MRR works sanctions

TRANSCRIPT

  • GOVERNMENT OF ANDHRA PRADESH ABSTRACT

    PRED MRR Proposals 2012-13 609 WORKS COSTING Rs. 20865.12 Lakh for Providing BT Renewal Administrative sanction Accorded Orders Issued.

    ------------------------------------------------------------------------------------- PANCHAYAT RAJ & RURAL DEVELOPMENT (PROGS.I) DEPARTMENT

    G.O.Rt.No. 1840 DATED:05-10-2012. Read the following:

    1) From the ENC, Hyderabad Lr. No. W1/DEE1/BTR/12, dt. 12-06-12. 2) From the ENC, Hyderabad Lr. No. W1/PMGSY/B.T.Renewals/2012 dt. 24-09-2012.

    *****

    O R D E R:

    In the reference 2nd read above the Engineer-in-Chief, PR, Hyderabad has submitted proposals for BT renewals for 609 road works i.e. 309 works for PMGSY Roads and 300 works for Non PMGSY Roads for a total amount of Rs. 20865.12 lakh for the period 2012-13 under Maintenance of Rural Roads Grant which were completed under PMGSY and Non PMGSY.

    2. The proposals have been examined and Government hereby accord administrative sanction for an amount of Rs. 20865.12 lakh for the period 2012-13 for 609 works as annexed to this order under MRR Grant under the following Head of Account.

    MJH 3054 Roads & Buildings MH 04 District & Other Roads. GH 196 Assistance to Zilla Parishads. SH (12) Assistance to Panchayat Raj Institutions for Maintenance of Rural Roads.

    270 Minor works. 272 Maintenance.

    3. The Engineer-in-Chief, PR, Hyderabad is directed to take up Maintenance of the roads by providing BT Renewals so as to not only protect the BT road assets already created but also to extend their life. It is further instructed to ensure durable and good riding surface with the presently sanctioned Maintenance works duly having necessary quantitative and qualitative checks and executing the works confirming relevant technical specifications. Propose maintenance of CD works wherever necessary. Removal of High berms and jungle on the road margins must be attended. Removal of encroachments etc, in the road margins in towns and villages, which obstruct flow of rain water wherever necessary may be attended.

    4. The Engineer-in-Chief, PR should see that the works are executed within the administrative sanction amounts and no revision of estimated cost exceeding administrative sanction will be allowed.

    5. The Superintending Engineer, PR, concerned should check and verify that the works sanctioned in Para 2 above is not already sanctioned/grounded/semi finished under any other grants. Any discrepancy noticed is to be brought to the notice of the higher authority immediately who will inform to Government for further necessary action. The above instructions shall be followed scrupulously. If such works as sanctioned in this GO are already grounded etc., it may deemed to have been cancelled automatically and the same may be informed to Government immediately for taking further necessary action. The technical estimate must be verified by the concerned Executive Engineer, before grounding the work. Alternate sanctions will not be entertained.

    6. The Engineer-in-Chief PR, Hyderabad shall take necessary action in the matter accordingly and submit the utilization Certificates to Government soon after completion of the works in the stipulated time.

    P.T.O.

  • ::2::

    7. A copy of this order is available on internet and can be accessed at www.ap.gov.in/goir .

    (BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH) C.R. BISWAL

    PRINCIPAL SECRETARY TO GOVERNMENT To The Engineer-in-Chief, PR, Hyderabad. Copy to The Chief Engineer, PR, Hyderabad The Superintending Engineer, PR Concerned (Through Chief Engineer (PR), Hyd) The District Treasury Officer, Concerned. The Director of works and Accounts, Hyderabad The Accountant General, AP, Hyderabad The PS to Honble Min. (PR&RWS) The PS to Principal Secretary (PR). Sc/sf.

    //FORWARDED::BY ORDER// SECTION OFFICER

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    1 Adilabad Asifabad BT Renewal to R/F PWD Road to

    Govindapur.

    24.00

    2 Adilabad Khanapur BT Renewal to R/F PWD road to

    Rampur

    20.00

    3 Adilabad Khanapur BT Renewal to R/F Kaval to Kothapet 12.00

    PMGSY

    Roads Total

    56.00

    1 Adilabad Adilabad BT Renewal to R&B Road to Jamini via

    Laxmipur

    60.00

    2Adilabad Asifabad

    BT Renewal to Road from R&B Road to

    Jamda18.00

    3 Adilabad Asifabad BT Renewal to Road from Tadihatnoor

    to Gunjala

    66.00

    4 Adilabad Bellampally BT Renewal to Bellampally Budha

    Guest house to Chandravelly

    30.00

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    ANNEXURE TO THE G.O.RT. NO. 1840, PR&RD (PROGS.I) DEPT., DT: 05-10-12.

    Guest house to Chandravelly

    5 Adilabad Bellampally BT Renewal to PWD road to Bugga

    Temple via Kannal

    35.00

    6Adilabad Boath

    BT Renewal to R/F PWD Road to

    Mahaduguda (In Km 0/0 to 3/5)30.00

    7 Adilabad Chennur BT Renewal to Road from PWD Road

    to Ramakrishnapur Via Kyathanpalli

    MPP Mandamarri

    43.00

    8 Adilabad Chennur BT Renewal to Road from Chennur to

    Arjungutta MPP Kotapally

    40.00

    9Adilabad Khanapur

    BT Renewal to R/F Khanapur to

    Tharlapad20.00

    10 Adilabad Mancherial BT Renewal to PWD Road to Dwaraka,

    Via.Naspur.

    65.00

    11 Adilabad Mudhole BT Renewal to Kallur to Gollamadugu

    via kuntala

    140.00

    12 Adilabad Nirmal BT Renewal to PWD road to Dilawarpur 35.00

    13 Adilabad Nirmal BT Renewal to PWD road to Mujgi via

    Chityal

    30.00

    14Adilabad Sirpur(T)

    BT Renewal to R/F. Peddabanda to

    Jambuga24.00

    15 Adilabad Sirpur(T) BT Renewal to R/F Nazrulnagar

    Community Hall to Camp

    13.80

    Non-PMGSY

    Roads Total

    649.80

    Adilabad 705.80Adilabad

    Total

    705.80

    1 Anantapur Dharmavaram BT Renewal to Dharmavaram

    toTadimarri via Thummala

    60.00

    2 Anantapur Guntakal BT Renewal to Devarapalli to

    Hanumpalli

    23.40

    3 Anantapur Hinudpur BT Renewal to HB Road to Kirikera

    Weavers Colony

    11.00

    4 Anantapur Hinudpur BT Renewal to KA Road to

    Tummalakunta

    10.00

    5 Anantapur Kadiri BT Renewal to AP Road to K.Pulakunta 32.00

    1

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    6 Anantapur Kalyandurg BT Renewal to Setturu to Chintarlapalli 30.00

    7 Anantapur Kalyandurg BT Renewal to Approach road to

    Buddaiahdoddi & Gantaiahdoddi

    20.00

    8 Anantapur Penukonda BT Renewal to Roddam to Dodagatta 40.00

    9 Anantapur Puttaparthy BT Renewal to Approach road to

    Kandukurivandlapalli

    20.00

    10 Anantapur Singanamala BT Renewal to Approach road to

    Niluvurai

    20.00

    11 Anantapur Tadipatri BT Renewal to Yadiki to Bayareddypalli

    via Chinthalayapalli

    16.00

    12 Anantapur Tadipatri BT Renewal to Muchukota to

    Namanakampalli

    13.00

    PMGSY

    Roads Total

    295.40

    1 Anantapur Dharmavaram BT Renewal to Dhadithota to 67.58

    Chillavaripalli upto mandal limits.

    2 Anantapur Guntakal BT Renewal to Gooty to

    Nagasamudram road

    100.00

    3 Anantapur Kalyandurg BT Renewal to Kalyandrug to Mallipalli

    via Mudigallu

    60.00

    4 Anantapur Kalyandurg BT Renewal to Kambadur to

    Kotaguddam

    60.00

    5 Anantapur Puttaparthy BT Renewal to Dharmavaram-Kodur

    Road to Iragampalli

    35.00

    6 Anantapur Rapthadu BT Renewal to C.K. Palli to

    Nyamaddala

    50.00

    7 Anantapur Rapthadu BT Renewal to Atmakur to Peruru in Km

    27/0 to 35/0

    50.00

    8 Anantapur Singanamala BT Renewal to Kotanka to Garladinne-

    Penakacherla road in Km 14/0 to 19/0

    25.00

    9 Anantapur Singanamala BT Renewal to Gugudu to Maddipalli in

    Km 4/0 to 14/0

    100.00

    10 Anantapur Tadipatri BT Renewal to R&B road to

    Varadayapalli

    36.00

    11 Anantapur Uravakonda BT Renewal to Golla to Beluguppa 60.00

    Non-PMGSY

    Roads Total

    643.58

    Anantapur

    Total

    938.98

    Total

    1 Chittoor Chandragiri BT Renewal to P.N road to Cherlopalle 7.90

    2 Chittoor Chandragiri BT Renewal to Pudi to Mundlapudi 12.00

    3 Chittoor Chandragiri BT Renewal to P.N road to Settipalle

    village road

    10.20

    4 Chittoor Chandragiri BT Renewal to Karakambadi road to

    Mangalam

    9.70

    5 Chittoor Chandragiri BT Renewal to Rayalacheruvu road to

    Papireddilu via Chiguruvada

    15.60

    6 Chittoor Chittoor BT Renewal to Settinthangal to

    Naragallu

    23.65

    2

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    7 Chittoor Kuppam BT Renewal to Kuppam Vijalapuram to

