boe referendum discussion 9-10-15
TRANSCRIPT
Facilities Condition Assessment
and
Referendum
September 10, 2015
Haddonfield Public School District
1
Facilities Condition Assessment
Kick-started by 2013 ROD grant availability
In-depth needs assessment by architects and engineers Building envelope Mechanical and electrical systems Technology, security, and communications systems
2002
20022005
1964
1947
1890
1964
A
B
C
D
E
F
G
H
I
J
K
L
M
NP
P1
Q
Q1
R
ST
COURTYARD
D
39 LF STONE COPINGWITH CAST STONE
PARAPET WALL FINISH
164 LF OF STONECOPING WITH BRICKPARAPET WALL
470 LF OF STONECOPING WITH BRICKPARAPET WALL
527 LF OF SHINGLEROOF EDGE WITHCAST STONECORNICE/ INTEGRALGUTTER
64 LF OF SHINGLEROOF EDGE WITH
WOOD FASCIA/SOFFIT
148 LF OF SHINGLEROOF EDGE WITH
WOOD FASCIA/SOFFIT AND METAL
GUTTER
44 LF OF METALCOPING AND BRICKPARAPET WALL
13 LF OF STONECOPING AND BRICKPARAPET WALL
217 LF OF STONECOPING WITH BRICKPARAPET WALL
98 LF OF METALCOPING WITH EIFSPARAPET WALL
12 LF OF STONECOPING WITH BRICKPARAPET WALL
78 LF OF STONECOPING WITH BRICKPARAPET WALL
34 LF OF STONECOPING WITH BRICKPARAPET WALL
38 LF OF METALCOPING WITH EIFSPARAPET WALL
27 LF OF METALCOPING WITH EIFSPARAPET WALL
205 LF OF STONECOPING WITH BRICKPARAPET WALL
122 LF OF STONECOPING WITH BRICKPARAPET WALL
309 LF OF STONECOPING WITH BRICKPARAPET WALL
29 LF OF METALCOPING WITH EIFSPARAPET WALL
51 LF OF STONECOPING WITH BRICKPARAPET WALL
356 LF OF STONECOPING WITH BRICKPARAPET WALL
22 LF OF METALCOPING WITH EIFS
PARAPET WALL
22 LF OF STONECOPING WITH BRICKPARAPET WALL
'Q' & 'Q1' TOTAL 51 LFOF STONE COPINGWITH BRICK PARAPETWALL
170 SF, 51 LF OF CAST STONE ORNAMENTAL30 SF OF CAST STONE DOOR TRIM90 SF OF CAST STONE JAMB / HEAD WINDOW TRIM144 SF CAST STONE PANELS
30 SF OF CAST STONE WINDOW HEAD18 SF OF CAST STONE DOOR TRIM
9 LF OF CAST STONE ORNAMENTAL HEADDOOR TRIM
50 SF CAST STONE PANELS ANDORNAMENTAL TRIM AT PARAPET.
25 LF OF ORNAMENTAL TOP OF PARAPET
36 SF OF CAST STONE DOOR TRIM145 SF CAST STONE PANELS &
ORNAMENTAL DOOR HEAD50 SF CAST STONE PANELS AND
ORNAMENTAL TRIM AT PARAPET.100 SF OF CAST STONE WINDOW
TRIMS
470 LF OF STONECOPING WITH BRICKPARAPET WALL
REPLACE ALL WINDOWSON THIS ELEVATION,
INCLUDING BAYWINDOWS, TOTAL = 4,616 SF
REPLACE WINDOWSTOTAL = 856 SF
REPLACE WINDOWSTOTAL = 1,786 SF
REPLACE WINDOWS
REPLACE WINDOWS
REPLACE WINDOWS
Drawing Number:
Drawing Title:
Sign
atur
e/D
ate
Project Number:
Prel
imin
ary
Bui
ldin
g E
nvel
ope
Con
ditio
n A
sses
smen
t at
Cent
ral E
lem
enta
ry S
choo
l3
Linc
oln
Ave
, Had
donf
ield
, New
Jer
sey
080
33fo
r th
e
Had
donf
ield
Boa
rd o
f Edu
catio
n1
Linc
oln
Ave
, Had
donf
ield
, New
Jer
sey
080
33
Set Issue:
Schematic
STE
VE
N A
. BE
CIC
A, R
.A. N
.J.A
I 21A
I011
3760
0
Issue Date:
Contractor shall check and verify allconditions and dimensions at the sitebefore proceeding with this work.
