boac briefing 2014-05-04
TRANSCRIPT
![Page 1: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/1.jpg)
LAX CONNECTED Board of Airport Commissioners Ground Transportation Workshop May 5, 2014
![Page 2: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/2.jpg)
BOAC PRESENTATION
Workshop Goals
• Share our work - No decisions will be made today! • Provide overview of general objectives and elements for LAX’s
ground transportation system. • Demonstrate planning progress on critical elements. • Outline future steps needed to deliver a new ground transportation
system at LAX.
2
![Page 3: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/3.jpg)
BOAC PRESENTATION
Ground Transportation Workshop
Agenda
Context
• Key Problems • Overview of the Solution
Details
• Consolidated Rent-A-Car Center (CONRAC)
• Automated People Mover (APM)
• Intermodal Transportation Facility (ITF/LAX Connect)
• Metro • Roadways
Path Forward
• Key Factors of Success • Timeline
3
![Page 4: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/4.jpg)
BOAC PRESENTATION
Not Enough Curb Curb is too short and too shallow. Outer Curb Between Traffic lanes. Poor passenger experience now. Increased demand will make this worse.
4
CONTEXT
![Page 5: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/5.jpg)
BOAC PRESENTATION
Shared roadway and curb creates conflict between private, commercial, and service vehicles.
5
Mode Conflict
CONTEXT
![Page 6: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/6.jpg)
BOAC PRESENTATION
Limited Roadways Roadway capacity saturated during peaks. Low predictability for passengers. Peaks will be longer as activity increases.
6
CONTEXT
![Page 7: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/7.jpg)
BOAC PRESENTATION
CONTEXT
Single Option System
Regardless of mode choice, all airport users end up using the existing roadway and curb. Opportunities for new roadway or curb in the CTA is limited. LAWA does not have the facilities to efficiently or conveniently shift modes outside of the CTA to relieve congestion and improve the level of service.
![Page 8: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/8.jpg)
BOAC PRESENTATION
CONTEXT An APM unlocks new ways to access LAX.
![Page 9: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/9.jpg)
BOAC PRESENTATION
CONTEXT Today’s Congestion
![Page 10: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/10.jpg)
BOAC PRESENTATION
CONTEXT Tomorrow: CONRAC
![Page 11: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/11.jpg)
BOAC PRESENTATION
CONTEXT Tomorrow: ITF Commercial Modes
![Page 12: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/12.jpg)
BOAC PRESENTATION
CONTEXT Tomorrow: Private Vehicles And Metro
![Page 13: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/13.jpg)
BOAC PRESENTATION
CONRAC
APM – CTA Section (2 Alternatives)
APM – ITF Section
APM – CONRAC Section
![Page 14: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/14.jpg)
BOAC PRESENTATION
ITF Metro Roads
APM – CTA Section (2 Alternatives)
APM – ITF Section
APM – CONRAC Section
![Page 15: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/15.jpg)
BOAC PRESENTATION
Click to edit Master title style
Program Focus
Define a new ground transportation system for LAX that is:
• Constructible
• Financially sustainable
• Offers a High-Quality Passenger Experience
![Page 16: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/16.jpg)
BOAC PRESENTATION
• Details provided today are the result of initial planning efforts, and represent concepts only.
• Prior to entering the project delivery phase, all program elements must undergo environmental review, preliminary design and engineering, and an extensive procurement process.
• LAWA will be conducting outreach concerning these proposals to solicit feedback from airport stakeholders.