    Battuvaripalli

    28.60

    8 Chittoor Kuppam BT Renewal to KP road to

    Bandasettipalle

    11.00

    9 Chittoor Kuppam BT Renewal to Soniganipalle road to

    Yanamasanapalle

    13.20

    10 Chittoor Kuppam BT Renewal to Kuppam patchuru road

    to Mulakalapalle

    13.20

    11 Chittoor Madanapalle BT Renewal to MPL-NPL road to

    Mustoor

    28.60

    12 Chittoor Palamaner BT Renewal to Dandapalle road to

    Nagireddipalle

    26.40

    13 Chittoor Piler BT Renewal to VGG Road to Cherlopalli

    in KM 0/0-2/0

    25.00

    14 Chittoor Piler BT Renewal to VGG Road to Cherlopalli

    in KM 2/0-10/0

    80.00

    15 Chittoor Punganur BT Renewal to Sodam Nanjampeta 63.8015 Chittoor Punganur BT Renewal to Sodam Nanjampeta

    road to Pacharimakula via

    Yerrathivaripalli and Buragamanda

    63.80

    16 Chittoor Puthalapattu BT Renewal to Diguvamogham to

    Nallpareddipalle

    27.50

    17 Chittoor Puthalapattu BT Renewal to Thumbakuppam to

    Perumallapalle

    28.60

    18 Chittoor Satyavedu BT Renewal to Nagalauram

    Vembakamroad to Koltakadu

    14.40

    19 Chittoor Srikalahasthi BT Renewal to KT Road

    toThangellapalem

    14.00

    20 Chittoor Srikalahasthi BT Renewal to P.N road to

    Subbanaidugunta

    15.00

    21 Chittoor Srikalahasthi BT Renewal to PN road to

    Annaswampalle

    30.00

    22 Chittoor Srikalahasthi BT Renewal to P.N road to Guthivari

    Palle

    12.00

    23 Chittoor Srikalahasthi BT Renewal to P.N. road to

    Vedullacheruvu

    12.00

    24 Chittoor Thamballapalle BT Renewal to PTM Kandukuru road to

    Gollapalle

    26.40

    PMGSY

    Roads Total

    548.75

    1 Chittoor Chandragiri BT Renewal to Nennuru Kammapalli

    Road to Kandulavaripalli (via) Kotha

    Nennuru

    36.00

    Nennuru2 Chittoor Chandragiri BT Renewal to C.Ramapuram to KKV

    Puram (via) Diguva Ramapuram

    42.00

    3 Chittoor Chittoor BT Renewal to Chittoor-Tiruttani Road

    to meet MCB Road (via) 197

    Ramapuram

    75.20

    4 Chittoor G.D.Nellore BT Renewal to Chittoor Penumur road

    to Meet Nendragunta Penumur road via

    Adavipalli and Bandakindapalli

    67.00

    5 Chittoor Kuppam BT Renewal to Kuppam - Patchuru road

    to Vasanadu via Mnakaladoddi

    20.00

    3

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    6 Chittoor Kuppam BT Renewal to Road from KP road to

    Peddabommanapalli

    6.00

    7 Chittoor Kuppam BT Renewal to KP road to Seegalapalli

    via Samaguttapalli

    24.00

    8 Chittoor Kuppam BT Renewal to Pandyalamadugu -

    Chakalakuppam Via Gorivimakulapalli

    24.00

    9Chittoor Madanapalle

    BT Renewal to Tirupathi road to

    Pothapolu road via Buchipalle16.00

    10 Chittoor Madanapalle BT Renewal to Bangalore road to

    Ponnetipalem

    18.00

    11 Chittoor Nagari BT Renewal to The road from

    Kosalanaram to Patha Arcot road in

    Vijayapuram Mandal

    38.00

    12 Chittoor Nagari BT Renewal to Road from Vengalathuru

    road to Ururupeta via Mangalagiri

    Kandriga in Nindra mandal

    52.00

    Kandriga in Nindra mandal

    13 Chittoor Nagari BT Renewal to Road from Thadukupeta

    to Vinayakapuram road via

    Melapattu,Tharani in in Nagari mandal

    43.00

    14Chittoor Palamaner

    BT Renewal to MBT Road to Kotur via

    Melmoi&Gundl Palle10.40

    15 Chittoor Piler BT Renewal to Providing B.T.S to the

    road from VG road to Gollapalle

    38.40

    16 Chittoor Piler BT Renewal to K.V Palli road to

    Vangimalluvaripalli (via)

    Chinthamakulapalli

    18.00

    17 Chittoor Piler BT Renewal to Ellamanda road to meet

    Ellamdna road via Kotapalle

    45.00

    18 Chittoor Piler BT Renewal to Agraharm-sodam R & B

    road to Kammamittapalle

    4.00

    19Chittoor Punganur

    BT Renewal to MBT road to

    Chandramakulapalle18.00

    20 Chittoor Punganur BT Renewal to R/F Thudumvaripalle to

    Venkayalavaripalle of Pulicherla Mandal

    19.00

    21 Chittoor Punganur BT Renewal to PPC road to

    Chukkavandlapalle Km 0/0 to 3/100

    34.00

    22 Chittoor Satyavedu BT Renewal to KP road to Katrapalli

    Y/C

    8.40

    Y/C

    23 Chittoor Satyavedu BT Renewal to P.V.Road to Endrapeta 6.00

    24 Chittoor Srikalahasthi BT Renewal to RPK Road to Madibaka 10.80

    25 Chittoor Srikalahasthi BT Renewal to Muchivolu road to

    Akkurthi

    12.00

    26Chittoor Thamballapalle

    BT Renewal to Peddamandyam road to

    Kayalaallu of Kotala24.50

    Non-PMGSY

    Roads Total709.70

    4

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    Chittoor Total1258.45

    1 East Godavari Amalapuram BT Renewal to AY Road to KNF Road

    (via) A.Vemavarappadu.

    15.00

    2 East Godavari Amalapuram BT Renewal to Nadipudi to Varrepalem

    of Nallacheruvu (via) Khambampadu.

    15.00

    3 East Godavari Amalapuram BT Renewal to Sriram Nagar Colony of

    Nadipudi to Kambam padu of

    Palagummi

    20.00

    4 East Godavari anaparthy BT Renewal to Kuthukuluru to

    Pulagurtha

    21.00

    5 East Godavari Jaggampeta BT Renewal to Approach road to

    Yerrampalem

    21.00

    6 East Godavari Kothapeta BT Renewal to Palivela-Pallipalem R&B

    road to Sarepalem

    16.98

    7 East Godavari Kothapeta BT Renewal to Rajavaram-Podalada 14.887 East Godavari Kothapeta BT Renewal to Rajavaram-Podalada

    R&B road to Pujaripalem

    14.88

    8 East Godavari Kothapeta BT Renewal to Rajavaram-Podalada

    R&B road to Jithugapadu

    14.18

    9 East Godavari P.Gannavaram BT Renewal to B.T Renewals to the

    Road from Pappulavaripalem to

    Kundalapalli

    15.00

    10 East Godavari P.Gannavaram BT Renewal to B.T Renewals to the

    Road from Z.P.Road to

    Chinnamvaripeta of Irusumanda

    7.50

    11 East Godavari Peddapuram BT Renewal to Tirupathi to Thatiparthi

    via Chandramampalli

    52.50

    12 East Godavari Pithapuram BT Renewal to Jalluru to meet

    Samalkota-Uppada R&B road via

    Mallam Govindarajupalem

    40.50

    13 East Godavari Pithapuram BT Renewal to Mallam to meet

    Pithapuram Kolanka ZP Road Via

    Virawada

    21.30

    14 East Godavari Prathipadu BT Renewal to -do- L.R.Palem

    N.N.Patnam

    24.00

    15 East Godavari Rajanagaram BT Renewal to Undeswarapuram to

    Butchampeta

    76.00

    16 East Godavari Ramachandrapu

    ram

    BT Renewal to Kolanka to Pallipalem

    road to Corangi canal (Via)

    Namavaripalem, Dugguduru, TR Palem

    (Proposed from Kolanka to

    21.00

    (Proposed from Kolanka to

    Namavaripalem)17 East Godavari Rampa

    chodavaram

    BT Renewal to R/f Busigudem to

    Tadepalli

    56.70

    PMGSY

    Roads Total

    452.53

    1 East Godavari Amalapuram BT Renewal to Road from R & B road to

    Allavaram to Mamidithota SC colony

    20.00

    2 East Godavari Amalapuram BT Renewal to Road from R&B road to

    Settipeta of Bhathanavalli

    21.50

    5

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    3 East Godavari Amalapuram BT Renewal to Munipalli to N Kothapalli 32.00

    4 East Godavari anaparthy BT Renewal to R&B road to L.N.Puram 15.00

    5 East Godavari anaparthy BT Renewal to R/f LN Puram to

    Kapavaram

    15.00

    6 East Godavari Jaggampeta BT Renewal to Gandepalli to Kanupuru 60.00

    7 East Godavari Jaggampeta BT Renewal to 29/8 of R& B Road @

    Gokavaram to R.Yerrmapalem

    42.00

    8 East Godavari Kakinada BT Renewal to Ganganapalli Village

    Road

    55.00

    9 East Godavari Kakinada BT Renewal to Panduru to Namam road 24.00

    10 East Godavari Mandapeta BT Renewal to R&B to Nalluru 25.00

    11 East Godavari Mummidivaram BT Renewal to KM 81/4 of NH 214 to 75.0011 East Godavari Mummidivaram BT Renewal to KM 81/4 of NH 214 to

    Krapa chintalapudi

    75.00

    12 East Godavari P.Gannavaram BT Renewal to Road from Bellampudi to

    Narendrapuram (via)

    Adimulamvaripoalem

    45.00

    13 East Godavari Rajahmundry BT Renewal to Kadiam to Burrilanka Via

    Venkayammapeta

    29.00

    14 East Godavari Ramachandrapu

    ram

    BT Renewal to Road from Korangi cato

    Ithalapudi.

    70.00

    15 East Godavari Razole BT Renewal to BT Road from

    Malikipuram to Visweswarayapuram via

    mandal office

    15.00

    16 East Godavari Razole BT Renewal to R&B road to

    Gollavaripeta in Sakhinetipalli

    Lanka(V)Sakhinetipalli(M)

    16.00

    17East Godavari Tuni

    BT Renewal to Tuni Pentakota R & B

    road to Kavalapadu20.00

    Non-PMGSY

    Roads Total579.50

    East Godavari

    Total 1032.03

    1 Guntur Bapatla BT Renewal to NH 216 to

    Bhavanamvaripalem (Via) Chowdipalem

    20.00

    2 Guntur Bapatla BT Renewal to MN R&B road to 12.602 Guntur Bapatla BT Renewal to MN R&B road to

    Nattalavaripalem

    12.60

    3 Guntur Macherla BT Renewal to Veeranjaneyapuram 7th

    Mile to Kothur, Macherla (M)

    22.00

    4 Guntur Narasaraopet BT Renewal to Satuluru to Dondapadu 40.00

    5 Guntur Narasaraopet BT Renewal to Chilakaluripet Major to

    Nallagarlapadu

    30.00

    6 Guntur Narasaraopet BT Renewal to Kesanapalli to

    P.Turakapalem

    38.00

    7 Guntur Pedakurapadu BT Renewal to Thammavaram to

    Podapadu

    20.00

    6

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    8 Guntur Prathipadu BT Renewal to Chinalingayapalem to

    Kondabalavaripalem

    10.00

    9 Guntur Sattenapalli BT Renewal to Road from SAP-NRT

    road to Paludevaralapadu

    17.00

    10 Guntur Tadikonda BT Renewal to R/f Vemuluripadu to

    Ameenabad

    16.00

    11 Guntur Tadikonda BT Renewal to R/f MG R&B road to

    Lingayapalem

    25.00

    12 Guntur Tadikonda BT Renewal to R/f MR R&B road to

    uddandarayunipalem road to

    Uddandarayudupalem

    16.00

    13 Guntur Tenali BT Renewal to R&B Road to South

    Dalithawada of Nandivelugu

    13.00

    14 Guntur Vemuru BT Renewal to Tenali-Cherukupalli R&B

    road @16/8km to yelavarru

    15.00

    15 Guntur Vinukonda BT Renewal to R&B road to

    Brahmanapalli

    20.00

    Brahmanapalli

    16 Guntur Vinukonda BT Renewal to Bandlamotu to

    Malapadu

    10.00

    PMGSY

    Roads Total

    324.60

    1 Guntur Bapatla BT Renewal to NH 216 to Ramnagar

    (Via) Putchakurthivaripalem

    32.00

    2 Guntur Bapatla BT Renewal to Khajipalem - P.V.palem

    R&B road to Kothapalem (via)

