blackmoor gates - town of collingwood

92
BLACKMOOR GATES STRAW HAT RESTORATION TRAFFIC IMPACT STUDY 17M-01364-00 | May 2018

Upload: others

Post on 27-Jan-2022

18 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BLACKMOOR GATES - Town of Collingwood

BLACKMOOR GATES

STRAW HAT RESTORATION

TRAFFIC IMPACT STUDY

17M-01364-00 | May 2018

Page 2: BLACKMOOR GATES - Town of Collingwood

WSP Canada Inc.

BLACKMOOR GATES DEVELOPMENT, COLLINGWOOD

TRAFFIC IMPACT STUDY

STRAW HAT RESTORATION

PROJECT NO.: OUR REF. NO. 17M-01364-00

DATE: MAY 10, 2018

100 COMMERCE VALLEY DRIVE WEST

THORNHILL, ON

CANADA L3T 0A1

T: +1 905 882-1100

F: +1 905 882-0055

WSP.COM

Page 3: BLACKMOOR GATES - Town of Collingwood

WSP Canada Inc.

100 Commerce Valley Drive West

Thornhill, ON

Canada L3T 0A1

T: +1 905 882-1100

F: +1 905 882-0055

wsp.com

May 10, 2018

John Velick Manager, Engineering (Public Works) Town of Collingwood P.O. Box 157, 97 Hurontario Street Collingwood, Ontario L9Y 3Z5

Dear Sir:

Subject: Traffic Impact Study for Blackmoor Gates, Collingwood

WSP Canada Group Limited (WSP) was retained by Straw Hat Restoration, to prepare a Transportation Impact Study for a proposed residential development with access from Campbell Street near the Hurontario Street & Campbell Street intersection, Collingwood. The report follows the specific directions and scope of work based on the Terms of Reference submitted to the Town on March 22, 2018.

The report focuses on the proposed site access points and analyzes traffic impacts expected at these locations. The report addresses the surrounding road network, transit, active transportation, parking for vehicle and bicycles, as well as loading facilities for the development.

Please do not hesitate to contact us if you have any questions regarding our analysis, conclusions or recommendations. Brett Sears, the project manager for this assignment, can be reached at + 1 905-882-4211 Extension 6573 or [email protected]

Yours sincerely,

Brett Sears, MCIP RPP Senior Project Manager Transportation – Planning & Advisory Services

Encl. TIS Report WSP ref.: 17M-01364-00

Page 4: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development, Collingwood Project No. OUR REF. NO. Straw Hat Restoration

WSP

Page ii

TABLE OF CONTENTS

EXECUTIVE SUMMARY................................................... 1

1 INTRODUCTION ................................................... 2

1.1 Development proposal .................................................... 4

1.1.1 Land Use ................................................................................. 4

1.1.2 Access ..................................................................................... 4

2 EXISTING TRANSPORTATION CONDITIONS ..... 7

2.1 Boundary Roadways ....................................................... 7

2.2 Traffic Data ...................................................................... 9

2.3 Transit Routes ................................................................. 9

2.4 Active Transportation .................................................... 10

2.5 Data Collection and Methodology ................................. 12

2.6 Analysis Methodology ................................................... 14

2.6.1 Intersection Capacity Analysis ............................................. 14

2.7 Existing Traffic Condition Analysis ................................ 14

3 FUTURE BACKGROUND GROWTH .................. 17

3.1 Future Background Traffic Volumes .............................. 17

3.2 Future Roadway Transit Improvement .......................... 17

3.3 Future Backgound TRaffIc Condition ............................ 17

4 PROPOSED SITE GENERATED TRAFFIC ........ 22

4.1 Proposed Trip Generation ............................................. 22

4.1.1 Modal Split Reduction .......................................................... 22

4.2 Proposed Trip Distribution ............................................. 22

4.3 Trip Assignment............................................................. 23

5 TOTAL TRAFFIC CONDITIONS ANALYSIS ....... 25

6 AUTO TURN AND SIGHT LINE ANALYSIS ........ 27

6.1 Auto Turn ....................................................................... 27

Page 5: BLACKMOOR GATES - Town of Collingwood

Page iii

6.2 Sight Line Analysis ........................................................ 27

7 PARKING REQUIREMENTS ............................... 36

7.1 Applicable By-law for PARKING.................................... 36

7.2 Parking REquirements .................................................. 37

7.3 Proposed Parking Supply .............................................. 37

8 CONCLUSIONS AND RECOMMENDATIONS .... 38

Page 6: BLACKMOOR GATES - Town of Collingwood

Page iv

LIST OF TABLES

TABLE 1.1 SITE CHARACTERISTICS ........................... 4 TABLE 2.1 TRANSIT SERVICES ................................... 9 TABLE 2.2: LEVEL OF SERVICE ANALYSIS FOR

EXISTING TRAFFIC CONDITIONS .. 15 TABLE 3.1 : LEVEL OF SERVICE ANALYSIS FOR

BACKGROUND TRAFFIC CONDITIONS .................................... 18

TABLE 4.1: TRIP GENERATION .................................. 21 TABLE 4.2: SITE TRIP DISTRIBUTION ...................... 22 TABLE 5.1: LEVEL OF SERVICE ANALYSIS FOR

TOTAL TRAFFIC CONDITIONS ....... 24 TABLE 7.1: PARKING REQUIREMENTS ..................... 36 TABLE 7.2: PROPOSED PARKING SUPPLY ............. 36

FIGURES

Figure 1-1: Site Location And Context ............................ 3 Figure 1-2: Proposed Site Plan ....................................... 5 Figure 1-3: Proposed Site Access ................................... 6 Figure 2-1: Existing Lane Configurations ........................ 8 Figure 2-2:Existing Active Transportation Infrastructure

........................................................... 11 Figure 2-3:Study Area ................................................... 13 Figure 2-4: Existing Traffic Volumes ............................. 16 Figure 3-1: Lane Configuration For Background Analysis

........................................................... 19 Figure 3-2:Future Background Traffic Volume .............. 20 Figure 4-1:Site Generated Traffic Volume .................... 23 Figure 5-1:Total Future Volumes .................................. 25 Figure 6-1 : Passenger Vehicle Auto Turn Analysis ..... 27 Figure 6-2 : Emergency Vehicle Auto Turn Analysis

(Anti-Clockwise) ................................. 28 Figure 6-3: Emergency Vehicle Auto Turn Analysis

(Clockwise) ........................................ 29 Figure 6-4 : Garbage Vehicles Auto Turn Analysis ( Anti-

Clockwise) ......................................... 30 Figure 6-5: Garbage Vehicle Auto Turn Analysis

(Clockwise) ........................................ 31 Figure 6-6: Medium Truck (Outside Curb) .................... 32 Figure 6-7: Medium Truck (Inside Curb) ....................... 33 Figure 6-8: Sight Line Analysis For Emergency Exit .... 34 Figure 7-1:Zoning Map .................................................. 35

Page 7: BLACKMOOR GATES - Town of Collingwood

Page v

Appendices

A- Tis Terms of Reference

B- Traffic Volume Data

C- Signal Timing

D- Level of Service Definitions

E- Existing Traffic Conditions Analysis

F- Background Traffic Volumes

G- Future Background Traffic Conditions Analysis-Synchro Output Sheets

H- Total Traffic Conditions Analysis Synchro Output Sheets

I - Background Developments

Page 8: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 1

EXECUTIVE SUMMARY WSP Canada Group Limited (WSP) has been retained by Straw Hat Restoration to prepare a Transportation Impact Study (TIS) for the proposed Blackmoor Gates residential development.

A Traffic Impact Study is required by the Town of Collingwood per a Pre-Consultation Meeting held on November 30, 2017 and Letter from Herb Lemon dated November 29, 2017. This report follows the specific direction provided by the Town and the subsequent Terms of Reference submitted on March 22, 2018.

The development is proposed to have 34 detached and semi-detached residential units. Out of the 34 units one detached unit is an already existing residence with access from Hurontario Street. The access to the proposed development is from Campbell Street located on the north of the development. Out of the 34 residential units, two detached residential units shall access from the Findlay Drive located on the south of the proposed site. The development also has an emergency access on to Hurontario Street.

Based on the ITE trip generation calculation method, the development shall generate 9 (inbound), 26 (outbound) vehicular trips during am peak hour and 25(inbound) 14 (outbound) vehicular trips during p.m peakhour. The operational analysis of the intersection within the study area indicates that the intersections operate at acceptable levels of service during the existing and future conditions.

The number of parking spaces required for the development was calculated based on the Towns by-laws. The by-law stipulates 62 parking for the dwelling units and 8 parking spaces for visitors. The proposed development meets this minimum parking requirements.

Page 9: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 2

1 INTRODUCTION WSP Canada Group Limited (WSP) has been retained by Straw Hat Restoration to prepare a Transportation Impact Study (TIS) for the proposed Blackmoor Gates residential development.

The Blackmoor Gates site is bound by Hurontario Street to the east, Campbell Street to the north, Findlay Drive to the south, and Maple Street to the west. Figure 1.1 illustrates the site location and context.

The analysis in this report is based on the site plan provided to WSP by Straw Hat Restoration and the terms of reference submitted to the Town of Collingwood. The terms of reference for this study are provided in Appendix A.

The analysis assesses the transportation impacts associated with the proposed development with consideration to anticipated background developments. The evaluation of the existing multimodal transportation performance (transit, pedestrian, and cycling) is included. A review of the Town’s Zoning By-law standards regarding parking and loading supply and potential Transportation Demand Management (TDM) measures will be examined. Improvements to the existing road network, if any, to accommodate the development-related trips will be determined as part of the recommendation.

Page 10: BLACKMOOR GATES - Town of Collingwood
samantha.gatchene
Image
samantha.gatchene
Rectangle
samantha.gatchene
Image
samantha.gatchene
Text Box
FIGURE 1.1 Site Location and Context
samantha.gatchene
Polygon
samantha.gatchene
Text Box
N
samantha.gatchene
Text Box
Legend
samantha.gatchene
Text Box
Site
samantha.gatchene
Rectangle
samantha.gatchene
Text Box
NOT TO SCALE
samantha.gatchene
Polygon
samantha.gatchene
Text Box
SITE
samantha.gatchene
Text Box
2
samantha.gatchene
Text Box
Campbell Street at Hurontario Street (Signalized) Campbell Street at Maple Street (Unsignalized)
samantha.gatchene
Text Box
1
samantha.gatchene
Text Box
2
samantha.gatchene
Text Box
1
Page 11: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 4

1.1 DEVELOPMENT PROPOSAL

The subject site is located on south side of Campbell Street and the west side of Hurontario Street. We understand that the proposed development will consist 34 residential units, including 2 semi-detached units off Findlay Drive and 1 existing single-detached house on Hurontario Street. The development is proposed on 1.70 hectares of land.

1.1.1 LAND USE

Table 1.1 summarizes the development characteristics, and Figure 1.2 illustrates the proposed site plan.

Table 1.1 Site Characteristics

Development Type Magnitude

Residential units (Proposed) 31

Residential units with direct Access from Findlay Drive (Proposed)

2

Residential unit on Hurontario street (Existing) 1

1.1.2 ACCESS

The Blackmoor Gates site accessed by a new road forming a T-intersection on Campbell Street. The new road will be stop controlled while Campbell Street will continue to be free flow at this location. Further, an emergency access-only is proposed on Hurontario Street. The proposed site accesses are shown in Figure 1.3. The two residential units on Findlay Drive will have direct access via driveways to the road and the existing one residential unit on Hurontario Street shall continue to have direct access from Hurontario Street.

Page 12: BLACKMOOR GATES - Town of Collingwood

WV

WV

WV

M A

P L

E

S T

R E

E T

F I N D L AY D R I V E

C A M P B E L L S T R E E T

ElementarySchool CatholicNotre-Dame-De-La-Huronie

H U

R O

N T

A R

I O

S T

R E

E T

WV

WV

N73° 18' 20"E 55.03N73° 18' 20"E 51.10N73° 18' 20"E

12.84

N8

° 4

8' 2

0"W

80

.05

N8

° 4

2' 4

0"W

80

.07

N73° 18' 00"E12.70

N8

° 4

8' 0

0"W

60

.70

N73° 17' 30"E 45.72

N73° 26' 40"E 178.09

N8

° 4

8' 0

0"W

34

.61

N8

° 1

2' 5

0"W

60

.43

34

.49

26

.21

41.374.35

37.1869.2325.94

20

.28

19

.32

37

.36

3.0

9

3.0

3

17

.68

1.7

2

19

.00

19

.00

0.9

4

2.1

7

1.56

1.53

1.95

0.5

7

0.6

5

1.1

8

1.3

0

2.44

0.0

6 N

N73° 18' 20"E12.84

FE

NC

E

0.0

4 N

EN

D O

F F

EN

CE

2.5

4.4

2.4

N0°

58'

10"

E

33.9

0

49.77

22.5622.13

27.28

19.81

30.48

N73° 27' 50"E

172.01

18

.97

N9

° 2

1' 2

0"W

73

.15

6.4

1

N9

° 2

2' 3

0"W

50

.29

A

A

A

A

A

A A A A*

A A A A

B

BBBB

B

B

BB

B C

C

C

C

A

A

A

A

Blackmoor GateCollingwood

March 26, 2018

Scale 1 : 1,200

Concept Sketch

16 x 30ft. detached unitsBuilding Width = 9.0m (29.5 ft.)Building Depth = 12.0m (39.3 ft.)Max. GFA = 189m² (2,000 sq.ft.)

Front Garage

Rear Garage

11 x 30ft. detached unitsBuilding Width = 9.0m (29.5 ft.)Building Depth = 12.0m (39.3 ft.)Max. GFA = 177m² (1,900 sq.ft.)

4 x 25ft. semi-detached unitsBuilding Width = 7.5m (24.6 ft.)Building Depth = 12.0m (39.3 ft.)Max. GFA = 140m² (1,500 sq.ft.)

Site Area = 1.71haUnits = 3431 unit condo2 new units on Findlay1 existing unit on Hurontario