Getting Into the Details
16
Context Details Path Forward
![Page 17: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/17.jpg)
BOAC PRESENTATION
CONRAC Making Renting and Returning a Car Simple and Efficient
![Page 18: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/18.jpg)
BOAC PRESENTATION
List of Airports with Operating CONRACs ABQ – Albuquerque AKG – Anchorage ATL – Atlanta BOS – Boston Logan BWI – Baltimore/Washington MDW – Chicago Midway CLE – Cleveland DFW – Dallas/Fort Worth FTL – Fort Lauderdale/Hollywood IAH – Houston MCI – Kansas City
18
Case Studies DETAILS | CONRAC
LAS – Las Vegas MEM – Memphis MIA – Miami JWN – Nashville MSY – New Orleans PHX – Phoenix SMF – Sacramento SFO – San Francisco SJC – San Jose SEA – Seattle
Over 20 CONRAC facilities have been built in the last 16 years
![Page 19: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/19.jpg)
BOAC PRESENTATION
Case Studies Phoenix Sky Harbor International Airport Miami International Airport
San Jose International Airport Atlanta International Airport
• Provide:
o Better customer service o Reduced roadway/curb
congestion o Improved air quality o Economies of scale
• Access mode options: o Walk o Bus o APM
• Landside constrained airports use APM access, including: o ATL o MIA o SFO
DETAILS | CONRAC
![Page 20: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/20.jpg)
BOAC PRESENTATION
Miami International Airport • Opened in 2010
• Initial access via consolidated buses
• APM Access provided after the first
year
• Reduced roadway and curb congestion
Case Studies DETAILS | CONRAC
![Page 21: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/21.jpg)
BOAC PRESENTATION
San Jose International Airport • Opened in 2010
• Directly adjacent to Terminal B
• 3,000 vehicle facility
• Reduced operating cost
• Reduced curb congestion by 20%
Case Studies DETAILS | CONRAC
![Page 22: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/22.jpg)
BOAC PRESENTATION
Non-chain
Larger Chain
Rental Cars: Today DETAILS | CONRAC
v
v
22
![Page 23: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/23.jpg)
BOAC PRESENTATION
DETAILS | CONRAC
Rental Cars: Tomorrow
23
![Page 24: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/24.jpg)
BOAC PRESENTATION
• Will reduce the number of people on the CTA roadway and curb by approximately 17%.
• Approximately 9% of assigned curb would become available for reprogramming.
CTA Congestion Relief
DETAILS | CONRAC
24
![Page 25: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/25.jpg)
BOAC PRESENTATION
Efficient Roadway Access Efficient access to and from the CONRAC is essential. Major ramp revisions necessary to allow direct freeway transitions for rental car customers.
DETAILS | CONRAC
25
CONRAC
I-105/405 Access
I-105 Access I-405
Access
![Page 26: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/26.jpg)
BOAC PRESENTATION
Key Findings & Next Steps
DETAILS | CONRAC
Key Findings
• Provides predictable congestion relief to CTA roadway/curbs • Good roadway access to/from freeway to improve visitor ease of access • Internal elements of CONRAC facility straightforward based on most recent
CONRAC designs
Next Steps
• Site Plan and Right-Sizing Planning efforts (underway) • Discussions with Rental Car Companies (underway) • Develop solutions for roadway access (underway) • Develop Project Phasing and Delivery Strategy • Initiate environmental review
26
![Page 27: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/27.jpg)
BOAC PRESENTATION
APM The Backbone of the Future Ground Transportation System
![Page 28: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/28.jpg)
BOAC PRESENTATION
APM Details
Phoenix Int. Airport - Sky Harbor Miami Int. Airport – Mia Mover
JFK - AirTrain Dallas / Fort Worth Int. Airport
Common characteristics for APMs around the country are: • Designed for airport
passengers • Automated & Grade Separated • 24-Hour Service • Very short wait times at station
(3 minutes or less) • Free for airport users • Designed to last 30+ years
28
![Page 29: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/29.jpg)
BOAC PRESENTATION
U.S. Airports with Automated People Mover Systems
Key = airside or landside system
List of Airports ATL – Atlanta ORD – Chicago CVG – Cincinnati DFW – Dallas/Fort Worth DEN – Denver DTW – Detroit IAH – Houston LAS – Las Vegas MIA – Miami MSP – Minneapolis/St. Paul JFK – New York EWR – Newark MCO – Orlando PIT – Pittsburgh PHX – Phoenix SFO – San Francisco SEA – Seattle TPA – Tampa IAD – Washington Dulles
Source: Transportation Research Board, Airport Cooperative Research Program, ACRP Report 37: Guidebook for Planning and Implementing Automated People Mover Systems at Airports, 2010.