    Parisavaripalem

    30.00

    3 Guntur Chilakaluripet BT Renewal to Solasa to

    Sankuratripadu

    60.00

    4 Guntur Mangalagiri BT Renewal to TM R & B road at Km

    11/8 to

    Kolakaluru(via)Manchikalapudi,KR

    Konduru

    70.00

    5 Guntur Narasaraopet BT Renewal to Rompicherla Muppalla

    R&B Road to Ramireddypalem

    34.00

    6 Guntur Narasaraopet BT Renewal to Nrt- Rompicherla R&B

    Road to Thungapadu

    5.00

    7 Guntur Pedakurapadu BT Renewal to R/f Pedakurapadu to

    Kannegnadla via Lagadapadu

    30.00

    8 Guntur Pedakurapadu BT Renewal to Velpur-Madipadu R&B

    Road to Zattupalli thanda

    30.00

    9 Guntur Ponnur BT Renewal to Ponnur - Chnadolu R &

    B road at Km 2/8 to Komali via Jadavalli

    74.00

    B road at Km 2/8 to Komali via Jadavalli

    10 Guntur Prathipadu BT Renewal to R/f GBC Road to PV

    Road

    20.00

    11 Guntur Repalle BT Renewal to Road from PV Palem -

    Nizampatnam R&B Road to

    Gattuvaripalem (via)

    Satyanarayanapuram,Pedapalli &

    Srinagar in Nagaram(M)

    88.00

    12 Guntur Repalle BT Renewal to Road from 4/7 Gullapalli-

    Nagaram R&B road to Pudiwada

    46.30

    7

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    13 Guntur Sattenapalli BT Renewal to Mupulla to Narnepadu

    (via) L.Kurapadu

    60.00

    14 Guntur Sattenapalli BT Renewal to Road from Golllapadu ot

    Dondapadu (via) K.V.Palem

    50.00

    15 Guntur Tadikonda BT Renewal to GNT - NRT R&B Road

    @ Km 26/8 to Kandrika

    32.00

    16 Guntur Tadikonda BT Renewal to R/F Nudurupadu to

    Kandriga, Phirangipuram Mandal

    30.00

    17 Guntur Tenali BT Renewal to Road from Athota to

    Yadavapalem

    48.00

    18 Guntur Tenali BT Renewal to G.H road to G.H road

    (via) Ganganamma temple in Khajipet

    17.00

    19 Guntur Vemuru BT Renewal to Tenali-Vellaturu R&B

    road @13/4 to Penamarru via

    Ravikampadu

    30.00

    Non-PMGSY

    Roads Total

    786.30

    Roads Total

    Guntur Total 1110.90

    1 Kadapa Badvel BT Renewal to NBB road to C

    Boyanapalli

    25.60

    2 Kadapa Badvel BT Renewal to NBB Road to

    Kothacheruvu

    52.40

    3 Kadapa J.Madugu BT Renewal to Providing BT to the road

    from NBB road to Thorrivemula of

    Mylavaram Mandal

    29.00

    4 Kadapa Kamalapuram BT Renewal to CT road to

    Venkateswarapuram

    19.50

    5 Kadapa Kamalapuram BT Renewal to C.P. road to Machunur

    via Konayapalli Chennamrajupalli

    10.56

    6 Kadapa Mydukur BT Renewal to Road from

    Bhoomayapalli to Thimmayapalli via

    Krishnapuram

    23.00

    7 Kadapa Rajampet BT Renewal to BT road from Mandapalli

    to Adavirachapalli

    14.00

    8 Kadapa Rayachoty BT Renewal to RV road to Kurnoothala

    (Via) Kakulavaram 5/0 to 11/0

    34.00

    9 Kadapa Rayachoty BT Renewal to Chinnamandem -

    Kalibanda road to Chinna Nerusupalli

    16.00

    PMGSY

    Roads Total

    224.06

    1 Kadapa Badvel BT Renewal to CP Road to Bhakrapeta 23.001 Kadapa Badvel BT Renewal to CP Road to Bhakrapeta 23.00

    2 Kadapa Kamalapuram BT Renewal to Bayanapalli to

    Balasinganapalli

    10.00

    3 Kadapa Kamalapuram BT Renewal to CK road to Sugar factory 10.00

    4 Kadapa Kamalapuram BT Renewal to CT road to

    Thollaganganapalli

    11.54

    5Kadapa Kodur

    BT Renewal to P.C.Road to

    Ketharajupalli24.00

    6 Kadapa Kodur BT Renewal to C.K.Road to

    Thimmayapalem

    36.00

    8

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    7 Kadapa Mydukur BT Renewal to Sunkesula to Miduthur 86.00

    8 Kadapa Proddatur BT Renewal to Proddatur-Yerraguntla

    main road to Nanganurpalli

    35.00

    9 Kadapa Pulivendula BT Renewal to R.V.Road to

    Varikuntapalli, Chakrayapeta (M)

    70.00

    10 Kadapa Rajampet BT Renewal to Providing BT to the road

    from Naramrajupalli to Mandanapalli in

    Km 0/0 to 2/6 of Rajampet (M)

    21.00

    Non-PMGSY

    Roads Total

    326.54

    Kadapa Total 550.60

    1 Karimnagar Choppadandi Road from Vilasagar to PR Road

    Vemulawada Boinpally Via Desaipally,

    Ratnampet, Ramannapet ( i.e.

    20.00

    Ratnampet, Ramannapet ( i.e.

    Desaipally to ZP Road limits )2 Karimnagar Dharmapuri BT Renewal to Road from Ayacut road

    to Bathikepally

    30.00

    3 Karimnagar Husnabad BT Renewal to Road from Ghanpur to

    Aknoor.

    10.00

    4 Karimnagar Karimnagar BT Renewal to PWD road to Nagnoor 15.00

    5 Karimnagar Manakondur BT Renewal to 8/0 Km of T02 to

    Devampally

    26.00

    6 Karimnagar Manakondur BT Renewal to R/F PWD road

    Maddikunta, Kalleda

    30.00

    7 Karimnagar Manthani BT Renewal to R/F PWD T02 to

    Brahmanpally, M.P.Mahadevpur

    34.00

    8 Karimnagar Manthani BT Renewal to R/F T02 to Besthapally,

    M.P.Manthani

    14.00

    9 Karimnagar Manthani BT Renewal to R/F PWD Road

    Yamanpally T01 to Konampet via

    Mutharam, M.P.Mahadevpur

    18.00

    10 Karimnagar Manthani BT Renewal to R/F PWD Road to

    Ramakistapur ZP Road via Madipally,

    M.P.Manthani

    7.50

    11 Karimnagar Manthani BT Renewal to R/F Siripuram to

    Besthapally, M.P.Manthani

    5.00

    12 Karimnagar Sircilla BT Renewal to R/F Kothapalli to

    Sirigadha

    50.00

    13 Karimnagar Vemulawada BT Renewal to R/F Approach Road to 12.0013 Karimnagar Vemulawada BT Renewal to R/F Approach Road to

    Ootupalli-M.P.Kathalapur

    12.00

    14 Karimnagar Vemulawada BT Renewal to R/F ZP Road to

    Kondapur-M.P.Konaraopet

    15.00

    15 Karimnagar Vemulawada BT Renewal to R/F Rudarangi to

    Harizanawada-M.P.Chandurthy

    7.50

    PMGSY

    Roads Total

    294.00

    1 Karimnagar Choppadandi Boinpally to Vemulawada 90.00

    2 Karimnagar Husnabad BT Renewal to ZP Road Akunur to

    Sarvaipet via Perkapalli

    44.80

    9

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    3 Karimnagar Husnabad BT Renewal to R/F Kurella to Koheda 7.50

    4 Karimnagar Husnabad BT Renewal to R/F R&B road to

    Mustafapoor vai Gollapally,

    Bheemadevarapalli

    25.00

    5 Karimnagar Huzurabad BT Renewal to Jammikunta to Uppal

    (via) Bheempali

    100.00

    6 Karimnagar Huzurabad BT Renewal to Kothapalli to kamalapur 100.00

    7 Karimnagar Jagtial BT Renewal to R&B Road to BB Rao

    Palli (via) Jabithapur,

    58.00

    8 Karimnagar Karimnagar BT Renewal to PWD road to PWD road

    via Gopalpur

    45.00

    9 Karimnagar Korutla BT Renewal to Mogilpet to Mallapur 60.00

    10 Karimnagar Manakondur BT Renewal to Molangur CADA road to

    Rajapur

    20.00

    Rajapur

    11 Karimnagar Manthani BT Renewal to R/F Keshanpalli to

    Edulapur via Mydambanda, Machupet,

    Lakkaram, Sarvaram, M.P.Muthram

    (MNT)

    144.00

    12 Karimnagar Peddapalli BT Renewal to R/F PWD Road Nittoor

    to Kodurpaka, M.P.Peddapalli

    30.00

    13 Karimnagar Ramagundam BT Renewal to Road from Kukkalagudur

    to Potyal

    90.00

    14Karimnagar Sircilla

    BT Renewal to R/F PWD Road to

    Chandrampet, M.P.Sircilla25.00

    15 Karimnagar Sircilla BT Renewal to Almaspur to Gollapalli 60.00

    16Karimnagar Vemulawada

    BT Renewal to R/F Vemulawada to

    Laxmipur, M.P.Laxmipur20.00

    17 Karimnagar Vemulawada BT Renewal to PWD Road to Rudraram 42.00

    Non-PMGSY

    Roads Total

    961.30

    Karimnagar

    Total

    1255.30

    1 Khammam Aswaraopeta BT Renewal to R/F Aswaraopeta to

    Naramvarigudem

    30.00

    2 Khammam Bhaddrachalam BT Renewal to R/F Cherukuru to Peruru 83.40

    3 Khammam Kothagudem BT Renewal to R/F Yanambile to 43.203 Khammam Kothagudem BT Renewal to R/F Yanambile to

    Prabathnagar

    43.20

    4 Khammam Kothagudem BT Renewal to R/F PWD road to

    Rampuram

    10.80

    5 Khammam Madhira BT Renewal to R/F Nagulavancha to

    patharlapadu

    24.00

    6 Khammam Madhira BT Renewal to R/F Pandillapalli to

    Ananthasagar

    24.00

    7 Khammam Palair BT Renewal to R/F R&B road to

    Kasnathanda

    22.50

    8 Khammam Pinapaka BT Renewal to R/F PWD road to

    Ramachandrapuram

    55.40

    10

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    9 Khammam Sathupalli BT Renewal to R/F PWD road to