A

B

C

* = Requires variance

AutoCAD SHX Text
11760
AutoCAD SHX Text
187.113
AutoCAD SHX Text
INV E 200 PVC
AutoCAD SHX Text
11759
AutoCAD SHX Text
187.078
AutoCAD SHX Text
INV W 300 PVC
AutoCAD SHX Text
198.011
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
197.043
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
197.189
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
11741
AutoCAD SHX Text
196.196
AutoCAD SHX Text
DS
AutoCAD SHX Text
197.741
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
197.265
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
197.154
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
197.568
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
195.585
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
195.528
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
195.566
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
194.860
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.734
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.763
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.762
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.839
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.750
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.704
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.664
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.731
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.789
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
11715
AutoCAD SHX Text
195.145
AutoCAD SHX Text
DS
AutoCAD SHX Text
11714
AutoCAD SHX Text
195.115
AutoCAD SHX Text
DS G
AutoCAD SHX Text
194.972
AutoCAD SHX Text
FB
AutoCAD SHX Text
195.026
AutoCAD SHX Text
FB
AutoCAD SHX Text
195.051
AutoCAD SHX Text
FB
AutoCAD SHX Text
195.126
AutoCAD SHX Text
FB
AutoCAD SHX Text
11709
AutoCAD SHX Text
195.073
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11708
AutoCAD SHX Text
195.067
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11707
AutoCAD SHX Text
195.076
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11706
AutoCAD SHX Text
194.979
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
195.045
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.910
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
195.001
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.860
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.722
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.732
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.758
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
194.754
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
194.668
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
194.699
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
194.785
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
11689
AutoCAD SHX Text
194.705
AutoCAD SHX Text
UGW
AutoCAD SHX Text
11688
AutoCAD SHX Text
194.706
AutoCAD SHX Text
UGW
AutoCAD SHX Text
UGG
AutoCAD SHX Text
UGG
AutoCAD SHX Text
UGG
AutoCAD SHX Text
UGG
AutoCAD SHX Text
UGG
AutoCAD SHX Text
UGG
AutoCAD SHX Text
UGG
AutoCAD SHX Text
UGG
AutoCAD SHX Text
UGG
AutoCAD SHX Text
UGG
AutoCAD SHX Text
UGG
AutoCAD SHX Text
11676
AutoCAD SHX Text
194.747
AutoCAD SHX Text
UGS
AutoCAD SHX Text
11675
AutoCAD SHX Text
194.703
AutoCAD SHX Text
UGS
AutoCAD SHX Text
11674
AutoCAD SHX Text
194.671
AutoCAD SHX Text
UGS
AutoCAD SHX Text
11673
AutoCAD SHX Text
193.458
AutoCAD SHX Text
INV SE 300 HDPE
AutoCAD SHX Text
11672
AutoCAD SHX Text
193.525
AutoCAD SHX Text
INV NE 300 HDPE
AutoCAD SHX Text
11671
AutoCAD SHX Text
193.098
AutoCAD SHX Text
INV SW 300 HDPE
AutoCAD SHX Text
11670
AutoCAD SHX Text
193.103
AutoCAD SHX Text
INV N 300 HDPE
AutoCAD SHX Text
11669
AutoCAD SHX Text
193.061
AutoCAD SHX Text
INV W 300 HDPE
AutoCAD SHX Text
11668
AutoCAD SHX Text
193.040
AutoCAD SHX Text
INV W 300 HDPE
AutoCAD SHX Text
11667
AutoCAD SHX Text
193.038
AutoCAD SHX Text
INV E 400 HDPE
AutoCAD SHX Text
11666
AutoCAD SHX Text
189.122
AutoCAD SHX Text
INV W 200 PVC
AutoCAD SHX Text
11665
AutoCAD SHX Text
189.078
AutoCAD SHX Text
INV E 200 PVC
AutoCAD SHX Text
190.500
AutoCAD SHX Text
TL
AutoCAD SHX Text
190.401
AutoCAD SHX Text
TL
AutoCAD SHX Text
190.496
AutoCAD SHX Text
TL
AutoCAD SHX Text
190.465
AutoCAD SHX Text
TL
AutoCAD SHX Text
190.604
AutoCAD SHX Text
TL
AutoCAD SHX Text
191.102
AutoCAD SHX Text
SHED
AutoCAD SHX Text
191.131
AutoCAD SHX Text
SHED
AutoCAD SHX Text
191.085
AutoCAD SHX Text
SHED
AutoCAD SHX Text
11567
AutoCAD SHX Text
191.070
AutoCAD SHX Text
POST
AutoCAD SHX Text
11557
AutoCAD SHX Text
192.262
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11556
AutoCAD SHX Text
192.136
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11555
AutoCAD SHX Text
192.095
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11554
AutoCAD SHX Text
191.918
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11553
AutoCAD SHX Text
191.930
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11552
AutoCAD SHX Text
192.029
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11551
AutoCAD SHX Text
192.122
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11550
AutoCAD SHX Text
192.143
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11549
AutoCAD SHX Text
192.205
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11548
AutoCAD SHX Text
192.641
AutoCAD SHX Text
DS
AutoCAD SHX Text
192.808
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
192.797
AutoCAD SHX Text
DECK
AutoCAD SHX Text
192.888
AutoCAD SHX Text
DECK
AutoCAD SHX Text
193.988
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
193.541
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
193.560
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
193.538
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
194.801
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
194.962
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
194.975
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
195.263
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
195.169
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
191.886
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
11517
AutoCAD SHX Text
192.641
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11516
AutoCAD SHX Text
192.603
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11515
AutoCAD SHX Text
192.427
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11514
AutoCAD SHX Text
192.413
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11513
AutoCAD SHX Text
192.563
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11512
AutoCAD SHX Text
192.641
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
192.401
AutoCAD SHX Text
HL
AutoCAD SHX Text
192.514
AutoCAD SHX Text
HL
AutoCAD SHX Text
192.441
AutoCAD SHX Text
HL
AutoCAD SHX Text
192.441
AutoCAD SHX Text
HL
AutoCAD SHX Text
192.464
AutoCAD SHX Text
HL
AutoCAD SHX Text
192.328
AutoCAD SHX Text
HL
AutoCAD SHX Text
192.240
AutoCAD SHX Text
HL
AutoCAD SHX Text
192.140
AutoCAD SHX Text
HL
AutoCAD SHX Text
UGG
AutoCAD SHX Text
UGG
AutoCAD SHX Text
UGG
AutoCAD SHX Text
UGG
AutoCAD SHX Text
192.183
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.337
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.434
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.399
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.346
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.322
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.344
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.416
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.435
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.411
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.376
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.297
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.140
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.065
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.191
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.185
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.127
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.423
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.477
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.524
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.428
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.447
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.340
AutoCAD SHX Text
FB
AutoCAD SHX Text
197.678
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
198.391
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
195.986
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
195.711
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
196.158
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
196.443
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
196.517
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
192.032
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.880
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.815
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.956
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
192.947
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
192.949
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
192.935
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
11434
AutoCAD SHX Text
190.640
AutoCAD SHX Text
INV E 300 PVC
AutoCAD SHX Text
192.406
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.430
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.412
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.480
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.552
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.587
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.430
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.480
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.472
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
11414
AutoCAD SHX Text
192.090
AutoCAD SHX Text
POST
AutoCAD SHX Text
11413
AutoCAD SHX Text
192.077
AutoCAD SHX Text
POST
AutoCAD SHX Text
11412
AutoCAD SHX Text
192.052
AutoCAD SHX Text
POST
AutoCAD SHX Text
192.340
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.355
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.273
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.345
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.346
AutoCAD SHX Text
HL
AutoCAD SHX Text
192.369
AutoCAD SHX Text
HL
AutoCAD SHX Text
192.162
AutoCAD SHX Text
HL
AutoCAD SHX Text
192.069
AutoCAD SHX Text
HL
AutoCAD SHX Text
192.054
AutoCAD SHX Text
HL
AutoCAD SHX Text
191.857
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.934
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.017
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.066
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.117
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.069
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.049
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.029
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.971
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.934
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.852
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.810
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.849
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.810
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.824
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.663
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.503
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.569
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.689
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.700
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.722
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.768
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.867
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.922
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.917
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.833
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.787
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.986
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.919
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.927
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.822
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.730
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.190
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.197
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.203
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.150
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.133
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.096
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
11347
AutoCAD SHX Text
189.612
AutoCAD SHX Text
INV E 300 PVC
AutoCAD SHX Text
11346
AutoCAD SHX Text
188.966
AutoCAD SHX Text
INV W 300 PVC
AutoCAD SHX Text
11345
AutoCAD SHX Text
188.614
AutoCAD SHX Text
INV N 600 CONC
AutoCAD SHX Text
11344
AutoCAD SHX Text
188.647
AutoCAD SHX Text
INV S 450 CONC
AutoCAD SHX Text
11343
AutoCAD SHX Text
190.298
AutoCAD SHX Text
INV W 300 PVC
AutoCAD SHX Text
11342
AutoCAD SHX Text
190.028
AutoCAD SHX Text
INV N 450 CONC
AutoCAD SHX Text
11341
AutoCAD SHX Text
189.914
AutoCAD SHX Text
INV S 600 HDPE
AutoCAD SHX Text
197.460
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
196.383
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
193.804
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
193.838
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
193.865
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
193.843
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
193.762
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
193.688
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
192.520
AutoCAD SHX Text
SHED
AutoCAD SHX Text
191.797
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.789
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.898
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.070
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.997
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.930
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.889
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.257
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.207
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.175
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.299
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.420
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.451
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.445
AutoCAD SHX Text
DECK
AutoCAD SHX Text
192.432
AutoCAD SHX Text
DECK
AutoCAD SHX Text
192.285
AutoCAD SHX Text
DECK
AutoCAD SHX Text
192.185
AutoCAD SHX Text
DECK
AutoCAD SHX Text
11307
AutoCAD SHX Text
192.195
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11306
AutoCAD SHX Text
192.208
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11305
AutoCAD SHX Text
192.339
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11304
AutoCAD SHX Text
192.338
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11303
AutoCAD SHX Text
192.353
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11302
AutoCAD SHX Text
192.464
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11301
AutoCAD SHX Text
192.462
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
11300
AutoCAD SHX Text
192.418
AutoCAD SHX Text
PATIO
AutoCAD SHX Text
192.442
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
192.352
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
192.454
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
192.532
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
192.660
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.571
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.701
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.711
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.694
AutoCAD SHX Text
BF
AutoCAD SHX Text
192.431
AutoCAD SHX Text
BF
AutoCAD SHX Text
192.592
AutoCAD SHX Text
BF
AutoCAD SHX Text
192.555
AutoCAD SHX Text
BF
AutoCAD SHX Text
192.523
AutoCAD SHX Text
SHED
AutoCAD SHX Text
192.473
AutoCAD SHX Text
SHED
AutoCAD SHX Text
192.526
AutoCAD SHX Text
SHED
AutoCAD SHX Text
192.517
AutoCAD SHX Text
BF
AutoCAD SHX Text
192.467
AutoCAD SHX Text
BF
AutoCAD SHX Text
191.544
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.714
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.587
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.441
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.417
AutoCAD SHX Text
FB
AutoCAD SHX Text
11232
AutoCAD SHX Text
191.660
AutoCAD SHX Text
192.263
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.273
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.618
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.407
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.482
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.359
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.268
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.823
AutoCAD SHX Text
CLF
AutoCAD SHX Text
192.363
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.401
AutoCAD SHX Text
TL
AutoCAD SHX Text
11121
AutoCAD SHX Text
191.786
AutoCAD SHX Text
BH2
AutoCAD SHX Text
192.836
AutoCAD SHX Text
CLF
AutoCAD SHX Text
192.857
AutoCAD SHX Text
CLF
AutoCAD SHX Text
192.818
AutoCAD SHX Text
CLF
AutoCAD SHX Text
192.786
AutoCAD SHX Text
CLF
AutoCAD SHX Text
192.727
AutoCAD SHX Text
CLF
AutoCAD SHX Text
192.215
AutoCAD SHX Text
CLF
AutoCAD SHX Text
191.923
AutoCAD SHX Text
CLF
AutoCAD SHX Text
191.965
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.709
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.676
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.518
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.109
AutoCAD SHX Text
FB
AutoCAD SHX Text
191.055
AutoCAD SHX Text
FB
AutoCAD SHX Text
190.789
AutoCAD SHX Text
EC
AutoCAD SHX Text
190.772
AutoCAD SHX Text
EC
AutoCAD SHX Text
190.484
AutoCAD SHX Text
SHED
AutoCAD SHX Text
190.581
AutoCAD SHX Text
SHED
AutoCAD SHX Text
190.805
AutoCAD SHX Text
SHED
AutoCAD SHX Text
190.545
AutoCAD SHX Text
HL
AutoCAD SHX Text
190.561
AutoCAD SHX Text
HL
AutoCAD SHX Text
190.649
AutoCAD SHX Text
HL
AutoCAD SHX Text
11009
AutoCAD SHX Text
190.644
AutoCAD SHX Text
IF
AutoCAD SHX Text
11004
AutoCAD SHX Text
190.919
AutoCAD SHX Text
POST
AutoCAD SHX Text
11002
AutoCAD SHX Text
190.988
AutoCAD SHX Text
POST
AutoCAD SHX Text
190.602
AutoCAD SHX Text
SHED
AutoCAD SHX Text
190.499
AutoCAD SHX Text
HL
AutoCAD SHX Text
190.407
AutoCAD SHX Text
HL
AutoCAD SHX Text
190.465
AutoCAD SHX Text
HL
AutoCAD SHX Text
190.540
AutoCAD SHX Text
HL
AutoCAD SHX Text
191.461
AutoCAD SHX Text
SHED
AutoCAD SHX Text
191.517
AutoCAD SHX Text
SHED
AutoCAD SHX Text
191.462
AutoCAD SHX Text
SHED
AutoCAD SHX Text
10908
AutoCAD SHX Text
190.019
AutoCAD SHX Text
POST
AutoCAD SHX Text
192.058
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
190.900
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
190.723
AutoCAD SHX Text
DECK
AutoCAD SHX Text
190.699
AutoCAD SHX Text
DECK
AutoCAD SHX Text
190.709
AutoCAD SHX Text
DECK
AutoCAD SHX Text
189.926
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.902
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.929
AutoCAD SHX Text
SW
AutoCAD SHX Text
191.795
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
190.422
AutoCAD SHX Text
CLF
AutoCAD SHX Text
190.438
AutoCAD SHX Text
CLF
AutoCAD SHX Text
190.307
AutoCAD SHX Text
CLF
AutoCAD SHX Text
190.214
AutoCAD SHX Text
CLF
AutoCAD SHX Text
190.126
AutoCAD SHX Text
CLF
AutoCAD SHX Text
190.206
AutoCAD SHX Text
CLF
AutoCAD SHX Text
189.916
AutoCAD SHX Text
CLF
AutoCAD SHX Text
189.986
AutoCAD SHX Text
CLF
AutoCAD SHX Text
190.612
AutoCAD SHX Text
BF
AutoCAD SHX Text
191.009
AutoCAD SHX Text
BF
AutoCAD SHX Text
189.622
AutoCAD SHX Text
BF
AutoCAD SHX Text
189.824
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
189.713
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
189.595
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
10799
AutoCAD SHX Text
189.923
AutoCAD SHX Text
DS
AutoCAD SHX Text
192.303
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
191.899
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
192.502
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
192.333
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
192.354
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
192.446
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
192.478
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
190.141
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
190.246
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
190.263
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
190.842
AutoCAD SHX Text
EP
AutoCAD SHX Text
191.509
AutoCAD SHX Text
EP
AutoCAD SHX Text
191.598
AutoCAD SHX Text
CL
AutoCAD SHX Text
192.366
AutoCAD SHX Text
CL
AutoCAD SHX Text
192.281
AutoCAD SHX Text
EP
AutoCAD SHX Text
192.668
AutoCAD SHX Text
EP
AutoCAD SHX Text
10779
AutoCAD SHX Text
192.411
AutoCAD SHX Text
BOLLARD
AutoCAD SHX Text
10778
AutoCAD SHX Text
192.463
AutoCAD SHX Text
BOLLARD
AutoCAD SHX Text
10777
AutoCAD SHX Text
192.480
AutoCAD SHX Text
BOLLARD
AutoCAD SHX Text
10776
AutoCAD SHX Text
192.484
AutoCAD SHX Text
BOLLARD
AutoCAD SHX Text
10775
AutoCAD SHX Text
192.439
AutoCAD SHX Text
BOLLARD
AutoCAD SHX Text
10774
AutoCAD SHX Text
192.429
AutoCAD SHX Text
GAS UNIT
AutoCAD SHX Text
191.709
AutoCAD SHX Text
EC
AutoCAD SHX Text
192.106
AutoCAD SHX Text
EC
AutoCAD SHX Text
192.119
AutoCAD SHX Text
EC
AutoCAD SHX Text
191.763
AutoCAD SHX Text
EC
AutoCAD SHX Text
191.754
AutoCAD SHX Text
DI INLET
AutoCAD SHX Text
191.687
AutoCAD SHX Text
DI
AutoCAD SHX Text
191.890
AutoCAD SHX Text
DI
AutoCAD SHX Text
192.100
AutoCAD SHX Text
DI
AutoCAD SHX Text
192.383
AutoCAD SHX Text
TB
AutoCAD SHX Text
192.324
AutoCAD SHX Text
TB
AutoCAD SHX Text
192.353
AutoCAD SHX Text
TB
AutoCAD SHX Text
192.511
AutoCAD SHX Text
TB
AutoCAD SHX Text
192.651
AutoCAD SHX Text
TB
AutoCAD SHX Text
192.825
AutoCAD SHX Text
TB
AutoCAD SHX Text
192.986
AutoCAD SHX Text
TB
AutoCAD SHX Text
193.027
AutoCAD SHX Text
SW
AutoCAD SHX Text
193.014
AutoCAD SHX Text
SW
AutoCAD SHX Text
MH
AutoCAD SHX Text
192.849
AutoCAD SHX Text
EP
AutoCAD SHX Text
192.947
AutoCAD SHX Text
CL
AutoCAD SHX Text
192.621
AutoCAD SHX Text
CL
AutoCAD SHX Text
192.541
AutoCAD SHX Text
EP
AutoCAD SHX Text
192.555
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.582
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.626
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.420
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.395
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.334
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.338
AutoCAD SHX Text
CL
AutoCAD SHX Text
192.238
AutoCAD SHX Text
EP
AutoCAD SHX Text
192.336
AutoCAD SHX Text
SW
AutoCAD SHX Text
192.304
AutoCAD SHX Text
SW
AutoCAD SHX Text
192.277
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.299
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.369
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.213
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.175
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.127
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
192.039
AutoCAD SHX Text
CL
AutoCAD SHX Text
191.960
AutoCAD SHX Text
EP
AutoCAD SHX Text
192.126
AutoCAD SHX Text
SW
AutoCAD SHX Text
192.127
AutoCAD SHX Text
SW
AutoCAD SHX Text
191.911
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.833
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.778
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.665
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.695
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.742
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.857
AutoCAD SHX Text
SW
AutoCAD SHX Text
191.847
AutoCAD SHX Text
SW
AutoCAD SHX Text
191.671
AutoCAD SHX Text
EP
AutoCAD SHX Text
191.778
AutoCAD SHX Text
CL
AutoCAD SHX Text
191.585
AutoCAD SHX Text
CL
AutoCAD SHX Text
191.412
AutoCAD SHX Text
EP
AutoCAD SHX Text
191.537
AutoCAD SHX Text
SW
AutoCAD SHX Text
191.588
AutoCAD SHX Text
SW
AutoCAD SHX Text
191.060
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.064
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.122
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
190.969
AutoCAD SHX Text
CL
AutoCAD SHX Text
190.854
AutoCAD SHX Text
EP
AutoCAD SHX Text
190.860
AutoCAD SHX Text
EP
AutoCAD SHX Text
190.967
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.090
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
191.124
AutoCAD SHX Text
SW
AutoCAD SHX Text
191.039
AutoCAD SHX Text
SW
AutoCAD SHX Text
190.789
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
190.839
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
190.879
AutoCAD SHX Text
SW
AutoCAD SHX Text
190.888
AutoCAD SHX Text
SW
AutoCAD SHX Text
190.547
AutoCAD SHX Text
EP
AutoCAD SHX Text
190.647
AutoCAD SHX Text
SW
AutoCAD SHX Text
190.652
AutoCAD SHX Text
SW
AutoCAD SHX Text
190.523
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
190.451
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
190.384
AutoCAD SHX Text
CL
AutoCAD SHX Text
190.293
AutoCAD SHX Text
EP
AutoCAD SHX Text
190.404
AutoCAD SHX Text
SW
AutoCAD SHX Text
190.438
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.130
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.140
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.192
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.174
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.129
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.176
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.370
AutoCAD SHX Text
DWYG
AutoCAD SHX Text
189.322
AutoCAD SHX Text
DWYG
AutoCAD SHX Text
189.263
AutoCAD SHX Text
DWYG
AutoCAD SHX Text
189.319
AutoCAD SHX Text
DWYG
AutoCAD SHX Text
189.366
AutoCAD SHX Text
DWYG
AutoCAD SHX Text
189.482
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
189.448
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
189.370
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
189.414
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
189.447
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
189.480
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
CO
AutoCAD SHX Text
189.433
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
189.440
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
189.453
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
189.466
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
189.483
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
189.557
AutoCAD SHX Text
DWYC
AutoCAD SHX Text
10612
AutoCAD SHX Text
189.649
AutoCAD SHX Text
GAS UNIT
AutoCAD SHX Text
189.642
AutoCAD SHX Text
HL
AutoCAD SHX Text
189.665
AutoCAD SHX Text
HL
AutoCAD SHX Text
189.618
AutoCAD SHX Text
HL
AutoCAD SHX Text
189.610
AutoCAD SHX Text
HL
AutoCAD SHX Text
189.632
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
189.549
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
189.552
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
189.551
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
189.550
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
189.533
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
189.527
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
189.536
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
189.554
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
189.623
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
189.020
AutoCAD SHX Text
DI
AutoCAD SHX Text
188.994
AutoCAD SHX Text
DI
AutoCAD SHX Text
188.940
AutoCAD SHX Text
DI
AutoCAD SHX Text
10587
AutoCAD SHX Text
188.873
AutoCAD SHX Text
INV
AutoCAD SHX Text
189.240
AutoCAD SHX Text
CSP
AutoCAD SHX Text
189.511
AutoCAD SHX Text
TB
AutoCAD SHX Text
189.528
AutoCAD SHX Text
TB
AutoCAD SHX Text
189.582
AutoCAD SHX Text
TB
AutoCAD SHX Text
189.622
AutoCAD SHX Text
TB
AutoCAD SHX Text
189.624
AutoCAD SHX Text
TB
AutoCAD SHX Text
189.124
AutoCAD SHX Text
BB
AutoCAD SHX Text
189.199
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.263
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.043
AutoCAD SHX Text
CLF
AutoCAD SHX Text
188.978
AutoCAD SHX Text
CLF
AutoCAD SHX Text
189.201
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.145
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.148
AutoCAD SHX Text
BB
AutoCAD SHX Text
189.577
AutoCAD SHX Text
TB
AutoCAD SHX Text
189.578
AutoCAD SHX Text
TB
AutoCAD SHX Text
188.964
AutoCAD SHX Text
CLF
AutoCAD SHX Text
189.095
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.095
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.075
AutoCAD SHX Text
BB
AutoCAD SHX Text
189.511
AutoCAD SHX Text
TB
AutoCAD SHX Text
189.171
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.062
AutoCAD SHX Text
SW
AutoCAD SHX Text
188.985
AutoCAD SHX Text
BB
AutoCAD SHX Text
189.430
AutoCAD SHX Text
TB
AutoCAD SHX Text
188.919
AutoCAD SHX Text
CLF
AutoCAD SHX Text
189.097
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.093
AutoCAD SHX Text
SW
AutoCAD SHX Text
188.986
AutoCAD SHX Text
BB
AutoCAD SHX Text
189.358
AutoCAD SHX Text
TB
AutoCAD SHX Text
188.936
AutoCAD SHX Text
CLF
AutoCAD SHX Text
189.096
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.086
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.036
AutoCAD SHX Text
SW
AutoCAD SHX Text
189.035
AutoCAD SHX Text
SW
AutoCAD SHX Text
188.907
AutoCAD SHX Text
BB
AutoCAD SHX Text
189.329
AutoCAD SHX Text
TB
AutoCAD SHX Text
189.336
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.363
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.409
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.468
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.536
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.587
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.610
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.649
AutoCAD SHX Text
EP
AutoCAD SHX Text
10537
AutoCAD SHX Text
189.746
AutoCAD SHX Text
CR
AutoCAD SHX Text
10536
AutoCAD SHX Text
189.707
AutoCAD SHX Text
CR
AutoCAD SHX Text
10535
AutoCAD SHX Text
189.654
AutoCAD SHX Text
CR
AutoCAD SHX Text
10534
AutoCAD SHX Text
189.639
AutoCAD SHX Text
CR
AutoCAD SHX Text
10532
AutoCAD SHX Text
189.608
AutoCAD SHX Text
CR
AutoCAD SHX Text
10531
AutoCAD SHX Text
189.571
AutoCAD SHX Text
CR
AutoCAD SHX Text
10530
AutoCAD SHX Text
189.547
AutoCAD SHX Text
CR
AutoCAD SHX Text
10529
AutoCAD SHX Text
189.505
AutoCAD SHX Text
CR
AutoCAD SHX Text
10528
AutoCAD SHX Text
189.458
AutoCAD SHX Text
CR
AutoCAD SHX Text
189.370
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.350
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.391
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.409
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.413
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.394
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.356
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.401
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.448
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.470
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.490
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.500
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.502
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.505
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.506
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.513
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.471
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.474
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.517
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.532
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.531
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.593
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.590
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.552
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.526
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.554
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.577
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.624
AutoCAD SHX Text
EP
AutoCAD SHX Text
189.633
AutoCAD SHX Text
EP
AutoCAD SHX Text
10494
AutoCAD SHX Text
191.820
AutoCAD SHX Text
TOR
AutoCAD SHX Text
10493
AutoCAD SHX Text
190.838
AutoCAD SHX Text
BH3
AutoCAD SHX Text
10492
AutoCAD SHX Text
192.643
AutoCAD SHX Text
TOR
AutoCAD SHX Text
10491
AutoCAD SHX Text
191.652
AutoCAD SHX Text
BH2
AutoCAD SHX Text
10490
AutoCAD SHX Text
191.734
AutoCAD SHX Text
BH2
AutoCAD SHX Text
10489
AutoCAD SHX Text
191.922
AutoCAD SHX Text
TOR
AutoCAD SHX Text
10488
AutoCAD SHX Text
190.887
AutoCAD SHX Text
BH1
AutoCAD SHX Text
192.680
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.587
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.240
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.384
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.318
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.313
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.322
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.514
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.583
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.481
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.587
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.608
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.532
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.581
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.616
AutoCAD SHX Text
TL
AutoCAD SHX Text
192.792
AutoCAD SHX Text
TL
AutoCAD SHX Text
10424
AutoCAD SHX Text
192.643
AutoCAD SHX Text
BH17.05
AutoCAD SHX Text
10389
AutoCAD SHX Text
193.130
AutoCAD SHX Text
BH 17-06
AutoCAD SHX Text
10381
AutoCAD SHX Text
194.319
AutoCAD SHX Text
BH17-07
AutoCAD SHX Text
194.716
AutoCAD SHX Text
FB
AutoCAD SHX Text
192.890
AutoCAD SHX Text
CLF
AutoCAD SHX Text
193.017
AutoCAD SHX Text
CLF
AutoCAD SHX Text
193.108
AutoCAD SHX Text
CLF
AutoCAD SHX Text
193.341
AutoCAD SHX Text
CLF
AutoCAD SHX Text
193.625
AutoCAD SHX Text
CLF
AutoCAD SHX Text
194.170
AutoCAD SHX Text
CLF
AutoCAD SHX Text
194.644
AutoCAD SHX Text
CLF
AutoCAD SHX Text
194.872
AutoCAD SHX Text
CLF
AutoCAD SHX Text
194.921
AutoCAD SHX Text
CLF
AutoCAD SHX Text
195.024
AutoCAD SHX Text
CLF
AutoCAD SHX Text
194.990
AutoCAD SHX Text
CLF
AutoCAD SHX Text
195.022
AutoCAD SHX Text
SHED
AutoCAD SHX Text
194.993
AutoCAD SHX Text
SHED
AutoCAD SHX Text
194.989
AutoCAD SHX Text
SHED
AutoCAD SHX Text
195.001
AutoCAD SHX Text
SHED
AutoCAD SHX Text
195.033
AutoCAD SHX Text
CLF
AutoCAD SHX Text
194.935
AutoCAD SHX Text
BF
AutoCAD SHX Text
194.942
AutoCAD SHX Text
BF
AutoCAD SHX Text
195.043
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.058
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.041
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.143
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.028
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.094
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.103
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.094
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.053
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.137
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.187
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.131
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.101
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.030
AutoCAD SHX Text
HL
AutoCAD SHX Text
194.916
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.107
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.145
AutoCAD SHX Text
HL
AutoCAD SHX Text
194.993
AutoCAD SHX Text
HL
AutoCAD SHX Text
194.911
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.085
AutoCAD SHX Text
HL
AutoCAD SHX Text
195.109
AutoCAD SHX Text
HL
AutoCAD SHX Text
194.983
AutoCAD SHX Text
HL
AutoCAD SHX Text
194.992
AutoCAD SHX Text
HL
AutoCAD SHX Text
194.908
AutoCAD SHX Text
HL
AutoCAD SHX Text
194.833
AutoCAD SHX Text
HL
AutoCAD SHX Text
194.973
AutoCAD SHX Text
DECK
AutoCAD SHX Text
195.056
AutoCAD SHX Text
DECK
AutoCAD SHX Text
195.132
AutoCAD SHX Text
DECK
AutoCAD SHX Text
195.111
AutoCAD SHX Text
DECK
AutoCAD SHX Text
195.131
AutoCAD SHX Text
DECK
AutoCAD SHX Text
195.111
AutoCAD SHX Text
DECK
AutoCAD SHX Text
195.147
AutoCAD SHX Text
FB
AutoCAD SHX Text
195.161
AutoCAD SHX Text
FB
AutoCAD SHX Text
195.148
AutoCAD SHX Text
FB
AutoCAD SHX Text
195.129
AutoCAD SHX Text
FB
AutoCAD SHX Text
195.115
AutoCAD SHX Text
EC
AutoCAD SHX Text
195.134
AutoCAD SHX Text
EC
AutoCAD SHX Text
195.156
AutoCAD SHX Text
EC
AutoCAD SHX Text
195.161
AutoCAD SHX Text
EC
AutoCAD SHX Text
195.142
AutoCAD SHX Text
EC
AutoCAD SHX Text
194.910
AutoCAD SHX Text
EC
AutoCAD SHX Text
194.925
AutoCAD SHX Text
DWYG
AutoCAD SHX Text
194.912
AutoCAD SHX Text
DWYG
AutoCAD SHX Text
194.845
AutoCAD SHX Text
DWYG
AutoCAD SHX Text
195.015
AutoCAD SHX Text
SW PS
AutoCAD SHX Text
194.904
AutoCAD SHX Text
SW PS
AutoCAD SHX Text
194.843
AutoCAD SHX Text
SW PS
AutoCAD SHX Text
194.797
AutoCAD SHX Text
SW PS
AutoCAD SHX Text
194.802
AutoCAD SHX Text
SW PS
AutoCAD SHX Text
194.856
AutoCAD SHX Text
SW PS
AutoCAD SHX Text
194.899
AutoCAD SHX Text
SW PS
AutoCAD SHX Text
195.000
AutoCAD SHX Text
SW PS
AutoCAD SHX Text
195.026
AutoCAD SHX Text
EC
AutoCAD SHX Text
195.001
AutoCAD SHX Text
EC
AutoCAD SHX Text
195.024
AutoCAD SHX Text
EC
AutoCAD SHX Text
195.041
AutoCAD SHX Text
EC
AutoCAD SHX Text
195.089
AutoCAD SHX Text
EC
AutoCAD SHX Text
195.082
AutoCAD SHX Text
EC
AutoCAD SHX Text
195.006
AutoCAD SHX Text
EC
AutoCAD SHX Text
195.071
AutoCAD SHX Text
EC
AutoCAD SHX Text
194.735
AutoCAD SHX Text
FB
AutoCAD SHX Text
194.717
AutoCAD SHX Text
FB
AutoCAD SHX Text
194.731
AutoCAD SHX Text
FB
AutoCAD SHX Text
194.579
AutoCAD SHX Text
FB
AutoCAD SHX Text
194.581
AutoCAD SHX Text
FB
AutoCAD SHX Text
194.587
AutoCAD SHX Text
FB
AutoCAD SHX Text
194.520
AutoCAD SHX Text
BF
AutoCAD SHX Text
194.664
AutoCAD SHX Text
BF
AutoCAD SHX Text
194.715
AutoCAD SHX Text
BF
AutoCAD SHX Text
194.818
AutoCAD SHX Text
BF
AutoCAD SHX Text
194.902
AutoCAD SHX Text
BF
AutoCAD SHX Text
194.981
AutoCAD SHX Text
BF
AutoCAD SHX Text
194.896
AutoCAD SHX Text
HL
AutoCAD SHX Text
194.967
AutoCAD SHX Text
HL
AutoCAD SHX Text
194.896
AutoCAD SHX Text
HL
AutoCAD SHX Text
194.818
AutoCAD SHX Text
HL
AutoCAD SHX Text
194.780
AutoCAD SHX Text
HL
AutoCAD SHX Text
194.763
AutoCAD SHX Text
HL
AutoCAD SHX Text
194.833
AutoCAD SHX Text
HL
AutoCAD SHX Text
194.842
AutoCAD SHX Text
HL
AutoCAD SHX Text
194.744
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.850
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
195.107
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
195.073
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.868
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.722
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
10178
AutoCAD SHX Text
194.737
AutoCAD SHX Text
UG PED
AutoCAD SHX Text
10177
AutoCAD SHX Text
194.705
AutoCAD SHX Text
UG PED
AutoCAD SHX Text
10176
AutoCAD SHX Text
194.728
AutoCAD SHX Text
UG PED
AutoCAD SHX Text
10175
AutoCAD SHX Text
194.734
AutoCAD SHX Text
UG PED
AutoCAD SHX Text
194.691
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.780
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.986
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.954
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.740
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.805
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
10167
AutoCAD SHX Text
194.819
AutoCAD SHX Text
TRANS
AutoCAD SHX Text
194.825
AutoCAD SHX Text
EC
AutoCAD SHX Text
194.814
AutoCAD SHX Text
EC
AutoCAD SHX Text
194.825
AutoCAD SHX Text
EC
AutoCAD SHX Text
194.837
AutoCAD SHX Text
EC
AutoCAD SHX Text
194.822
AutoCAD SHX Text
EC
AutoCAD SHX Text
195.008
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.708
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.749
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.973
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
10150
AutoCAD SHX Text
194.903
AutoCAD SHX Text
UG BPED
AutoCAD SHX Text
194.774
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.994
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
195.181
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
195.183
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.805
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
10141
AutoCAD SHX Text
194.921
AutoCAD SHX Text
CC
AutoCAD SHX Text
194.896
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.886
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.794
AutoCAD SHX Text
EP
AutoCAD SHX Text
10135
AutoCAD SHX Text
194.879
AutoCAD SHX Text
CR
AutoCAD SHX Text
194.820
AutoCAD SHX Text
EP
AutoCAD SHX Text
194.779
AutoCAD SHX Text
EP
AutoCAD SHX Text
10129
AutoCAD SHX Text
194.846
AutoCAD SHX Text
CR
AutoCAD SHX Text
194.757
AutoCAD SHX Text
EP
AutoCAD SHX Text
194.852
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.878
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.443
AutoCAD SHX Text
EC
AutoCAD SHX Text
194.152
AutoCAD SHX Text
EC
AutoCAD SHX Text
194.134
AutoCAD SHX Text
EC
AutoCAD SHX Text
194.408
AutoCAD SHX Text
EC
AutoCAD SHX Text
194.113
AutoCAD SHX Text
DI INLET
AutoCAD SHX Text
194.760
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.962
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.853
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.819
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.773
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.728
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.858
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.841
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.741
AutoCAD SHX Text
EP
AutoCAD SHX Text
10107
AutoCAD SHX Text
194.810
AutoCAD SHX Text
CR
AutoCAD SHX Text
194.763
AutoCAD SHX Text
EP
AutoCAD SHX Text
194.722
AutoCAD SHX Text
EP
AutoCAD SHX Text
10102
AutoCAD SHX Text
194.752
AutoCAD SHX Text
CR
AutoCAD SHX Text
194.726
AutoCAD SHX Text
EP
AutoCAD SHX Text
194.769
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.802
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.790
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.762
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.659
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.697
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.710
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.708
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.719
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.656
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.635
AutoCAD SHX Text
EP
AutoCAD SHX Text
10083
AutoCAD SHX Text
194.712
AutoCAD SHX Text
CR
AutoCAD SHX Text
194.667
AutoCAD SHX Text
EP
AutoCAD SHX Text
194.606
AutoCAD SHX Text
EP
AutoCAD SHX Text
194.605
AutoCAD SHX Text
EP
AutoCAD SHX Text
10073
AutoCAD SHX Text
194.707
AutoCAD SHX Text
CR
AutoCAD SHX Text
194.605
AutoCAD SHX Text
EP
AutoCAD SHX Text
194.615
AutoCAD SHX Text
EP
AutoCAD SHX Text
194.733
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.737
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.653
AutoCAD SHX Text
EP
AutoCAD SHX Text
10063
AutoCAD SHX Text
194.699
AutoCAD SHX Text
CR
AutoCAD SHX Text
194.651
AutoCAD SHX Text
EP
AutoCAD SHX Text
194.660
AutoCAD SHX Text
EP
AutoCAD SHX Text
10058
AutoCAD SHX Text
194.744
AutoCAD SHX Text
CR
AutoCAD SHX Text
194.658
AutoCAD SHX Text
EP
AutoCAD SHX Text
194.745
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.816
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.702
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.746
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.740
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.759
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.714
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.720
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.868
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.878
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.899
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.834
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.829
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.815
AutoCAD SHX Text
DWYA
AutoCAD SHX Text
194.852
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.849
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.736
AutoCAD SHX Text
EP
AutoCAD SHX Text
10035
AutoCAD SHX Text
194.799
AutoCAD SHX Text
CR
AutoCAD SHX Text
194.732
AutoCAD SHX Text
EP
AutoCAD SHX Text
194.794
AutoCAD SHX Text
EP
AutoCAD SHX Text
10030
AutoCAD SHX Text
194.859
AutoCAD SHX Text
CR
AutoCAD SHX Text
194.799
AutoCAD SHX Text
EP
AutoCAD SHX Text
194.911
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.919
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.986
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.990
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.872
AutoCAD SHX Text
EP
AutoCAD SHX Text
10021
AutoCAD SHX Text
194.920
AutoCAD SHX Text
CR
AutoCAD SHX Text
194.887
AutoCAD SHX Text
EP
AutoCAD SHX Text
194.942
AutoCAD SHX Text
EP
AutoCAD SHX Text
10016
AutoCAD SHX Text
194.963
AutoCAD SHX Text
CR
AutoCAD SHX Text
194.925
AutoCAD SHX Text
EP
AutoCAD SHX Text
195.057
AutoCAD SHX Text
SW
AutoCAD SHX Text
195.057
AutoCAD SHX Text
SW
AutoCAD SHX Text
194.886
AutoCAD SHX Text
CLF
AutoCAD SHX Text
194.444
AutoCAD SHX Text
CLF
AutoCAD SHX Text
194.446
AutoCAD SHX Text
EC
AutoCAD SHX Text
194.418
AutoCAD SHX Text
EC
AutoCAD SHX Text
194.224
AutoCAD SHX Text
EC
AutoCAD SHX Text
194.248
AutoCAD SHX Text
EC
AutoCAD SHX Text
194.228
AutoCAD SHX Text
DI INL
AutoCAD SHX Text
5%%%
AutoCAD SHX Text
5%%%
samantha.gatchene
Rectangle
samantha.gatchene
Text Box
FIGURE 1.2 Proposed Site Plan
Page 13: BLACKMOOR GATES - Town of Collingwood
samantha.gatchene
Image
samantha.gatchene
Rectangle
samantha.gatchene
Image
samantha.gatchene
Text Box
FIGURE 1.3 Proposed Site Access
samantha.gatchene
Text Box
NOT TO SCALE
samantha.gatchene
Polygon
samantha.gatchene
Text Box
N
samantha.gatchene
Ellipse
samantha.gatchene
Text Box
Campbell Street Access
vinod.soman
Ellipse
vinod.soman
Text Box
Hurontario Emergency Access
vinod.soman
Text Box
Page 14: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 7

