Facilities Condition Assessment

and

Referendum

September 10, 2015

Haddonfield Public School District

1

Page 2: BOE Referendum Discussion 9-10-15

Facilities Condition Assessment

Kick-started by 2013 ROD grant availability

In-depth needs assessment by architects and engineers Building envelope Mechanical and electrical systems Technology, security, and communications systems

2002

20022005

1964

1947

1890

1964

A

B

C

D

E

F

G

H

I

J

K

L

M

NP

P1

Q

Q1

R

ST

COURTYARD

D

39 LF STONE COPINGWITH CAST STONE

PARAPET WALL FINISH

164 LF OF STONECOPING WITH BRICKPARAPET WALL

470 LF OF STONECOPING WITH BRICKPARAPET WALL

527 LF OF SHINGLEROOF EDGE WITHCAST STONECORNICE/ INTEGRALGUTTER

64 LF OF SHINGLEROOF EDGE WITH

WOOD FASCIA/SOFFIT

148 LF OF SHINGLEROOF EDGE WITH

WOOD FASCIA/SOFFIT AND METAL

GUTTER

44 LF OF METALCOPING AND BRICKPARAPET WALL

13 LF OF STONECOPING AND BRICKPARAPET WALL

217 LF OF STONECOPING WITH BRICKPARAPET WALL

98 LF OF METALCOPING WITH EIFSPARAPET WALL

12 LF OF STONECOPING WITH BRICKPARAPET WALL

78 LF OF STONECOPING WITH BRICKPARAPET WALL

34 LF OF STONECOPING WITH BRICKPARAPET WALL

38 LF OF METALCOPING WITH EIFSPARAPET WALL

27 LF OF METALCOPING WITH EIFSPARAPET WALL

205 LF OF STONECOPING WITH BRICKPARAPET WALL

122 LF OF STONECOPING WITH BRICKPARAPET WALL

309 LF OF STONECOPING WITH BRICKPARAPET WALL

29 LF OF METALCOPING WITH EIFSPARAPET WALL

51 LF OF STONECOPING WITH BRICKPARAPET WALL

356 LF OF STONECOPING WITH BRICKPARAPET WALL

22 LF OF METALCOPING WITH EIFS

PARAPET WALL

22 LF OF STONECOPING WITH BRICKPARAPET WALL

'Q' & 'Q1' TOTAL 51 LFOF STONE COPINGWITH BRICK PARAPETWALL

170 SF, 51 LF OF CAST STONE ORNAMENTAL30 SF OF CAST STONE DOOR TRIM90 SF OF CAST STONE JAMB / HEAD WINDOW TRIM144 SF CAST STONE PANELS

30 SF OF CAST STONE WINDOW HEAD18 SF OF CAST STONE DOOR TRIM

9 LF OF CAST STONE ORNAMENTAL HEADDOOR TRIM

50 SF CAST STONE PANELS ANDORNAMENTAL TRIM AT PARAPET.

25 LF OF ORNAMENTAL TOP OF PARAPET

36 SF OF CAST STONE DOOR TRIM145 SF CAST STONE PANELS &

ORNAMENTAL DOOR HEAD50 SF CAST STONE PANELS AND

ORNAMENTAL TRIM AT PARAPET.100 SF OF CAST STONE WINDOW

TRIMS

470 LF OF STONECOPING WITH BRICKPARAPET WALL

REPLACE ALL WINDOWSON THIS ELEVATION,

INCLUDING BAYWINDOWS, TOTAL = 4,616 SF

REPLACE WINDOWSTOTAL = 856 SF

REPLACE WINDOWSTOTAL = 1,786 SF

REPLACE WINDOWS

REPLACE WINDOWS

REPLACE WINDOWS

Drawing Number:

Drawing Title:

Sign

atur

e/D

ate

Project Number:

Prel

imin

ary

Bui

ldin

g E

nvel

ope

Con

ditio

n A

sses

smen

t at

Cent

ral E

lem

enta

ry S

choo

l3

Linc

oln

Ave

, Had

donf

ield

, New

Jer

sey

080

33fo

r th

e

Had

donf

ield

Boa

rd o

f Edu

catio

n1

Linc

oln

Ave

, Had

donf

ield

, New

Jer

sey

080

33

Set Issue:

Schematic

STE

VE

N A

. BE

CIC

A, R

.A. N

.J.A

I 21A

I011

3760

0

Issue Date:

Contractor shall check and verify allconditions and dimensions at the sitebefore proceeding with this work.