    Ganeshpadu

    20.00

    10 Khammam Sathupalli BT Renewal to R/F Kuppenakuntla to

    Janakipuram

    18.00

    PMGSY

    Roads Total

    331.30

    1 Khammam Khammam BT Renewal to R/F R&B road to

    Kodumuru via Rudramkota & Puttakota

    80.00

    2 Khammam Khammam BT Renewal to Approach road to

    Manchukonda

    10.00

    3 Khammam Madhira BT Renewal to R/F Yerrupalem Rly.

    Station to Jayanthi

    95.00

    4 Khammam Palair BT Renewal to R/F R&B road to Beerole

    via Kakaravai, Erragadda and

    Thallachervu

    125.00

    5 Khammam Pinapaka BT Renewal to R/F Krishnasagar Jr. 27.005 Khammam Pinapaka BT Renewal to R/F Krishnasagar Jr.

    College to ST Colony

    27.00

    6 Khammam Wyra BT Renewal to R/F Relakayalapalli to

    Tekulapalli

    60.00

    7 Khammam Yellandu BT Renewal to R/F

    Satyanarayanapuram R & B Road to

    Chinna Krishnapuram, Garla (m)

    100.00

    Non-PMGSY

    Roads Total

    497.00

    Khammam

    Total

    828.30

    1 Krishna Avanigadda BT Renewal to Road from Narapalam to

    Pittalanka

    46.00

    2 Krishna Gudivada BT Renewal to Link road to Pedalingala

    to Chinalingala from MNK road

    55.00

    3 Krishna Jaggaiahpeta BT Renewal to Road from Chittela to

    Singavaram

    19.20

    4 Krishna Jaggaiahpeta BT Renewal to R/C NH9 to

    Katchavaram(via) Takkellapadu.

    15.00

    5 Krishna Kaikaluru BT Renewal to Atapaka to

    Varahapatnam

    57.60

    6 Krishna Machilipatnam BT Renewal to M.E Road to

    Borrapathupalem

    24.00

    7 Krishna Mylavaram BT Renewal to Road from NH9 to

    Tummalapalem.

    9.60

    Tummalapalem.

    8 Krishna Mylavaram BT Renewal to Road from MNK VV road

    to Patha Naguliuru

    9.60

    9 Krishna Mylavaram BT Renewal to R/F I.T.road to

    Gurrajupalem

    20.40

    10 Krishna Nandigama BT Renewal to Road from NH 9 Kesara

    to S.Amaravaram

    18.00

    11 Krishna Nandigama BT Renewal to Road from CAD R&B

    Road to Munnaluru

    16.80

    12 Krishna Nandigama BT Renewal to Road from Gudimetla to

    Krishna river

    18.00

    11

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    13 Krishna Pamarru BT Renewal to Veeranki Lock to

    Peanamakuru bridge

    25.00

    14 Krishna Pedana BT Renewal to Kaza R & B road to

    Mutrasipalem

    49.68

    15 Krishna Pedana BT Renewal to V.S R&B road to

    Guruvindagunta

    9.00

    16 Krishna Pedana BT Renewal to PBG(R & B) road to

    Atchayyavaripalem

    18.00

    17 Krishna Pedana BT Renewal to PBG Road to

    Nageswararaopeta

    9.90

    18 Krishna Pedana BT Renewal to PBG Road to

    Manimeswaram

    25.02

    19 Krishna Pedana BT Renewal to Garsipudi R&B road to

    Chandala Domlagondi

    36.00

    20 Krishna Tiruvuru BT Renewal to MNK road to Jeellakunta 10.00

    21 Krishna Tiruvuru BT Renewal to Meduru to Kotha 60.0021 Krishna Tiruvuru BT Renewal to Meduru to Kotha

    Arlapadu

    60.00

    PMGSY

    Roads Total

    551.80

    1 Krishna Gannavaram BT Renewal to Kalavapamula to

    Vemanda

    44.00

    2 Krishna Machilipatnam BT Renewal to R&B Road to Tavisapudi 36.00

    3 Krishna Machilipatnam BT Renewal to Machilipatnam to

    Chittipalem road

    35.00

    4 Krishna Nuzvidu BT Renewal to Gogulampadu to East

    Digavalli

    50.40

    5 Krishna Pamarru BT Renewal to R&B Road to

    Matlamalapalli

    45.00

    6 Krishna Pamarru BT Renewal to R&B Raod to

    Vemulamadamalapalli

    30.00

    7 Krishna Penamaluru BT Renewal to Penamaluru to Vanukuru 70.00

    8 Krishna Penamaluru BT Renewal to Vuyyuru - Valluru road to

    Vuyyuru H/w

    20.00

    9 Krishna Penamaluru BT Renewal to Improvements to the BT

    road from KM 53/0 of VM road to

    Ventrapragada (via) Jabarlapudi and

    Mudunuru

    46.00

    Non-PMGSY

    Roads Total

    376.40

    Roads Total

    Krishna Total 928.20

    1 Kurnool Alur BT Renewal to Providing BT surface to

    the road from Karidiguddam to

    Muddanageri

    23.50

    2 Kurnool Banaganapalli BT Renewal to Yerragudi to

    Hussainapuram.

    42.00

    3 Kurnool Kodumur BT Renewal to Providing BT surface to

    road from Varkur to Kallaparri

    67.00

    4 Kurnool Mantralayam BT Renewal to Providing BT surface

    approach road to Ramapuram

    14.00

    12

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    5 Kurnool Mantralayam BT Renewal to Providing BT surface

    approach road to Arlabanda 0/0 to 1/6

    17.00

    6 Kurnool Nandikotkur BT Renewal to Providing BT surface to

    the road from Kadumur to Chowtkur

    30.00

    7 Kurnool Panyam BT Renewal to Providing BT surface

    approach road to Durvesi.

    15.00

    8 Kurnool Pathikonda BT Renewal to Providing BT surface to

    the road from Pagidiroy to

    Ramalingayapalli

    23.50

    9 Kurnool Srisailam BT Renewal to Providing BT surface

    road from Ernapadu to G. Singavaram

    17.75

    10 Kurnool Srisailam BT Renewal to BT road from KG road to

    Indereswaram.

    42.85

    11 Kurnool Srisailam BT Renewal to Seetharamapuram to

    Mothkulapalli.

    16.80

    Mothkulapalli.

    12 Kurnool Srisailam BT Renewal to O.N. road to

    Nandimpalli.

    7.90

    13 Kurnool Yemmiganur BT Renewal to Providing BT surface to

    the road from Parlapalli to Guvvaladoddi

    28.00

    14 Kurnool Yemmiganur BT Renewal to Providing BT surface to

    the road from R&B road to Bapuram

    13.00

    PMGSY

    Roads Total

    358.30

    1 Kurnool Adoni BT Renewal to GPA road to Sadapuram 21.00

    2 Kurnool Allagadda BT Renewal to R/F Chagalamarri to

    Mundrallapalli in Km 0/0 to 1/1 of

    Chagalamarri Mandal

    20.00

    3 Kurnool Alur BT Renewal to Chippagiri to Yerur 70.00

    4 Kurnool Banaganapalli BT Renewal to Road from Perusomala

    to Peddaventurla via Kammavaripalli in

    Km 0/0 to 5/0 upto Kadapa district

    border

    65.00

    5 Kurnool Dhone BT Renewal to Kurnool Bethamcherla

    R&B road to Seetharampuram

    72.00

    6 Kurnool Nandikotkur BT Renewal to KG road to

    P.Lingapuram via., Tharigopula

    30.00

    P.Lingapuram via., Tharigopula

    7 Kurnool Nandyal BT Renewal to Road from Pasurupadu

    to Jillella in Km 0/0 to 4/9

    80.00

    8 Kurnool Panyam BT Renewal to R/f Gadivemula to

    Regadiguduru road in Gadivemula(M)

    116.00

    9 Kurnool Pathikonda BT Renewal to Jonnagiri to Peapuly 30.00

    Non-PMGSY

    Roads Total

    504.00

    Kurnool Total 862.30

    13

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    1 Mahabubnagar Alampur BT Renewal to Narayanpur to Pedda

    Amudalapad

    15.00

    2 Mahabubnagar Alampur BT Renewal to R&B Road to Konkal 16.00

    3 Mahabubnagar Alampur BT Renewal to R&B Road to Pedda

    Dhanwada via Tanagala Mandoddi

    40.00

    4 Mahabubnagar Devarkadra BT Renewal to PWD road to Fareedpur 27.00

    5 Mahabubnagar Devarkadra BT Renewal to ZP Road to Thatikonda 35.00

    6 Mahabubnagar Kalwakurthy BT Renewal to PWD road to Kotra (V.R) 26.00

    7 Mahabubnagar Kalwakurthy BT Renewal to PWD Road to

    Charikonda (via) Mudvin

    80.00

    8 Mahabubnagar Kodangal BT Renewal to R/F. PWD road to

    Angadiraichur (via) Chitlapally

    66.00

    9 Mahabubnagar Kollapur BT Renewal to R/F PWD road Singotam 60.009 Mahabubnagar Kollapur BT Renewal to R/F PWD road Singotam

    to Korlakunta (via) Badugadinne

    60.00

    10 Mahabubnagar Kollapur BT Renewal to Tellarallapalli to

    Rajapoor

    28.00

    11 Mahabubnagar Mahabubnagar BT Renewal to ZP.Road to Gundyal 13.00

    12 Mahabubnagar Makthal BT Renewal to R/F. Maganoor to

    Warkoor

    13.00

    13 Mahabubnagar Makthal BT Renewal to R/F. Neredigam to

    Neredigamdoddi

    30.00

    14 Mahabubnagar Nagarkurnool BT Renewal to R/F PWD road to

    Polepally

    25.00

    15 Mahabubnagar Nagarkurnool BT Renewal to R/F Chinnamuddanur to

    Karvanga via Thallapally

    50.00

    16 Mahabubnagar Narayanpet BT Renewal to R/F. PWD road to

    Gunmukla to Yermonipally

    22.00

    17 Mahabubnagar Wanaparthy BT Renewal to R/F Nagapur to

    Bandaraipakula

    15.00

    PMGSY

    Roads Total

    561.00

    1 Mahabubnagar Achampet BT Renewal to Polishetty Palli PWD

    road to Golagundam

    (via)Chennur,Kondaredypally

    100.00

    2 Mahabubnagar Gadwal BT Renewal to R&B Road to

    Penchikalpad, Ghattu(M)

    36.00

    Penchikalpad, Ghattu(M)

    3 Mahabubnagar Gadwal BT Renewal to R&B Road to Palvai,

    Dharur(M)

    36.00

    4 Mahabubnagar Gadwal BT Renewal to R&B Road to

    Sindhanoor (via) Induvasi

    72.00

    5 Mahabubnagar Jadcherla BT Renewal to Road from PWD Road

    at Boinpally to Mudharam via

    Mallapur,Gudiganipally

    100.00

    6 Mahabubnagar Mahabubnagar BT Renewal to R/F Hanwada to

    Kothlabad via Vepur

    80.00

    7 Mahabubnagar Makthal BT Renewal to PWD Road to

    Motlampally Atmakur(M)

    18.50

    14

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    8 Mahabubnagar Makthal BT Renewal to PWD Road to Kollur 7.00

    9 Mahabubnagar Narayanpet BT Renewal to PWD road to Putpak via

    Eklaspur Narayanpet(M)

    15.00

    10 Mahabubnagar Narayanpet BT Renewal to PWD Road to

    Kollampally, Narayanpet(M)

    7.00

    11 Mahabubnagar Narayanpet BT Renewal to PWD Road to Gadapah

    via Vitalapur, Damargidda(M)

    20.00

    12 Mahabubnagar Shadnagar BT Renewal to R/F Shadnagar to

    J.P.Darga (via) Dooskal

    120.00

    Non-PMGSY

    Roads Total

    611.50

    Mahabubnaga

    r Total

    1172.50

    1 Medak Andole BT Renewal to PWD road Uppariguda . 20.00

    2 Medak Andole BT Renewal to Shivampet PWD road to

    Chakriyal .

