Chapter 8Boiler Operation Procedures
Taking Over a Shift First-Time BoilerStart-up Procedures Routine Boiler
Start-up Procedures Boiler aintenance
Procedures Boiler ShutdownProcedures Boiler !nspection
"#drostatic Test Boiler Trou$leshooting
-
7/25/2019 Boiler Note 1
2/21
%hapter & ' Boiler Operation Procedures
Boiler operation information is communicated to the
$oiler operator starting the shift to specif# an# special
procedures re(uired)
-
7/25/2019 Boiler Note 1
3/21
%hapter & ' Boiler Operation Procedures
*hen $lowing down the
gauge glass+ water should
enter the gauge glass (uickl#
when the gauge glass
$lowdown valve is closed)
-
7/25/2019 Boiler Note 1
4/21
%hapter & ' Boiler Operation Procedures
,uring a $ottom$lowdown+ the $oilershould $e underlight load and the
water level should$e at the O*.)
-
7/25/2019 Boiler Note 1
5/21
%hapter & ' Boiler Operation Procedures
The $lowdown valve isopened to evacuate thelow water fuel cutoffcham$er with the $urner
firing during $lowdown)
-
7/25/2019 Boiler Note 1
6/21
%hapter & ' Boiler Operation Procedures
*hen testing theflame scanner+ theflame scanner sensoris covered to simulate
a flame failure)
-
7/25/2019 Boiler Note 1
7/21
%hapter & ' Boiler Operation Procedures
Before starting the$oiler for the first time+the $oiler should havea minimum water level
of appro/imatel# 01a$ove the $ottom of thegauge glass)
-
7/25/2019 Boiler Note 1
8/21
%hapter & ' Boiler Operation Procedures
The $urner is started inlow fire according toprocedures specified$# the manufacturer)
-
7/25/2019 Boiler Note 1
9/21
%hapter & ' Boiler Operation Procedures
The $oiler vent is closedwhen pressure in the$oiler reaches 23 psi to24 psi)
-
7/25/2019 Boiler Note 1
10/21
%hapter & ' Boiler Operation Procedures
The main steam stopvalve is opened slowl# toallow the pressure toe(uali5e when the $oiler
is a few pounds $elowthe header pressure)
-
7/25/2019 Boiler Note 1
11/21
%hapter & ' Boiler Operation Procedures
6 $roken or discoloredgauge glass is replacedusing standardprocedures for ma/imum
safet#)
-
7/25/2019 Boiler Note 1
12/21
%hapter & ' Boiler Operation Procedures
The low water fuel cutoffcontrols must $e installedverticall# for properperformance)
-
7/25/2019 Boiler Note 1
13/21
%hapter & ' Boiler Operation Procedures
The $urner is maintained and tested to ensure properoperation and ma/imum efficienc#)
-
7/25/2019 Boiler Note 1
14/21
%hapter & ' Boiler Operation Procedures
Feedwater pumpsshould $e checkedperiodicall# to ensureproper $earing
temperatures andchecked for an#unusual vi$ration)
-
7/25/2019 Boiler Note 1
15/21
%hapter & ' Boiler Operation Procedures
Safet# valves areroutinel# tested to ensureproper operation andmust $e serviced $# an
authori5ed manufacturerrepresentative)
-
7/25/2019 Boiler Note 1
16/21
%hapter & ' Boiler Operation Procedures
Steam traps are checkedfor proper operationwhen determining thecause of a steam$ound
feedwater pump)
-
7/25/2019 Boiler Note 1
17/21
%hapter & ' Boiler Operation Procedures
*hen inspecting a$oiler+ inspect tu$esheets+ tu$es+ andother internal parts for
corrosion+ overheating+and7or other damage)
-
7/25/2019 Boiler Note 1
18/21
%hapter & ' Boiler Operation Procedures
"andhole covers areremoved to provideaccess to $oiler partsduring a $oiler
inspection)
-
7/25/2019 Boiler Note 1
19/21
%hapter & ' Boiler Operation Procedures
6ll internal surfacesare e/posed andcleaned prior to the$oiler inspection)
-
7/25/2019 Boiler Note 1
20/21
%hapter & ' Boiler Operation Procedures
Trou$leshooting stepsfrom the manufacturerprovide a guide tocorrecting a $oiler
operation pro$lem)
-
7/25/2019 Boiler Note 1
21/21
%hapter & ' Boiler Operation Procedures
The $oiler room log lists$oiler operation data thatcan $e used to increase$oiler efficienc# and
identif# a potentialmalfunction)