boardwalk residences boardwalk plaza study at … · boardwalk residences at marina bay 03.06.2013...

3
BOARDWALK RESIDENCES AT MARINA BAY 03.06.2013 OPTION -1: REDUCE PARKING W/ OPEN PLAZA SPACE OPTION -2: REDUCE PARKING W/ CENTRAL LAWN PLANTING OPTION -3: PLAZA WITHOUT PARKING TREE PLANTING IN PAVING DUMPSTER RELOCATION BOLLARDS 15 14 TREE PLANTING ON LAWN OUTDOOR SEATING OUTDOOR SEATING BOLLARDS 0 16’ 8’ 32’ 64’ OUTDOOR SEATING BOARDWALK PLAZA STUDY DUMPSTER RELOCATION CHILLER LOCATION KEY PLAN BOARDWALK PLAZA STUDY NORTH BUILDING DRIVEWAY STUDY SOUTH BUILDING PARKING STUDY

Upload: others

Post on 12-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BOARDWALK RESIDENCES BOARDWALK PLAZA STUDY AT … · boardwalk residences at marina bay 03.06.2013 option -1: reduce parking w/ open plaza space option -2: reduce parking w/ central

BOARDWALK RESIDENCESAT MARINA BAY

03.06.2013

OPTION -1: REDUCE PARKING W/ OPEN PLAZA SPACE OPTION -2: REDUCE PARKING W/ CENTRAL LAWN PLANTING

OPTION -3: PLAZA WITHOUT PARKING

TREE PLANTING IN PAVING

DUMPSTER RELOCATION

BOLLARDS

15 14

TREE PLANTING ON LAWNOUTDOOR SEATING

OUTDOOR SEATING

BOLLARDS

0 16’8’ 32’ 64’

OUTDOOR SEATING

BOARDWALK PLAZA STUDY

DUMPSTER RELOCATION

CHILLER LOCATION

KEY PLAN

BOARDWALK PLAZA STUDY

NORTH BUILDING DRIVEWAY STUDY

SOUTH BUILDING PARKING STUDY

Page 2: BOARDWALK RESIDENCES BOARDWALK PLAZA STUDY AT … · boardwalk residences at marina bay 03.06.2013 option -1: reduce parking w/ open plaza space option -2: reduce parking w/ central

BOARDWALK RESIDENCESAT MARINA BAY

03.06.2013

NORTH BUILDING DRIVEWAY STUDY

0 16’8’ 32’ 64’

OPTION -1: DEAD-END CONDITION W/ PARKING

OPTION -2: DEAD-END CONDITION WITH PLANTING ALONG BUILDING FACADE

OPTION -3: TURN-AROUND CIRCLE WITH PLANTING ALONG BUILDING FACADE

GENERAL CONCEPT: EXTEND THE BOARDWALK TO THE PARK AND OPEN UP THE WEST EDGE OF THE PROPERTY.

• EXTEND WOOD DECKING TO PROPERTY LINE• RETURN STAIR AT THE WEST SIDE TO CREATE A MORE WELCOMING CONNECTION TO THE TRAIL • SPECIAL PAVING AT THE END OF THE ROAD TO CREATE A TRANSITION BETWEEN PARK AND THE BOARDWALK• ADD FIRE TRUCK TURN-AROUND ROUTE

9 12

Page 3: BOARDWALK RESIDENCES BOARDWALK PLAZA STUDY AT … · boardwalk residences at marina bay 03.06.2013 option -1: reduce parking w/ open plaza space option -2: reduce parking w/ central

BOARDWALK RESIDENCESAT MARINA BAY

03.06.2013

• SIMPLIFY CIRCULATION, REDUCE VEHICLE CONFLICTS • TOTAL 36 PARKING SPACES• ENTRANCE PLANTING OPPORTUNITY• DROP OFF AREA IN FRONT OF LOBBY

• WIDER PLANTING AREA FOR STREET TREES • TOTAL 34 PARKING SPACES• ENTRANCE PLANTING OPPORTUNITY

31

26

10

OPTION -1: 90 DEGREE PARKING WITH STREET TREES

OPTION -2: 90 DEGREE AND PARALLEL PARKING WITH PLANTING STRIP

SOUTH BUILDING PARKING STUDY

DROP OFF

3

0 16’8’ 32’ 64’