    12.00

    3 Medak Andole BT Renewal to PWD road to

    Masanpally.

    20.00

    4 Medak Dubbak BT Renewal to R/F Makthamasanpally

    to Begumpet via.Bangla

    Venkatapur,Yelkal (2/0 - 4/0Km)

    60.00

    5 Medak Dubbak BT Renewal to R/F Dubbak to

    Dumpalapally (0/0-1/0Km)

    11.50

    6 Medak Medak BT Renewal to R/F Nagsanpally PWD

    road to Yedupayal temple (0/0-1/2 km)

    50.00

    7 Medak Narsapur BT Renewal to PWD road to Kistapur 6.00

    8 Medak Patancheru BT Renewal to R/F PWD road to

    Chennapur via Nallavally, Kothapally

    85.00

    9 Medak Sangareddy BT Renewal to SNT PWD road to

    Kulabgoor .

    23.40

    10 Medak Siddipet BT Renewal to R/F PWD road to

    Cherlankireddipally

    18.00

    11 Medak Siddipet BT Renewal to R/F PWD road to

    Ensanpally

    9.50

    PMGSY

    Roads Total

    315.40

    1Medak Andole

    BT Renewal to PWD road to

    Mansapally20.00Medak Andole

    Mansapally20.00

    2 Medak Andole BT Renewal to Khammampally to

    Chinnachelmeda

    40.00

    3 Medak Andole BT Renewal to Neredigunta to

    Makthagudem

    40.00

    4Medak Dubbak

    BT Renewal to R&B road to R&B road

    via Khangal27.00

    5 Medak Dubbak BT Renewal to R&B road Yellareddipet

    to Thadkapally via Peddamasanpally

    (M)

    30.00

    15

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    6

    Medak Gajwel

    BT Renewal to BT Renewal on R/F

    Duddeda Road to Ankireddypally in MP

    Kondapak

    15.00

    7 Medak Gajwel BT Renewal to R/F Gajwel to Rajiv

    Rahadari via Muthrajpalli in MP Gajwel

    20.00

    8 Medak Gajwel BT Renewal to R/F Mulugu to

    Narsampalli in MP Mulugu

    20.00

    9 Medak Gajwel BT Renewal to R/F Meenajipet to

    Thunki Khalsa MP Wargal

    20.00

    10 Medak Medak BT Renewal to R/F PWD road to SC

    Colony, Kothapally

    5.00

    11 Medak Narayankhed BT Renewal to R/F. PWD road to

    Magdoompoor via Panchagaon,

    Ranapur, Thumnur

    120.00

    12Medak Narsapur

    BT Renewal to road from Potharam to

    Palata24.00Medak Narsapur

    Palata24.00

    13 Medak Narsapur BT Renewal to PWD Road at

    Amsanpally to Kulcharam

    60.00

    14 Medak Narsapur BT renewals road from SNT PWD road to

    Chinnaguttimukkala to Sinkindalapur

    44.00

    15 Medak Narsapur BT renewals SNT PWD road to

    Pothulabogada X road of Yeldurthy road

    65.40

    16 Medak Patancheru BT Renewal to Road from Kodakanchi

    to Indresham

    30.00

    17 Medak Sangareddy BT Renewal to R/F Ismailkhanpet NH9

    to Erdanur

    20.00

    18 Medak Sangareddy BT Renewal to Ananthasagar PWD

    road to Sadasivapet via.Rejinthal

    18.00

    19 Medak Sangareddy BT Renewal to Improvements of BT

    road from Nizampur to pottipally via

    Kollkur(Kolkur Limits)Nizampur to Kolkur

    40.00

    20 Medak Siddipet BT Renewal to R/F Narmetta to

    Nangnoor (via) Ramchandrapur

    44.00

    21 Medak Siddipet BT Renewal to R/F PWD road to

    Konaipally (via) Velkatur

    36.00

    22 Medak Zaheerabad BT Renewal to NH-9 to Edakulapally 60.00

    23 Medak Zaheerabad BT Renewal to PWD road to Ramthirth

    via Husselly

    50.00

    24 Medak Zaheerabad BT Renewal to Arjun naik Thanda to 60.0024 Medak Zaheerabad BT Renewal to Arjun naik Thanda to

    anegunta

    60.00

    Non-PMGSY

    Roads Total

    908.40

    Medak Total 1223.80

    1 Nalgonda Alair R/F Raigiri - Mothkur Road to

    Athmakur Village

    18.00

    2 Nalgonda Devarakonda BT Renewal to R/F Devarakonda to

    Kamepally via Thatikole Telugupally

    173.00

    3 Nalgonda Huzurnagar BT Renewal to R/F PWD road to

    Sarvaram via Abbireddygudem

    51.00

    16

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    4 Nalgonda Huzurnagar BT Renewal to R/F Palakeedu to

    Sajjapuram Thanda

    42.00

    5 Nalgonda Huzurnagar BT Renewal to R/F Nakkagudem to

    Kistapuram

    28.00

    6 Nalgonda Huzurnagar BT Renewal to R/F LB Nagar to

    Ramachandrapuram via Kondandaram

    Puram

    27.00

    7 Nalgonda Kodad BT Renewal to R/F Bethole to

    Acharyulagudem

    42.00

    8 Nalgonda Kodad BT Renewal to R/F Madjaram (NH9) to

    Nelamarry

    52.00

    9 Nalgonda Kodad BT Renewal to R/f Hussainabad to

    Burkacherla Thanda

    40.00

    10 Nalgonda Miryalaguda BT Renewal to R/F Miryalaguda to

    Iylapur (via) Nandipahad

    72.00

    11 Nalgonda Munugod BT Renewal to R/F Kondapur to

    Nermatte

    42.00

    Nermatte

    12 Nalgonda Munugod BT Renewal to R/F NH 9 to

    Dharmojigudem

    16.20

    13 Nalgonda Munugod BT Renewal to PWD Road to

    Udthalapally

    24.00

    14 Nalgonda Nagarjuna Sagar BT Renewal to R/F Borraipalem R&B

    Road to Thimmapuram (via)

    Harijathanda,kanyathanda

    71.00

    15 Nalgonda Nagarjuna Sagar BT Renewal to R/F Chepur to

    Theratigudem

    25.00

    16 Nalgonda Nagarjuna Sagar BT Renewal to R/F Kannekal to

    Dharmapuram

    40.00

    17 Nalgonda Nakrekal BT Renewal to R/F NH9 to Kurumarthy

    via Chervuannaram

    60.90

    18 Nalgonda Nakrekal BT Renewal to R/F Narketpally to

    Mandra

    23.00

    19 Nalgonda Nakrekal NH9 to Pittampally 58.80

    20 Nalgonda Nakrekal R/F Urumadla to Nereda 3.50

    21 Nalgonda Nalgonda BT Renewal to Addanki road to

    Dacharam

    48.00

    22 Nalgonda Nalgonda BT Renewal to R/F PWD road to

    Cherlagowraram via Darveshpur

    15.60

    23 Nalgonda Nalgonda BT Renewal to R/F PWD road to

    Anneparthy

    30.00

    24 Nalgonda Nalgonda Sagar PWD Road to Chinnamadaram

    via Chetlachennaram

    50.00

    via Chetlachennaram

    25 Nalgonda Suryapet BT Renewal to Dupahad to Mukundapur 100.00

    26 Nalgonda Suryapet BT Renewal to R/F shanti Nagar to

    Kusumavarigudem via Dasaigudem,

    Kesaram

    72.00

    27 Nalgonda Thungathruthy PWD road to Monsingtanda via

    Thallasingaram,Somla tanda

    86.25

    28 Nalgonda Thungathruthy PWD road to Uyyalawada 60.00

    17

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    29 Nalgonda Thungathruthy BT Renewal to Donabanda x road to

    Shaligowraram

    zp road

    18.23

    30 Nalgonda Thungathruthy BT Renewal to BT R/F R&B Road to

    Itukalapahad

    45.00

    PMGSY

    Roads Total

    1434.48

    1 Nalgonda Alair BT Renewal to R/F Alair to

    Ammanabole road to Motakondur via

    Dilawarpur

    72.00

    2 Nalgonda Alair BT Renewal to R/F RM Road at

    Athmakur to Anantharam via Koratikal

    36.00

    3 Nalgonda Bhongir BT Renewal to Anantharam to

    Hanumapuram (balance work)

    10.00

    4 Nalgonda Bhongir BT Renewal to NH 9 to Saibrindavanam

    (via) Deshmukh

    70.00

    5 Nalgonda Devarakonda BT Renewal to R/f Devarakonda- 10.005 Nalgonda Devarakonda BT Renewal to R/f Devarakonda-

    Mahaboob Nagar PWD road to

    Seripally road

    10.00

    6 Nalgonda Huzurnagar BT Renewal to R/F Merlllacheruvu to

    Vepala Madharam

    26.00

    7 Nalgonda Huzurnagar BT Renewal to R/F PWD Road to

    Karakkayalagudem via

    Madhavarayanigudem

    35.00

    8 Nalgonda Miryalaguda BT Renewal to R/F Miryalaguda to

    Dilawarpur (via) Chinthapally

    40.00

    9 Nalgonda Munugod BT Renewal to R/F Nagaram PWD

    Road to Nagaram (via) Turupugudem

    76.80

    10 Nalgonda Munugod BT Renewal to R/F Donipamula to

    Thummalapalli (via)