DescriptionRevisions# Date

Drawn by: Checked by:

15HPS00001

April 7, 2015

BE

CIC

A A

SSO

CIA

TES

LLC

Arc

hite

ctur

e/E

ngin

eeri

ng50

0 So

uth

Kin

gs H

ighw

ayCh

erry

Hill

, New

Jer

sey

0803

4P:

856

.795

.118

0F:

856

.354

.636

7W

: w

ww

.bec

ica.

com

NJ

Cer

tifi

cate

s of

Aut

hori

zati

on: A

rchi

tect

ure

- 2

1AC

00

0271

00

/ E

ngi

neer

ing-

24G

A28

022

600

A-2.1

& Roof LegendExisting Roof Plan

SABRS

EXISTING ROOF PLAN1 1/16" = 1'-0"

PARAPET REPAIR / RE-CONSTRUCTION

STONE COPING REPAIR

CAST STONE REPAIR

BRICK MASONRY REPLACEMENT

BRICK MASONRY REPAIR

WOOD REPAIR / REPLACEMENT

WOOD CORNICE REPAIR/ RESTORATION

ROOF REPLACEMENT

REPLACE WINDOWS

ROOF LEGEND

BLDG. YEAR ROOF AREA MANUF. INSTALLER MATERIALWARRANTY

DATE/ YEARINSTALLED

GUARANTEEDURATION NOTES

APPROX.AREA (SF)

1890 A ? ? ASPHALTSHINGLES

? ? 2,378

1947? B ? ? EPDM ? ? 115

1947 C ? ? MODIFIEDBITUMEN

2000? ? 85

1947 / 1964 D ? ? ASPHALTSHINGLES

2000? ? 13,778

1964 E SIPLAST PATRIOTROOFING

2 PLY MOD.BITUMEN

9/5/2005 20 YEARS 1 2,867

1964 F SIPLAST PATRIOTROOFING

2 PLY MOD.BITUMEN

9/5/2005 20 YEARS 1 14,060

1964 G SIPLAST PATRIOTROOFING

2 PLY MOD.BITUMEN

9/5/2005 20 YEARS 1 1,681

1964 H SIPLAST PATRIOTROOFING

2 PLY MOD.BITUMEN

9/5/2005 20 YEARS 1 6,922

1964 I SIPLAST PATRIOTROOFING

2 PLY MOD.BITUMEN

9/5/2005 20 YEARS 1 5,499

1964 J SIPLAST PATRIOTROOFING

2 PLY MOD.BITUMEN

9/5/2005 20 YEARS 1 7,870

1964 K SIPLAST PATRIOTROOFING

2 PLY MOD.BITUMEN

9/5/2005 20 YEARS 1 2,617

2002 L SIPLAST BROWN &GUARINO

2 PLY MOD.BITUMEN

8/22/2002 20 YEARS 2 228

2002 M SIPLAST BROWN &GUARINO

2 PLY MOD.BITUMEN

8/22/2002 20 YEARS 2 5,816

2002 N SIPLAST BROWN &GUARINO

2 PLY MOD.BITUMEN

8/22/2002 20 YEARS 2 5,633

2002 P SIPLAST BROWN &GUARINO

2 PLY MOD.BITUMEN

8/22/2002 20 YEARS 2 1,065

2002 P1 SIPLAST BROWN &GUARINO

2 PLY MOD.BITUMEN

8/22/2002 20 YEARS 2 506

2002 Q SIPLAST BROWN &GUARINO

2 PLY MOD.BITUMEN

8/22/2002 20 YEARS 2 130

2002 Q1 SIPLAST BROWN &GUARINO

2 PLY MOD.BITUMEN

8/22/2002 20 YEARS 2 79

2002 R SIPLAST BROWN &GUARINO

2 PLY MOD.BITUMEN

8/22/2002 20 YEARS 2 191

2002 S SIPLAST BROWN &GUARINO

2 PLY MOD.BITUMEN

8/22/2002 20 YEARS 2 2,249

2005? T SIPLAST A.F. CALLAN& CO. INC.

2 PLY MOD.BITUMEN

8/16/2006 20 YEARS 3 456

NOTES:

1. DATA SOURCE: FRANK DIPPOLITO OF SIPLAST (JAN. 21, 2015.) 290 SQUARES ARE INSTALLED OVER A GYP. DECK WITH 1/4"STRUCTURAL SLOPE, 2" POLYISO INSULATION AND 1/4" DENS DECK (MECH. ATTACHED), 1" WOOD FIBERBOARD SET IN HOTASPHALT AND 2 PLY MODIFIED BITUMEN ROOFING IN HOT ASPHALT. 60 SQUARES ARE INSTALLED OVER A GYPSUM DECK WITH 1/4"DENS DECK., 2" POLYISO INSULATION/ 1" WOOD FIBERBOARD (SIMULTANEOUSLY SCREW FASTENED), AND 2 PLY MODIFIEDBITUMEN ROOFING IN COLD ADHESIVE.

