NWR-CRE-PDC-000001 version 1.0
Network Rail Infrastructure Projects - Strictly Private and Confidential
March 2020
OFFICIAL
R4 TRUE R4 0 6 2.5mm
R4Ap TRUE R4Ap 0 6 2.5mm
R4Ch TRUE R4Ch 0 6 2.5mm
R4Date TRUE R4Date 0 dd/mm/yy
2.5mm
R4Description
TRUE R4Description 0 28 2.5mm
R4Dr TRUE R4Dr 0 6 2.5mm
Reference No
Replaces Drawing and Model Number
TRUE Reference Number
0 36 2.2mm
Region Programme
TRUE Region or Programme
0 20 5mm
Rev TRUE Rev 0 7 3.5mm
Rev Vertical
TRUE RevV 0 7 2.5mm
Role FALSE Role 0 n/a n/a
Role_Discipline
TRUE Role/Discipline
0 19 2.5mm
RoleSub FALSE Sub Role 0 n/a n/a
Scale TRUE Scale 0 18 2.5mm
Sht TRUE Sht 0 3 2.5mm
ShtTot TRUE ShtTot 0 3 2.5mm
Suitability
TRUE Suitability 3 18 5mm
Suitability Code
TRUE Suitability Code
3 3 5mm
Survey Grid
TRUE Survey Grid 0 38 2.5mm
Title Line 1
TRUE Title Line 1 0 20 5mm
Title Line 2
TRUE Title Line 2 0 20 5mm
Title Line 3
TRUE Title Line 3 0 20 5mm
Title Line 4
TRUE Title Line 4 0 20 5mm
Volume System
TRUE Volume/System
0 19 2.5mm
Withdrawn By
TRUE Withdrawn By
3 18 2.5mm
Withdrawn by
TRUE Withdrawn by eSign
3 21 2.2mm
BIM4IP-NWR-CRE-PDC-000001 version 1.0
Network Rail Infrastructure Projects - Strictly Private and Confidential
March 2020
OFFICIAL
eSign
Withdrawn Date
TRUE Withdrawn Date
3 dd/mm/yyyy
2.5mm
0
0
0
Table 5.1 NR Titleblock Tagets
5.6 Migrating to the NR CAD Borders and Titleblocks
5.6.1 Attribute Exchange
Tagsets can be updated using the CDE attributes using Attribute Exchange rules.
Column 1 defines the Tag name to be used in the defined rules.
Contact RSIT Support for setting up rules for your CDE
NOTE: Rules can be setup to axchange attributes to multiple Tagsets, therefore the CDE
can move to the Approved Titleblocks and CAD Resource files without disrupting the use
exchange to previous NR titleblocks