Black Creek Parkway ProposalA Less Intrusive Alternative to the Often Abandoned I-170 Extension
![Page 2: Black creek parkway proposal](https://reader036.vdocuments.net/reader036/viewer/2022062523/58f17dd31a28ab8b728b4567/html5/thumbnails/2.jpg)
I-170
• I-170 was never meant to end at I-64• Cost Overruns Shelved Southward Expansion• 2 Proposed Routes were created one following
creek, the other follow railroad right of way• Several Attempts at Resuming Construction
met with Strong Opposition
![Page 3: Black creek parkway proposal](https://reader036.vdocuments.net/reader036/viewer/2022062523/58f17dd31a28ab8b728b4567/html5/thumbnails/3.jpg)
Opposition Concerns
• Noisy• Ugly/Blight• Leads to Urban Sprawl• Interferes with Walk-able Routes• Property Loss
![Page 4: Black creek parkway proposal](https://reader036.vdocuments.net/reader036/viewer/2022062523/58f17dd31a28ab8b728b4567/html5/thumbnails/4.jpg)
Extension Benefits
• Allows southern residents convenient access to Central Corridor
• Reduce pollution caused by Stop and Go Traffic
• Reduces Traffic from 3 Alternative Major Streets
![Page 5: Black creek parkway proposal](https://reader036.vdocuments.net/reader036/viewer/2022062523/58f17dd31a28ab8b728b4567/html5/thumbnails/5.jpg)
Original Plan
• Follow Black Creek with 6 Lane Interstate• Consumes 152 Homes, 208 Apartments, 43
Businesses and 3 Parks
![Page 6: Black creek parkway proposal](https://reader036.vdocuments.net/reader036/viewer/2022062523/58f17dd31a28ab8b728b4567/html5/thumbnails/6.jpg)
Changes Since Original Proposal
• Brentwood Promenade claimed nearly 80 of the Affected Homes Already
• MetroLink built over railroad route, leaving only Black Creek Alternative.
• Venture Store long shuttered (9 months after County Councilman Kurt Odenwald used it as an example of loss from Interstate Proposal…Don’t Worry… He is no longer in office… he’s a Circuit Court Judge now!).
![Page 7: Black creek parkway proposal](https://reader036.vdocuments.net/reader036/viewer/2022062523/58f17dd31a28ab8b728b4567/html5/thumbnails/7.jpg)
Determining Original Route
• No County Proposal Map Available
• Only Map comes from 1990 Newspaper Article
• Georeferenced Map, Traced Routes, Inaccuracies Manually corrected based on verbal details listed in several Newspaper Articles
![Page 8: Black creek parkway proposal](https://reader036.vdocuments.net/reader036/viewer/2022062523/58f17dd31a28ab8b728b4567/html5/thumbnails/8.jpg)
Methods for Determining Interstate Effects
• Using Traced Original Black Creek Route• 120ft Buffer created to represent 240 average
width of 6 lane Interstate• County Parcels Selected which overlap buffer• Interstate would now only affect 93 properties,
most would need to be completely razed• Property Values lost would equal $82 Million
Dollars
![Page 9: Black creek parkway proposal](https://reader036.vdocuments.net/reader036/viewer/2022062523/58f17dd31a28ab8b728b4567/html5/thumbnails/9.jpg)
Methods for Determining Parkway Effects
• Traced Original Black Creek Route• 40ft Buffer created to represent 80ft average
width of 4 lane Parkway similar to Forest Park Parkway
• County Parcels Selected which overlap buffer• Interstate would now only affect 73 properties• If all represented lost Property, Values lost would
equal $72 Million Dollars• Most Properties would not be completely lost
![Page 10: Black creek parkway proposal](https://reader036.vdocuments.net/reader036/viewer/2022062523/58f17dd31a28ab8b728b4567/html5/thumbnails/10.jpg)
Comparisons
![Page 11: Black creek parkway proposal](https://reader036.vdocuments.net/reader036/viewer/2022062523/58f17dd31a28ab8b728b4567/html5/thumbnails/11.jpg)
Comparisons
![Page 12: Black creek parkway proposal](https://reader036.vdocuments.net/reader036/viewer/2022062523/58f17dd31a28ab8b728b4567/html5/thumbnails/12.jpg)
Effects of Parkway Substitute
• Total Losses would include 2 Houses, 12 Vacant/Agricultural Tracts along Black Creek Flood Plain and 1 Brentwood Park
• 7 Houses would loose some backyard property• 2 Parks would lose approximately 1/3 total
area• 1 Apartment Complex and 8 Industrial Parks
would lose portions of their parking lots.
![Page 13: Black creek parkway proposal](https://reader036.vdocuments.net/reader036/viewer/2022062523/58f17dd31a28ab8b728b4567/html5/thumbnails/13.jpg)
Opposition Concerns Mitigated
• Eye-sore creek replaced with eye-sore Parkway• Commuter Cars only and reduced speed limits create
less noise• Introduction of Stead Speed Route reduces stop and go
traffic on 3 major street alternatives, thus reducing pollution from emissions
• Elevated Parkway would actually block view of Industrial Courts(and other blights) from many neighborhoods
• Property Loss very minimal
![Page 14: Black creek parkway proposal](https://reader036.vdocuments.net/reader036/viewer/2022062523/58f17dd31a28ab8b728b4567/html5/thumbnails/14.jpg)
Conclusion
• Parkway would provide many of the long sought after benefits while minimizing the effects on local residents
• Richmond Heights, Maplewood, and Brentwood could all see increased tax revenue as Parkway would conveniently bring commuters straight to the heart of their retail districts