29
![Page 30: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/30.jpg)
BOAC PRESENTATION
Landside APM Case Studies
Miami International Airport JFK International Airport Phoenix Sky Harbor International Airport
DETAILS | APM
![Page 31: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/31.jpg)
BOAC PRESENTATION
Case Study MIA Mover
DETAILS | APM
• Serves passenger access to/from CONRAC and intermodal facility
• 1.25 mile, 2-station, pinched loop system
![Page 32: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/32.jpg)
BOAC PRESENTATION
Case Study PHX Sky Train
DETAILS | APM
Stage 1 • Serves passengers
access to/from regional rail and remote parking
• 1.7 mile, 3 station, pinched loop system
Stage 2 • Potential Service to
CONRAC
![Page 33: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/33.jpg)
BOAC PRESENTATION
Case Study JFK AirTrain
DETAILS | APM
• Serves passenger
inter-terminal connectivity, CONRAC, regional rail
• 8.1 mile, 10-station, loop system
![Page 34: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/34.jpg)
BOAC PRESENTATION
APM Alignment Options Details | APM
CONRAC Section ITF Section CTA Section
• 2.1 to 3.4 miles • 4 to 6 stations • Pinch loop system
34
![Page 35: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/35.jpg)
BOAC PRESENTATION
CONRAC Section - Alignment Options
DETAILS | APM
Century Blvd.
Avia
tion
Blv
d.
Airp
ort
Blv
d.
Arbor Vitae St.
35
![Page 36: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/36.jpg)
BOAC PRESENTATION
Property Ownership
DETAILS | APM
Rental Car
Rental Car
Hotel
Hotel
Hotel Hotel
Hotel
Other
Metro
Other
LAWA Acquisition
Area
Other Other
Century Blvd.
Avia
tion
Blv
d.
Airp
ort
Blv
d.
Arbor Vitae St.
![Page 37: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/37.jpg)
BOAC PRESENTATION
Preferred Alignment - “Backlot”
DETAILS | APM
Preferred Option
Century Blvd.
Avia
tion
Blv
d.
Airp
ort
Blv
d.
Arbor Vitae St.
Rental Car
Rental Car
Hotel
Hotel
Hotel
Hotel
Other
Metro
Other
LAWA Acquisition
Area
Other Other Hotel
• Alignment through “backlot” area minimizes roadway closures during and after construction
• Reduces guide way length
• ROW acquisition is required
![Page 38: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/38.jpg)
BOAC PRESENTATION
Alignment Option – Arbor Vitae
DETAILS | APM
Arbor Vitae St. Alignment
Century Blvd.
Avia
tion
Blv
d.
Airp
ort
Blv
d.
Arbor Vitae St.
Rental Car
Rental Car
Hotel
Hotel
Hotel
Hotel
Other
Metro
Other
LAWA Acquisition
Area
Other Other Hotel
• Arbor Vitae St. alignment is possible
• Longest guideway length of all options
• ROW acquisition is required
![Page 39: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/39.jpg)
BOAC PRESENTATION
• Construction would require lengthy roadway closure due to limited corridor
96th St. Alignment
Discarded Option – 96th Street
DETAILS | APM
Century Blvd.
Avia
tion
Blv
d.
Airp
ort
Blv
d.
Arbor Vitae St.
Rental Car
Rental Car
Hotel
Hotel
Hotel
Hotel
Other
Metro
Other
LAWA Acquisition
Area
Other Other Hotel
![Page 40: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/40.jpg)
BOAC PRESENTATION
98th St. Alignment
Discarded Option – 98th Street
DETAILS | APM
Century Blvd.
Avia
tion
Blv
d.
Airp
ort
Blv
d.
Arbor Vitae St.
Rental Car
Rental Car
Hotel
Hotel
Hotel
Hotel
Other
Metro
Other
LAWA Acquisition
Area
Other Other Hotel
• Construction would require lengthy roadway closure due to limited corridor
![Page 41: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/41.jpg)
BOAC PRESENTATION
ITF Section - Alignment Options
Details | APM
Century Blvd.
Sepu
lved
a B
lvd.
41
![Page 42: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/42.jpg)
BOAC PRESENTATION
ITF Section - Property Ownership
DETAILS | APM
Century Blvd.
Sepu
lved
a B
lvd.
Rental Car Other
Other Hotel Hotel Metro
42
![Page 43: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/43.jpg)
BOAC PRESENTATION
Preferred Alignment - “Century”
DETAILS | APM
Century Blvd.