2 EXISTING TRANSPORTATION CONDITIONS

2.1 BOUNDARY ROADWAYS

All roadways within the study area are under the jurisdiction of either the County of Simcoe the Town of Collingwood, and are classified per published County and Municipal Official Plans. The following roadways make up the boundary road network that surrounds the subject site:

• Hurontario Street is a north-south arterial road with a 3-lane cross-section between Campbell Street and Findlay Drive. There is one lane in each direction and a centre two way left turn lane. Hurontario Street has a posted speed limit of 50km/h and no on-street parking is permitted. Sidewalks exist on the west side of the street.

• Campbell Street is an east-west collector road with a 2-lane cross-section at its intersection with Hurontario Street. There is one lane in each direction. At the intersection with Hurontario Street, the posted speed limit is 50km/h. Sidewalks exist on one side of the street, alternating between the north and south sides of the street.

• Maple Street is a north-south collector road with a 2-lane cross-section at its intersection with Campbell Street. At its intersection with Campbell Street, the posted speed limit is 50km/hr and no on street parking is permitted. Sidewalks exist on both sides of the street on the north of Campbell Street and there are no sidewalks south of Campbell Street.

• Findlay Drive is an east-west collector road with a 2-lane cross-section at its intersection with Hurontario Street. There is one lane in each direction. At the intersection with Hurontario Street, the posted speed limit is 50km/h and no on street parking is permitted. Sidewalks exist on the north side of the street. Figure 3.1 illustrates the existing lane configurations of all the above-noted roads along with the types of intersection control currently in operation.

Page 15: BLACKMOOR GATES - Town of Collingwood
samantha.gatchene
Rectangle
samantha.gatchene
Image
samantha.gatchene
Snapshot
samantha.gatchene
Text Box
FIGURE 2.1 Lane Configuration for Background Analysis
Page 16: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 9

2.2 TRAFFIC DATA

Turning movement counts were undertaken by Ontario Traffic Inc. on behalf of WSP and are summarized in Appendix C. The counts were undertaken at the site accesses and the study intersections listed in Table 3.1.

Table 2.1: Study Intersections

Intersection Intersection Control

Hurontario Street & Campbell Street Signalized

Maple Street & Campbell Street Unsignalized

In order to analyze the various peak periods associated with the roadway, traffic counts were conducted during the following time periods:

— Thursday, March 22nd, 2018 from 7:00am-9:00am; and

— Thursday, March 22nd, 2018 from 4:00pm-6:00pm.

The signal timing plans for the signalized study intersections were acquired from the Town of Collingwood and are provided in Appendix D.

2.3 TRANSIT ROUTES

The public transit system of Collingwood is known by the name ‘Colltrans’. Three bus routes operate in the city of Collingwood, I.e. the Crosstown Route, the East Route and the West Route. The East Route operates near the development, the existing bus stop served by the East Route is located at Hurontario Street-Lockhart Road intersection and is within 50 m of the development. Commuters may also be able to access the Colltrans buses operating on the West Route at Hurontario Street- Cameron Street intersection located 500 m north of the development

The below table summarizes the transit routes located in the vicinity of the proposed development. Figure 2.2 reflects the existing transit facilities in the vicinity of the proposed development

Table 2.1 Transit Services

Route Operating

Days Operating hours Frequency

Colltrans East Route

7 Days a Week

Mon to Fri: 6.30 am to 8.30pm

Sat: 7.00 am to 5.30 pm

Sun: 9.00 am to 4.30pm

Every 30 mins (Peak hour) &

1.00 Hour (Non-peak hour)

Colltran West Route

7 Days a Week

Mon to Fri: 6.30 am to 8.00 pm

Sat: 7.00 am to 5.30 pm

Sun: 9.00 am to 4.00pm

Every 30 mins (Peak hour) &

1.00 Hour (Non-peak hour)

Page 17: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 10

2.4 ACTIVE TRANSPORTATION

There is a well-connected network of sidewalk within the study area. The sidewalks/multi use lanes are mostly located on one side of the road.

There are no existing bike lanes or cycling tracks along Hurontario Street or Campbell Street. The existing active transportation network is reflected in Figure 2.2

Page 18: BLACKMOOR GATES - Town of Collingwood
vinod.soman
Snapshot
Page 19: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 12

2.5 DATA COLLECTION AND METHODOLOGY

Existing traffic volumes were surveyed on 22 March 2018. Turning movement counts were collected for the weekday a.m. peak and weekday p.m. peak for each of the studied intersections listed below. The study intersections are illustrated in Figure 2.3.

• Hurontario Street- Campbell Street (Signalized)

• Campbell Street-Maple Street (Unsignalized)

Page 20: BLACKMOOR GATES - Town of Collingwood
samantha.gatchene
Image
samantha.gatchene
Rectangle
samantha.gatchene
Image
samantha.gatchene
Text Box
FIGURE 2.3 Study Area
samantha.gatchene
Text Box
NOT TO SCALE
samantha.gatchene
Polygon
samantha.gatchene
Text Box
N
samantha.gatchene
Text Box
Campbell Street Access
samantha.gatchene
Text Box
1
samantha.gatchene
Text Box
2
samantha.gatchene
Text Box
Legend
samantha.gatchene
Text Box
Site
samantha.gatchene
Rectangle
samantha.gatchene
Ellipse
samantha.gatchene
Text Box
Signalized Unsignalized
samantha.gatchene
Ellipse
samantha.gatchene
Text Box
1. Campbell Street at Hurontario 2. Campbell Street at Maple Street
Page 21: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 14

2.6 ANALYSIS METHODOLOGY

Intersections are the critical capacity control points for a transportation network. Key intersections in the Study area have been analyzed to determine the average vehicle delay (level of service) as well as any capacity constraints in select traffic movements (as measured by volume to capacity ratio).

2.6.1 INTERSECTION CAPACITY ANALYSIS

Capacity analyses were undertaken using the Synchro 9 traffic analysis software to analyze existing traffic conditions in the study area. This software incorporates the methodology outlined in the Highway Capacity Manual (HCM), Transportation Research Board, 2000. An intersection capacity analysis provides an indication of traffic operations based on calculations of volume-to-capacity (v/c) and delays for individual movements at an intersection. Level of Service (LOS) denoted by letters ‘A’ through ‘D’, represent satisfactory traffic operations. LOS denoted by the letters ‘E’ and ‘F’ represent congested traffic operations. The Level of Service definitions for signalized and unsignalized intersections are included in Appendix D. The overall level of service has been reported for each intersection. Individual turning movements with volume to capacity ratios of 0.85 or greater have been reported at intersections on the road network.

2.7 EXISTING TRAFFIC CONDITION ANALYSIS

Existing traffic volume data and signal timing and phasing plans were input into the Synchro 9 traffic analysis software to determine existing levels of service and critical movements at the intersections in the study area. These base conditions shall help determine the impacts of the proposed development on the existing transportation network. The existing traffic volumes used in the analysis are shown in Figure 2-4. The analysis of existing conditions is summarized Table 2.2. Synchro output sheets detailing the analyses are provided in Appendix E.

Page 22: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 15

Table 2.2: Level of Service Analysis for Existing Traffic Conditions

Intersection Control

Type

AM Peak Hour PM Peak Hour

LOS1 Delay in Seconds

Critical Movements2

(v/c)

LOS1 Delay in Seconds

Critical Movements2

(v/c)

Hurontario St & Campbell St

Signalized B (10.8) -- A (8.4) --

Campbell St & Maple St

Unsignalized B (11.0) -- B (10.2) --

Notes: 1. The LOS at an unsignalized intersection is defined by the movement with the highest delay. 2. Critical movements are those with a volume-to-capacity ratio exceeding 0.85 for a signalized intersection or with an LOS of ‘E’ or ‘F’ for an unsignalized intersection. NB = northbound; SB = southbound; EB = eastbound; WB = westbound; L= left; T = through; R = right

Both the intersections operate at acceptable levels of service with minimal delay during the a.m. and p.m. peak hours.

Page 23: BLACKMOOR GATES - Town of Collingwood
samantha.gatchene
Image
samantha.gatchene
Text Box
Legend
samantha.gatchene
Text Box
xx - Weekday A.M Peak Hour Volumes (xx) - Weekday P.M Hour Voumes
samantha.gatchene
Snapshot
samantha.gatchene
Text Box
FIGURE 2.4 Weekday Existing Traffic Volumes
samantha.gatchene
Image
Page 24: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 17

3 FUTURE BACKGROUND GROWTH The assessment of future traffic conditions considers the increase in background volumes and the trips generated by other developments that might also lead to increased traffic volumes on the roads adjacent to the proposed development and reports the future lane configurations.