DescriptionRevisions# Date
Drawn by: Checked by:
15HPS00001
April 7, 2015
BE
CIC
A A
SSO
CIA
TES
LLC
Arc
hite
ctur
e/E
ngin
eeri
ng50
0 So
uth
Kin
gs H
ighw
ayCh
erry
Hill
, New
Jer
sey
0803
4P:
856
.795
.118
0F:
856
.354
.636
7W
: w
ww
.bec
ica.
com
NJ
Cer
tifi
cate
s of
Aut
hori
zati
on: A
rchi
tect
ure
- 2
1AC
00
0271
00
/ E
ngi
neer
ing-
24G
A28
022
600
A-2.1
& Roof LegendExisting Roof Plan
SABRS
EXISTING ROOF PLAN1 1/16" = 1'-0"
PARAPET REPAIR / RE-CONSTRUCTION
STONE COPING REPAIR
CAST STONE REPAIR
BRICK MASONRY REPLACEMENT
BRICK MASONRY REPAIR
WOOD REPAIR / REPLACEMENT
WOOD CORNICE REPAIR/ RESTORATION
ROOF REPLACEMENT
REPLACE WINDOWS
ROOF LEGEND
BLDG. YEAR ROOF AREA MANUF. INSTALLER MATERIALWARRANTY
DATE/ YEARINSTALLED
GUARANTEEDURATION NOTES
APPROX.AREA (SF)
1890 A ? ? ASPHALTSHINGLES
? ? 2,378
1947? B ? ? EPDM ? ? 115
1947 C ? ? MODIFIEDBITUMEN
2000? ? 85
1947 / 1964 D ? ? ASPHALTSHINGLES
2000? ? 13,778
1964 E SIPLAST PATRIOTROOFING
2 PLY MOD.BITUMEN
9/5/2005 20 YEARS 1 2,867
1964 F SIPLAST PATRIOTROOFING
2 PLY MOD.BITUMEN
9/5/2005 20 YEARS 1 14,060
1964 G SIPLAST PATRIOTROOFING
2 PLY MOD.BITUMEN
9/5/2005 20 YEARS 1 1,681
1964 H SIPLAST PATRIOTROOFING
2 PLY MOD.BITUMEN
9/5/2005 20 YEARS 1 6,922
1964 I SIPLAST PATRIOTROOFING
2 PLY MOD.BITUMEN
9/5/2005 20 YEARS 1 5,499
1964 J SIPLAST PATRIOTROOFING
2 PLY MOD.BITUMEN
9/5/2005 20 YEARS 1 7,870
1964 K SIPLAST PATRIOTROOFING
2 PLY MOD.BITUMEN
9/5/2005 20 YEARS 1 2,617
2002 L SIPLAST BROWN &GUARINO
2 PLY MOD.BITUMEN
8/22/2002 20 YEARS 2 228
2002 M SIPLAST BROWN &GUARINO
2 PLY MOD.BITUMEN
8/22/2002 20 YEARS 2 5,816
2002 N SIPLAST BROWN &GUARINO
2 PLY MOD.BITUMEN
8/22/2002 20 YEARS 2 5,633
2002 P SIPLAST BROWN &GUARINO
2 PLY MOD.BITUMEN
8/22/2002 20 YEARS 2 1,065
2002 P1 SIPLAST BROWN &GUARINO
2 PLY MOD.BITUMEN
8/22/2002 20 YEARS 2 506
2002 Q SIPLAST BROWN &GUARINO
2 PLY MOD.BITUMEN
8/22/2002 20 YEARS 2 130
2002 Q1 SIPLAST BROWN &GUARINO
2 PLY MOD.BITUMEN
8/22/2002 20 YEARS 2 79
2002 R SIPLAST BROWN &GUARINO
2 PLY MOD.BITUMEN
8/22/2002 20 YEARS 2 191
2002 S SIPLAST BROWN &GUARINO
2 PLY MOD.BITUMEN
8/22/2002 20 YEARS 2 2,249
2005? T SIPLAST A.F. CALLAN& CO. INC.
