VALUE DELIVERED Replacement of poor or unsuitable accommodations, some of which dated back to World War II; more effective and efficient healthcare delivery to the people within the facility’s service area. SCOPE OF WORK • Design • Mechanical Services • Electrical Services • Public Health Services • Medical Gases BACKGROUND Bishop Auckland Hospital is one of three traditional hospitals, including University Hospital of North Durham and Darlington Memorial Hospital, that serve a large rural area with a population of 125,000 in County Durham and Darlington. For its local population, Bishop Auckland provides all routine care, both medical and surgical, including 24-hour ambulatory and emergency service. OBJECTIVES To redevelop existing buildings and build a new 320-bed general hospital for South Durham Healthcare NHS Trust. SOLUTION EMCOR Drake & Scull provided design assistance, and mechanical and electrical construc- tion services, as well as public health and medical gas expertise, for this three-stage project. Specific applications included air conditioning, cooling, closed-circuit television, and fire alarm and nurse call systems. Bishop Auckland Hospital, SOUTH DURHAM, UK CASE STUDY BIOTECH/HEALTHCARE OPERATING COMPANY: EMCOR Drake & Scull CLIENT: Criterion Healthcare MAIN CONTRACTOR: Shepherd Construction CONSULTANT: Hoare Lea & Partners CONTRACT AMOUNT: Shepherd Construction PROJECT DURATION: 1999 - 2002 TECHNICAL SOLUTIONS Relationships Quality Service VALUE ENGINEERING Experience Project Schedule & Coordination EXPERTISE New Construction Retrofit Electrical Construction Mechanical Construction Facilities Services Consulting Services Design/Construction Services 1 Thameside Center, Kew Bridge Road Kew Bridge, Middlesex England TW8 OHF United Kingdom T: 011 44 20 8380 6700 F: 011 44 20 8380 6701 www.emcoruk.com HOSPITALS • Air Conditioning • Cooling • CCTV • Fire Alarms • Nurse Call Systems This document contains confidential and proprietary information and is intended solely for the internal business use of EMCOR Group, Inc. and its subsidiaries (“EMCOR”). The download, reproduction, or use of this document (in whole or in part) by anyone other than an EMCOR employee is not permitted and the distribution or display of this document (in whole or in part) to anyone other than an EMCOR employee is not permitted without the prior written consent of the Marketing and Communications Department of EMCOR Group, Inc. This document should be returned to EMCOR immediately upon request. Copyright 2004, EMCOR Group, Inc., All Rights Reserved

Upload: stuart-ray

Post on 12-Apr-2017

49 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BishopAuckland Case Study

VALUE DELIVEREDReplacement of poor or unsuitable accommodations, some of which dated back to World War

II; more effective and efficient healthcare delivery to the people within the facility’s service area.

SCOPE OF WORK• Design

• Mechanical Services

• Electrical Services

• Public Health Services

• Medical Gases

BACKGROUNDBishop Auckland Hospital is one of three traditional hospitals, including University Hospital

of North Durham and Darlington Memorial Hospital, that serve a large rural area with a population of 125,000 in County Durham and Darlington. For its local population, Bishop Auckland provides all routine care, both medical and surgical, including 24-hour ambulatory and emergency service.

OBJECTIVESTo redevelop existing buildings and build a new 320-bed general hospital for South Durham

Healthcare NHS Trust.

SOLUTIONEMCOR Drake & Scull provided design assistance, and mechanical and electrical construc-

tion services, as well as public health and medical gas expertise, for this three-stage project. Specific applications included air conditioning, cooling, closed-circuit television, and fire alarm and nurse call systems.

Bishop Auckland Hospital, SOUTH DURHAM, UK

C A S E S T U D Y

BIOTECH/HEALTHCARE

OPERATING COMPANY: EMCOR Drake & Scull

CLIENT: Criterion Healthcare

MAIN CONTRACTOR: Shepherd Construction

CONSULTANT: Hoare Lea & Partners

CONTRACT AMOUNT: Shepherd Construction

PROJECT DURATION: 1999 - 2002

TECHNICAL SOLUTIONS Relationships Quality Service VALUE ENGINEERING ExperienceProject Schedule & Coordination EXPERTISE

New Construction

Retrofit

Electrical Construction

Mechanical Construction

Facilities Services

Consulting Services

Design/Construction Services

1 Thameside Center, Kew Bridge RoadKew Bridge, MiddlesexEngland TW8 OHFUnited KingdomT: 011 44 20 8380 6700 F: 011 44 20 8380 6701www.emcoruk.com

HOSPITALS

• Air Conditioning

• Cooling

• CCTV

• Fire Alarms

• Nurse Call Systems

This document contains confidential and proprietary information and is intended solely for the internal business use of EMCOR Group, Inc. and its subsidiaries (“EMCOR”). The download, reproduction, or use of this document (in whole or in part) by anyone other than an EMCOR employee is not permitted and the distribution or display of this document (in whole or in part) to anyone other than an EMCOR employee is not permitted without the prior written consent of the Marketing and Communications Department of EMCOR Group, Inc. This document should be returned to EMCOR immediately upon request.