3.1 FUTURE BACKGROUND TRAFFIC VOLUMES

The non-site traffic increase is the generalized traffic growth in the study area. For the purposes of this study, a 2% annual traffic growth rate is assumed for background traffic growth. This growth rate is derived from the Environmental Noise Study of the proposed residential development on 1 Lockhart Road. In addition to the background traffic growth, forecast traffic expected to be generated from the following three developments located close to the proposed site are also considered for the analysis, the traffic volumes from these developments were derived based on the data available on the towns web site.

• Liberty Pretty River Estate Phase II

• Mountaincroft Subdivision Phase IV

• Eden Oak McNabb Subdivision

Traffic volume contributed by Liberty Pretty Rive Estate development and Mountaincroft

subdivision on Hurontario- Campbell intersection is assumed based on the trip generation of the

development and the existing traffic counts. The Eden Oak Mc Nabb subdivision traffic volume

is based on the traffic impact study for the development. The details of the development are

provided in Appendix F

3.2 FUTURE ROADWAY TRANSIT IMPROVEMENT

There are no transit projects foreseen in the near future that would be expected to influence the mode split of the forecast traffic from the proposed development.

3.3 FUTURE BACKGOUND TRAFFIC CONDITION

The future background traffic, comprising of the three other developments near the study area in addition to the background traffic growth were analyzed using Synchro software. The lane configurations used in the future background traffic analyses are shown in Figure 3-1. Future background traffic volumes at study area Intersections are shown in Figure 3-2. The intersection volumes were input into Synchro for analysis, with the resulting levels of service and critical movements summarized in Table 3.1. The signal timing splits were optimized as necessary with the cycle lengths remaining unchanged to minimize the delays of critical movements. The details of the analyses are provided in Appendix G.

Page 25: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 18

Table 3.1 : Level of Service Analysis for Background Traffic Conditions

Intersection Control Type

AM Peak Hour PM Peak Hour

LOS1 Delay in Seconds

Critical Movements2

(v/c)

LOS1 Delay in Seconds

Critical Movements2

(v/c)

Hurontario St & Campbell St

Signalized B (14.0) __ A (9.7) __

Campbell St & Maple St

Unsignalized B (11.6) __ B (10.4) __

Notes: 1. The LOS at an unsignalized intersection is defined by the movement with the highest delay. 2. Critical movements are those with a volume-to-capacity ratio exceeding 0.85 for a signalized intersection or with an LOS of ‘E’ or ‘F’ for an unsignalized intersection. NB = northbound; SB = southbound; EB = eastbound; WB = westbound; L= left; T = through; R = right

The analysis of future background traffic conditions shows that both intersections are forecast to operate at acceptable levels of service with minimal delay during the a.m. and p.m. peak hours. The overall impact to the traffic operations is marginal with the addition of background development traffic. The traffic study reports of the considered developments do not identify any mitigation measures to the existing road network.

Based on the above, no improvements are recommended under future background conditions.

Page 26: BLACKMOOR GATES - Town of Collingwood
samantha.gatchene
Rectangle
samantha.gatchene
Image
samantha.gatchene
Text Box
Figure 3.1 Proposed Lane Configurations
samantha.gatchene
Snapshot
Page 27: BLACKMOOR GATES - Town of Collingwood
samantha.gatchene
Image
samantha.gatchene
Text Box
Legend
samantha.gatchene
Text Box
xx - Weekday A.M Peak Hour Volumes (xx) - Weekday P.M Hour Voumes
samantha.gatchene
Text Box
FIGURE 3.2 Future Background Traffic Volumes
samantha.gatchene
Snapshot
samantha.gatchene
Image
Page 28: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 21

4 PROPOSED SITE GENERATED TRAFFIC

4.1 PROPOSED TRIP GENERATION

The trip generation associated with the proposed development was based on information provided in the Institute of Transportation Engineers’ (ITE) Trip Generation Manual (9th Edition). Residential Land Use Code 210 (Single-Family Detached Housing) was used to estimate the number of trips generated by the development for the Weekday a.m. and p.m. peak hours. The trip generation is based on 34 units. The trip generation for the site is summarized in Table 4.1.

Table 4.1: Trip Generation

Use

ITE Category

(ITE Code)

Independent variable

Statistics

Weekday A.M Peak hour Weekday P.M. Peak Hour

Inbd. Outbd. Total Inbd. Outbd. Total

Residential Development

Single-Family

Detached Housing

(210)

T = 0.7 X + 9.74 Ln(T) = 0.9 Ln(X) + 0.51

Directional

Split

26 % 74% 100% 64% 36% 100%

Trips 9 26 35 25 14 39

4.1.1 MODAL SPLIT REDUCTION

Considering that the development is a small size development and in order to understand the worst-case scenario of the future operations of the junctions, no trip reduction is attributed to transit or active transportation.

4.2 PROPOSED TRIP DISTRIBUTION

The projected distribution for the trips generated by the proposed development is based on the analysis of the traffic counts and acquired knowledge of the town destinations. A manual distribution method is used to assign the trips from the development within the study area.

Page 29: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 22

Table 4.2: Site Trip Distribution

Direction A.M. P.M.

Inbound Outbound Inbound Outbound

North 7% 25% 43% 23%

South 38% 30% 20% 14%

East# 0% 0% 0% 0%

West 55% 45% 37% 63%

Total 100% 100% 100% 100%

# Lockhart Road consist mostly of residential units with no major origin/destination land use.

4.3 TRIP ASSIGNMENT

The resulting site trips were then assigned to individual roads in the road network based on the distribution described in Section 4.2. As the only everyday vehicular site access is located on the Campbell Street, the movement of vehicles in and out of the development will be at the intersection of Campbell Street and Hurontario Street. The secondary access which is an emergency access is from the Hurontario Street located on the east of the development. This access shall be utilized only in case of an emergency requirement. The trips to and from the two units on the Findlay Drive and the existing one unit on the Hurontario were assigned to the corresponding street and access on which the residential unit is located. Vehicular traffic has been assigned to the primary site access for inbound and outbound vehicle trips with respect to the trip distribution assumption. The development related trips are shown on Figure 4.1.

Page 30: BLACKMOOR GATES - Town of Collingwood
samantha.gatchene
Image
samantha.gatchene
Text Box
Legend
samantha.gatchene
Text Box
xx - Weekday A.M Peak Hour Volumes (xx) - Weekday P.M Hour Voumes
samantha.gatchene
Text Box
FIGURE 4.1 Site Generated Traffic Volumes
samantha.gatchene
Snapshot
samantha.gatchene
Image
Page 31: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 24

5 TOTAL TRAFFIC CONDITIONS ANALYSIS

The total traffic volumes for the development were determined by adding the site-generated traffic volumes to the background traffic volumes (which include background developments and existing traffic volumes). The total future traffic volumes are presented in Figure 5.1. The results are summarized in Table 5.1.

Table 5.1: Level of Service Analysis for Total Traffic Conditions

Notes: 1. The LOS at an unsignalized intersection is defined by the movement with the highest delay. 2. Critical movements are those with a volume-to-capacity ratio exceeding 0.85 for a signalized intersection or with an LOS of ‘E’ or ‘F’ for an unsignalized intersection. NB = northbound; SB = southbound; EB = eastbound; WB = westbound; L= left; T = through; R = right

The analysis shows that all intersections are forecast to operate at acceptable levels of service with minimal delay during the a.m. and p.m. peak hours. As the overall addition of the proposed development’s vehicular traffic to the road network is marginal compared to the existing and background traffic volumes and does not negatively affect the level of service at the study area intersections. No improvements are recommended at these intersections. The configuration of the site driveway at Campbell Street intersection is recommended as a T-intersection with one lane in each direction. Site driveway traffic will stop for Campbell Street traffic. No turn lanes are required on Campbell Street. Northbound right and northbound left turns from the site driveway onto Campbell Street can be accommodated by one shared lane. No additional turning lanes are required on the site driveway.

Intersection Control Type

A.M. Peak Hour P.M. Peak Hour

LOS1 Delay in Seconds

Critical Movements2

(v/c)

LOS1 Delay in Seconds

Critical Movements2

(v/c)

Hurontario St & Campbell St

Signalized B (16.4) __ B (10.0) --

Campbell St & Maple St

Unsignalized B (11.7) -- B (10.6) __

Site Access Unsignalized B (10.0) A (9.9)

Page 32: BLACKMOOR GATES - Town of Collingwood
samantha.gatchene
Image
samantha.gatchene
Text Box
Legend
samantha.gatchene
Text Box
xx - Weekday A.M Peak Hour Volumes (xx) - Weekday P.M Hour Voumes
samantha.gatchene
Text Box
FIGURE 5.1 Total Future Traffic Volumes
samantha.gatchene
Snapshot
samantha.gatchene
Image
Page 33: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 26

6 AUTO TURN AND SIGHT LINE ANALYSIS

6.1 AUTO TURN

Auto turn analysis was carried out on the internal roads of the Blackmoor Gates development using the following vehicles:

• Passenger Vehicle (5.6m);

• Fire Truck/ Emergency vehicle, using Fire Truck as specified by the Town;

• Garbage Truck (12m); and

• Medium Size Truck (10m).

Figure 6.1 to Figure 6.7 reflect the results of the Auto Turn analysis. The geometry of the road including the turning radius are found to be adequate for smooth maneuver of all the above-mentioned vehicles.

6.2 SIGHT LINE ANALYSIS

The sight line analysis was carried out emergency access only on Hurontario Street to assess any safety of road uses during an emergency at the proposed site. Based on the Town’s Development standard, for road with posted speed on 60 Km/hr, the required sight distance is 85m. The sight line analysis indicates that the section of the Hurontario Street adjacent to the development is mostly straight with adequate safe sight distance (more than 85m) is available on the North and South of the emergency access on Hurontario Street. The results of the sight line analysis are represented in Figure 6.8.

The only vehicle that would be using this access would be an emergency vehicle, and only in the event that the site driveway to Campbell Street was closed. The emergency vehicle would be expected to be using its flashing lights and siren while entering or exiting the emergency access, which would alert other drivers to the presence of the vehicle. There are no analyzed concerns with sight line analysis at the emergency access location on Hurontario Street.

Page 34: BLACKMOOR GATES - Town of Collingwood

FIGURE 6­1ABlackmoor Development

Large Passenger Vehicle Circulation

Scale 1:1000

ubaidalis
Text Box
FIGURE 6-1
Page 35: BLACKMOOR GATES - Town of Collingwood

FIGURE 6-1B

Blackmoor Development

Collingwood Fire Truck Circulation

Anticlockwise Movement

Scale 1:1000

vinod.soman
Text Box
FIGURE 6-2
Page 36: BLACKMOOR GATES - Town of Collingwood

FIGURE 6-1C

Blackmoor Development

Collingwood Fire Truck Circulation

Clockwise Movement

Scale 1:1000

vinod.soman
Text Box
FIGURE 6-3
Page 37: BLACKMOOR GATES - Town of Collingwood

FIGURE 20D

Blackmoor Development

Garbage Truck Circulation (Anti-Clockwise)

Scale 1:1000

ubaidalis
Text Box
FIGURE 6-4
Page 38: BLACKMOOR GATES - Town of Collingwood

FIGURE 20E

Blackmoor Development

Garbage Truck Circulation (Clockwise)

Scale 1:1000

ubaidalis
Text Box
FIGURE 6-5
Page 39: BLACKMOOR GATES - Town of Collingwood

FIGURE 20G

Blackmoor Development

Medium Truck Circulation

(Inside Curb)

Scale 1:1000

ubaidalis
Text Box
FIGURE 6-6
Page 40: BLACKMOOR GATES - Town of Collingwood

FIGURE 20F

Blackmoor Development

Medium Truck Circulation

(Outside Curb)

Scale 1:1000

ubaidalis
Text Box
FIGURE 6-7
Page 41: BLACKMOOR GATES - Town of Collingwood

FIGURE

Blackmoor Development

Hurontario Street

Emergency Exit Horizontal Sightline Assessment

Scale 1:1000

ubaidalis
Text Box
FIGURE 6-2
vinod.soman
Text Box
FIGURE 6-8
Page 42: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 35

7 PARKING REQUIREMENTS

7.1 APPLICABLE BY-LAW FOR PARKING

The Subject Site is classified in R2 and R2-13 zone (i.e. Residential Second Density) of the Collingwood Zoning By-law. However, to develop the group or cluster development and exception is required (R2-E). The zone permits Single-Detached, Semi- Detached dwelling units. The parking requirements for the development are as stipulated in the Collingwood Zoning By-law.

Figure 7-1:Zoning Map

Page 43: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 36

7.2 PARKING REQUIREMENTS

Table 7.1 summarizes the Zoning By-law minimum parking requirements for the site.

Table 7.1: Parking Requirements

Land Use Component Zoning By-law Parking

Rate

Proposed Development

(No. of Units)

Parking

Spaces

Required

Single-Detached

Dwelling Unit 2 spaces per unit 27 54

Semi- Detached

Dwelling Unit 2 spaces per unit 4 8

Visitor Parking 0.25 Per Unit 31 8

Accessible Parking

Spaces

Minimum 3 accessible

parking Space 3 #

Bicycle Parking

0.5 bicycle spaces per

dwelling unit to a total

maximum of 20 bicycle

spaces

31 15

# The total number of residential parking shall include three (3) accessible parking spaces.

7.3 PROPOSED PARKING SUPPLY

According to the site statistics dated April 2018, a total of 70 car parking and 16 bicycle parking spaces are provided at the site, as detailed in Table 7.2.

Table 7.2: Proposed Parking Supply

Type Subject Site Parking Provided Minimum Parking Requirement

Parking Supply Parking Demand

Dwelling units 62 (including 2 accessible parking)

62

Visitors parking & Accessible

8 (including 1 accessible parking)

8

Bicycle Parking 16 16

Note: The parking calculation does not include the existing house fronting Hurontario Street, and those proposed on Findlay Drive which has its own independent parking

The development will meet the vehicular parking and bicycling parking requirements of the applicable By-law.

Page 44: BLACKMOOR GATES - Town of Collingwood

Blackmoor Gates Development

Traffic Impact Study Report

Page 37

8 CONCLUSIONS AND

RECOMMENDATIONS Based on the preceding study, the following conclusions can be made:

• All of the study area intersections are operating at acceptable Levels of Service under existing traffic conditions and signal timing plans.

• All of the study area intersections are forecast to operate at acceptable Levels of Service under future background traffic conditions.

• The proposed development is estimated to generate 9 inbound & 26 outbound trips during a.m. peak hour. Further, during the p.m. peak hour 25 inbound &14 outbound trips.

• The traffic associated with the proposed development can be accommodated by the road network. No transportation improvements are recommended to accommodate the vehicular traffic forecast to be generated by this development.

• The intersections of Hurontario Street & Campbell Street, and Campbell Street & Maple Street are forecast to operate at acceptable Levels of Service during the a.m. and p.m. peak hours.

• Since the impact to the existing level of service at the study intersection with the introduction of the proposed development traffic is marginal, no improvements are recommended to the Site Accesses.

• A parking supply review was conducted for compliance to Town Zoning By-laws.

• The developer proposes to provide a total of 70 vehicle parking spaces, which meets the required parking demand as per the Zoning By-law.

• The developer proposed to provide 16 bicycle parking spaces to satisfy the required amount bicycle parking spaces;

Page 45: BLACKMOOR GATES - Town of Collingwood

APPENDIX

A TIS TERMS OF

REFERENCE

Page 46: BLACKMOOR GATES - Town of Collingwood

WSP Canada Group Limited

100 Commerce Valley Drive West

Thornhill, ON

Canada L3T 0A1

T: +1 905 882-1100

F: +1 905 882-0055

wsp.com

March 22, 2018

Herb Lemon

Engineering Technologist

Town of Collingwood

P.O. Box 157, 97 Hurontario Street

Collingwood, Ontario

L9Y 3Z5

Dear Sir:

Subject: Traffic Impact Study for Blackmoor Gate Development, Collingwood

Per our discussion with the Town of Collingwood on February 28, 2018, WSP is pleased to

provide this Terms of Reference to prepare a Traffic Impact Study for the planned Blackmoor

Gate development in the Town of Collingwood.

The proposed development will consist of a total of 34 detached and semi-detached residential

units, with a main access onto Campbell Street and an emergency access onto Hurontario Street.

This scope of work reflects our understanding of what is required to meet the Town’s expectations

and to receive approval from a traffic perspective.

PROPOSED WORK PROGRAM

The work program includes the following tasks:

1) BACKGROUND INFORMATION COLLECTION AND REVIEW

We will obtain and review information related to the study area from the project team, including

the latest site plan in PDF and AutoCAD formats, site development statistics including the number

of dwelling units and proposed parking spaces, and the as built drawing for Hurontario Street that

is needed for the sight line analysis.

We will also seek to collect the traffic impact study reports from the Town on the following

background developments identified by the Town that are currently planned or under construction

in the study area:

— Liberty Pretty River Estate Phase Two Residential Subdivision

— Mountaincroft Subdivision Phase 4 Removal of a Holding Provision

— Red-Line Revision to Eden Oak McNabb Subdivision

Page 47: BLACKMOOR GATES - Town of Collingwood

Page 2

2) STUDY AREA

We will review the characteristics of Campbell Street and Hurontario Street in the immediate area

of the development. We will conduct a site visit of the study area and document the relevant

characteristics of the subject road network, noting the approximate location of the site access point

on Campbell Street and the emergency access point on Hurontario Street. This will include the

number of lanes and lane configurations, speed limits, cross-sections and traffic controls. A figure

illustrating the study area and pertinent characteristics will be included.

3) TRAFFIC DATA COLLECTION

Per Town direction, we will collect vehicular traffic volume data at the following intersections by

conducting turning movement during a typical weekday:

— Campbell Street & Hurontario Street (Signalized);

— Campbell Street & Maple Street (Unsignalized);

We plan to collect these data on March 22, 2018. These data will enable us to identify peak travel

volumes on these streets and analyze intersection performance.

4) PROPOSED DEVELOPMENT

We will detail the proposed land use and phasing/completion year and provide an overall site plan

illustrating the proposed access locations, the internal road network, building locations, and

parking supply.

5) FUTURE BACKGROUND TRAFFIC OPERATIONS

We will undertake the following tasks to determine the future conditions of the two intersections

in the study area, namely Campbell Street at Hurontario Street and Campbell Street at Maple

Street. This analysis will be done without the Blackmoor Gate development traffic in order to

gauge the impacts of adding Blackmoor Gate development traffic in the next work task. The steps

include:

(a) Confirm with the Town any future road improvements within the study area, which are

anticipated to be in place within full build out of the proposed development. These may

be derived from the traffic reports of surrounding developments;

(b) Assume a through growth rate of 2% along Hurontario Street and Campbell Street. This

growth rate is derived from the 2012 Collingwood Transportation Study, and the 2017

Noise Assessment Report for the development at 1 Lockhart Road;

(c) Apply the growth rates to the collected traffic volumes;

(d) Incorporate traffic from other planned developments by estimating the traffic increases

related to these other developments (if not available through site specific traffic impact

studies) and assign this traffic to the study intersections; and

(e) Develop the future background traffic forecast for the build-out year horizon, on the basis

of the existing traffic volumes, applicable traffic growth rates, and anticipated future

traffic related to other developments in the vicinity of the site.

Page 48: BLACKMOOR GATES - Town of Collingwood

Page 3

6) FUTURE TOTAL TRAFFIC CONDITIONS

First, we will develop the site trip generation for the weekday a.m. and p.m. peak hours based on

the trip generation rates in the Institute of Transportation Engineers (ITE) Trip Generation

Manual.

We will then distribute and assign the site-generated traffic to the site driveway on Campbell

Street and the two study intersections on the basis of local traffic patterns.

Second, we will complete the future total traffic analysis. This includes the following steps:

(a) Superimpose the peak hour site-generated traffic onto the future background traffic

forecast identified to develop the five year horizon future total peak hour traffic forecast;

(b) Analyze the future total peak hour traffic conditions based on the forecast volumes;

(c) Identify the potential delays at the proposed site access and study intersections based on

the future total traffic volumes and make recommendations for any improvements, if

necessary;

(d) Re-run the traffic analyses with any recommended improvements to assess the potential

relief they may provide.

7) 10 YEAR HORIZON CONDITIONS

After determining the Future Total Traffic conditions at build out, we will reanalyze the road

network under background traffic grown using the annual growth rate by 10 years beyond build

out of the development, per the Town’s specific request.

8) SIGHTLINE ASSESSMENT

The Town requested a sight line analysis of the emergency access point on Hurontario Street. We

will determine sight distance requirements based on appropriate standards (Transportation

Association of Canada), and the availability of sight distance will be determined from the as-built

engineering plans. In the event that the sight distance does not comply with the minimum

requirements, mitigating measures will be identified.

9) TRAFFIC IMPACTS

In consideration of the existing traffic volumes and additional site volumes, the Traffic Impact

Study will provide a conclusive statement regarding the level of impact of the proposed

development on the operations of the adjacent road system. The Traffic Impact Study will also

address how the development plan (including the access, parking area and internal circulatory

system) is adequate to suit the site traffic.

Page 49: BLACKMOOR GATES - Town of Collingwood

Page 4

10) DOCUMENTATION

A Traffic Impact Study report including relevant maps, graphs, tables and figures will be prepared

to detail the findings of the Study.