Sepu
lved
a B
lvd.
• Avoids Park
One
• Requires Metro lot right-of-way
Rental Car Other
Other Hotel Hotel Metro
43
![Page 44: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/44.jpg)
BOAC PRESENTATION
Alignment Option - Park One Alignment
DETAILS | APM
Century Blvd.
Sepu
lved
a B
lvd.
• Restricts development of Park One
• Presents phasing challenges
Rental Car Other
Other Hotel Hotel Metro
44
![Page 45: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/45.jpg)
BOAC PRESENTATION
CTA Options
DETAILS | APM
45
![Page 46: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/46.jpg)
BOAC PRESENTATION
CTA Alignment Screening DETAILS | APM
72 Possible Combination of APM Options
Initial Alignment Screening • Horizontal Alignment • Vertical Alignment • Station Location
Detailed Review and Analysis • Spine Alignment • Scissor Alignment
46
![Page 47: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/47.jpg)
BOAC PRESENTATION
Key Factors – Construction in the CTA
APM • Design
Requirements
Airport Operations • Safety & Security • Airside/Terminal
Operations • Pedestrian Activity • Landside/Roadway
Operations
Construction/ Development • Constructability • Cost • Phasing
DETAILS | APM
47
![Page 48: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/48.jpg)
BOAC PRESENTATION
CTA Challenges
Terminals
World Way
Parking Garages
Center Way
Constrained land area in the CTA
DETAILS | APM
48
![Page 49: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/49.jpg)
BOAC PRESENTATION
Terminal/ Airside
Terminal/ Airside
World Way
Parking Garages
Center Way
Parking Garages
World Way
Horizontal Alignment Possibilities DETAILS | APM
![Page 50: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/50.jpg)
BOAC PRESENTATION
Terminal/ Airside
World Way
Parking Garages
Center Way
Parking Garages
Horizontal Alignment Possibilities DETAILS | APM
World Way
Terminal/ Airside
Terminal/ Airside
World Way
World Way
Terminal/ Airside
![Page 51: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/51.jpg)
BOAC PRESENTATION
Underground
Aerial
At-Grade
Vertical Alignments Possibilities DETAILS | APM
![Page 52: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/52.jpg)
BOAC PRESENTATION
Underground
Aerial
At-Grade
Vertical Alignments Possibilities DETAILS | APM
![Page 53: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/53.jpg)
BOAC PRESENTATION
APM Zone Slide
Station Options Considered
![Page 54: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/54.jpg)
BOAC PRESENTATION
APM Zone Slide
Station Options Considered
![Page 55: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/55.jpg)
BOAC PRESENTATION
Horizontal Alignment Vertical Alignment Number of Stations
Terminal/Airside Aerial 1
World Way At-Grade 2
Parking Garages Underground 3
Center Way 4
5
6+ 72 possible combinations
Summary of Initial Screening Options DETAILS | APM
![Page 56: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/56.jpg)
BOAC PRESENTATION
Horizontal Alignment Vertical Alignment Number of Stations
Aerial
2
Parking Garages
Center Way 4 These options have been packaged into two alternatives:
• 2-Station Spine (Center Way, Aerial, 2 stations)
• 4-Station Scissors (Parking Garages, Aerial, 4 stations)
Summary of Initial Screening Options DETAILS | APM
![Page 57: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/57.jpg)
BOAC PRESENTATION
Comparative Review
DETAILS | APM
• Constructability
• Passenger Experience
• Cost
57
![Page 58: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/58.jpg)
BOAC PRESENTATION 58
Spine Alignment
DETAILS | APM
Single Alignments along Center Way
Two stations
Walkways connect the APM stations to the terminals
Reconstruction of two parking garages
![Page 59: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/59.jpg)
BOAC PRESENTATION 59
Spine Alignment
DETAILS | APM
East Section
Center Section
West Section
![Page 60: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/60.jpg)
BOAC PRESENTATION 60
Spine Alignment Concept Rendering
DETAILS | APM
![Page 61: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/61.jpg)
BOAC PRESENTATION 61
Scissor Alignment
DETAILS | APM
Dual Alignments along World integrated into/ around parking garages
Four stations Walkways providing
access to the terminals and parking garages
Reconstruction of six parking garages
![Page 62: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/62.jpg)
BOAC PRESENTATION 62
Scissor Alignment
DETAILS | APM
West Section
Center Section
East Section
![Page 63: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/63.jpg)
BOAC PRESENTATION 63
Scissor Alignment Concept Rendering
DETAILS | APM
![Page 64: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/64.jpg)
BOAC PRESENTATION
APM - Constructability
DETAILS | APM
• Feasibility Assessment
• Provides High-level analysis of potential construction phasing/ sequencing for comparative purposes.