2 PLY MOD.BITUMEN
8/16/2006 20 YEARS 3 456
NOTES:
1. DATA SOURCE: FRANK DIPPOLITO OF SIPLAST (JAN. 21, 2015.) 290 SQUARES ARE INSTALLED OVER A GYP. DECK WITH 1/4"STRUCTURAL SLOPE, 2" POLYISO INSULATION AND 1/4" DENS DECK (MECH. ATTACHED), 1" WOOD FIBERBOARD SET IN HOTASPHALT AND 2 PLY MODIFIED BITUMEN ROOFING IN HOT ASPHALT. 60 SQUARES ARE INSTALLED OVER A GYPSUM DECK WITH 1/4"DENS DECK., 2" POLYISO INSULATION/ 1" WOOD FIBERBOARD (SIMULTANEOUSLY SCREW FASTENED), AND 2 PLY MODIFIEDBITUMEN ROOFING IN COLD ADHESIVE.
2. DATA SOURCE: FRANK DIPPOLITO OF SIPLAST (JAN. 21, 2015.) 154 SQUARES INSTALLED OVER A METAL ROOF DECK WITH 1-1/2"POLYISO INSULATION, TAPERED INSULATION AND 1/4" DENS DECK PRIME (ALL INSULATION AND DENS DECK MECHANICALLYATTACHED- SIMULTANEOUSLY) WITH 2 PLY MODIFIED BITUMEN (20 EG & 30 FR SHEETS) IN COLD ADHESIVE.
3. DATA SOURCE: FRANK DIPPOLITO OF SIPLAST (JAN. 21, 2015.) 5 QUARES INSTALLED OVER 1/4" SLOPED METAL ROOF DECK WITH 2"POLYISO INSULATION AND TAPERED INSULATION (SIMULTANEOUSLY MECHANICALLY ATTACHED), 1" HD FIBERBOARD AND 2 PLYMODIFIED BITUMEN ROOFING IN POLYURETHANE ADHESIVE.
2
Elizabeth Haddon Elementary School
3
Elizabeth Haddon Elementary School
4
Elizabeth Haddon Elementary School
5
Elizabeth Haddon Elementary School
6
J. Fithian Tatem Elementary School
7
J. Fithian Tatem Elementary School
8
J. Fithian Tatem Elementary School
9
Haddonfield Middle SchoolCentral
Elementary School
10
Haddonfield Middle SchoolCentral
Elementary School
11
Haddonfield Middle SchoolCentral
Elementary School
12
Haddonfield Memorial High School
13
Haddonfield Memorial High School
14
Haddonfield Memorial High School
15
Haddonfield Memorial High School
16
Facilities Challenges
Taft Coolidge Truman Eisenhower Kennedy Johnson GH Bush GW Bush
1913 1923-26
19631947-52 1954-55 1964 1989-90 2002-05
Central Central
MS
MS
Tatem
Tatem
Tatem
Tatem
Haddon
Haddon
Haddon Haddon
HaddonHMHS
HMHS
1971
HMHS
Building age Multiple additions Patchwork upgrades Varying educational conditions
Nixon
Central
17
Critical Infrastructure Issues throughout District
Building Envelope:
Damaged masonry and eroding mortar joints and corroded lintels
Stability issues – masonry walls, stone elements, parapets
Deteriorating wood trim with peeling paint
Problem roof areas
Building Systems:
Inefficient and outdated heating plant controls
Air-conditioning not in all instructional spaces
Inadequate electrical service and distribution
Obsolete and/or inadequate special systems (public address, clock, security)
18
Proposed Scope of WorkBuilding Envelope:
Roof Replacement
Window Replacement
Exterior Wall and Structural Repairs
Chimney Repairs
Building System Improvements:
Air Condition Classrooms and Electrical Upgrades
Boiler Upgrades and Central Building Controls
Security/Cameras
Master Clock System
Telephone and Public Address Systems
Technology Upgrades
Education Facility Improvements
Haddonfield Memorial High School New Student Commons