We would appreciate your written approval of this Terms of Reference. If you have any questions

or concerns regarding our proposed methodology, please feel free to contact me at 905-882-4211

extension 6573 or at [email protected].

Yours sincerely,

Brett Sears, MCIP RPP

Senior Project Manager, Transportation -

Planning & Advisory Services

Page 50: BLACKMOOR GATES - Town of Collingwood

APPENDIX

B TRAFIC VOLUME DATA

Page 51: BLACKMOOR GATES - Town of Collingwood

Ontario Traffic Inc.

Morning Peak Diagram Specified PeriodFrom:To:

7:00:00

9:00:00

One Hour PeakFrom:To:

8:00:00

9:00:00

Municipality:Site #:Intersection:TFR File #:Count date:

Collingwood

1810700001

Hurontario St & Campbell St-Lockha

5

22-Mar-18

Weather conditions:

Person(s) who counted:

** Signalized Intersection ** Major Road: Hurontario St runs N/S

North Leg Total:

North Entering:

North Peds:

Peds Cross:

864

292

20

Cyclists

Trucks

Cars

Totals

0

1

29

30

1

18

221

240

0

1

21

22

1

20

271

Cyclists

Trucks

Cars

Totals

8

37

527

572

Cyclists Trucks Cars Totals

2 5 134 141

Cyclists Trucks Cars Totals

0 1 50 51

2 2 54 58

0 1 57 58

2 4 161

Peds Cross:

West Peds:

West Entering:

West Leg Total:

11

167

308

Hurontario St

Campbell StW

N

E

S

Lockhart Rd

Hurontario St

East Leg Total:

East Entering:

East Peds:

Peds Cross:

292

130

5

Cars Trucks Cyclists Totals

27 3 0 30

42 2 2 46

44 10 0 54

113 15 2

Cars Trucks Cyclists Totals

147 13 2 162

Cars

Trucks

Cyclists

Totals

322

29

1

352

Cars

Trucks

Cyclists

Totals

63

2

0

65

450

33

8

491

72

10

0

82

585

45

8

Peds Cross:

South Peds:

South Entering:

South Leg Total:

5

638

990

Comments

Page 52: BLACKMOOR GATES - Town of Collingwood

Ontario Traffic Inc.

Afternoon Peak Diagram Specified PeriodFrom:To:

16:00:00

18:00:00

One Hour PeakFrom:To:

17:00:00

18:00:00

Municipality:Site #:Intersection:TFR File #:Count date:

Collingwood

1810700001

Hurontario St & Campbell St-Lockha

5

22-Mar-18

Weather conditions:

Person(s) who counted:

** Signalized Intersection ** Major Road: Hurontario St runs N/S

North Leg Total:

North Entering:

North Peds:

Peds Cross:

973

521

4

Cyclists

Trucks

Cars

Totals

1

1

76

78

5

27

393

425

0

5

13

18

6

33

482

Cyclists

Trucks

Cars

Totals

6

23

423

452

Cyclists Trucks Cars Totals

4 1 160 165

Cyclists Trucks Cars Totals

0 0 36 36

3 0 40 43

1 0 17 18

4 0 93

Peds Cross:

West Peds:

West Entering:

West Leg Total:

6

97

262

Hurontario St

Campbell StW

N

E

S

Lockhart Rd

Hurontario St

East Leg Total:

East Entering:

East Peds:

Peds Cross:

148

76

8

Cars Trucks Cyclists Totals

13 3 0 16

42 0 3 45

12 3 0 15

67 6 3

Cars Trucks Cyclists Totals

60 9 3 72

Cars

Trucks

Cyclists

Totals

422

30

6

458

Cars

Trucks

Cyclists

Totals

42

0

0

42

374

20

6

400

7

4

0

11

423

24

6

Peds Cross:

South Peds:

South Entering:

South Leg Total:

5

453

911

Comments

Page 53: BLACKMOOR GATES - Town of Collingwood

Ontario Traffic Inc.

Total Count Diagram

Municipality:Site #:Intersection:TFR File #:Count date:

Collingwood

1810700001

Hurontario St & Campbell St-Lockha

5

22-Mar-18

Weather conditions:

Person(s) who counted:

** Signalized Intersection ** Major Road: Hurontario St runs N/S

North Leg Total:

North Entering:

North Peds:

Peds Cross:

2996

1427

28

Cyclists

Trucks

Cars

Totals

2

3

149

154

12

71

1141

1224

0

6

43

49

14

80

1333

Cyclists

Trucks

Cars

Totals

18

103

1448

1569

Cyclists Trucks Cars Totals

7 7 409 423

Cyclists Trucks Cars Totals

0 1 121 122

5 2 169 176

1 1 133 135

6 4 423

Peds Cross:

West Peds:

West Entering:

West Leg Total:

24

433

856

Hurontario St

Campbell StW

N

E

S

Lockhart Rd

Hurontario St

East Leg Total:

East Entering:

East Peds:

Peds Cross:

632

287

20

Cars Trucks Cyclists Totals

50 13 0 63

120 2 5 127

81 16 0 97

251 31 5

Cars Trucks Cyclists Totals

316 24 5 345

Cars

Trucks

Cyclists

Totals

1355

88

13

1456

Cars

Trucks

Cyclists

Totals

140

2

0

142

1277

89

18

1384

104

16

0

120

1521

107

18

Peds Cross:

South Peds:

South Entering:

South Leg Total:

17

1646

3102

Comments

Page 54: BLACKMOOR GATES - Town of Collingwood

Ontario Traffic Inc.Traffic Count Summary

Intersection: Hurontario St & Campbell St-Lockh Count Date: 22-Mar-18 Municipality: Collingwood

North Approach Totals South Approach Totals

East Approach Totals West Approach Totals

Includes Cars, Trucks, & Cyclists Includes Cars, Trucks, & Cyclists

Includes Cars, Trucks, & Cyclists Includes Cars, Trucks, & Cyclists

Hour Hour

Hour Hour

Ending Ending

Ending Ending

Left Left

Left Left

Thru Thru

Thru Thru

Right Right

Right Right

Grand Grand

Grand Grand

Total Total

Total Total

Total Total

Total Total

Peds Peds

Peds Peds

North/South

East/West

Total

Total

Approaches

Approaches

Calculated Values for Traffic Crossing Major StreetHours Ending:Crossing Values:

Totals:

Totals:

7:00:00 0 0 0 0 0 0 7:00:00 0 0 0 0 08:00:00 2 135 11 148 0 354 8:00:00 18 170 18 206 09:00:00 22 240 30 292 20 930 9:00:00 65 491 82 638 5

16:00:00 0 3 0 3 0 10 16:00:00 2 4 1 7 017:00:00 7 421 35 463 4 805 17:00:00 15 319 8 342 718:00:00 18 425 78 521 4 974 18:00:00 42 400 11 453 5

7:00:00 0 0 0 0 0 0 7:00:00 0 0 0 0 08:00:00 18 18 6 42 0 112 8:00:00 12 17 41 70 09:00:00 54 46 30 130 5 297 9:00:00 51 58 58 167 11

16:00:00 0 0 0 0 0 1 16:00:00 0 0 1 1 017:00:00 10 18 11 39 7 137 17:00:00 23 58 17 98 718:00:00 15 45 16 76 8 172 18:00:00 36 42 18 96 6

7:00 8:00 9:00 16:00 17:00 17:00 18:00 18:000 48 188 0 102 102 105 105

49 1224 154 1427 28 3073 142 1384 120 1646 17

97 127 63 287 20 719 122 175 135 432 24

Page 55: BLACKMOOR GATES - Town of Collingwood

Ontario Traffic Inc.Count Date: 22-Mar-18 Site #: 1810700001

IntervalTime

Passenger Cars - North Approach Trucks - North Approach Cyclists - North Approach Pedestrians

Left Left LeftThru Thru ThruRight Right Right North Cross

Cum Cum Cum Cum Cum Cum Cum Cum Cum CumIncr Incr Incr Incr Incr Incr Incr Incr Incr Incr

7:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15:00 0 0 30 30 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 07:30:00 1 1 60 30 3 1 0 0 1 1 0 0 0 0 0 0 0 0 0 07:45:00 2 1 88 28 5 2 0 0 3 2 0 0 0 0 0 0 0 0 0 08:00:00 2 0 131 43 11 6 0 0 4 1 0 0 0 0 0 0 0 0 0 08:15:00 4 2 171 40 14 3 0 0 8 4 0 0 0 0 0 0 0 0 0 08:30:00 8 4 223 52 21 7 0 0 11 3 1 1 0 0 0 0 0 0 4 48:45:00 15 7 308 85 36 15 0 0 17 6 1 0 0 0 0 0 0 0 19 159:00:00 23 8 352 44 40 4 1 1 22 5 1 0 0 0 1 1 0 0 20 19:00:44 23 0 355 3 40 0 1 0 22 0 1 0 0 0 1 0 0 0 20 0

16:00:00 23 0 355 0 40 0 1 0 22 0 1 0 0 0 1 0 0 0 20 016:15:00 26 3 433 78 45 5 1 0 30 8 2 1 0 0 3 2 0 0 20 016:30:00 30 4 526 93 51 6 1 0 35 5 2 0 0 0 4 1 0 0 22 216:45:00 30 0 634 108 60 9 1 0 39 4 2 0 0 0 6 2 0 0 22 017:00:00 30 0 748 114 73 13 1 0 44 5 2 0 0 0 7 1 1 1 24 217:15:00 32 2 852 104 91 18 2 1 48 4 2 0 0 0 9 2 2 1 25 117:30:00 38 6 947 95 104 13 4 2 54 6 2 0 0 0 10 1 2 0 25 017:45:00 38 0 1038 91 124 20 4 0 64 10 2 0 0 0 11 1 2 0 27 218:00:00 43 5 1141 103 149 25 6 2 71 7 3 1 0 0 12 1 2 0 28 118:00:04 43 0 1141 0 149 0 6 0 71 0 3 0 0 0 12 0 2 0 28 018:15:00 43 0 1141 0 149 0 6 0 71 0 3 0 0 0 12 0 2 0 28 018:15:15 43 0 1141 0 149 0 6 0 71 0 3 0 0 0 12 0 2 0 28 0

Page 56: BLACKMOOR GATES - Town of Collingwood

Ontario Traffic Inc.Count Date: 22-Mar-18 Site #: 1810700001

IntervalTime

Passenger Cars - East Approach Trucks - East Approach Cyclists - East Approach Pedestrians

Left Left LeftThru Thru ThruRight Right Right East Cross

Cum Cum Cum Cum Cum Cum Cum Cum Cum CumIncr Incr Incr Incr Incr Incr Incr Incr Incr Incr

7:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15:00 3 3 3 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:30:00 6 3 4 1 1 1 0 0 0 0 1 1 0 0 0 0 0 0 0 07:45:00 10 4 10 6 2 1 0 0 0 0 1 0 0 0 0 0 0 0 0 08:00:00 18 8 18 8 4 2 0 0 0 0 2 1 0 0 0 0 0 0 0 08:15:00 23 5 27 9 9 5 0 0 0 0 2 0 0 0 0 0 0 0 0 08:30:00 27 4 38 11 13 4 1 1 1 1 2 0 0 0 1 1 0 0 1 18:45:00 42 15 45 7 21 8 3 2 1 0 3 1 0 0 2 1 0 0 3 29:00:00 62 20 60 15 31 10 10 7 2 1 5 2 0 0 2 0 0 0 5 29:00:44 62 0 60 0 31 0 10 0 2 0 5 0 0 0 2 0 0 0 5 0

16:00:00 62 0 60 0 31 0 10 0 2 0 5 0 0 0 2 0 0 0 5 016:15:00 64 2 65 5 31 0 10 0 2 0 5 0 0 0 2 0 0 0 7 216:30:00 66 2 66 1 35 4 10 0 2 0 6 1 0 0 2 0 0 0 7 016:45:00 68 2 71 5 37 2 11 1 2 0 8 2 0 0 2 0 0 0 9 217:00:00 69 1 78 7 37 0 13 2 2 0 10 2 0 0 2 0 0 0 12 317:15:00 70 1 88 10 39 2 13 0 2 0 10 0 0 0 3 1 0 0 14 217:30:00 77 7 103 15 41 2 14 1 2 0 10 0 0 0 5 2 0 0 16 217:45:00 80 3 110 7 48 7 15 1 2 0 11 1 0 0 5 0 0 0 18 218:00:00 81 1 120 10 50 2 16 1 2 0 13 2 0 0 5 0 0 0 20 218:00:04 81 0 120 0 50 0 16 0 2 0 13 0 0 0 5 0 0 0 20 018:15:00 81 0 120 0 50 0 16 0 2 0 13 0 0 0 5 0 0 0 20 018:15:15 81 0 120 0 50 0 16 0 2 0 13 0 0 0 5 0 0 0 20 0

Page 57: BLACKMOOR GATES - Town of Collingwood

Ontario Traffic Inc.Count Date: 22-Mar-18 Site #: 1810700001

IntervalTime

Passenger Cars - South Approach Trucks - South Approach Cyclists - South Approach Pedestrians

Left Left LeftThru Thru ThruRight Right Right South Cross

Cum Cum Cum Cum Cum Cum Cum Cum Cum CumIncr Incr Incr Incr Incr Incr Incr Incr Incr Incr

7:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15:00 1 1 30 30 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 07:30:00 4 3 55 25 5 3 0 0 7 7 1 1 0 0 0 0 0 0 0 07:45:00 9 5 90 35 10 5 0 0 10 3 1 0 0 0 0 0 0 0 0 08:00:00 18 9 154 64 17 7 0 0 16 6 1 0 0 0 0 0 0 0 0 08:15:00 29 11 225 71 24 7 0 0 25 9 1 0 0 0 0 0 0 0 0 08:30:00 47 18 369 144 34 10 0 0 36 11 2 1 0 0 4 4 0 0 1 18:45:00 64 17 502 133 65 31 1 1 46 10 10 8 0 0 7 3 0 0 4 39:00:00 81 17 604 102 89 24 2 1 49 3 11 1 0 0 8 1 0 0 5 19:00:44 83 2 608 4 90 1 2 0 49 0 11 0 0 0 8 0 0 0 5 0

16:00:00 83 0 608 0 90 0 2 0 49 0 11 0 0 0 8 0 0 0 5 016:15:00 86 3 677 69 92 2 2 0 52 3 12 1 0 0 8 0 0 0 8 316:30:00 89 3 755 78 94 2 2 0 57 5 12 0 0 0 9 1 0 0 8 016:45:00 92 3 827 72 97 3 2 0 65 8 12 0 0 0 11 2 0 0 9 117:00:00 98 6 903 76 97 0 2 0 69 4 12 0 0 0 12 1 0 0 12 317:15:00 105 7 992 89 97 0 2 0 74 5 12 0 0 0 14 2 0 0 12 017:30:00 114 9 1083 91 99 2 2 0 79 5 13 1 0 0 15 1 0 0 14 217:45:00 129 15 1184 101 101 2 2 0 84 5 14 1 0 0 17 2 0 0 15 118:00:00 140 11 1277 93 104 3 2 0 89 5 16 2 0 0 18 1 0 0 17 218:00:04 140 0 1277 0 104 0 2 0 89 0 16 0 0 0 18 0 0 0 17 018:15:00 140 0 1277 0 104 0 2 0 89 0 16 0 0 0 18 0 0 0 17 018:15:15 140 0 1277 0 104 0 2 0 89 0 16 0 0 0 18 0 0 0 17 0

Page 58: BLACKMOOR GATES - Town of Collingwood

Ontario Traffic Inc.Count Date: 22-Mar-18 Site #: 1810700001

IntervalTime

Passenger Cars - West Approach Trucks - West Approach Cyclists - West Approach Pedestrians

Left Left LeftThru Thru ThruRight Right Right West Cross

Cum Cum Cum Cum Cum Cum Cum Cum Cum CumIncr Incr Incr Incr Incr Incr Incr Incr Incr Incr

7:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15:00 2 2 3 3 11 11 0 0 0 0 0 0 0 0 0 0 0 0 0 07:30:00 2 0 7 4 17 6 0 0 0 0 0 0 0 0 0 0 0 0 0 07:45:00 4 2 10 3 31 14 0 0 0 0 0 0 0 0 0 0 0 0 0 08:00:00 12 8 17 7 41 10 0 0 0 0 0 0 0 0 0 0 0 0 0 08:15:00 14 2 21 4 51 10 0 0 0 0 0 0 0 0 0 0 0 0 0 08:30:00 27 13 28 7 63 12 0 0 0 0 0 0 0 0 1 1 0 0 5 58:45:00 53 26 48 20 76 13 1 1 0 0 1 1 0 0 2 1 0 0 11 69:00:00 62 9 71 23 98 22 1 0 2 2 1 0 0 0 2 0 0 0 11 09:00:44 62 0 71 0 99 1 1 0 2 0 1 0 0 0 2 0 0 0 11 0

16:00:00 62 0 71 0 99 0 1 0 2 0 1 0 0 0 2 0 0 0 11 016:15:00 71 9 84 13 108 9 1 0 2 0 1 0 0 0 2 0 0 0 12 116:30:00 78 7 106 22 109 1 1 0 2 0 1 0 0 0 2 0 0 0 14 216:45:00 81 3 114 8 113 4 1 0 2 0 1 0 0 0 2 0 0 0 16 217:00:00 85 4 129 15 116 3 1 0 2 0 1 0 0 0 2 0 0 0 18 217:15:00 93 8 141 12 119 3 1 0 2 0 1 0 0 0 2 0 0 0 19 117:30:00 103 10 148 7 124 5 1 0 2 0 1 0 0 0 3 1 1 1 21 217:45:00 110 7 158 10 129 5 1 0 2 0 1 0 0 0 4 1 1 0 23 218:00:00 121 11 168 10 133 4 1 0 2 0 1 0 0 0 5 1 1 0 24 118:00:04 121 0 169 1 133 0 1 0 2 0 1 0 0 0 5 0 1 0 24 018:15:00 121 0 169 0 133 0 1 0 2 0 1 0 0 0 5 0 1 0 24 018:15:15 121 0 169 0 133 0 1 0 2 0 1 0 0 0 5 0 1 0 24 0

Page 59: BLACKMOOR GATES - Town of Collingwood

Ontario Traffic Inc.

Morning Peak Diagram Specified PeriodFrom:To:

7:00:00

9:00:00

One Hour PeakFrom:To:

8:00:00

9:00:00

Municipality:Site #:Intersection:TFR File #:Count date:

Collingwood

1810700002

Campbell St & Maple St

3

22-Mar-18

Weather conditions:

Person(s) who counted:

** Non-Signalized Intersection ** Major Road: Campbell St runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

127

33

8

Cyclists

Trucks

Cars

Totals

0

0

11

11

0

0

2

2

0

0

20

20

0

0

33

Cyclists

Trucks

Cars

Totals

0

0

94

94

Cyclists Trucks Cars Totals

2 3 102 107

Cyclists Trucks Cars Totals

0 0 41 41

2 4 141 147

1 0 5 6

3 4 187

Peds Cross:

West Peds:

West Entering:

West Leg Total:

21

194

301

Maple St

Campbell St W

N

E

S

Campbell St

Maple St

East Leg Total:

East Entering:

East Peds:

Peds Cross:

315

145

11

Cars Trucks Cyclists Totals

52 0 0 52

88 3 2 93

0 0 0 0

140 3 2

Cars Trucks Cyclists Totals

164 4 2 170

Cars

Trucks

Cyclists

Totals

7

0

1

8

Cars

Trucks

Cyclists

Totals

3

0

0

3

1

0

0

1

3

0

0

3

7

0

0

Peds Cross:

South Peds:

South Entering:

South Leg Total:

11

7

15

Comments

Page 60: BLACKMOOR GATES - Town of Collingwood

Ontario Traffic Inc.

Afternoon Peak Diagram Specified PeriodFrom:To:

16:00:00

18:00:00

One Hour PeakFrom:To:

17:00:00

18:00:00

Municipality:Site #:Intersection:TFR File #:Count date:

Collingwood

1810700002

Campbell St & Maple St

3

22-Mar-18

Weather conditions:

Person(s) who counted:

** Non-Signalized Intersection ** Major Road: Campbell St runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

104

63

5

Cyclists

Trucks

Cars

Totals

1

0

40

41

0

0

1

1

0

0

21

21

1

0

62

Cyclists

Trucks

Cars

Totals

1

0

40

41

Cyclists Trucks Cars Totals

4 1 174 179

Cyclists Trucks Cars Totals

0 0 12 12

4 0 70 74

0 0 3 3

4 0 85

Peds Cross:

West Peds:

West Entering:

West Leg Total:

9

89

268

Maple St

Campbell St W

N

E

S

Campbell St

Maple St

East Leg Total:

East Entering:

East Peds:

Peds Cross:

262

166

1

Cars Trucks Cyclists Totals

28 0 1 29

132 1 3 136

1 0 0 1

161 1 4

Cars Trucks Cyclists Totals

92 0 4 96

Cars

Trucks

Cyclists

Totals

5

0

0

5

Cars

Trucks

Cyclists

Totals

2

0

0

2

0

0

0

0

1

0

0

1

3

0

0

Peds Cross:

South Peds:

South Entering:

South Leg Total:

11

3

8

Comments

Page 61: BLACKMOOR GATES - Town of Collingwood

Ontario Traffic Inc.

