Bohemian Highway Bridge over the Russian River CEQA Scoping Meeting April 14, 2021

Upload: others

Post on 20-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Bohemian Highway Bridgeover the Russian River

CEQA Scoping Meeting

April 14, 2021

Welcome!

Agenda Overview

o Introductions o Project Overviewo What is CEQAo What is Scoping o Schedule and Next Stepso How to Submit Comments o Questions

Ground Rules

o Microphones will be muted during presentation, please use the hand raise function so individual microphones can be unmuted for comments, questions and answers session at the end of the presentation.

oWe will be unable to go into details about any particular project element at this time.

o A recording of the Scoping Meeting will be available in its entirety on the County Website.

Introductions

oCounty StaffoCEQA Team- Jackson Ford, Chris Seppeler, Deborah Waller

and John MackoEngineering Project Manager, Samuel Baumgardner-Kranz

oNot on the call are the consulting team helping to provide planning and design to move this project to fruition.

Bridge Project Overview

Project Location

Bohemian Highway Bridge Replacement Project

Purpose of the Project

oTo correct deficiencies in the bridgeoSeismic PerformanceoPier ScouroBridge Geometry

Seismic Performance

oRequired performance:o No collapseo 5% probability of

exceedance in 50 yearsoAnalysis of the Monte Rio

bridge found that it does not meet this criteria

Pier Scour

oThe bridge is supported by piers, which is supported by the soil underneath

oFlow from the water washes the soil away from the piers.

oBridge strength, including seismic performance, is reduced by the loss of soil

Pier Scour

Bridge Geometry

oNarrow LanesoNo shoulderoNarrow and obstructed

sidewalksoNot ADA compliant

Funding Source

o The Federal Highway Administration (FHWA) and Caltrans prioritize the repair and replacement of seismically deficient and scour critical bridges

o This project funded largely by FHWA with some state and local matching funds.

o Requirements for Funding:o Correct all deficiencieso Comply with the National Environmental Policy Act (NEPA)

and the California Environmental Quality Act (CEQA)

Work Completed to date

oPublic Workshops have helped determine preliminary project scope.

o December 2015o September 2018o January 2019o March 2021

oMain Topics of Discussion included aesthetic design, alignment, multi-modal structure, and beach access.

N

Proposed Bridge

Cross Section

Steel-tied Arch

What is CEQA?

CEQA (See-Qua)

o California Environmental Quality Act (1970)o Public disclosure and input processo Avoid, minimize, and reduce potential environmental

impacts o Adopt mitigation and monitoring program

CEQA Environmental Review Process

Environmental Analysis for EIR

oAesthetics/VisualoAgriculture and

Forestry ResourcesoAir QualityoBiological ResourcesoCultural ResourcesoEnergyoGeology and SoilsoGreenhouse Gas

Emissions

oHazards and Hazards Materials

oHydrology and Water Quality

oLand Use and PlanningoMineral ResourcesoNoiseoPopulation and HousingoPublic ServicesoRecreation

oTransportationoTribal Cultural

ResourcesoUtilities and

Service SystemsoWildfireoCumulative EffectsoGrowth Inducing Effects

What is Scoping?

CEQA Scoping

oPublic and resource agency input on the environmental analysis

oTopic areas oIssues of concerns oProposed avoidance, minimization and mitigation

measures

What Scoping is Not?

oJudgements on the merits of the project oDiscussion of property values and right-of-way

processes

Schedule and Next Steps

Moving forward

Publish Draft EIRFall 2021

Public Comment

PeriodLate Fall

2021 (45 days)

Publish Final EIRWinter 2021

Board Certifies

EIREarly 2022

Dates are approximate, may change based on project development.

How to Submit Scoping Comments

How to Submit Comments

oApril 21, 2021 by 5:00pm oEmail: [email protected]: Jackson Ford, 707-565-8356oRegular Mail to:

Permit Sonoma Attn: Jackson Ford2550 Ventura Avenue Santa Rosa, CA 95403

The scoping presentation will be available at this website: https://sonomacounty.ca.gov/PRMD/Planning/Natural-Resources/

Thank you!

CommentsPlease use the hand raise function so

individual microphones can be unmutedin the order received

Email: [email protected] gCall: Jackson Ford, 707-565-8356 Regular Mail to:

Permit Sonoma Attn: Jackson Ford 2550 Ventura Avenue Santa Rosa, CA 95403

Bohemian Highway Bridgeover the Russian River

CEQAScoping Meeting

April 14, 2021