64
![Page 65: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/65.jpg)
BOAC PRESENTATION
Construction Phasing – 2 Station Spine APM Alignment Assumption: Phasing represents a fully functioning APM system independent from other project elements.
![Page 66: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/66.jpg)
BOAC PRESENTATION
Exit Exit
Construction Impacts • Closure of
Center Way, increasing traffic on World Way
• Closure of P2 garages, part of Park One
YEAR 0
Quarter Construction Duration
1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8
1 | 2 | 3 | 4
2-Station Spine Alignment
66
![Page 67: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/67.jpg)
BOAC PRESENTATION
8 10
8
Area 1
Area 2
Area 3
Quarter 1 | 2 | 3 | 4
Construction Duration 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4
YEAR 0 YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8
Construction Impacts • Construction
focused on Center of CTA
2-Station Spine Alignment
67
![Page 68: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/68.jpg)
BOAC PRESENTATION
Quarter 1 | 2 | 3 | 4
Construction Duration 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4
YEAR 0 YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8
Construction Impacts • Terminals and
World Way Impacted During Pedestrian Bridge Construction
2-Station Spine Alignment
68
![Page 69: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/69.jpg)
BOAC PRESENTATION
Construction Phasing – 4 Station Scissor APM Alignment
Prime Focus: • Evaluate constructability
Assumption: • Phasing represents a fully functioning
independent APM system from other project elements.
![Page 70: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/70.jpg)
BOAC PRESENTATION
Quarter 1 | 2 | 3 | 4
Construction Duration 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4
YEAR 0 YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8
Construction Impacts • Parking
closures Phase 1: Park One, P1, P2 Phase 2: Park One, P5, P6, P7
4-Station Scissor Alignment
70
![Page 71: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/71.jpg)
BOAC PRESENTATION
Quarter 1 | 2 | 3 | 4
Construction Duration 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4
YEAR 0 YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8
4-Station Scissor Alignment
71
Construction Impacts • Northside
developed in first phase
![Page 72: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/72.jpg)
BOAC PRESENTATION
Quarter 1 | 2 | 3 | 4
Construction Duration 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4 1 | 2 | 3 | 4
YEAR 0 YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8
4-Station Scissor Alignment
72
Construction Impacts • Southside in
second phase
![Page 73: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/73.jpg)
BOAC PRESENTATION
APM – Construction Duration • Constructability analysis
produced estimated duration.
• Ranges address uncertainties, including contemporaneous construction
• Construction would simultaneously occur off-airport as well.
73
0 1 2 3 4 5 6 7 8 9 10
Scissor
Spine 5-7 years
7-9 years
DETAILS | APM
![Page 74: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/74.jpg)
BOAC PRESENTATION
CTA Parking Changes Spine • 10% loss during
construction • No change after
completion Scissor • 40% loss during
construction • 15% increase
after completion
0%
20%
40%
60%
80%
100%
120%
Pre Construction During Construction Post Construction
Spine
Scissor
74
DETAILS | APM
Existing
![Page 75: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/75.jpg)
BOAC PRESENTATION
ROM Cost Estimate (in billions) APM Guideway and System
Capital Cost
DETAILS | APM
0
0.5
1
1.5
2
2.5
3
Spine Scissor
$1.5-2.0
$2.0-2.5
75
• Range of cost is provided due to high-level uncertainty of these estimates
• Difference between options is due primarily to:
• Length of guideway • Parking garage
reconstruction
![Page 76: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/76.jpg)
BOAC PRESENTATION
Passenger Convenience DETAILS | APM
0 5 10
Spine
Scissors ITF Station WaitTimeIn Vehicle Time
Walk Time
Average Journey Time - ITF to Terminals* (minutes)
76
Spine • 1-2 minute higher
overall journey times
• Single train operation
Scissor • Longer wait time
at APM stations • Dual train
operation *Additional 3 minutes to/from CONRAC
![Page 77: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/77.jpg)
BOAC PRESENTATION
Option Construction
Duration Development
Cost
Passenger Journey Time
(ITF to Terminals)
Spine 5-7 years $1.5-2 B 9-11 min.