Total Count Diagram

Municipality:Site #:Intersection:TFR File #:Count date:

Collingwood

1810700002

Campbell St & Maple St

3

22-Mar-18

Weather conditions:

Person(s) who counted:

** Non-Signalized Intersection ** Major Road: Campbell St runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

339

161

16

Cyclists

Trucks

Cars

Totals

1

0

88

89

0

0

3

3

0

0

69

69

1

0

160

Cyclists

Trucks

Cars

Totals

1

0

177

178

Cyclists Trucks Cars Totals

9 5 403 417

Cyclists Trucks Cars Totals

0 0 75 75

6 4 357 367

1 0 8 9

7 4 440

Peds Cross:

West Peds:

West Entering:

West Leg Total:

39

451

868

Maple St

Campbell St W

N

E

S

Campbell St

Maple St

East Leg Total:

East Entering:

East Peds:

Peds Cross:

863

423

20

Cars Trucks Cyclists Totals

100 0 1 101

308 5 6 319

3 0 0 3

411 5 7

Cars Trucks Cyclists Totals

430 4 6 440

Cars

Trucks

Cyclists

Totals

14

0

1

15

Cars

Trucks

Cyclists

Totals

7

0

2

9

2

0

0

2

4

0

0

4

13

0

2

Peds Cross:

South Peds:

South Entering:

South Leg Total:

24

15

30

Comments

Page 62: BLACKMOOR GATES - Town of Collingwood

Ontario Traffic Inc.Traffic Count Summary

Intersection: Campbell St & Maple St Count Date: 22-Mar-18 Municipality: Collingwood

North Approach Totals South Approach Totals

East Approach Totals West Approach Totals

Includes Cars, Trucks, & Cyclists Includes Cars, Trucks, & Cyclists

Includes Cars, Trucks, & Cyclists Includes Cars, Trucks, & Cyclists

Hour Hour

Hour Hour

Ending Ending

Ending Ending

Left Left

Left Left

Thru Thru

Thru Thru

Right Right

Right Right

Grand Grand

Grand Grand

Total Total

Total Total

Total Total

Total Total

Peds Peds

Peds Peds

North/South

East/West

Total

Total

Approaches

Approaches

Calculated Values for Traffic Crossing Major StreetHours Ending:Crossing Values:

Totals:

Totals:

7:00:00 0 0 0 0 0 0 7:00:00 0 0 0 0 08:00:00 6 0 1 7 1 9 8:00:00 1 1 0 2 09:00:00 20 2 11 33 8 40 9:00:00 3 1 3 7 11

16:00:00 0 0 0 0 0 0 16:00:00 0 0 0 0 017:00:00 22 0 36 58 2 61 17:00:00 3 0 0 3 218:00:00 21 1 41 63 5 66 18:00:00 2 0 1 3 11

7:00:00 0 0 0 0 0 0 7:00:00 0 0 0 0 08:00:00 2 37 5 44 2 117 8:00:00 5 68 0 73 19:00:00 0 93 52 145 11 339 9:00:00 41 147 6 194 21

16:00:00 0 1 0 1 0 2 16:00:00 0 1 0 1 017:00:00 0 52 15 67 6 161 17:00:00 17 77 0 94 818:00:00 1 136 29 166 1 255 18:00:00 12 74 3 89 9

0:00 0:00 7:00 8:00 9:00 16:00 17:00 18:000 0 0 11 57 0 39 34

69 3 89 161 16 176 9 2 4 15 24

3 319 101 423 20 874 75 367 9 451 39

Page 63: BLACKMOOR GATES - Town of Collingwood

Ontario Traffic Inc.Count Date: 22-Mar-18 Site #: 1810700002

IntervalTime

Passenger Cars - North Approach Trucks - North Approach Cyclists - North Approach Pedestrians

Left Left LeftThru Thru ThruRight Right Right North Cross

Cum Cum Cum Cum Cum Cum Cum Cum Cum CumIncr Incr Incr Incr Incr Incr Incr Incr Incr Incr

7:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15:00 3 3 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 07:30:00 3 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:45:00 5 2 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 08:00:00 6 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 18:15:00 10 4 0 0 3 2 0 0 0 0 0 0 0 0 0 0 0 0 2 18:30:00 13 3 1 1 4 1 0 0 0 0 0 0 0 0 0 0 0 0 2 08:45:00 19 6 2 1 8 4 0 0 0 0 0 0 0 0 0 0 0 0 8 69:00:00 26 7 2 0 12 4 0 0 0 0 0 0 0 0 0 0 0 0 9 19:00:26 26 0 2 0 12 0 0 0 0 0 0 0 0 0 0 0 0 0 9 0

16:00:00 26 0 2 0 12 0 0 0 0 0 0 0 0 0 0 0 0 0 9 016:15:00 32 6 2 0 22 10 0 0 0 0 0 0 0 0 0 0 0 0 9 016:30:00 39 7 2 0 31 9 0 0 0 0 0 0 0 0 0 0 0 0 9 016:45:00 43 4 2 0 39 8 0 0 0 0 0 0 0 0 0 0 0 0 10 117:00:00 48 5 2 0 48 9 0 0 0 0 0 0 0 0 0 0 0 0 11 117:15:00 53 5 2 0 60 12 0 0 0 0 0 0 0 0 0 0 0 0 15 417:30:00 57 4 2 0 70 10 0 0 0 0 0 0 0 0 0 0 1 1 15 017:45:00 62 5 2 0 76 6 0 0 0 0 0 0 0 0 0 0 1 0 15 018:00:00 69 7 3 1 88 12 0 0 0 0 0 0 0 0 0 0 1 0 16 118:00:04 69 0 3 0 88 0 0 0 0 0 0 0 0 0 0 0 1 0 16 018:15:00 69 0 3 0 88 0 0 0 0 0 0 0 0 0 0 0 1 0 16 018:15:15 69 0 3 0 88 0 0 0 0 0 0 0 0 0 0 0 1 0 16 0

Page 64: BLACKMOOR GATES - Town of Collingwood

Ontario Traffic Inc.Count Date: 22-Mar-18 Site #: 1810700002

IntervalTime

Passenger Cars - East Approach Trucks - East Approach Cyclists - East Approach Pedestrians

Left Left LeftThru Thru ThruRight Right Right East Cross

Cum Cum Cum Cum Cum Cum Cum Cum Cum CumIncr Incr Incr Incr Incr Incr Incr Incr Incr Incr

7:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15:00 0 0 4 4 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 07:30:00 0 0 9 5 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:45:00 0 0 21 12 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1 18:00:00 2 2 37 16 5 4 0 0 0 0 0 0 0 0 0 0 0 0 2 18:15:00 2 0 54 17 13 8 0 0 0 0 0 0 0 0 0 0 0 0 2 08:30:00 2 0 73 19 32 19 0 0 1 1 0 0 0 0 1 1 0 0 4 28:45:00 2 0 99 26 46 14 0 0 2 1 0 0 0 0 2 1 0 0 12 89:00:00 2 0 125 26 57 11 0 0 3 1 0 0 0 0 2 0 0 0 13 19:00:26 2 0 126 1 57 0 0 0 3 0 0 0 0 0 2 0 0 0 13 0

16:00:00 2 0 126 0 57 0 0 0 3 0 0 0 0 0 2 0 0 0 13 016:15:00 2 0 136 10 59 2 0 0 4 1 0 0 0 0 2 0 0 0 13 016:30:00 2 0 142 6 63 4 0 0 4 0 0 0 0 0 2 0 0 0 14 116:45:00 2 0 157 15 65 2 0 0 4 0 0 0 0 0 2 0 0 0 16 217:00:00 2 0 176 19 72 7 0 0 4 0 0 0 0 0 3 1 0 0 19 317:15:00 2 0 206 30 77 5 0 0 4 0 0 0 0 0 5 2 0 0 19 017:30:00 3 1 236 30 83 6 0 0 4 0 0 0 0 0 6 1 1 1 19 017:45:00 3 0 268 32 93 10 0 0 4 0 0 0 0 0 6 0 1 0 20 118:00:00 3 0 308 40 100 7 0 0 5 1 0 0 0 0 6 0 1 0 20 018:00:04 3 0 308 0 100 0 0 0 5 0 0 0 0 0 6 0 1 0 20 018:15:00 3 0 308 0 100 0 0 0 5 0 0 0 0 0 6 0 1 0 20 018:15:15 3 0 308 0 100 0 0 0 5 0 0 0 0 0 6 0 1 0 20 0

Page 65: BLACKMOOR GATES - Town of Collingwood

Ontario Traffic Inc.Count Date: 22-Mar-18 Site #: 1810700002

IntervalTime

Passenger Cars - South Approach Trucks - South Approach Cyclists - South Approach Pedestrians

Left Left LeftThru Thru ThruRight Right Right South Cross

Cum Cum Cum Cum Cum Cum Cum Cum Cum CumIncr Incr Incr Incr Incr Incr Incr Incr Incr Incr

7:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:30:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:45:00 1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 08:00:00 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 08:15:00 1 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 18:30:00 2 1 1 0 2 2 0 0 0 0 0 0 0 0 0 0 0 0 2 18:45:00 4 2 1 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 11 99:00:00 4 0 2 1 3 1 0 0 0 0 0 0 0 0 0 0 0 0 11 09:00:26 4 0 2 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 11 0

16:00:00 4 0 2 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 11 016:15:00 4 0 2 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 11 016:30:00 4 0 2 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 13 216:45:00 5 1 2 0 3 0 0 0 0 0 0 0 2 2 0 0 0 0 13 017:00:00 5 0 2 0 3 0 0 0 0 0 0 0 2 0 0 0 0 0 13 017:15:00 5 0 2 0 3 0 0 0 0 0 0 0 2 0 0 0 0 0 15 217:30:00 5 0 2 0 3 0 0 0 0 0 0 0 2 0 0 0 0 0 18 317:45:00 6 1 2 0 4 1 0 0 0 0 0 0 2 0 0 0 0 0 20 218:00:00 7 1 2 0 4 0 0 0 0 0 0 0 2 0 0 0 0 0 24 418:00:04 7 0 2 0 4 0 0 0 0 0 0 0 2 0 0 0 0 0 24 018:15:00 7 0 2 0 4 0 0 0 0 0 0 0 2 0 0 0 0 0 24 018:15:15 7 0 2 0 4 0 0 0 0 0 0 0 2 0 0 0 0 0 24 0

Page 66: BLACKMOOR GATES - Town of Collingwood

Ontario Traffic Inc.Count Date: 22-Mar-18 Site #: 1810700002

IntervalTime

Passenger Cars - West Approach Trucks - West Approach Cyclists - West Approach Pedestrians

Left Left LeftThru Thru ThruRight Right Right West Cross

Cum Cum Cum Cum Cum Cum Cum Cum Cum CumIncr Incr Incr Incr Incr Incr Incr Incr Incr Incr

7:00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:15:00 0 0 12 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:30:00 1 1 23 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 07:45:00 3 2 40 17 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 18:00:00 5 2 68 28 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 08:15:00 9 4 80 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 08:30:00 19 10 109 29 3 3 0 0 0 0 0 0 0 0 1 1 0 0 3 28:45:00 39 20 162 53 3 0 0 0 2 2 0 0 0 0 2 1 1 1 20 179:00:00 46 7 209 47 5 2 0 0 4 2 0 0 0 0 2 0 1 0 22 29:00:26 46 0 210 1 5 0 0 0 4 0 0 0 0 0 2 0 1 0 22 0

16:00:00 46 0 210 0 5 0 0 0 4 0 0 0 0 0 2 0 1 0 22 016:15:00 54 8 235 25 5 0 0 0 4 0 0 0 0 0 2 0 1 0 22 016:30:00 59 5 259 24 5 0 0 0 4 0 0 0 0 0 2 0 1 0 24 216:45:00 63 4 270 11 5 0 0 0 4 0 0 0 0 0 2 0 1 0 26 217:00:00 63 0 287 17 5 0 0 0 4 0 0 0 0 0 2 0 1 0 30 417:15:00 63 0 304 17 5 0 0 0 4 0 0 0 0 0 2 0 1 0 32 217:30:00 63 0 322 18 5 0 0 0 4 0 0 0 0 0 4 2 1 0 34 217:45:00 66 3 339 17 6 1 0 0 4 0 0 0 0 0 5 1 1 0 37 318:00:00 75 9 357 18 8 2 0 0 4 0 0 0 0 0 6 1 1 0 39 218:00:04 75 0 357 0 8 0 0 0 4 0 0 0 0 0 6 0 1 0 39 018:15:00 75 0 357 0 8 0 0 0 4 0 0 0 0 0 6 0 1 0 39 018:15:15 75 0 357 0 8 0 0 0 4 0 0 0 0 0 6 0 1 0 39 0

Page 67: BLACKMOOR GATES - Town of Collingwood

APPENDIX

C SIGNAL TIMING

Page 68: BLACKMOOR GATES - Town of Collingwood
Page 69: BLACKMOOR GATES - Town of Collingwood

APPENDIX

D LEVEL OF SERVICE DEFINITIONS

Page 70: BLACKMOOR GATES - Town of Collingwood

LEVEL OF SERVICE DEFINITIONS AT SIGNALIZED INTERSECTIONS( 1)

Level of service for signalized intersections is defined in terms of delay, which is a measure of driver discomfort and frustration, fuel consumption, and lost travel time. Specifically, level-of-service (LOS) criteria are stated in terms of the average control delay per vehicle, typically for a 15-min analysis period. The criteria are given in the table below. Delay may be measured in the field or estimated using software such as Highway Capacity Software. Delay is a complex measure and is dependent upon a number of variables, including quality of progression, the cycle length, the green ratio, and the v/c ratio for the lane group in question.

Level of Service

Features Control Delay per

vehicle (sec) A LOS A describes operations with very low delay, up to 10 sec

per vehicle. This level of service occurs when progression is extremely favourable and most vehicles arrive during the green phase. Most vehicles do not stop at all. Short cycle lengths may also contribute to low delay.

10

B LOS B describes operations with delay greater than 10 and up to 20 sec per vehicle. This level generally occurs with good progression, short cycle lengths, or both. More vehicles stop than with LOS A, causing higher levels of average delay.

10 and 20

C LOS C describes operations with delay greater than 20 and up to 35 sec per vehicle. These higher delays may result from fair progression, longer cycle lengths, or both. Individual cycle failures may begin to appear at this level. The number of vehicles stopping is significant at this level, though many still pass through the intersection without stopping.

20 and 35

D LOS D describes operations with delay greater than 35 and up to 55 sec per vehicle. At level D, the influence of congestion becomes more noticeable. Longer delays may result from some combination of unfavourable progression, long cycle lengths, of high v/c ratios. Many vehicles stop, and the proportion of vehicles not stopping declines. Individual cycle failures are noticeable.

35 and 55

E LOS E describes operations with delay greater than 55 and up to 80 sec per vehicle. This level is considered by many agencies to be the limit of acceptable delay. These high delay values generally indicate poor progression, long cycle lengths, and high v/c ratios. Individual cycle failures are frequent occurrences.

55 and 80

F LOS F describes operations with delay in excess of 80 sec per vehicle. This level, considered to be unacceptable to most drivers, often occurs with oversaturation, that is, when arrival flow rates exceed the capacity of the intersection. It may also occur at high v/c ratios below 1.0 with many individual cycle failures. Poor progression and long cycle lengths may also be major contributing causes to such delay levels.

80

(1) Highway Capacity Manual 2000

J:\General Office\Appendix\Capacity Appendix\Signalized\hcs signalized_delay.doc

A-22

Page 71: BLACKMOOR GATES - Town of Collingwood

LEVEL OF SERVICE DEFINITIONS AT UNSIGNALIZED INTERSECTIONS( 1)

The level of service criteria for unsignalized intersections are given in the table below. As used here, total delay is defined as the total elapsed time from when a vehicle stops at the end of the queue until the vehicle departs from the stop line; this time includes the time required for the vehicle to travel from the last-in-queue position to the first-in-queue position. The average total delay for any particular minor movement is a function of the service rate or capacity of the approach and the degree of saturation.

Level of Service Features Average Total Delay (sec/veh)

A Little or no traffic delay occurs. Approaches appear open, turning movements are easily made, and drivers have freedom of operation.

10

B Short traffic delays occur. Many drivers begin to feel somewhat restricted in terms of freedom of operation.

10 and 15

C Average traffic delays occur. Operations are generally stable, but drivers emerging from the minor street may experience difficulty in completing their movement. This may occasionally impact on the stability of flow on the major street.

15 and 25

D Long traffic delays occur. Motorists emerging from the minor street experience significant restriction and frustration. Drivers on the major street will experience congestion and delay as drivers emerging from the minor street interfere with the major through movements.

25 and 35

E Very long traffic delays occur. Operations approach the capacity of the intersection.

35 and 50

F Saturation occurs, with vehicle demand exceeding the available capacity. Very long traffic delays occur.

50

(1) Highway Capacity Manual 2000.

J:\Capacity Appendix\Unsignalized\hcs unsignalized_delay.doc

A-23

Page 72: BLACKMOOR GATES - Town of Collingwood

APPENDIX

E EXISTING

TRAFFIC

CONDITIONS

ANALYSIS

Page 73: BLACKMOOR GATES - Town of Collingwood

Lanes, Volumes, Timings

4: Hurontario Street & Campbell Street 04/18/2018

Existing A.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Traffic Volume (vph) 51 58 58 54 46 30 65 491 82 22 240 30

Future Volume (vph) 51 58 58 54 46 30 65 491 82 22 240 30

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900

Lane Width (m) 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6

Grade (%) 0% 0% 0% 0%

Storage Length (m) 0.0 0.0 0.0 0.0 61.0 0.0 50.0 0.0

Storage Lanes 0 0 0 0 1 0 1 0

Taper Length (m) 7.5 7.5 7.5 7.5

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Ped Bike Factor

Frt 0.953 0.969 0.979 0.983

Flt Protected 0.985 0.980 0.950 0.950

Satd. Flow (prot) 0 1749 0 0 1769 0 1770 1824 0 1770 1831 0

Flt Permitted 0.883 0.810 0.580 0.364

Satd. Flow (perm) 0 1567 0 0 1462 0 1080 1824 0 678 1831 0

Right Turn on Red Yes Yes Yes Yes

Satd. Flow (RTOR) 46 26 20 15

Link Speed (k/h) 50 50 50 50

Link Distance (m) 240.3 173.8 184.6 148.9

Travel Time (s) 17.3 12.5 13.3 10.7

Confl. Peds. (#/hr)

Confl. Bikes (#/hr)

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%

Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0

Parking (#/hr)

Mid-Block Traffic (%) 0% 0% 0% 0%

Adj. Flow (vph) 55 63 63 59 50 33 71 534 89 24 261 33

Shared Lane Traffic (%)

Lane Group Flow (vph) 0 181 0 0 142 0 71 623 0 24 294 0

Number of Detectors 1 1 1 1 1 0 1 0

Detector Template Left Left

Leading Detector (m) 2.0 7.5 2.0 7.5 7.5 0.0 7.5 0.0

Trailing Detector (m) 0.0 -1.5 0.0 -1.5 -1.5 0.0 -1.5 0.0

Turn Type Perm NA Perm NA Perm NA Perm NA

Protected Phases 4 8 2 6

Permitted Phases 4 8 2 6

Detector Phase 4 4 8 8 2 2 6 6

Switch Phase

Minimum Initial (s) 7.0 7.0 7.0 7.0 30.2 30.2 30.2 30.2

Minimum Split (s) 23.7 23.7 23.7 23.7 36.0 36.0 36.0 36.0

Total Split (s) 24.0 24.0 24.0 24.0 36.0 36.0 36.0 36.0

Total Split (%) 40.0% 40.0% 40.0% 40.0% 60.0% 60.0% 60.0% 60.0%

Maximum Green (s) 18.3 18.3 18.3 18.3 30.2 30.2 30.2 30.2

Yellow Time (s) 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3

All-Red Time (s) 2.4 2.4 2.4 2.4 2.5 2.5 2.5 2.5

Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0

Lanes, Volumes, Timings

4: Hurontario Street & Campbell Street 04/18/2018

Existing A.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Total Lost Time (s) 5.7 5.7 5.8 5.8 5.8 5.8

Lead/Lag

Lead-Lag Optimize?

