Overview
Plot & Fit V-I Historical Trends of Fit Parameter Monitoring of Current, HV, Temp. etc Conclusions
Plot V-I
FIT: I(V) = a+bV V<4000 Volt
I(V) = a+bV +k (exp(V/c) –1) V>5000 Volt
Plot V-I
< 1 July > 1 July
Historical Trend of Linear Slope
T = 20 exp(-(T-20)) = 1/12
Historical Trend of Exp. Slope
5 – 15 June Currents
CAEN H.V.
60 µA
11 kV
24 June – 8 JulyCurrents
CAEN H.V.
Currents
Temperatures Gas Flow
134 A
SF6Isob.
Currents
Isob. Flow
CAEN H.V.
Currents 9 – 16 July
Currents
CAEN H.V.
Temperatures
Conclusions
Behavior of BML-D 001 quite “stable” Increasing current on one layer due to the
problem on isobutane Delay between HV and “regime” current needs
more investigation Continuous Monitoring of HV, Current, Gas
Flow & Env. Parameters is Essential