BLIP Operations – 162 days of operation o Safety o Forklift needs a new tire o Production o Sr-82 targets out of beam as of 14 Jun o New Sr-82 targets in 16 Jun o Next Sr-82 production starts 1 Jun o New Be-7 chemistry testing last week and this week Anna Goldberg 16 Jun 2015

Upload: howard-cobb

Post on 17-Jan-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BLIP Operations – 162 days of operation o Safety o Forklift needs a new tire o Production o Sr-82 targets out of beam as of 14 Jun o New Sr-82 targets

BLIP Operations – 162 days of operation

o Safety

o Forklift needs a new tire

o Production o Sr-82 targets out of beam as of 14 Jun

o New Sr-82 targets in 16 Jun

o Next Sr-82 production starts 1 Jun

o New Be-7 chemistry testing last week and this week

Anna Goldberg16 Jun 2015

Goldberg, Anna
do i mention Ni-63 decon efforts at all?
Goldberg, Anna
I'll get the right date from Wolfgang next week
Goldberg, Anna
I'll get the infro from Lou on Monday
Page 2: BLIP Operations – 162 days of operation o Safety o Forklift needs a new tire o Production o Sr-82 targets out of beam as of 14 Jun o New Sr-82 targets

BLIP Operations – 162 days of operation

o BLIP Maintenance o Last one on 10 Jun (~7 hr)

o Next scheduled for 24 Jun

o Researcho Ac-225 out of beam 14 Jun (10 day irradiation)

o Two Pt targets for 1 hr each (15 & 16 Jun)

o As target safety submission this week

Anna Goldberg16 Jun 2015

Goldberg, Anna
do i mention Ni-63 decon efforts at all?
Goldberg, Anna
I'll get the right date from Wolfgang next week
Goldberg, Anna
I'll get the infro from Lou on Monday