Vehicle Extension (s) 3.0 3.0 3.0 3.0 0.2 0.2 0.2 0.2

Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Recall Mode None None None None Max Max Max Max

Walk Time (s) 7.0 7.0 7.0 7.0 16.0 16.0 16.0 16.0

Flash Dont Walk (s) 11.0 11.0 11.0 11.0 14.0 14.0 14.0 14.0

Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0

Act Effct Green (s) 10.4 10.4 34.5 34.5 34.5 34.5

Actuated g/C Ratio 0.20 0.20 0.66 0.66 0.66 0.66

v/c Ratio 0.52 0.46 0.10 0.52 0.05 0.24

Control Delay 19.5 20.1 6.4 9.0 6.4 6.2

Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0

Total Delay 19.5 20.1 6.4 9.0 6.4 6.2

LOS B C A A A A

Approach Delay 19.5 20.1 8.7 6.3

Approach LOS B C A A

Queue Length 50th (m) 11.7 10.0 2.6 31.1 0.9 11.4

Queue Length 95th (m) 26.7 23.1 8.9 72.0 4.1 27.7

Internal Link Dist (m) 216.3 149.8 160.6 124.9

Turn Bay Length (m) 61.0 50.0

Base Capacity (vph) 575 526 709 1204 445 1207

Starvation Cap Reductn 0 0 0 0 0 0

Spillback Cap Reductn 0 0 0 0 0 0

Storage Cap Reductn 0 0 0 0 0 0

Reduced v/c Ratio 0.31 0.27 0.10 0.52 0.05 0.24

Intersection Summary

Area Type: Other

Cycle Length: 60

Actuated Cycle Length: 52.6

Natural Cycle: 60

Control Type: Semi Act-Uncoord

Maximum v/c Ratio: 0.52

Intersection Signal Delay: 10.8 Intersection LOS: B

Intersection Capacity Utilization 74.6% ICU Level of Service D

Analysis Period (min) 15

Splits and Phases: 4: Hurontario Street & Campbell Street

Page 74: BLACKMOOR GATES - Town of Collingwood

HCM Unsignalized Intersection Capacity Analysis

2: Maple Street & Campbell Street 04/18/2018

Existing A.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Traffic Volume (veh/h) 41 147 6 0 93 52 3 1 3 20 3 11

Future Volume (Veh/h) 41 147 6 0 93 52 3 1 3 20 3 11

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 45 160 7 0 101 57 3 1 3 22 3 12

Pedestrians

Lane Width (m)

Walking Speed (m/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (m) 240

pX, platoon unblocked

vC, conflicting volume 158 167 396 412 164 386 386 130

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 158 167 396 412 164 386 386 130

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 97 100 99 100 100 96 99 99

cM capacity (veh/h) 1422 1411 540 514 881 556 530 920

Direction, Lane # EB 1 WB 1 NB 1 SB 1

Volume Total 212 158 7 37

Volume Left 45 0 3 22

Volume Right 7 57 3 12

cSH 1422 1411 642 635

Volume to Capacity 0.03 0.00 0.01 0.06

Queue Length 95th (m) 0.8 0.0 0.3 1.5

Control Delay (s) 1.8 0.0 10.7 11.0

Lane LOS A B B

Approach Delay (s) 1.8 0.0 10.7 11.0

Approach LOS B B

Intersection Summary

Average Delay 2.1

Intersection Capacity Utilization 31.8% ICU Level of Service A

Analysis Period (min) 15

Page 75: BLACKMOOR GATES - Town of Collingwood

Lanes, Volumes, Timings

4: Hurontario Street & Campbell Street 04/18/2018

Existing P.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Traffic Volume (vph) 36 43 18 15 45 16 42 400 11 18 425 78

Future Volume (vph) 36 43 18 15 45 16 42 400 11 18 425 78

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900

Lane Width (m) 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6

Grade (%) 0% 0% 0% 0%

Storage Length (m) 0.0 0.0 0.0 0.0 61.0 0.0 50.0 0.0

Storage Lanes 0 0 0 0 1 0 1 0

Taper Length (m) 7.5 7.5 7.5 7.5

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Ped Bike Factor

Frt 0.975 0.972 0.996 0.977

Flt Protected 0.982 0.990 0.950 0.950

Satd. Flow (prot) 0 1783 0 0 1792 0 1770 1855 0 1770 1820 0

Flt Permitted 0.844 0.911 0.427 0.498

Satd. Flow (perm) 0 1533 0 0 1649 0 795 1855 0 928 1820 0

Right Turn on Red Yes Yes Yes Yes

Satd. Flow (RTOR) 20 17 3 22

Link Speed (k/h) 50 50 50 50

Link Distance (m) 240.3 173.8 184.6 148.9

Travel Time (s) 17.3 12.5 13.3 10.7

Confl. Peds. (#/hr)

Confl. Bikes (#/hr)

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%

Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0

Parking (#/hr)

Mid-Block Traffic (%) 0% 0% 0% 0%

Adj. Flow (vph) 39 47 20 16 49 17 46 435 12 20 462 85

Shared Lane Traffic (%)

Lane Group Flow (vph) 0 106 0 0 82 0 46 447 0 20 547 0

Number of Detectors 1 1 1 1 1 0 1 0

Detector Template Left Thru Left Thru Left Left

Leading Detector (m) 2.0 7.5 2.0 7.5 7.5 0.0 7.5 0.0

Trailing Detector (m) 0.0 -1.5 0.0 -1.5 -1.5 0.0 -1.5 0.0

Turn Type Perm NA Perm NA Perm NA Perm NA

Protected Phases 4 8 2 6

Permitted Phases 4 8 2 6

Detector Phase 4 4 8 8 2 2 6 6

Switch Phase

Minimum Initial (s) 7.0 7.0 7.0 7.0 30.2 30.2 30.2 30.2

Minimum Split (s) 23.7 23.7 23.7 23.7 36.0 36.0 36.0 36.0

Total Split (s) 24.0 24.0 24.0 24.0 36.0 36.0 36.0 36.0

Total Split (%) 40.0% 40.0% 40.0% 40.0% 60.0% 60.0% 60.0% 60.0%

Maximum Green (s) 18.3 18.3 18.3 18.3 30.2 30.2 30.2 30.2

Yellow Time (s) 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3

All-Red Time (s) 2.4 2.4 2.4 2.4 2.5 2.5 2.5 2.5

Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0

Lanes, Volumes, Timings

4: Hurontario Street & Campbell Street 04/18/2018

Existing P.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Total Lost Time (s) 5.7 5.7 5.8 5.8 5.8 5.8

Lead/Lag

Lead-Lag Optimize?

Vehicle Extension (s) 3.0 3.0 3.0 3.0 0.2 0.2 0.2 0.2

Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Recall Mode None None None None Max Max Max Max

Walk Time (s) 7.0 7.0 7.0 7.0 16.0 16.0 16.0 16.0

Flash Dont Walk (s) 11.0 11.0 11.0 11.0 14.0 14.0 14.0 14.0

Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0

Act Effct Green (s) 8.6 8.6 34.5 34.5 34.5 34.5

Actuated g/C Ratio 0.17 0.17 0.68 0.68 0.68 0.68

v/c Ratio 0.39 0.28 0.09 0.36 0.03 0.44

Control Delay 19.9 17.6 5.4 6.2 4.9 6.9

Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0

Total Delay 19.9 17.6 5.4 6.2 4.9 6.9

LOS B B A A A A

Approach Delay 19.9 17.6 6.2 6.8

Approach LOS B B A A

Queue Length 50th (m) 7.2 5.4 1.5 17.6 0.6 22.3

Queue Length 95th (m) 18.3 14.9 5.6 38.5 3.0 49.4

Internal Link Dist (m) 216.3 149.8 160.6 124.9

Turn Bay Length (m) 61.0 50.0

Base Capacity (vph) 564 604 538 1258 628 1240

Starvation Cap Reductn 0 0 0 0 0 0

Spillback Cap Reductn 0 0 0 0 0 0

Storage Cap Reductn 0 0 0 0 0 0

Reduced v/c Ratio 0.19 0.14 0.09 0.36 0.03 0.44

Intersection Summary

Area Type: Other

Cycle Length: 60

Actuated Cycle Length: 50.9

Natural Cycle: 60

Control Type: Semi Act-Uncoord

Maximum v/c Ratio: 0.44

Intersection Signal Delay: 8.4 Intersection LOS: A

Intersection Capacity Utilization 54.0% ICU Level of Service A

Analysis Period (min) 15

Splits and Phases: 4: Hurontario Street & Campbell Street

Page 76: BLACKMOOR GATES - Town of Collingwood

HCM Unsignalized Intersection Capacity Analysis

2: Maple Street & Campbell Street 04/18/2018

Existing P.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Traffic Volume (veh/h) 12 74 3 1 136 29 2 0 1 21 1 41

Future Volume (Veh/h) 12 74 3 1 136 29 2 0 1 21 1 41

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 13 80 3 1 148 32 2 0 1 23 1 45

Pedestrians

Lane Width (m)

Walking Speed (m/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (m) 240

pX, platoon unblocked

vC, conflicting volume 180 83 319 290 82 274 275 164

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 180 83 319 290 82 274 275 164

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 99 100 100 100 100 97 100 95

cM capacity (veh/h) 1408 1527 600 615 984 676 629 886

Direction, Lane # EB 1 WB 1 NB 1 SB 1

Volume Total 96 181 3 69

Volume Left 13 1 2 23

Volume Right 3 32 1 45

cSH 1408 1527 690 799

Volume to Capacity 0.01 0.00 0.00 0.09

Queue Length 95th (m) 0.2 0.0 0.1 2.3

Control Delay (s) 1.1 0.0 10.2 9.9

Lane LOS A A B A

Approach Delay (s) 1.1 0.0 10.2 9.9

Approach LOS B A

Intersection Summary

Average Delay 2.4

Intersection Capacity Utilization 23.3% ICU Level of Service A

Analysis Period (min) 15

Page 77: BLACKMOOR GATES - Town of Collingwood

APPENDIX

F BACKGROUND

TRAFFIC

VOLUME

Page 78: BLACKMOOR GATES - Town of Collingwood

Trip Generation for Mountaincroft Subdivision Phase IV

Use & Units

ITE Category

(ITE Code)

Independent variable

Statistics

Weekday A.M Peak hour Weekday P.M. Peak Hour

Inbd. Outbd. Total Inbd. Outbd. Total

Residential Development

(61)

Single-Family

Detached Housing

(210)

T = 0.7 X + 9.74 Ln(T) = 0.9 Ln(X) + 0.51

Directional

Split

26 % 74% 100% 64% 36% 100%

Trips 14 41 55 44 25 69

Page 79: BLACKMOOR GATES - Town of Collingwood
vinod.soman
Text Box
Liberty Pretty River Estate Phase II
Page 80: BLACKMOOR GATES - Town of Collingwood
vinod.soman
Text Box
Trip Generation Liberty Pretty River Estate Phase II
Page 81: BLACKMOOR GATES - Town of Collingwood

53 48

16 31

0 26 27

0 0 16 48 31

0 0

0 0 4 2 52 33

0 0 0 0 30 17

0 0

0 0 0 0 1

0 0 3

28 1

4 3

28 1 28 14

4 3 43 73

2 0 26 12 16

4 0 0 0 0 18 25 8 27

15 10 0 0

19 12 3 2 18 12 18 12 8 27

20 6 0 0 46 6 46 6 46 6 16 25

20 6 0 0

0 0 0 1 0

0 3 0

2 1

3 3

LEGEND

R T L

Figure 5-1 Site Traffic Volumes (2021)

Eden Oak Homes - Proposed Residential Subdivision

Town of Collingwood

May 2016

PM Peak HourSignal Control

AM Peak HourStop Control

Findlay Dr Tracey Ln

Poplar SideroadPoplar Sideroad

Poplar Sideroad

Hu

ron

tari

o

County Rd 124

Hurontario St

Portland St

vinod.soman
Text Box
Eden Oak McNabb Subdivision
Page 82: BLACKMOOR GATES - Town of Collingwood

APPENDIX

G FUTURE

BACKGROUND

TRAFFIC

CONDITIONS

ANALYSIS

SYCNHRO

OUTPUT SHEETS

Page 83: BLACKMOOR GATES - Town of Collingwood

Lanes, Volumes, Timings

1: Hurontario Street & Campbell Street 04/18/2018

Future Background A.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Traffic Volume (vph) 51 65 58 54 47 30 65 661 82 22 290 30

Future Volume (vph) 51 65 58 54 47 30 65 661 82 22 290 30

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900

Lane Width (m) 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6

Grade (%) 0% 0% 0% 0%

Storage Length (m) 0.0 0.0 0.0 0.0 61.0 0.0 50.0 0.0

Storage Lanes 0 0 0 0 1 0 1 0

Taper Length (m) 7.5 7.5 7.5 7.5

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Ped Bike Factor 0.98 0.99 0.99 1.00 1.00 1.00

Frt 0.955 0.969 0.983 0.986

Flt Protected 0.986 0.980 0.950 0.950

Satd. Flow (prot) 0 1725 0 0 1592 0 1736 1730 0 1719 1736 0

Flt Permitted 0.885 0.800 0.552 0.241

Satd. Flow (perm) 0 1536 0 0 1297 0 1002 1730 0 436 1736 0

Right Turn on Red Yes Yes Yes Yes

Satd. Flow (RTOR) 43 26 15 13

Link Speed (k/h) 50 50 50 50

Link Distance (m) 240.3 173.8 184.6 148.9

Travel Time (s) 17.3 12.5 13.3 10.7

Confl. Peds. (#/hr) 20 5 5 20 11 5 5 11

Confl. Bikes (#/hr)

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Heavy Vehicles (%) 2% 4% 2% 19% 5% 10% 4% 7% 13% 5% 8% 4%

Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0

Parking (#/hr)

Mid-Block Traffic (%) 0% 0% 0% 0%

Adj. Flow (vph) 55 71 63 59 51 33 71 718 89 24 315 33

Shared Lane Traffic (%)

Lane Group Flow (vph) 0 189 0 0 143 0 71 807 0 24 348 0

Number of Detectors 1 1 1 1 1 0 1 0

Detector Template Left Left

Leading Detector (m) 2.0 7.5 2.0 7.5 7.5 0.0 7.5 0.0

Trailing Detector (m) 0.0 -1.5 0.0 -1.5 -1.5 0.0 -1.5 0.0

Turn Type Perm NA Perm NA Perm NA Perm NA

Protected Phases 4 8 2 6

Permitted Phases 4 8 2 6

Detector Phase 4 4 8 8 2 2 6 6

Switch Phase

Minimum Initial (s) 7.0 7.0 7.0 7.0 30.2 30.2 30.2 30.2

Minimum Split (s) 23.7 23.7 23.7 23.7 36.0 36.0 36.0 36.0

Total Split (s) 24.0 24.0 24.0 24.0 36.0 36.0 36.0 36.0

Total Split (%) 40.0% 40.0% 40.0% 40.0% 60.0% 60.0% 60.0% 60.0%

Maximum Green (s) 18.3 18.3 18.3 18.3 30.2 30.2 30.2 30.2

Yellow Time (s) 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3

All-Red Time (s) 2.4 2.4 2.4 2.4 2.5 2.5 2.5 2.5

Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0

Lanes, Volumes, Timings

1: Hurontario Street & Campbell Street 04/18/2018

Future Background A.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Total Lost Time (s) 5.7 5.7 5.8 5.8 5.8 5.8

Lead/Lag

Lead-Lag Optimize?

Vehicle Extension (s) 3.0 3.0 3.0 3.0 0.2 0.2 0.2 0.2

Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Recall Mode None None None None Max Max Max Max

Walk Time (s) 7.0 7.0 7.0 7.0 16.0 16.0 16.0 16.0

Flash Dont Walk (s) 11.0 11.0 11.0 11.0 14.0 14.0 14.0 14.0

Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0

Act Effct Green (s) 10.8 10.8 34.6 34.6 34.6 34.6

Actuated g/C Ratio 0.20 0.20 0.65 0.65 0.65 0.65

v/c Ratio 0.55 0.50 0.11 0.71 0.08 0.31

Control Delay 20.4 21.6 6.7 15.0 7.4 7.0

Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0

Total Delay 20.4 21.6 6.7 15.0 7.4 7.0

LOS C C A B A A

Approach Delay 20.4 21.6 14.3 7.1

Approach LOS C C B A

Queue Length 50th (m) 12.8 10.2 2.7 52.1 0.9 14.7

Queue Length 95th (m) 28.3 23.8 9.3 #144.6 4.6 35.6

Internal Link Dist (m) 216.3 149.8 160.6 124.9

Turn Bay Length (m) 61.0 50.0

Base Capacity (vph) 559 465 653 1133 284 1136

Starvation Cap Reductn 0 0 0 0 0 0

Spillback Cap Reductn 0 0 0 0 0 0

Storage Cap Reductn 0 0 0 0 0 0

Reduced v/c Ratio 0.34 0.31 0.11 0.71 0.08 0.31

Intersection Summary

Area Type: Other

Cycle Length: 60

Actuated Cycle Length: 53.1

Natural Cycle: 60

Control Type: Semi Act-Uncoord

Maximum v/c Ratio: 0.71

Intersection Signal Delay: 14.0 Intersection LOS: B

Intersection Capacity Utilization 76.9% ICU Level of Service D

Analysis Period (min) 15

# 95th percentile volume exceeds capacity, queue may be longer.

Queue shown is maximum after two cycles.

Splits and Phases: 1: Hurontario Street & Campbell Street

Page 84: BLACKMOOR GATES - Town of Collingwood

HCM Unsignalized Intersection Capacity Analysis

2: Maple Street & Campbell Street 04/18/2018

Future Background A.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Traffic Volume (veh/h) 41 163 6 0 103 52 3 1 3 20 2 11

Future Volume (Veh/h) 41 163 6 0 103 52 3 1 3 20 2 11

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 45 177 7 0 112 57 3 1 3 22 2 12

Pedestrians 21 11 11 8

Lane Width (m) 3.6 3.6 3.6 3.6

Walking Speed (m/s) 1.2 1.2 1.2 1.2

Percent Blockage 2 1 1 1

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (m) 240

pX, platoon unblocked

vC, conflicting volume 177 195 456 458 202 434 434 170

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 177 195 456 458 202 434 434 170

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 97 100 99 100 100 96 100 99

cM capacity (veh/h) 1402 1365 478 478 828 506 494 859

Direction, Lane # EB 1 WB 1 NB 1 SB 1

Volume Total 229 169 7 36

Volume Left 45 0 3 22

Volume Right 7 57 3 12

cSH 1402 1365 584 585

Volume to Capacity 0.03 0.00 0.01 0.06

Queue Length 95th (m) 0.8 0.0 0.3 1.6

Control Delay (s) 1.7 0.0 11.2 11.6

Lane LOS A B B

Approach Delay (s) 1.7 0.0 11.2 11.6

Approach LOS B B

Intersection Summary

Average Delay 2.0

Intersection Capacity Utilization 40.2% ICU Level of Service A

Analysis Period (min) 15

Page 85: BLACKMOOR GATES - Town of Collingwood

HCM Unsignalized Intersection Capacity Analysis

2: Maple Street & Campbell Street 04/27/2018

Future Background P.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Traffic Volume (veh/h) 12 82 3 1 151 29 2 0 1 21 1 41

Future Volume (Veh/h) 12 82 3 1 151 29 2 0 1 21 1 41

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 13 89 3 1 164 32 2 0 1 23 1 45

Pedestrians

Lane Width (m)

Walking Speed (m/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (m) 240

pX, platoon unblocked

vC, conflicting volume 196 92 344 314 90 300 300 180

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 196 92 344 314 90 300 300 180

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 99 100 100 100 100 96 100 95

cM capacity (veh/h) 1389 1515 577 595 973 651 610 868

Direction, Lane # EB 1 WB 1 NB 1 SB 1

Volume Total 105 197 3 69

Volume Left 13 1 2 23

Volume Right 3 32 1 45

cSH 1389 1515 668 777

Volume to Capacity 0.01 0.00 0.00 0.09

Queue Length 95th (m) 0.2 0.0 0.1 2.3

Control Delay (s) 1.0 0.0 10.4 10.1

Lane LOS A A B B

Approach Delay (s) 1.0 0.0 10.4 10.1

Approach LOS B B

Intersection Summary

Average Delay 2.3

Intersection Capacity Utilization 23.8% ICU Level of Service A

Analysis Period (min) 15

Page 86: BLACKMOOR GATES - Town of Collingwood

Lanes, Volumes, Timings

1: Hurontario Street & Campbell Street 04/18/2018

Future Background P.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Traffic Volume (vph) 36 48 18 15 45 16 42 496 11 18 569 78

Future Volume (vph) 36 48 18 15 45 16 42 496 11 18 569 78

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900

Lane Width (m) 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6

Grade (%) 0% 0% 0% 0%

Storage Length (m) 0.0 0.0 0.0 0.0 61.0 0.0 50.0 0.0

Storage Lanes 0 0 0 0 1 0 1 0

Taper Length (m) 7.5 7.5 7.5 7.5

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Ped Bike Factor 0.99 0.99 1.00 1.00 1.00 1.00

Frt 0.976 0.972 0.997 0.982

Flt Protected 0.983 0.990 0.950 0.950

Satd. Flow (prot) 0 1814 0 0 1686 0 1805 1791 0 1410 1748 0

Flt Permitted 0.850 0.916 0.323 0.424

Satd. Flow (perm) 0 1565 0 0 1558 0 613 1791 0 627 1748 0

Right Turn on Red Yes Yes Yes Yes

Satd. Flow (RTOR) 19 17 3 17

Link Speed (k/h) 50 50 50 50

Link Distance (m) 240.3 173.8 184.6 148.9

Travel Time (s) 17.3 12.5 13.3 10.7

Confl. Peds. (#/hr) 4 5 5 4 6 8 8 6

Confl. Bikes (#/hr)

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Heavy Vehicles (%) 0% 0% 0% 20% 0% 19% 0% 5% 37% 28% 7% 2%

Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0

Parking (#/hr)

Mid-Block Traffic (%) 0% 0% 0% 0%

Adj. Flow (vph) 39 52 20 16 49 17 46 539 12 20 618 85

Shared Lane Traffic (%)

Lane Group Flow (vph) 0 111 0 0 82 0 46 551 0 20 703 0

Number of Detectors 1 1 1 1 1 0 1 0

Detector Template Left Thru Left Thru Left Left

Leading Detector (m) 2.0 7.5 2.0 7.5 7.5 0.0 7.5 0.0

Trailing Detector (m) 0.0 -1.5 0.0 -1.5 -1.5 0.0 -1.5 0.0

Turn Type Perm NA Perm NA Perm NA Perm NA

Protected Phases 4 8 2 6

Permitted Phases 4 8 2 6

Detector Phase 4 4 8 8 2 2 6 6

Switch Phase

Minimum Initial (s) 7.0 7.0 7.0 7.0 30.2 30.2 30.2 30.2

Minimum Split (s) 23.7 23.7 23.7 23.7 36.0 36.0 36.0 36.0

Total Split (s) 24.0 24.0 24.0 24.0 36.0 36.0 36.0 36.0

Total Split (%) 40.0% 40.0% 40.0% 40.0% 60.0% 60.0% 60.0% 60.0%

Maximum Green (s) 18.3 18.3 18.3 18.3 30.2 30.2 30.2 30.2

Yellow Time (s) 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3

All-Red Time (s) 2.4 2.4 2.4 2.4 2.5 2.5 2.5 2.5

Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0

Lanes, Volumes, Timings

1: Hurontario Street & Campbell Street 04/18/2018

Future Background P.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Total Lost Time (s) 5.7 5.7 5.8 5.8 5.8 5.8

Lead/Lag

Lead-Lag Optimize?

