black sea sap: 2007 technical draft
TRANSCRIPT
![Page 1: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/1.jpg)
The main purpose of the BSERP is to assist in the implementation of
practical measures to restore and protect the Black Sea environment, as agreed by the coastal countries
in the BSSAP (1996)
Black Sea SAP 2007 Technical
DraftCountry Coast
length (km)Basin area
(km2)Bulgaria 300 22,244Georgia 310 32,816Romania 225 90,894Russian Federation
550 457,600 (estimated)
Turkey 1,400 246,525 Ukraine 1,628 592,000
(estimated)Total 4,413 Approx.
1,900,000
15 Years of UNDP/GEF in the Black Sea Region, Final Seminar, 14-15 February 2008, Istanbul
![Page 2: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/2.jpg)
1996 Black Sea SAPWell-writtenComprehensive (lacked detail)Over-ambitiousImprecise – lacked an implementation planContained targets re. timescales, but no indicators of successProgress on legislationPoor progress on capital investments
![Page 3: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/3.jpg)
2007/8 Black Sea SAP Update/Revision (1)
Technical Draft is 110 pages long – scary-lookingGreater focus on indicators: P, SR & ESBreaks down grand targets from the 1996 SAP into a larger number of lower level management targetsAnnex 1 – EcoQO Matrices – 50 pagesMain text only 16 pages long
![Page 4: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/4.jpg)
2007/8 Black Sea SAP Update/Revision (2)
Summary table in Section 3.3 is just over 3 pages longTherefore, relatively easy/simple to get a quick
overview of the main points
Technical Draft is NOT a negotiated document
![Page 5: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/5.jpg)
Viewpoints – Purpose and Implementation of the SAP
To improve environmental status cost-effectively, with as few negative socio-economic impacts as possible. Long-term view with shorter-term targetsRegional perspective - if proposed actions are not included, they will be ignored60-70% of actions undertaken/completedGEF view – realistic targets; 100% achievement
![Page 6: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/6.jpg)
2007 Information Sources1996 BS SAP1996 BS SAP Regional Gap Analysis (2007) 2007 TDAConsultation with BSC Permanent Secretariat & Advisory Groups
![Page 7: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/7.jpg)
EcoQOs (1)4 priority transboundary problems, so 4 EcoQOs:•EcoQO 1: To preserve commercial marine living resources (fish and invertebrates) to ensure sustainable reproduction levels of their stocks:
EcoQO 1a: Sustainable use of commercial fisheries
EcoQO 1b: Restore/rehabilitate stocks of commercial marine living resources/fisheries
![Page 8: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/8.jpg)
EcoQOs (2)•EcoQO 2: Conservation of Black Sea Biodiversity and Habitats: EcoQO 2a: Reduce the risk of
extinction to threatened species EcoQO 2b: Minimise coastal and marine habitat destruction; recover the quality of degraded habitats; increase the extent and area of declined habitats; and conserve, restore and maintain the natural character and aesthetic look of Black Sea coastal and submarine landscapes. EcoQO 2c: Reduce human mediated species introductions
![Page 9: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/9.jpg)
EcoQOs (3)•EcoQO 3: Reduce eutrophication in order to restore the ecological balance within the Black Sea
0
3
6
9
1961
-19
63
1983
-19
90
1995
-19
97
1998
-20
05
Biom
ass
(g/m
3 )
0
3
6
9
1960
s
1983
-19
90
1991
-20
00
2001
-20
05
Bio
mas
s (g
/m
3 )
Danube
![Page 10: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/10.jpg)
EcoQOs (4)•EcoQO 4: Improved environmental condition to ensure good water quality for human health, recreational use and aquatic biota:
EcoQO 4a: Reduce pollutants originating from land based sourcesEcoQO 4b: Reduce pollutants originating from shipping activities and offshore installations
![Page 11: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/11.jpg)
Cross-Cutting IssuesCapacity strengthening for enforcement (pollution, alien species, fisheries management)Improved public engagementImproved institutional organisation of BSC and advisory groupsClimate change
![Page 12: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/12.jpg)
EcoQO Matrices (1)Management targetsAnticipated outputs Time required to implement Legal, institutional or policy reforms required Indicators of success Relative priority: high, medium or lowUncertainties
![Page 13: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/13.jpg)
Comparison – SAP Gaps & Proposed Targets
Gap analysis recognised 27 problem areas24 dealt with in management targets3 not dealt with:• Common norms for aquaculture and tourism • BD centre, Batumi to function as rehabilitation
centre for captive marine mammals• Identify concentration levels for trace
contaminants in dredged spoils
![Page 14: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/14.jpg)
Proposed Management Targets
Wish list of short-, mid- and long-term targets (109):EcoQO <5
years5-10 years
>10 years
Preserve MLR 9 8 1Conserve biodiversity 16 8 3Reduce eutrophication 15 8 7Ensure good water quality 18 11 5
Total 58 35 16
![Page 15: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/15.jpg)
Next Steps (1)
Identify/appoint Regional contractor?Comments on main body of text provided to Regional ContractorCommissioners to identify/appoint national representativesRegional costs to implement individual management targets estimated by BSC/BSERP
![Page 16: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/16.jpg)
Next Steps (2)National costs to implement individual management targets provided by national representativesInformation on national budgets/plans provided by national representativesWhen total costs and budgets known, re-assess importance of individual management targetsMeeting to cut back Proposed Management Targets and adjust timescales to match available budgets
![Page 17: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/17.jpg)
Next Steps (3)Amend Technical Draft to produce Negotiated Document
![Page 18: Black Sea SAP: 2007 technical draft](https://reader034.vdocuments.net/reader034/viewer/2022042619/588692f11a28abf6158b6b99/html5/thumbnails/18.jpg)
Thank you