    Thimmareddygudem

    30.00

    11 Nalgonda Nagarjuna Sagar BT Renewal to B/W R/F pulicherla to

    Peddagummadam (via) Gemyanaik

    thanda

    29.00

    12 Nalgonda Nagarjuna Sagar BT Renewal to R/F Nagarjunasagar

    PWD Road to Marlagadda (via)

    Pulimamidi

    55.00

    13 Nalgonda Nagarjuna Sagar BT Renewal to R/F Kompally PWD road

    to Yellapuram

    16.00

    14 Nalgonda Nagarjuna Sagar BT Renewal to R/F PWD road to

    Palem

    3.00

    15 Nalgonda Nagarjuna Sagar BT Renewal to R/F Thimmapur to 15.0015 Nalgonda Nagarjuna Sagar BT Renewal to R/F Thimmapur to

    Kachavarigudem

    15.00

    16 Nalgonda Nagarjuna Sagar BT Renewal to R/F MLG DVK PWD

    road to Anumula

    12.00

    17 Nalgonda Nagarjuna Sagar BT Renewal to R/F LNG MBNR PWD

    road to Pittalagudem

    15.00

    18 Nalgonda Nagarjuna Sagar BT Renewal to R/F Tripuraram to

    Bejjikal

    15.00

    19 Nalgonda Nagarjuna Sagar BT Renewal to R/F Velmagudem to

    Sirsangandla via Basireddypally

    32.00

    20 Nalgonda Nagarjuna Sagar BT Renewal to R/F Pothunur to

    Pulicherla

    50.00

    18

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    21 Nalgonda Nagarjuna Sagar BT Renewal to R/F Kanekal PWD road

    to Yerraballi

    25.00

    22 Nalgonda Nagarjuna Sagar BT Renewal to R/F Nagarjuna Sagar

    PWD road to Chintalapalem

    7.00

    23 Nalgonda Nalgonda BT Renewal to Constn. Of Cause way

    across Kanagal Vagu at Thimmannguda

    33.18

    Non-PMGSY

    Roads Total

    712.98

    Nalgonda

    Total

    2147.46

    1 Nizamabad Armoor BT Renewal to Baduguna to Ch

    Kondoor Crosing

    10.00

    2 Nizamabad Armoor BT Renewal to ROAD FROM PIPRI TO

    MANTHANIUPGRADATION

    14.10

    3 Nizamabad Balkonda BT Renewal to Manal toGairigutta

    thanda

    35.00

    thanda

    4 Nizamabad Banswada BT Renewal to PWD Road to Borlam

    Near Bus depot

    22.00

    5 Nizamabad Banswada BT Renewal to R/F Birkur Pothangal

    road to Barengedgi

    20.00

    6 Nizamabad Bodhan BT Renewal to R/F: PWD Road to

    Bagepally vai Kunepally

    30.00

    7 Nizamabad Bodhan BT Renewal to Approach Road to

    Jamalam

    5.00

    8 Nizamabad Bodhan BT Renewal to PWD road to Posani

    Kunta Ootpalli

    10.00

    9 Nizamabad Jukkal BT Renewal to PWD road to Koma

    lancha

    22.00

    10 Nizamabad Jukkal BT Renewal to SNA PWD road to

    Rajula Via Bich kunda

    25.00

    11 Nizamabad Kamareddy BT Renewal to N.H.7 to Jangampally 9.00

    12 Nizamabad Kamareddy BT Renewal to Janagam Marry to

    Mohammada poor

    14.60

    13 Nizamabad Kamareddy BT Renewal to N.H. Way 7 to

    Kyasampally

    14.00

    14 Nizamabad Kamareddy BT Renewal to PWD road to

    Bhagirthpally

    10.00

    15 Nizamabad Nizamabad

    Rural

    BT Renewal to PWD Road to Mallapur 22.00

    16 Nizamabad Nizamabad

    Rural

    BT Renewal to PWD Road to Lolam

    (via) Yellareddypalli

    28.00

    Rural (via) Yellareddypalli

    17 Nizamabad Nizamabad

    Rural

    BT Renewal to R/f Mailaram to

    Chintaloor

    20.00

    18 Nizamabad Nizamabad

    Rural

    BT Renewal to PWD Road to

    Ansanaplly

    10.00

    19 Nizamabad Yellareddy BT Renewal to Yellareddy to Somarpet 11.50

    20 Nizamabad Yellareddy BT Renewal to PWD road to Pothangal

    Kalan

    10.00

    21 Nizamabad Yellareddy BT Renewal to ZP road to Mathu

    Sangem

    13.50

    19

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    PMGSY

    Roads Total

    355.70

    1 Nizamabad Armoor BT Renewal to Ch.Kondur to Badguna 54.00

    2 Nizamabad Balkonda BT Renewal to Konasamudram X Road

    to Ameernagar via Dammannapet and

    Narsapur

    70.00

    3 Nizamabad Banswada BT Renewal to R/F:Strengthening R/F

    Bakarfarm to Sunkini road via Digu

    Farm

    40.00

    4 Nizamabad Bodhan BT Renewal to Balance work Road from

    Nizampoor to Naleshwer

    8.00

    5 Nizamabad Bodhan BT Renewal to Approach Road Bodhan

    to Mosra Road via Anil Talkies

    10.00

    6 Nizamabad Bodhan BT Renewal to PWD Road to Pandu

    Form via Achenpally

    10.00

    Form via Achenpally

    7 Nizamabad Bodhan BT Renewal to R/F: Bandarpally X Road

    Chinna Mavandi via Pedda Mavandi

    32.00

    8 Nizamabad Kamareddy BT Renewal to NH - 44 to Anthampally 20.00

    9 Nizamabad Nizamabad

    Rural

    BT Renewal to PWD road to Kulaspoor

    thanda

    16.00

    10 Nizamabad Nizamabad

    Rural

    BT Renewal to ZP road Gundaram to

    Sastrinagar

    20.00

    11 Nizamabad Nizamabad

    Rural

    BT Renewal to Approach road to

    Tanakurd

    8.00

    12 Nizamabad Yellareddy BT Renewal to NH-7 to Thirmanpally via

    Markal

    30.00

    Non-PMGSY

    Roads Total

    318.00

    Nizamabad

    Total

    673.70

    1 Prakasam Addanki BT Renewal to Uppumagulur to

    Somavarappadu.

    35.00

    2 Prakasam Darsi BT Renewal to Rajampalli East

    Gayavaram R&B Road to T.S.Puram

    20.00

    3 Prakasam Darsi BT Renewal to R&B Road to Polavaram 20.00

    4 Prakasam Kondepi BT Renewal to R/f Ankarlapudi to

    Mupparajupalem

    30.00

    Mupparajupalem

    5 Prakasam Markapur BT Renewal to Road from Rayavaram

    to Kethagudipi (via) Goguladinne

    15.00

    6 Prakasam Ongole BT Renewal to Road from

    Vengamukkapalem - Konijedu (via)

    Survereddypalem.

    50.00

    7 Prakasam Parchur BT Renewal to Eddanapudi to

    Vinjanampadu.

    45.00

    8 Prakasam Parchur BT Renewal to NH5 to Ananthavaram 45.00

    9 Prakasam S.N.padu BT Renewal to Road from

    Ammanabrolu to Pamidipadu

    (Ommivaram to old Madras Road).

    20.00

    20

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    PMGSY

    Roads Total

    280.00

    1 Prakasam Addanki BT Renewal to Sajjapuram to

    Karumanchi (via) Elchuru

    15.00

    2 Prakasam Darsi BT Renewal to Talluru to Kunkupadu 40.00

    3 Prakasam Darsi BT Renewal to Dosakayalapadu to

    Lakkavaram

    15.00

    4 Prakasam Giddaluru BT Renewal to Komorole to

    Chintalapally (via) Purushothampalli,

    K.Bonthapally

    90.00

    5 Prakasam Kandukur BT Renewal to Road from Gudlur to RC

    Agraharam

    100.00

    6 Prakasam Kanigiri BT Renewal to OV road to

    Rangampeta R&B road

    70.00

    7 Prakasam Kondepi BT Renewal to R/f Konijedu to Ponduru 25.00

    8 Prakasam Markapur BT Renewal to Markapuram to

    Gajjalakona Via Naidu pally

    30.00

    9 Prakasam S.N.padu BT Renewal to OK road to Busarapalli 35.00

    10 Prakasam Y.Palem BT Renewal to Yerragonda Palem R&B

    Road to Pullalacheruvu

    80.00

    Non-PMGSY

    Roads Total

    500.00

    Prakasam

    Total

    780.00

    1 Ranga Reddy Chevella BT Renewal to R/M & BT on R/F PWD

    Road to Yetla Erravelly

    20.00

    2 Ranga Reddy Maheshwaram BT Renewal to R/F Ameerpet to

    Manikyamguda,Maheswaram (M)

    20.00

    PMGSY

    Roads Total

    40.00

    1 Ranga Reddy Chevella BT Renewal to R/F Shankerpally PWD

    Road to Tangutur

    20.00

    2 Ranga Reddy Chevella BT Renewal to R/F PWD Road to

    Yellakonda (Via) Lingampally

    20.00

    3 Ranga Reddy Chevella BT Renewal to R/F PWD Road to

    Gopularam

    15.00

    4 Ranga Reddy Ibrahimpatnam BT Renewal to R/F Mangalpally

    Patelguda to Sahebguda

    25.00

    5 Ranga Reddy Ibrahimpatnam BT Renewal to R/F Nerapally to 20.005 Ranga Reddy Ibrahimpatnam BT Renewal to R/F Nerapally to

    Majeedpur

    20.00

    6 Ranga Reddy Ibrahimpatnam BT Renewal to R/f Polkampalli to

    Dhandimyalaram (via) Narapally of

    Ibrahimpatnam mandal

    30.00

    7 Ranga Reddy Ibrahimpatnam BT Renewal to Peddaamberpet to

    Pasumanula of Hayatnagar Mandal

    30.00

    8 Ranga Reddy Ibrahimpatnam BT Renewal to Adibatla to Nadergul 10.00

    9 Ranga Reddy Maheshwaram BT Renewal to R/F Kandukur X Road to

    Meerkhanpet

    50.00

    21

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    10 Ranga Reddy Maheshwaram BT Renewal to R/F PWD Road to

    Gudur

    35.00

    11 Ranga Reddy Maheshwaram BT Renewal to R/F PWD Road to

    Jalpally, Saroornagar (M)

    20.00

    12 Ranga Reddy Maheshwaram BT Renewal to Agalmiyaguda to

    Thimmapur road, Kandukur (M)

    35.00

    13 Ranga Reddy Maheshwaram BT Renewal to Maheswaram to

    Kavalanibavithanda, Maheswaram (M)

    25.00

    14 Ranga Reddy Medchal BT Renewal to S/R to R/F CRPF Gate-II

    to ZP Road at Jawaharnagar of

    Shameerpet mandal

    81.00

    15 Ranga Reddy Pargi BT Renewal to R/F PWD Road to

    Enkepally

    20.00

    16 Ranga Reddy Pargi BT Renewal to R/F PWD Road to

    Kankal via Pedda Ummental

    70.00

    17 Ranga Reddy Pargi BT Renewal to PWD Road to 16.0017 Ranga Reddy Pargi BT Renewal to PWD Road to

    Dharmapuram

    16.00

    18 ranga Reddy Pargi BT Renewal to Mahammadabad PWD

    Road to Ramalayam

    3.00

    19 Ranga Reddy Quthbullapur BT Renewal to R/F Dulapally to

    Jeedimetla Industrial Area

    36.00

    20 Ranga Reddy Quthbullapur BT Renewal to R/F Narsapur PWD

    Road to Nuthankal PWD Road via D.P.