Vehicle Extension (s) 3.0 3.0 3.0 3.0 0.2 0.2 0.2 0.2

Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Recall Mode None None None None Max Max Max Max

Walk Time (s) 7.0 7.0 7.0 7.0 16.0 16.0 16.0 16.0

Flash Dont Walk (s) 11.0 11.0 11.0 11.0 14.0 14.0 14.0 14.0

Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0

Act Effct Green (s) 8.7 8.7 34.4 34.4 34.4 34.4

Actuated g/C Ratio 0.17 0.17 0.68 0.68 0.68 0.68

v/c Ratio 0.39 0.29 0.11 0.45 0.05 0.59

Control Delay 20.1 17.9 5.9 7.3 5.3 9.3

Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0

Total Delay 20.1 17.9 5.9 7.3 5.3 9.3

LOS C B A A A A

Approach Delay 20.1 17.9 7.2 9.2

Approach LOS C B A A

Queue Length 50th (m) 7.8 5.4 1.5 24.1 0.6 34.6

Queue Length 95th (m) 19.2 14.8 5.9 52.7 3.1 78.8

Internal Link Dist (m) 216.3 149.8 160.6 124.9

Turn Bay Length (m) 61.0 50.0

Base Capacity (vph) 575 572 414 1211 423 1187

Starvation Cap Reductn 0 0 0 0 0 0

Spillback Cap Reductn 0 0 0 0 0 0

Storage Cap Reductn 0 0 0 0 0 0

Reduced v/c Ratio 0.19 0.14 0.11 0.45 0.05 0.59

Intersection Summary

Area Type: Other

Cycle Length: 60

Actuated Cycle Length: 50.9

Natural Cycle: 60

Control Type: Semi Act-Uncoord

Maximum v/c Ratio: 0.59

Intersection Signal Delay: 9.7 Intersection LOS: A

Intersection Capacity Utilization 55.1% ICU Level of Service B

Analysis Period (min) 15

Splits and Phases: 1: Hurontario Street & Campbell Street

Page 87: BLACKMOOR GATES - Town of Collingwood

HCM Unsignalized Intersection Capacity Analysis

2: Maple Street & Campbell Street 04/27/2018

Future Background P.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Traffic Volume (veh/h) 12 82 3 1 151 29 2 0 1 21 1 41

Future Volume (Veh/h) 12 82 3 1 151 29 2 0 1 21 1 41

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 13 89 3 1 164 32 2 0 1 23 1 45

Pedestrians

Lane Width (m)

Walking Speed (m/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (m) 240

pX, platoon unblocked

vC, conflicting volume 196 92 344 314 90 300 300 180

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 196 92 344 314 90 300 300 180

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 99 100 100 100 100 96 100 95

cM capacity (veh/h) 1389 1515 577 595 973 651 610 868

Direction, Lane # EB 1 WB 1 NB 1 SB 1

Volume Total 105 197 3 69

Volume Left 13 1 2 23

Volume Right 3 32 1 45

cSH 1389 1515 668 777

Volume to Capacity 0.01 0.00 0.00 0.09

Queue Length 95th (m) 0.2 0.0 0.1 2.3

Control Delay (s) 1.0 0.0 10.4 10.1

Lane LOS A A B B

Approach Delay (s) 1.0 0.0 10.4 10.1

Approach LOS B B

Intersection Summary

Average Delay 2.3

Intersection Capacity Utilization 23.8% ICU Level of Service A

Analysis Period (min) 15

Page 88: BLACKMOOR GATES - Town of Collingwood

APPENDIX

H

TOTAL TRAFFIC

CONDITIONS

ANALYSIS SYCNHRO

OUTPUT SHEETS.

Page 89: BLACKMOOR GATES - Town of Collingwood

Lanes, Volumes, Timings

1: Hurontario Street & Campbell Street 04/18/2018

Future Total A.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Traffic Volume (vph) 58 65 66 54 47 30 68 662 82 22 291 32

Future Volume (vph) 58 65 66 54 47 30 68 662 82 22 291 32

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900

Lane Width (m) 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6

Grade (%) 0% 0% 0% 0%

Storage Length (m) 0.0 0.0 0.0 0.0 61.0 0.0 50.0 0.0

Storage Lanes 0 0 0 0 1 0 1 0

Taper Length (m) 7.5 7.5 7.5 7.5

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Ped Bike Factor 0.98 0.99 0.99 1.00 1.00 1.00

Frt 0.953 0.969 0.983 0.985

Flt Protected 0.985 0.980 0.950 0.950

Satd. Flow (prot) 0 1720 0 0 1592 0 1736 1730 0 1719 1734 0

Flt Permitted 0.873 0.788 0.551 0.213

Satd. Flow (perm) 0 1512 0 0 1277 0 1000 1730 0 385 1734 0

Right Turn on Red Yes Yes Yes Yes

Satd. Flow (RTOR) 46 26 15 13

Link Speed (k/h) 50 50 50 50

Link Distance (m) 123.6 173.8 184.6 148.9

Travel Time (s) 8.9 12.5 13.3 10.7

Confl. Peds. (#/hr) 20 5 5 20 11 5 5 11

Confl. Bikes (#/hr)

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Heavy Vehicles (%) 2% 4% 2% 19% 5% 10% 4% 7% 13% 5% 8% 4%

Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0

Parking (#/hr)

Mid-Block Traffic (%) 0% 0% 0% 0%

Adj. Flow (vph) 63 71 72 59 51 33 74 720 89 24 316 35

Shared Lane Traffic (%)

Lane Group Flow (vph) 0 206 0 0 143 0 74 809 0 24 351 0

Number of Detectors 1 1 1 1 1 0 1 0

Detector Template Left Left

Leading Detector (m) 2.0 7.5 2.0 7.5 7.5 0.0 7.5 0.0

Trailing Detector (m) 0.0 -1.5 0.0 -1.5 -1.5 0.0 -1.5 0.0

Turn Type Perm NA Perm NA Perm NA Perm NA

Protected Phases 4 8 2 6

Permitted Phases 4 8 2 6

Detector Phase 4 4 8 8 2 2 6 6

Switch Phase

Minimum Initial (s) 7.0 7.0 7.0 7.0 30.2 30.2 30.2 30.2

Minimum Split (s) 23.7 23.7 23.7 23.7 36.0 36.0 36.0 36.0

Total Split (s) 24.0 24.0 24.0 24.0 36.0 36.0 36.0 36.0

Total Split (%) 40.0% 40.0% 40.0% 40.0% 60.0% 60.0% 60.0% 60.0%

Maximum Green (s) 18.3 18.3 18.3 18.3 30.2 30.2 30.2 30.2

Yellow Time (s) 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3

All-Red Time (s) 2.4 2.4 2.4 2.4 2.5 2.5 2.5 2.5

Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0

Lanes, Volumes, Timings

1: Hurontario Street & Campbell Street 04/18/2018

Future Total A.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Total Lost Time (s) 5.7 5.7 5.8 5.8 5.8 5.8

Lead/Lag

Lead-Lag Optimize?

Vehicle Extension (s) 3.0 3.0 3.0 3.0 0.2 0.2 0.2 0.2

Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Recall Mode None None None None Max Max Max Max

Walk Time (s) 7.0 7.0 7.0 7.0 16.0 16.0 16.0 16.0

Flash Dont Walk (s) 11.0 11.0 11.0 11.0 14.0 14.0 14.0 14.0

Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0

Act Effct Green (s) 11.4 11.4 31.5 31.5 31.5 31.5

Actuated g/C Ratio 0.21 0.21 0.58 0.58 0.58 0.58

v/c Ratio 0.58 0.50 0.13 0.80 0.11 0.35

Control Delay 21.3 21.0 7.2 19.1 8.3 7.9

Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0

Total Delay 21.3 21.0 7.2 19.1 8.3 7.9

LOS C C A B A A

Approach Delay 21.3 21.0 18.1 7.9

Approach LOS C C B A

Queue Length 50th (m) 14.2 10.2 3.0 54.7 1.0 15.5

Queue Length 95th (m) 30.7 23.7 10.2 #149.9 5.0 37.9

Internal Link Dist (m) 99.6 149.8 160.6 124.9

Turn Bay Length (m) 61.0 50.0

Base Capacity (vph) 539 447 578 1006 222 1008

Starvation Cap Reductn 0 0 0 0 0 0

Spillback Cap Reductn 0 0 0 0 0 0

Storage Cap Reductn 0 0 0 0 0 0

Reduced v/c Ratio 0.38 0.32 0.13 0.80 0.11 0.35

Intersection Summary

Area Type: Other

Cycle Length: 60

Actuated Cycle Length: 54.5

Natural Cycle: 60

Control Type: Semi Act-Uncoord

Maximum v/c Ratio: 0.80

Intersection Signal Delay: 16.4 Intersection LOS: B

Intersection Capacity Utilization 79.2% ICU Level of Service D

Analysis Period (min) 15

# 95th percentile volume exceeds capacity, queue may be longer.

Queue shown is maximum after two cycles.

Splits and Phases: 1: Hurontario Street & Campbell Street

Page 90: BLACKMOOR GATES - Town of Collingwood

HCM Unsignalized Intersection Capacity Analysis

2: Maple Street & Campbell Street 04/18/2018

Future Total A.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Traffic Volume (veh/h) 41 168 6 0 115 52 3 1 3 20 2 11

Future Volume (Veh/h) 41 168 6 0 115 52 3 1 3 20 2 11

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 45 183 7 0 125 57 3 1 3 22 2 12

Pedestrians 21 11 11 8

Lane Width (m) 3.6 3.6 3.6 3.6

Walking Speed (m/s) 1.2 1.2 1.2 1.2

Percent Blockage 2 1 1 1

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (m) 240

pX, platoon unblocked

vC, conflicting volume 190 201 475 478 208 452 452 182

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 190 201 475 478 208 452 452 182

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 97 100 99 100 100 96 100 99

cM capacity (veh/h) 1387 1358 464 466 822 491 482 844

Direction, Lane # EB 1 WB 1 NB 1 SB 1

Volume Total 235 182 7 36

Volume Left 45 0 3 22

Volume Right 7 57 3 12

cSH 1387 1358 571 570

Volume to Capacity 0.03 0.00 0.01 0.06

Queue Length 95th (m) 0.8 0.0 0.3 1.6

Control Delay (s) 1.7 0.0 11.4 11.7

Lane LOS A B B

Approach Delay (s) 1.7 0.0 11.4 11.7

Approach LOS B B

Intersection Summary

Average Delay 2.0

Intersection Capacity Utilization 40.9% ICU Level of Service A

Analysis Period (min) 15

HCM Unsignalized Intersection Capacity Analysis

3: Site Driveway & Campbell Street 04/18/2018

Future Total A.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 2

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Traffic Volume (veh/h) 170 5 5 142 12 14

Future Volume (Veh/h) 170 5 5 142 12 14

Sign Control Free Free Stop

Grade 0% 0% 0%

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 185 5 5 154 13 15

Pedestrians

Lane Width (m)

Walking Speed (m/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (m) 124

pX, platoon unblocked

vC, conflicting volume 190 352 188

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 190 352 188

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 100 98 98

cM capacity (veh/h) 1384 644 855

Direction, Lane # EB 1 WB 1 NB 1

Volume Total 190 159 28

Volume Left 0 5 13

Volume Right 5 0 15

cSH 1700 1384 742

Volume to Capacity 0.11 0.00 0.04

Queue Length 95th (m) 0.0 0.1 0.9

Control Delay (s) 0.0 0.3 10.0

Lane LOS A B

Approach Delay (s) 0.0 0.3 10.0

Approach LOS B

Intersection Summary

Average Delay 0.9

Intersection Capacity Utilization 21.5% ICU Level of Service A

Analysis Period (min) 15

Page 91: BLACKMOOR GATES - Town of Collingwood

Lanes, Volumes, Timings

1: Hurontario Street & Campbell Street 04/18/2018

Future Total P.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 1

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Traffic Volume (vph) 40 48 20 15 45 16 48 497 11 18 571 89

Future Volume (vph) 40 48 20 15 45 16 48 497 11 18 571 89

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900

Lane Width (m) 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6 3.6

Grade (%) 0% 0% 0% 0%

Storage Length (m) 0.0 0.0 0.0 0.0 61.0 0.0 50.0 0.0

Storage Lanes 0 0 0 0 1 0 1 0

Taper Length (m) 7.5 7.5 7.5 7.5

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Ped Bike Factor 0.99 0.99 1.00 1.00 1.00 1.00

Frt 0.975 0.972 0.997 0.980

Flt Protected 0.982 0.990 0.950 0.950

Satd. Flow (prot) 0 1810 0 0 1686 0 1805 1791 0 1410 1745 0

Flt Permitted 0.845 0.921 0.312 0.422

Satd. Flow (perm) 0 1554 0 0 1566 0 592 1791 0 624 1745 0

Right Turn on Red Yes Yes Yes Yes

Satd. Flow (RTOR) 20 17 3 19

Link Speed (k/h) 50 50 50 50

Link Distance (m) 120.7 173.8 184.6 148.9

Travel Time (s) 8.7 12.5 13.3 10.7

Confl. Peds. (#/hr) 4 5 5 4 6 8 8 6

Confl. Bikes (#/hr)

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

Heavy Vehicles (%) 0% 0% 0% 20% 0% 19% 0% 5% 37% 28% 7% 2%

Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0

Parking (#/hr)

Mid-Block Traffic (%) 0% 0% 0% 0%

Adj. Flow (vph) 43 52 22 16 49 17 52 540 12 20 621 97

Shared Lane Traffic (%)

Lane Group Flow (vph) 0 117 0 0 82 0 52 552 0 20 718 0

Number of Detectors 1 1 1 1 1 0 1 0

Detector Template Left Thru Left Thru Left Left

Leading Detector (m) 2.0 7.5 2.0 7.5 7.5 0.0 7.5 0.0

Trailing Detector (m) 0.0 -1.5 0.0 -1.5 -1.5 0.0 -1.5 0.0

Turn Type Perm NA Perm NA Perm NA Perm NA

Protected Phases 4 8 2 6

Permitted Phases 4 8 2 6

Detector Phase 4 4 8 8 2 2 6 6

Switch Phase

Minimum Initial (s) 7.0 7.0 7.0 7.0 30.2 30.2 30.2 30.2

Minimum Split (s) 23.7 23.7 23.7 23.7 36.0 36.0 36.0 36.0

Total Split (s) 24.0 24.0 24.0 24.0 36.0 36.0 36.0 36.0

Total Split (%) 40.0% 40.0% 40.0% 40.0% 60.0% 60.0% 60.0% 60.0%

Maximum Green (s) 18.3 18.3 18.3 18.3 30.2 30.2 30.2 30.2

Yellow Time (s) 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3

All-Red Time (s) 2.4 2.4 2.4 2.4 2.5 2.5 2.5 2.5

Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0

Lanes, Volumes, Timings

1: Hurontario Street & Campbell Street 04/18/2018

Future Total P.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 2

Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Total Lost Time (s) 5.7 5.7 5.8 5.8 5.8 5.8

Lead/Lag

Lead-Lag Optimize?

Vehicle Extension (s) 3.0 3.0 3.0 3.0 0.2 0.2 0.2 0.2

Minimum Gap (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Time Before Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Time To Reduce (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Recall Mode None None None None Max Max Max Max

Walk Time (s) 7.0 7.0 7.0 7.0 16.0 16.0 16.0 16.0

Flash Dont Walk (s) 11.0 11.0 11.0 11.0 14.0 14.0 14.0 14.0

Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0

Act Effct Green (s) 8.9 8.9 34.4 34.4 34.4 34.4

Actuated g/C Ratio 0.17 0.17 0.67 0.67 0.67 0.67

v/c Ratio 0.41 0.29 0.13 0.46 0.05 0.61

Control Delay 20.3 17.7 6.2 7.5 5.4 9.8

Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0

Total Delay 20.3 17.7 6.2 7.5 5.4 9.8

LOS C B A A A A

Approach Delay 20.3 17.7 7.4 9.7

Approach LOS C B A A

Queue Length 50th (m) 8.2 5.4 1.8 24.6 0.6 36.4

Queue Length 95th (m) 20.0 14.8 6.8 53.9 3.2 83.7

Internal Link Dist (m) 96.7 149.8 160.6 124.9

Turn Bay Length (m) 61.0 50.0

Base Capacity (vph) 570 572 398 1207 420 1181

Starvation Cap Reductn 0 0 0 0 0 0

Spillback Cap Reductn 0 0 0 0 0 0

Storage Cap Reductn 0 0 0 0 0 0

Reduced v/c Ratio 0.21 0.14 0.13 0.46 0.05 0.61

Intersection Summary

Area Type: Other

Cycle Length: 60

Actuated Cycle Length: 51.1

Natural Cycle: 60

Control Type: Semi Act-Uncoord

Maximum v/c Ratio: 0.61

Intersection Signal Delay: 10.0 Intersection LOS: B

Intersection Capacity Utilization 60.8% ICU Level of Service B

Analysis Period (min) 15

Splits and Phases: 1: Hurontario Street & Campbell Street

Page 92: BLACKMOOR GATES - Town of Collingwood

HCM Unsignalized Intersection Capacity Analysis

2: Maple Street & Campbell Street 04/18/2018

Future Total P.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 1

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Traffic Volume (veh/h) 12 91 3 1 160 29 2 0 1 21 1 41

Future Volume (Veh/h) 12 91 3 1 160 29 2 0 1 21 1 41

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 13 99 3 1 174 32 2 0 1 23 1 45

Pedestrians

Lane Width (m)

Walking Speed (m/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (m) 240

pX, platoon unblocked

vC, conflicting volume 206 102 364 334 100 320 320 190

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 206 102 364 334 100 320 320 190

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 99 100 100 100 100 96 100 95

cM capacity (veh/h) 1377 1503 559 580 960 632 594 857

Direction, Lane # EB 1 WB 1 NB 1 SB 1

Volume Total 115 207 3 69

Volume Left 13 1 2 23

Volume Right 3 32 1 45

cSH 1377 1503 650 762

Volume to Capacity 0.01 0.00 0.00 0.09

Queue Length 95th (m) 0.2 0.0 0.1 2.4

Control Delay (s) 0.9 0.0 10.6 10.2

Lane LOS A A B B

Approach Delay (s) 0.9 0.0 10.6 10.2

Approach LOS B B

Intersection Summary

Average Delay 2.2

Intersection Capacity Utilization 24.3% ICU Level of Service A

Analysis Period (min) 15

HCM Unsignalized Intersection Capacity Analysis

3: Site Driveway & Campbell Street 04/18/2018

Future Total P.M. Peak Hour 04/13/2018 Synchro 9 Report

Page 2

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Traffic Volume (veh/h) 96 9 16 165 9 6

Future Volume (Veh/h) 96 9 16 165 9 6

Sign Control Free Free Stop

Grade 0% 0% 0%

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 104 10 17 179 10 7

Pedestrians

Lane Width (m)

Walking Speed (m/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (m) 121

pX, platoon unblocked

vC, conflicting volume 114 322 109

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 114 322 109

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 99 98 99

cM capacity (veh/h) 1475 664 945

Direction, Lane # EB 1 WB 1 NB 1

Volume Total 114 196 17

Volume Left 0 17 10

Volume Right 10 0 7

cSH 1700 1475 756

Volume to Capacity 0.07 0.01 0.02

Queue Length 95th (m) 0.0 0.3 0.6

Control Delay (s) 0.0 0.7 9.9

Lane LOS A A

Approach Delay (s) 0.0 0.7 9.9

Approach LOS A

Intersection Summary

Average Delay 1.0

Intersection Capacity Utilization 26.2% ICU Level of Service A

Analysis Period (min) 15