Scissor 7-9 years $2-2.5 B 8-10 min.
APM CTA Alignment Summary Comparison
77
DETAILS | APM
![Page 78: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/78.jpg)
BOAC PRESENTATION
Key Findings
DETAILS | APM
• “Backlot” is optimal alignment for CONRAC section of APM. • “Century” is optimal alignment for ITF section of APM. • Congestion relief in CTA determined by increment of users boarding the
system. • Significant traffic and parking mitigations will be needed for the duration
of construction of the APM in the CTA. • Procurement preparation and process will be complex and is expected
to take several years.
78
![Page 79: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/79.jpg)
BOAC PRESENTATION
Next Steps • Resolve rights-of-way issues outside of CTA (underway) • Refine financial analysis for APM options including potential lost
parking revenue (underway) • Develop CTA roadway and curb improvements schedule (underway) • Recommend a preferred alignment in the CTA (underway) • Further develop details regarding APM interface with terminals • Develop strategic parking plan to account for parking changes during
and after APM construction • Initiate environmental review • Launch system procurement preparation
79
DETAILS | APM
![Page 80: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/80.jpg)
BOAC PRESENTATION
ITF (LAX Connect) Creating Convenience and Choice for Air Travelers
80
![Page 81: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/81.jpg)
BOAC PRESENTATION
Planned ITF Feature LAX ITF
APM Portal
Replacement Commercial Vehicle Curb
Alternate Private Vehicle Drop-off
Bag Check
Parking
Meet and Greet Area
Regional Rail Connection
Potential Collateral Development
Key Features DETAILS | ITF
![Page 82: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/82.jpg)
BOAC PRESENTATION
ITF Feature LAX ITF Atlanta Miami Phoenix Newark
APM Portal
Replacement Commercial Vehicle Curb
Alternate Private Vehicle Drop-off
Bag Check
Parking
Meet and Greet Area
Regional Rail Connection
Potential Collateral Development
Key Features DETAILS | ITF
Partial/Potential
![Page 83: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/83.jpg)
BOAC PRESENTATION EXISTING CONDITION
![Page 84: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/84.jpg)
BOAC PRESENTATION FULL BUILD OUT POTENTIAL CONCEPT 84
![Page 85: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/85.jpg)
BOAC PRESENTATION APM ALIGNMENT AND NEW ROADWAY CONFIGURATION 85
![Page 86: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/86.jpg)
BOAC PRESENTATION PATH OF TRAVEL IN AND OUT OF THE ITF COMMERCIAL VEHICLE ROTARY 86
![Page 87: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/87.jpg)
BOAC PRESENTATION ITF CROSS SECTION – COMMERCIAL VEHICLE ROTARY
ITF Commercial Vehicle Rotary
87
Details | ITF
![Page 88: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/88.jpg)
BOAC PRESENTATION PRIVATE AUTO PASSENER DROP OFF CURB 88
![Page 89: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/89.jpg)
BOAC PRESENTATION ITF CROSS SECTION
ITF – Private Vehicle Drop Off Curb
89
![Page 90: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/90.jpg)
BOAC PRESENTATION MEET AND GREET PLAZA LOCATION
ITF– Meet and Greet Plaza
90
![Page 91: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/91.jpg)
BOAC PRESENTATION ITF CROSS SECTION 91
ITF – Meet and Greet Plaza
![Page 92: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/92.jpg)
BOAC PRESENTATION ITF CROSS SECTION
ITF – Metro Connection
92
Metro
![Page 93: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/93.jpg)
BOAC PRESENTATION
Metrorail Connection to LAX Metro is considering at least 6 options to connect Metrorail to LAX. Metro’s decision will still lead passengers to utilize the APM system to arrive at their terminals. LAWA can accommodate Metro at any of 4 locations.
