biostabilization integrated bank treatment

5
Biostabilization Integrated Bank Treatment

Upload: others

Post on 05-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Biostabilization Integrated Bank Treatment

Integrated Bank Treatment

May include fish habitat structures (according to NRCS Standard 395)

Integrated Bank Treatment Maximum rock height= 2 feet above OHWM in urban/CV/DriftlessMaximum rock height= 1 foot above OHWM in Southeastern Till Plains

BEPI Diagram

Bank Lip

Max Bank HeightTerrestrial

Vegetation

Ordinary High Water Mark (OHWM)

Rise

Run

ThalwegBank Toe(InflectionPoint)Stream Bed

Wetted Perimeter

Bank Face

Determining Thalweg Location

Thalweg

Thalweg

Thalweg

Assessed Bank

Location: Opposite

Location: Adjacent

Location: Center1/3

1/3

1/3 1/3 1/3

1/3 1/3

1/3 1/3

Assessed Bank

Assessed Bank