    Pally, Dundigal, Nagloore

    90.00

    21 Ranga Reddy Rajendranagar BT Renewal to R/F PWD Road to

    Sultanpally

    36.00

    22 Ranga Reddy Rajendranagar BT Renewal to R/F PWD Road Famaish

    Hotel to Hydershakote janda X Road

    12.00

    23 Ranga Reddy Tandur BT Renewal to Renewal BT on R/F

    Peddemul to Siddana madugu tanda up

    to Nagulapally for 3.50 laid in the Year

    2001 from 0/0-2/8&3/9-4/6s

    72.00

    24 Ranga Reddy Vikarabad BT Renewal to Renewal BT on R/F

    PWD Road Kerelly to Nagaram via

    Zaidpally Tharigoppula

    120.00

    Non-PMGSY

    Roads Total

    891.00

    Ranga Reddy

    Total

    931.00

    1 SPSR Nellore Atmkur BT Renewal to NB road to Thikkavaram 60.001 SPSR Nellore Atmkur BT Renewal to NB road to Thikkavaram 60.00

    2 SPSR Nellore Atmkur BT Renewal to R&B road to Pallipalem

    of Annareddypalem

    9.00

    3 SPSR Nellore Gudur BT Renewal to Road from MC Road tod

    G-Y Road (Via) Potupalem

    35.00

    4 SPSR Nellore Kavali BT Renewal to RI Road to Allur

    Galidibbalu

    35.00

    5 SPSR Nellore Sullurupeta BT Renewal to N.D Road to Nellorepalli 50.40

    22

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    6 SPSR Nellore Survepalli BT Renewal to Venkatachalam-

    Kasumuru road to N.P road via

    kandalapadu, Pullatheegalapadu and

    Siddavarappadu

    40.00

    7 SPSR Nellore Survepalli BT Renewal to MC Road to Pidur 40.00

    8 SPSR Nellore Udayagiri BT Renewal to Chinannalur to

    Krishnareddy palem (via) Thoguru

    vanaipalem T.Malapalem

    23.30

    9 SPSR Nellore Udayagiri BT Renewal to KU road to

    Lakshmipuram (via) Kammavari palem

    32.00

    10 SPSR Nellore Venkatagiri BT Renewal to V-R road to Chapalapalli 26.15

    PMGSY

    Roads Total

    350.85

    1 SPSR Nellore Kovur BT Renewal to Providing B.T.Renewal 21.50

    road from Chowkacherla to Pallipalem

    in Vidavalur Mandal.2 SPSR Nellore Nellore Rural BT Renewal to Nellore to Mutkur road

    (via) Rajupalem, Chintareddypalem &

    Vaviletipadu

    100.00

    3 SPSR Nellore Sullurupeta BT Renewal to Road from M-M road to

    IT road (via) Manganellore and SM

    Tageli

    30.00

    4 SPSR Nellore Survepalli BT Renewal to Providing B.T. Renewal

    road from Macherlavaripalem branch

    road in T.P.Gudur Mandal

    25.00

    5 SPSR Nellore Survepalli BT Renewal to Providing B.T.Renewal

    to Koverapalem branch road in

    T.P.Gudur (M)

    16.00

    6 SPSR Nellore Survepalli BT Renewal to Providing B.T.Renewal

    to Kothapalem branch road (via)

    Potlapudi in T.P.Gudur (M)

    35.00

    7 SPSR Nellore Venkatagiri BT Renewal to Utukur to Perumallapadu 51.60

    Non-PMGSY

    Roads Total

    279.10

    SRSP Nellore

    Total

    629.95

    1 Srikakulam Amadalavalasa BT Renewal to Kintali to Kajipeta 13.00

    2 Srikakulam Ichapuram BT Renewal to Road from Innisupeta to 16.002 Srikakulam Ichapuram BT Renewal to Road from Innisupeta to

    Rajapuram

    16.00

    3 Srikakulam Palakonda BT Renewal to A.B.Road to Keesari 50.00

    4 Srikakulam Pathapatnam BT Renewal to P.T.Road to Thampa 20.00

    5 Srikakulam Pathapatnam BT Renewal to T.G.Road to Karajada 6.00

    6 Srikakulam Pathapatnam BT Renewal to A B Road to Miriapalli

    via Turakapeta

    13.00

    7 Srikakulam Pathapatnam BT Renewal to A.B.Road to Irapadu 10.00

    8 Srikakulam Rajam BT Renewal to VP Road to AV Puram

    via Sirlam

    28.00

    23

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    9 Srikakulam Rajam BT Renewal to U/G to the road from

    M.S. puram to Peddimpeta (Via)

    Kopparavalasa and Polinaiduvalasa.

    (VR)

    68.00

    10 Srikakulam Srikakulam BT Renewal to Mittannapeta to

    Balarampuram

    26.00

    11 Srikakulam Srikakulam BT Renewal to C.S.P road to NH5 (via)

    Gudem,Chapuram

    66.00

    12 Srikakulam Tekkali BT Renewal to NH5 to Badagam 30.00

    PMGSY

    Roads Total

    346.00

    1 Srikakulam Amadalavalasa BT Renewal to Road from CSP road to

    Dusi R&B road via Vanjangi and

    Vanjagipeta

    42.00

    2 Srikakulam Etcherla BT Renewal to NH5 to Kuppili Road 56.00

    3 Srikakulam Ichapuram BT Renewal to NH5 to Jagati Silagam

    road via Dasariputtuga silagam

    50.00

    4 Srikakulam Narasannapeta BT Renewal to NH5 to Potayyavalasa 20.00

    5 Srikakulam Palasa BT Renewal to BT road Yerramukkam

    to Ratti via Marripadu

    42.00

    6 Srikakulam Srikakulam BT Renewal to Road from Killipalem to

    Kunduvanipeta

    56.00

    Non-PMGSY

    Roads Total

    266.00

    Srikakulam

    Total

    612.00

    1 Visakhapatna

    m

    Anakapalli BT Renewal to Providing BT road to

    Rajupalem to Gorlevanipalem via.

    Valluru

    21.00

    2 Visakhapatna

    m

    Anakapalli BT Renewal to Atcherla to

    Gokivanipalem

    28.00

    3 Visakhapatna

    m

    Anakapalli BT Renewal to Tumpala to AKP-CDM

    road via Dibbapalem

    36.80

    4 Visakhapatna

    m

    ArakuVally BT Renewal to R/f Bakuru to Patigaruvu 15.00

    5 Visakhapatna

    m

    ArakuVally BT Renewal to R & B road to Kilagada 16.00

    6 Visakhapatna

    m

    Bheemili BT Renewal to R/f NH5 to

    Kummaripalem via. Yathapeta

    24.96

    7 Visakhapatna

    m

    Bheemili BT Renewal to Vijayanagaram-Sontyam

    road to Buddivalasa(Nerallvalasa)

    24.00

    m road to Buddivalasa(Nerallvalasa)

    8 Visakhapatna

    m

    Chodavaram BT Renewal to Chodavaram to

    Damanapalli

    38.40

    9 Visakhapatna

    m

    Chodavaram BT Renewal to R.E.C. Road to

    P.Bheemavaram

    8.00

    10 Visakhapatna

    m

    Madugula BT Renewal to K.Kotapadu to

    Medicharla

    20.00

    11 Visakhapatna

    m

    Madugula BT Renewal to Jaithavaram to

    Dibbapalem

    25.60

    12 Visakhapatna

    m

    Narsipatnam BT Renewal to NRPM- Tuni road to

    Manyapu-ratla

    24.00

    24

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    13 Visakhapatna

    m

    Narsipatnam BT Renewal to Makavarapalem R&B

    road to PP Agraharam & Adduruwada

    22.40

    14 Visakhapatna

    m

    Narsipatnam BT Renewal to Narsipatnam-

    revupolavaram R& B road to

    Dharmasagaram

    12.80

    15 Visakhapatna

    m

    Narsipatnam BT Renewal to Narsipatnam-Tuni R&B

    road to MB Patnam

    12.80

    16 Visakhapatna

    m

    Narsipatnam BT Renewal to Narsipatnam-Tuni R&B

    road tomanyapuratal( Balance reach)

    4.80

    17 Visakhapatna

    m

    Paderu BT Renewal to R&B road to Gopavaram 16.00

    18 Visakhapatna

    m

    Paderu BT Renewal to PL Road to Vanjari 14.80

    19 Visakhapatna

    m

    Payakaraopeta BT Renewal to Approach road to

    Vemagiri

    16.00

    m Vemagiri

    20 Visakhapatna

    m

    Pendurthi BT Renewal to R/f AKP-SBM to Iruwada 17.60

    21 Visakhapatna

    m

    Pendurthi BT Renewal to R/f SBM-

    Venkannapalem road to

    Pedayathapalem via. A.Sirasapalli

    15.40

    22 Visakhapatna

    m

    Yellamanchili BT Renewal to Kattubolu to Murakada 20.00

    23 Visakhapatna

    m

    Yellamanchili BT Renewal to R/f AKP-Pudimadaka

    road to Arabupalem

    8.00

    PMGSY

    Roads Total

    442.36

    1 Visakhapatna

    m

    Anakapalli BT Renewal to Providing BT to the road

    from Nh-5 to Valluru via Rajupalem

    (Balance length other than PMGSY)

    28.00

    2 Visakhapatna

    m

    Bheemili BT Renewal to BN road to Kothavalasa

    via Ramavaram BD Palem

    36.80

    3 Visakhapatna

    m

    Paderu BT Renewal to Koyyuru to Revalla 48.00

    4 Visakhapatna

    m

    Paderu BT Renewal to Pentapadu to

    Damanapalli

    8.00

    5 Visakhapatna

    m

    Payakaraopeta BT Renewal to NH-5 to Devavaram 19.00

    6 Visakhapatna Pendurthi BT Renewal to BN road to Sabbavaram- 50.006 Visakhapatna

    m

    Pendurthi BT Renewal to BN road to Sabbavaram-

    AKP road via Nallaregulapalem,

    Balijapalem & Ammulapalem

    50.00

    7 Visakhapatna

    m

    Yellamanchili BT Renewal to PNR Peta to

    Mulakalapalli, Etikoppaka ring road

    45.00

    Non-PMGSY

    Roads Total

    234.80

    Visakhapatna

    m Total

    677.16

    1 Vizianagaram Bobbili BT Renewal to NH43 to Kottakki 20.00

    25

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    2 Vizianagaram Cheepurupalli BT Renewal to GB road to Sivaramparla

    road (via) Devada and Nadipenapeta

    60.00

    3 Vizianagaram Cheepurupalli BT Renewal to GG road to

    Ippalavalasa

    40.00

    4 Vizianagaram Cheepurupalli BT Renewal to Garividi Garbham road

    to Pedabantupalli via Routhupeta (MP)