2. DATA SOURCE: FRANK DIPPOLITO OF SIPLAST (JAN. 21, 2015.) 154 SQUARES INSTALLED OVER A METAL ROOF DECK WITH 1-1/2"POLYISO INSULATION, TAPERED INSULATION AND 1/4" DENS DECK PRIME (ALL INSULATION AND DENS DECK MECHANICALLYATTACHED- SIMULTANEOUSLY) WITH 2 PLY MODIFIED BITUMEN (20 EG & 30 FR SHEETS) IN COLD ADHESIVE.

3. DATA SOURCE: FRANK DIPPOLITO OF SIPLAST (JAN. 21, 2015.) 5 QUARES INSTALLED OVER 1/4" SLOPED METAL ROOF DECK WITH 2"POLYISO INSULATION AND TAPERED INSULATION (SIMULTANEOUSLY MECHANICALLY ATTACHED), 1" HD FIBERBOARD AND 2 PLYMODIFIED BITUMEN ROOFING IN POLYURETHANE ADHESIVE.

2

Page 3: BOE Referendum Discussion 9-10-15

Elizabeth Haddon Elementary School

3

Page 4: BOE Referendum Discussion 9-10-15

Elizabeth Haddon Elementary School

4

Page 5: BOE Referendum Discussion 9-10-15

Elizabeth Haddon Elementary School

5

Page 6: BOE Referendum Discussion 9-10-15

Elizabeth Haddon Elementary School

6

Page 7: BOE Referendum Discussion 9-10-15

J. Fithian Tatem Elementary School

7

Page 8: BOE Referendum Discussion 9-10-15

J. Fithian Tatem Elementary School

8

Page 9: BOE Referendum Discussion 9-10-15

J. Fithian Tatem Elementary School

9

Page 10: BOE Referendum Discussion 9-10-15

Haddonfield Middle SchoolCentral

Elementary School

10

Page 11: BOE Referendum Discussion 9-10-15

Haddonfield Middle SchoolCentral

Elementary School

11

Page 12: BOE Referendum Discussion 9-10-15

Haddonfield Middle SchoolCentral

Elementary School

12

Page 13: BOE Referendum Discussion 9-10-15

Haddonfield Memorial High School

13

Page 14: BOE Referendum Discussion 9-10-15

Haddonfield Memorial High School

14

Page 15: BOE Referendum Discussion 9-10-15

Haddonfield Memorial High School

15

Page 16: BOE Referendum Discussion 9-10-15

Haddonfield Memorial High School

16

Page 17: BOE Referendum Discussion 9-10-15

Facilities Challenges

Taft Coolidge Truman Eisenhower Kennedy Johnson GH Bush GW Bush

1913 1923-26

19631947-52 1954-55 1964 1989-90 2002-05

Central Central

MS

MS

Tatem

Tatem

Tatem

Tatem

Haddon

Haddon

Haddon Haddon

HaddonHMHS

HMHS

1971

HMHS

Building age Multiple additions Patchwork upgrades Varying educational conditions

Nixon

Central

17

Page 18: BOE Referendum Discussion 9-10-15

Critical Infrastructure Issues throughout District

Building Envelope:

Damaged masonry and eroding mortar joints and corroded lintels

Stability issues – masonry walls, stone elements, parapets

Deteriorating wood trim with peeling paint

Problem roof areas

Building Systems:

Inefficient and outdated heating plant controls

Air-conditioning not in all instructional spaces

Inadequate electrical service and distribution

Obsolete and/or inadequate special systems (public address, clock, security)

18

Page 19: BOE Referendum Discussion 9-10-15

Proposed Scope of WorkBuilding Envelope:

Roof Replacement

Window Replacement

Exterior Wall and Structural Repairs

Chimney Repairs

Building System Improvements:

Air Condition Classrooms and Electrical Upgrades

Boiler Upgrades and Central Building Controls

Security/Cameras

Master Clock System

Telephone and Public Address Systems

Technology Upgrades

Education Facility Improvements

Haddonfield Memorial High School New Student Commons

Food Service / Locker Rooms / Dance Gym / Support Facilities

Barrier-Free / ADA Accessibility / Structural Integrity / Program Needs

Long Range Facility Plan

Master Plan for the Future19

Page 20: BOE Referendum Discussion 9-10-15

Proposed Building Envelope Scope of Work

Elizabeth Haddon Elementary School

20

Page 21: BOE Referendum Discussion 9-10-15

Proposed Building Envelope Scope of Work

J. Fithian Tatem Elementary School

21

Page 22: BOE Referendum Discussion 9-10-15

Proposed Building Envelope Scope of Work

Haddonfield Middle SchoolCentral

Elementary School

22

Page 23: BOE Referendum Discussion 9-10-15

Proposed Building Envelope Scope of Work

Haddonfield Memorial High School

Construct New Student CommonsReconstruct Cafeteria, Kitchen and

Second Floor Dance Gym and Support Spaces

“B” Wing Gym, Façade Reconstruction and

Structural Repairs

23

Page 24: BOE Referendum Discussion 9-10-15

Proposed HVAC & Electrical Uprgrades

ELIZABETH HADDON CENTRAL ELEMENTARY / MIDDLE

J. FITHIAN TATEM HADDONFIELD HIGH SCHOOL

Air Condition Classrooms

24

Page 25: BOE Referendum Discussion 9-10-15

Proposed New Student Commons and Alterations

Haddonfield Memorial High School

“B” Wing GymFaçade Reconstruction and Structural Repairs

Reconstruct Cafeteria, Kitchen and Second Floor Dance Gym and Support Spaces

Provide Gym Level Locker Rooms

Construct New Student Commons

25

Page 26: BOE Referendum Discussion 9-10-15

Haddonfield Memorial High School

Air Condition “A” Wing Classrooms

Replace Auditorium HVAC System

Proposed New Student Commons and Alterations

Administrative Office Renovations

26

Page 27: BOE Referendum Discussion 9-10-15

Haddonfield Memorial High School

Proposed New Student Commons and Alterations

“C” Wing Home Ec Renovations

“C” Wing Science Lab Alterations

27

Page 28: BOE Referendum Discussion 9-10-15

Proposed Long Range Facilities Plan

Haddonfield Memorial High School

Vision For Future Improvements

28

Page 29: BOE Referendum Discussion 9-10-15

Long Range Facilities Plan

Haddonfield Memorial High School

Vision For Future Improvements

29

Page 30: BOE Referendum Discussion 9-10-15

Proposed Long Range Facilities Plan

Haddonfield Memorial High School

Vision For Future Improvements

30

Page 31: BOE Referendum Discussion 9-10-15

Proposed Long Range Facilities Plan

Ground Floor

Vision For Future Improvements

31

Haddonfield Middle SchoolCentral

Elementary School

Page 32: BOE Referendum Discussion 9-10-15

Proposed Long Range Facilities Plan

First Floor

Vision For Future Improvements

32

Haddonfield Middle SchoolCentral

Elementary School

Page 33: BOE Referendum Discussion 9-10-15

Proposed Long Range Facilities Plan

Second Floor

Vision For Future Improvements

33

Haddonfield Middle SchoolCentral

Elementary School

Page 34: BOE Referendum Discussion 9-10-15

Proposed Long Range Facilities PlanVision For Future Improvements

Elizabeth Haddon Elementary School

34

Page 35: BOE Referendum Discussion 9-10-15

Proposed Long Range Facilities PlanVision For Future Improvements

J. Fithian Tatem Elementary School

35

Page 36: BOE Referendum Discussion 9-10-15

Bond Referendum ProposalESTIMATED MOST PROBABLE COST FOR PROPOSED PROJECTS

ELIZABETH HADDON SCHOOL $ 3,443,500

CENTRAL ELEMENTARY/MIDDLE SCHOOL $ 8,715,000

J. FITHIAN TATEM SCHOOL $ 7,347,000

HADDONFIELD MEMORIAL HIGH SCHOOL $ 28,700,000

RE-SURFACE RUNNING TRACK $ 437,500

STADIUM STRUCTURAL RESTORATION $ 1,323,000

SUB-TOTAL $ 49,966,000

NJSDA REGULAR OPERATING DISTRICT (ROD) GRANTSOFFER FOR PROPOSED SCOPE OF WORK $ 6,034,500

BOND REFERENDUM $ 43,931,500

36

Page 37: BOE Referendum Discussion 9-10-15

Facilities Condition Assessment and Referendum

Haddonfield Board of Educationand

Public Comments