93
![Page 94: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/94.jpg)
BOAC PRESENTATION
Connection to LAX Connect Strong preference to have Metro connections occur at the ITF. • Centers intermodal activity
at ITF
• Would provide most services to those travelling on Metro
94
Metro Graphic
![Page 95: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/95.jpg)
BOAC PRESENTATION
Metro Studies – the Airport Metro Connector
Regardless of Metro’s decision, LAWA will work to ensure a seamless rail-to-rail connection for airport users.
95
![Page 96: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/96.jpg)
BOAC PRESENTATION
The amount of relief the ITF could provide to the CTA is dependent on changes to:
• Resident behavior.
• LAWA’s policy and
regulatory framework.
CTA Congestion Relief
DETAILS | ITF
96
![Page 97: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/97.jpg)
BOAC PRESENTATION
Changing Behavior
• Certain features at the
ITF might influence resident behavior:
o Remote bag check
o Meet and Greet Plaza
• Another way to change behavior is to dramatically improve roadway access to the ITF.
DETAILS | ITF
97
![Page 98: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/98.jpg)
BOAC PRESENTATION
ROADWAY ACCESS
A Dedicated Roadway System to Protect Neighborhood Streets
Disneyland
Dedicated Roadway System
Direct Freeway Access & Dedicated Lanes
98
![Page 99: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/99.jpg)
BOAC PRESENTATION
Existing Routes to the CTA
![Page 100: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/100.jpg)
BOAC PRESENTATION
Future Roadway Network
![Page 101: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/101.jpg)
BOAC PRESENTATION
Future Traffic Flows – to/from Northwest
![Page 102: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/102.jpg)
BOAC PRESENTATION
Future Traffic Flows – to/from the South
![Page 103: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/103.jpg)
BOAC PRESENTATION
Future Traffic Flows – to/from I-405
![Page 104: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/104.jpg)
BOAC PRESENTATION
• Ground transportation Infrastructure improvements will create the opportunity for CTA congestion relief.
• CTA access policies will ultimately provide the means for maximizing and balancing the improved ground transportation system.
CTA Congestion Relief – Policies
DETAILS | ITF
104
![Page 105: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/105.jpg)
BOAC PRESENTATION
Key Findings Details | ITF
• First of a kind • Several viable site plans • CTA congestion relief relies on changes to resident driver behavior:
• Intuitive roadway access • Convenience – such as remote ticketing and baggage-check
• Incremental ITF investment should be linked to clear added value – in terms of CTA congestion relief.
• Collateral development planning needs to follow ITF site plan and program.
105
![Page 106: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/106.jpg)
BOAC PRESENTATION
Next Steps • Develop a needs-based phasing strategy (underway) • Refine the roadway concept (underway) • Research potential passenger utilization of facility • Reach out to airport stakeholders • Align LAWA’s ground transportation regulatory and business
arrangements to support the development of the plan • Initiate environmental review • Complete a feasibility study of remote bag-check operation • Initiate necessary rights-of-way acquisition
Details | ITF
106
![Page 107: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/107.jpg)
BOAC PRESENTATION
The Path Forward
![Page 108: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/108.jpg)
BOAC PRESENTATION
Key Factors of Success
• Solutions cannot simply “move the problem” to another location • Deployment of new system ideally based on demands on CTA • Maintain operation of airport during construction • High adoption rate by airport users • System must integrate into terminals seamlessly • Buy-in from airport stakeholders
108
![Page 109: BOAC Briefing 2014-05-04](https://reader030.vdocuments.net/reader030/viewer/2022020314/577ccd541a28ab9e788c0188/html5/thumbnails/109.jpg)
BOAC PRESENTATION
LAX Ground Transportation Program
Timeline
Near Term
• Concept Analysis and Refinement
• Procure Environmental Consultants
• Stakeholder outreach
Medium Term
• Preferred Alternatives • Initiate Environmental
Review(s) • Initiate Procurement
(APM)
Long Term
• Procurement (Other Projects)
• Design & Engineering • Construction/ Project
Delivery
109