    30.00

    5 Vizianagaram Cheepurupalli BT Renewal to R/f Alugolu to Konuru via

    Ragolu (MP)

    30.00

    6 Vizianagaram Cheepurupalli BT Renewal to Puthikapeta to

    Chintalapeta

    27.00

    7 Vizianagaram Cheepurupalli BT Renewal to G.G.Road to

    Chinabantupalli

    8.00

    8 Vizianagaram Gajapathinagara

    m

    BT Renewal to NH43 to Keratam (via)

    Billalavalasa (2/0 to 4/0)

    20.00

    9 Vizianagaram Nellimerla BT Renewal to Nellimarla-Moida R&B 20.009 Vizianagaram Nellimerla BT Renewal to Nellimarla-Moida R&B

    road to Garikivalasa (via)

    Kondagumpam

    20.00

    10 Vizianagaram Parvathipuram BT Renewal to Road from SH 36 to

    Yegotivalasa

    80.00

    11 Vizianagaram Salur BT Renewal to Kothavalsa to

    Mirthivalasa

    35.00

    12 Vizianagaram Vizianagaram BT Renewal to V.K.road to Pedavemali

    Jn (via) Korukonda & Korukondapalem

    55.00

    PMGSY

    Roads Total

    425.00

    1 Vizianagaram Cheepurupalli BT Renewal to CPP Laveru road to

    Ardivalasa

    45.00

    2 Vizianagaram Gajapathinagara

    m

    BT Renewal to V.B.road to PSR puram

    (via) Korlam

    50.00

    3 Vizianagaram Gajapathinagara

    m

    BT Renewal to NH43 to Donkinavalasa

    (via) Chowdantivalasa

    12.00

    4 Vizianagaram Kurupam BT Renewal to DL Puram to Jumbiri. 15.00

    5 Vizianagaram Nellimerla BT Renewal to Munginapalli to

    Nellimarla (via) Saripalli

    50.00

    6 Vizianagaram Salur BT Renewal to NH43 to Gadivalasa 40.00

    Non-PMGSY

    Roads Total

    212.00

    Roads Total

    Vizianagaram

    Total

    637.00

    1 Warangal Bhupalpally BT Renewal to Chinnakodepaka to

    Gollapalli via Balaiahpalli

    19.00

    2 Warangal Bhupalpally BT Renewal to R&B Road to

    Vellampally

    17.60

    3 Warangal Ghanpur (Stn) BT Renewal to Raghunathpally to Veldi 28.50

    4 Warangal Jangaon BT Renewal to Thallathanda to

    Machupahad

    18.75

    26

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    5 Warangal Jangaon BT Renewal to PWD Road to Obula

    Keshavapur

    33.25

    6 Warangal Mulug BT Renewal to ZP Road to Ramnagar

    (Koyagudem)

    9.50

    7 Warangal Narsampet BT Renewal to PWD Road to

    Gundlpadh

    19.00

    8 Warangal Palakurthy BT Renewal to Thorrur to Chintalapally 4.75

    9 Warangal Palakurthy BT Renewal to ZP Road to

    Sirisannagudem

    7.60

    10 Warangal Parkal BT Renewal to Elugur Rangampet to

    Nallabelly via Mondrai

    29.35

    11 Warangal Wardhannapet BT Renewal to Somidi to Subbayyapalli 15.77

    PMGSY

    Roads Total

    203.07

    1 Warangal Bhupalpally BT Renewal to Vasanthapur to 40.00

    Gorikothapally

    2 Warangal Bhupalpally BT Renewal to PWD Road to

    Subbakkapally

    8.00

    3 Warangal Dornakal BT Renewal to Pagidipally to

    Bavojithanda

    70.00

    4 Warangal Ghanpur (Stn) BT Renewal to Komatigudem to

    Kanchanpally

    50.00

    5 Warangal Ghanpur (Stn) BT Renewal to PWD Road to Chilpur 40.00

    6 Warangal Jangaon BT Renewal to R&B Road Komuravelli

    to Rajiv Rahadari Khaman

    48.00

    7 Warangal Jangaon BT Renewal to Solipur to Ankushapur 12.00

    8 Warangal Mahabubabad BT Renewal to Kesamudram PWD road

    to Nellikudur PWD Road via

    Kalwala,Narayanpur

    130.00

    9 Warangal Mulug BT Renewal to R&B Road Mangapet to

    Kothur

    51.30

    10 Warangal Palakurthy BT Renewal to Nellutla to Nanchari

    Madur from Km 18/0 to 49/0

    80.00

    11 Warangal Parkal BT Renewal to Kamaram to Neerukulla 35.20

    12 Warangal Wardhannapet BT Renewal to SH-7 to Madipally 58.43

    13 Warangal Wardhannapet BT Renewal to PWD Road to Madipalli 35.0013 Warangal Wardhannapet BT Renewal to PWD Road to Madipalli

    (via) Anantasagaram

    35.00

    Non-PMGSY

    Roads Total

    657.93

    Warangal

    Total

    861.00

    1 West Godavari Denduluru BT Renewal to Maheswarapuram to

    Manuru

    25.00

    2 West Godavari Denduluru BT Renewal to Katlampudi village road 33.00

    3 West Godavari Gopalapuram BT Renewal to Gopalapuram to Bhimole 62.00

    27

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    4 West Godavari Narasapur BT Renewal to R&B road to

    Lakkuvarithota H/o Ramannapalem

    15.00

    5 West Godavari Nidadavole BT Renewal to Kanuru Agraharam to

    Nadupalli kota

    110.00

    6 West Godavari Palakol BT Renewal to Mattaparru to

    Penumadam

    45.00

    7 West Godavari Polavaram BT Renewal to R&B Road to

    T.Narsapuram

    22.00

    8 West Godavari Tanuku BT Renewal to Tanuku -Bhimavaram

    R&B road to Indira Nagar of Relangi via

    kethavaripalem

    25.00

    9 West Godavari Undi BT Renewal to Gollalakoderu to

    Mahadevapatnam

    20.00

    10 West Godavari Unguturu BT Renewal to Bhimadole to

    Lingampadu

    16.00

    PMGSY

    Roads Total

    373.00

    Roads Total

    1 West Godavari Achanta BT Renewal to Penugonda Deva

    Z.P.Road

    125.00

    2 West Godavari Bhimavaram BT Renewal to Road from Konithiwada

    to Rayakuduru in Veeravasaram (M)

    35.00

    3 West Godavari Bhimavaram BT Renewal to Dirusumarru Village

    Road in Bhimavaram(M)

    15.00

    4 West Godavari Bhimavaram BT Renewal to Road from Balepalli R&B

    Road to NREGS Road in Veeravasaram

    (M)

    10.00

    5 West Godavari Chintalapudi BT Renewal to Jeelakarragudem to

    Kamavarapukota (via) K.S.Ramavaram

    50.00

    6 West Godavari Chintalapudi BT Renewal to Jangaraddygudem to

    Pangidigudem

    30.00

    7 West Godavari Denduluru BT Renewal to Road from Duggirala to

    Chuttugunta

    21.00

    8 West Godavari Eluru BT Renewal to road from NH5 to

    Satrampadu

    35.00

    9 West Godavari Kovvuru BT Renewal to Pasivedala to Arikirevula 27.00

    10 West Godavari Narasapur BT Renewal to Road from Mogaltur to

    Rajugarithota

    25.00

    11 West Godavari Palakol BT Renewal to Abbirajupalem to

    Doddibatla road

    47.00

    Doddibatla road

    12 West Godavari T.P.gudem BT Renewal to Jatlapalem Palem to

    Mongipadu

    40.00

    13 West Godavari T.P.gudem BT Renewal to Navabpalem to

    Pattempalem (12/4-17/4)

    75.00

    14 West Godavari Tanuku BT Renewal to R/F Pekeru to R.

    Khandrika

    45.00

    15 West Godavari Undi BT Renewal to Road from R&B road to

    Komatigunta Village

    10.69

    16 West Godavari Unguturu BT Renewal to Bhimadole to

    Kurellagudem via Vadlapatla

    85.00

    28

  • Sl

    No.District Constituency Name of the work

    Amount in

    Rs.Lakhs

    BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

    Non-PMGSY

    Roads Total

    675.69

    West

    Godavari

    Total

    1048.69

    State Total 20865.12

    PRINCIPAL SECRETARY TO GOVERNMENT

    //FORWARDED::BY ORDER//

    SECTION OFFICER

    C.R. BISWAL

    29

  • No of

    works

    Amount No of

    works

    Amount No of

    works

    Amount

    1 Adilabad 3 56.00 15 649.80 18 705.80

    2 Anantapur 12 295.40 11 643.58 23 938.98

    3 Chittoor 24 548.75 26 709.70 50 1258.45

    4 East Godavari 17 452.53 17 579.50 34 1032.03

    5 Guntur 16 324.60 19 786.30 35 1110.90

    6 Kadapa 9 224.06 10 326.54 19 550.60

    7 Karimnagar 15 294.00 17 961.30 32 1255.30

    8 Khammam 10 331.30 7 497.00 17 828.30

    9 Krishna 21 551.80 9 376.40 30 928.20

    10 Kurnool 14 358.30 9 504.00 23 862.30

    11 Mahabubnagar 17 561.00 12 611.50 29 1172.50

    12 Medak 11 315.40 24 908.40 35 1223.80

    13 Nalgonda 30 1434.48 23 712.98 53 2147.46

    14 Nizamabad 21 355.70 12 318.00 33 673.70

    15 Prakasam 9 280.00 10 500.00 19 780.00

    16 Ranga Reddy 2 40.00 24 891.00 26 931.00

    17 SPSR Nellore 10 350.85 7 279.10 17 629.95

    18 Srikakulam 12 346.00 6 266.00 18 612.00

    19 Visakhapatnam 23 442.36 7 234.80 30 677.16

    20 Vizianagaram 12 425.00 6 212.00 18 637.00

    21 Warangal 11 203.07 13 657.93 24 861.00

    22 West Godavari 10 373.00 16 675.69 26 1048.69

    309 8563.595 300 12301.52 609 20865.12

    Abstract of BT Renewals Under MRR Grant

    District Total For Non -PMGSY

    Roads

    For PMGSY RoadsS.No.

    Amount Rs.in Lakhs