Food Service / Locker Rooms / Dance Gym / Support Facilities
Barrier-Free / ADA Accessibility / Structural Integrity / Program Needs
Long Range Facility Plan
Master Plan for the Future19
Proposed Building Envelope Scope of Work
Elizabeth Haddon Elementary School
20
Proposed Building Envelope Scope of Work
J. Fithian Tatem Elementary School
21
Proposed Building Envelope Scope of Work
Haddonfield Middle SchoolCentral
Elementary School
22
Proposed Building Envelope Scope of Work
Haddonfield Memorial High School
Construct New Student CommonsReconstruct Cafeteria, Kitchen and
Second Floor Dance Gym and Support Spaces
“B” Wing Gym, Façade Reconstruction and
Structural Repairs
23
Proposed HVAC & Electrical Uprgrades
ELIZABETH HADDON CENTRAL ELEMENTARY / MIDDLE
J. FITHIAN TATEM HADDONFIELD HIGH SCHOOL
Air Condition Classrooms
24
Proposed New Student Commons and Alterations
Haddonfield Memorial High School
“B” Wing GymFaçade Reconstruction and Structural Repairs
Reconstruct Cafeteria, Kitchen and Second Floor Dance Gym and Support Spaces
Provide Gym Level Locker Rooms
Construct New Student Commons
25
Haddonfield Memorial High School
Air Condition “A” Wing Classrooms
Replace Auditorium HVAC System
Proposed New Student Commons and Alterations
Administrative Office Renovations
26
Haddonfield Memorial High School
Proposed New Student Commons and Alterations
“C” Wing Home Ec Renovations
“C” Wing Science Lab Alterations
27
Proposed Long Range Facilities Plan
Haddonfield Memorial High School
Vision For Future Improvements
28
Long Range Facilities Plan
Haddonfield Memorial High School
Vision For Future Improvements
29
Proposed Long Range Facilities Plan
Haddonfield Memorial High School
Vision For Future Improvements
30
Proposed Long Range Facilities Plan
Ground Floor
Vision For Future Improvements
31
Haddonfield Middle SchoolCentral
Elementary School
Proposed Long Range Facilities Plan
First Floor
Vision For Future Improvements
32
Haddonfield Middle SchoolCentral
Elementary School
Proposed Long Range Facilities Plan
Second Floor
Vision For Future Improvements
33
Haddonfield Middle SchoolCentral
Elementary School
Proposed Long Range Facilities PlanVision For Future Improvements
Elizabeth Haddon Elementary School
34
Proposed Long Range Facilities PlanVision For Future Improvements
J. Fithian Tatem Elementary School
35
Bond Referendum ProposalESTIMATED MOST PROBABLE COST FOR PROPOSED PROJECTS
ELIZABETH HADDON SCHOOL $ 3,443,500
CENTRAL ELEMENTARY/MIDDLE SCHOOL $ 8,715,000
J. FITHIAN TATEM SCHOOL $ 7,347,000
HADDONFIELD MEMORIAL HIGH SCHOOL $ 28,700,000
RE-SURFACE RUNNING TRACK $ 437,500
STADIUM STRUCTURAL RESTORATION $ 1,323,000
SUB-TOTAL $ 49,966,000
NJSDA REGULAR OPERATING DISTRICT (ROD) GRANTSOFFER FOR PROPOSED SCOPE OF WORK $ 6,034,500
BOND REFERENDUM $ 43,931,500
36
Facilities Condition Assessment and Referendum
Haddonfield Board of Educationand
Public Comments
37