Blast furnace revamping solution:
Safety first, success on time
whatever happens
BOCCARD STEEL SOLUTIONSBlast Furnace Revamping
BLAST FURNACE REVAMPING
You want to achieve a new construction, modification, repairs and/or optimization with controlled production and guaranteed safety for your blast furnace project.
Boccard is an industrial integrator that strives to offer you the best, most cost-effective and safest choice in heavy industrial manufacturing. We offer innovative and integrated solutions for the construction of your Blast Furnace. By using our global expertise and resources in all skill sectors we are able to fully manage the project from start to finish.
An efficient preparation and a proactive team to ensure that the Restart is On Time.
BLAST FURNACE REVAMPING
MEANS DEVELOPED TO MEET YOUR REQUIREMENTS
LIFTING/WELDING PROVEN TECHNICAL PERFORMANCES
Welding quality• Optimization studies of the welding processes and metallurgical preparation
• 100% of the welders are qualified
• Implementation of continuous controls throughout the NDT (UT, MT, PT, VT, RT)
• Boccard achieves 100% of the WPQR (Welding Procedure Qualification Record)
3D laser• 3D modeling for a tailored integration of the shell’s parts
Fixed and mobile platforms• Design studies
• Manufacturing
• Commissioning
Cooling systemBoccard studying the best solutions to optimize the cooling of blast furnaces:
• Engineering
• Channel cooling manufacturing
Procedures of operations
After an organized preparation and planification period, Boccard develops processes to handle equipment inside of the blast furnaces (staves,etc.) involving mechanized and robotic solutions.
These technologies guarantee secure operations (Safety first).
YOUR BENEFITS
TRANSFERT THERMIQUE ET AGITATIONBLAST FURNACE REVAMPING
Boccard accompanies you and realizes for you the following specific operations:
• Studies, calculations
• Heavy load lifting
• Thick welding
AN INNOVATIVE APPROACH
• Reactivity for a systematic management of hazards
• Risk removal of the interfaces associated to multi-disciplines proposed by Boccard
• Expertise in the management of subcontractors
• Significant mobilization of qualified operational resources
• Proven experience in managing complex projects
• Safety procedures implementation before the shutdown
• Works before shutdown are optimized in order to generate free periods
+
Serenity
Entrust Boccardto build your project
from A to Zlimiting the risk
interfaces
+
Time savings
Boccard innovates to optimize
the performance of its operations
+
Lifting solutions• Experience in handling heavy loads
Thick weldingHigh performance welding processes qualified by Boccard (Innershield, coated electrodes), all positions:
• Max 120mm thickness with Post Weld Heat Treatment (PWHT)
• Max 80mm thickness without PWHT
Performance
Boccard has morethan 450
welding procedurescarried out internally
+A CUSTOMIZED EXPERTISE
ArcelorMittal Dunkerque - HF-2
[COUPE CONCENTRICITE CREUSET] Relevé 2015.
Agence Côte d’Opale
Ingénieurs - Géomètres Experts D.P.L.G
Aménagement - Environnement
Bureau d'Etude V.R.D
Parc de l’étoile
Rue Galilée
59760 GRANDE-SYNTHE
Tél : 03.28.27.98.58 Fax : 03.28.27.98.61
www.ma-geo.fr
BOCCARD CONSTRUCTION MAINTENANCE
Contact: [email protected]
Boc
card
Bla
st F
urna
ce re
vam
ping
leafl
et -
201
7 ve
rsio
n/D
esig
n an
d co
nstr
uctio
n: B
occa
rd
/ p
hoto
s : B
occa
rd -
iSoc
k/ 2
016
A global reach with local capabilities