    Mobilising BIM - Improving delivery

    processes on the construction site with

    mobile solutionsLee MullinConstruction Technical Specialist

    BIMnet31stMarch 2014

  • 8/10/2019 BIMnet - Mobilising BIM

    2/18

    2013 Autodesk

    BuildingInformation

    Modelling

  • 8/10/2019 BIMnet - Mobilising BIM

    3/18

    2013 Autodesk

    Why the BIM based handover?

    Lifecycle Information Loss

    Source: BIM After Construction, Brigitta Foster, Sandia National Labs, 2010

    Time

    InformationValue

    Planning

    Design

    Construction

    Operation

    Massive

    Information Loss

  • 8/10/2019 BIMnet - Mobilising BIM

    4/18

    2013 Autodesk

    Increase accuracy of data into FM

    Increase speed of preparing Asset Managemen Reduced labour for building commissioning

    Improve asset management throughout lifecycl

    Better tracking of installation and testing

    Better collaboration between project stakeholde

    Better predictability of parts based on actual da

    Benefits of adding handover data to BIM

  • 8/10/2019 BIMnet - Mobilising BIM

    5/18 2013 Autodesk

    Business Challenges

    ERP

    Scheduling

    Estimating

    Project

    Controls

    Constructability

    Quantificat

    Field Execution

    Coordination

    Planning

    & Logistics

    Fabrication

    Handover

    Business

    Development

  • 8/10/2019 BIMnet - Mobilising BIM

    6/18 2013 Autodesk

    BIM 360 Field overview

  • 8/10/2019 BIMnet - Mobilising BIM

    7/18 2013 Autodesk

    Autodesk BIM 360 FieldField Management, Commissioning & Handover

    DesignPre-

    ConstructionConstruction

    Commissioning

    & Handover

    Facility

    Management

    TargetedPhases

    Plan

  • 8/10/2019 BIMnet - Mobilising BIM

    8/18

    2013 Autodesk

    Autodesk BIM 360 FieldField Management, Commissioning & Handover

    Key

    Technologies:

    Cloud Computing

    Unlimited Users& Files

    Mobility (Also disconnected)

    iPad Smartphones

    Web Access

    Anyone withAccess Can U

    HowOnline & Mobile

    Document Library with

    Mark-up

    Checklists withCompany-wide

    Templates

    Issues & Tasks forWork to Complete,

    Snagging & More

    OpA

    R

    What

    Quality ProgramsSafety

    Programs Documents to the fieldCommiss

    Handover: F

  • 8/10/2019 BIMnet - Mobilising BIM

    9/18

    2013 Autodesk

    Field BIM

    Reports

    Mobile

    Web

    Autodesk BIM 360 FieldKey Features

    Inc

    ba

    Su

    of

    da

    We

    on

    Re

    da

    &

    ca

    iPad application, phone

    and email

    Syncs with

    BIM 360 Field Web data

    NO connectivity required

    Web-based- accessible on

    any device

    Available to contractor,

    subcontractors, owners,

    architects

  • 8/10/2019 BIMnet - Mobilising BIM

    10/18

    2013 Autodesk

    Plant/Generators

    Servers Machinery

    Air con unit

    MEP Systems

    Rooms

    (For fit out, painting etc) Doors / Windows

    Curtain wall panel

    Lighting/Electric Systems

    What could be treated as Equipment?

  • 8/10/2019 BIMnet - Mobilising BIM

    11/18

    2013 Autodesk

    Workflow

    BIM 360 Field

    IFC

    RVT DGN,etc

    Navisworks or Glue

    Installer enters commision

    (e.g. Install date, serial nu

    Asset data

    Additional data entered

    Facilities

    Management

    System

    DWG,

  • 8/10/2019 BIMnet - Mobilising BIM

    12/18

    Autodesk BIM 360 FieldReporting across and within projects

  • 8/10/2019 BIMnet - Mobilising BIM

    13/18

    2013 Autodesk

    Time

    Infor

    mationValue

    PlanningDesign

    Construction

    Operation

    Massive

    Information Loss

    Why the BIM based handover?

    Lifecycle Information Loss

    Time

    Infor

    mationValue

    PlanningDesign

    Construction

    Operation

  • 8/10/2019 BIMnet - Mobilising BIM

    14/18

    2013 Autodesk

    Using the data beyond construction

    Save in the BIM

    Build link to FM

    Carry on using BIM360

    Export reports

    Data Dump*

  • 8/10/2019 BIMnet - Mobilising BIM

    15/18

    2013 Autodesk

    Interoperability

    www.autodesk.com/ifc

    http://www.autodesk.com/ifchttp://www.autodesk.com/ifc
  • 8/10/2019 BIMnet - Mobilising BIM

    16/18

    2013 Autodesk

    COBie export

    www.autodesk.com/ifc

    http://www.autodesk.com/ifchttp://www.autodesk.com/ifc
  • 8/10/2019 BIMnet - Mobilising BIM

    17/18

    2013 Autodesk

    www.autodesk.com/ifc

    www.autodesk.com/bim360

    www.autodesk.com/consulting

    www.autodesk.co.uk/aecwebinars

    More information

    http://www.autodesk.com/ifchttp://www.autodesk.co.uk/aecwebinarshttp://www.autodesk.co.uk/aecwebinarshttp://www.autodesk.co.uk/aecwebinarshttp://www.autodesk.co.uk/aecwebinarshttp://www.autodesk.co.uk/aecwebinarshttp://www.autodesk.co.uk/aecwebinarshttp://www.autodesk.co.uk/aecwebinarshttp://www.autodesk.co.uk/aecwebinarshttp://www.autodesk.co.uk/aecwebinarshttp://www.autodesk.co.uk/aecwebinarshttp://www.autodesk.co.uk/aecwebinarshttp://www.autodesk.com/ifc