boltec mc training module 1 for barrick goldstrike mines incorporated
TRANSCRIPT
BOLTEC MC TRAININGBOLTEC MC TRAINING BOLTEC MC TRAININGBOLTEC MC TRAINING
Module 1For
Barrick Goldstrike Mines Incorporated
Matt Roemmich AC ElkoDan Gravelle AC ElkoBen Lupercio BGMI ElkoPaul Smith BGMI Elko Jaaron Johnson AC Denver
TrainersTrainers
Introduction
Introduction
OrientationOrientation
Introduction
Safety Share!Safety Share!
Introduction
Atlas CopcoBackgroundAtlas CopcoBackground
Introduction
Atlas CopcoBackgroundAtlas CopcoBackground
Introduction
Construction & Mining Technique
U/G Rock Excavation
Surface Drilling Equip.
Rocktec
Secoroc & BHMT
Construction Tools
Craelius
Drilling Solutions
Dynapac
CompressorTechnique
Airtec
Portable Air
Industrial Air
Oil-free Air
Gas and Process
IndustrialTechnique
Milwaukee Electric Tool
Atlas Copco Electric Tools
Atlas Copco Tools and Assembly Systems
Chicago Pneumatic
Atlas CopcoStockholm, Sweden
Construction & Mining Technique
Underground Drilling Equipment
Underground Loaders and Trucks
Construction & Mining Technique
Construction & Mining Technique
Rock Drilling Tools
Construction & Mining Technique
Surface Drilling Equipment
Construction & Mining Technique
Construction Tools
Construction & Mining Technique
Geotechnical Drilling Equipment
Compressor Technique
Industrial Technique
Introduction
Partners of the Future
Partners of the Future
Introduction
Rock RaceRock Race
Module 1Module 1
MODULE 1 OBJECTIVES
ELECTRICAL SYSTEM
INTRO-DUCTION
ESSENCE OF CONTRACTWORK MANAGEMENT
CMMS
MACHINE FAMILIARIZATION
RIG CONTROLS
RIG OPERATION
MANUALSRCS
OVERVIEWHYDRAULIC
SYSTEMS
CLAIR
PRACTICAL OPERATION
RIG MOVEMENTS
PREVENTIVE MAINTENANCE
TESTING
Course Map
Introduction
Learning Objectives
Objective 1: Introduction
Learners will see some of Atlas Copco’s products, history, meet the trainers and see the Boltec MC.
Objective 2: Barrick Presentation
Learners will review the contract obligations, responsibilities, pay items and discuss the spirit of the contract. Learners will see how to open a work order, hear about AMP, data management and the overall BGMI CMMS (EAM).
Objective 3: Machine Familiarization
Learners will see some of Atlas Copco’s terminology, signs, symbols and locations / definitions of Boltec MC components.
Introduction
Learning Objectives (continued)
Objective 4: Rig Controls
Learners will be able to identify the Boltec MC levers, buttons, switches and emergency features.
Objective 5: Rig Operation
Learners will see the fundamentals of rig startup, operating on diesel, operating on electric power, tramming and boom positioning.
Objective 6: Manuals
Learners will see how Atlas Copco organizes Boltec MC manuals as Operators Instructions, and Spare Parts Catalogs. Each section will be shown on the paper manuals and ActiView manuals will be shown.
Introduction
Learning Objectives (continued)
Objective 7: RCS Overview
Learners will see an introduction to the rig control system and be able to identify the system components.
Objective 8: Hydraulic System
Learners will be introduced to the components used in a Boltec MC hydraulic system including valves, sensors, pumps, filters and the corresponding schematic symbols.
Objective 9: Preventive Maintenance
Learners will be shown how to do regularly scheduled maintenance on the machine and the basic safety procedures to safely carry out the prescribed maintenance. Learners will be able to identify “critical task” actions.
Objective 10: CLAIR
Learners will be shown how to do daily washing, cleaning, lubrication, adjustment, inspection and repair (CLAIR bay).
Introduction
Learning Objectives (continued)
Objective 11: Electrical System
Learners will be introduced to the components used in a Boltec MC electric system including the RCS interface, 24 Volt system and 480 Volt system.
Objective 12: Basic Rig Movements
Learners will be shown how the controls of the rig correspond to movements for tramming and boom positioning. Learners will see how to do a brake test.
Objective 13: Practical Rig Operation
Learners will have hands on practice operating the boom, tramming the rig and reviewing test material.
Objective 14: MSHA 5000-23 and Testing
Learners will be field tested on boom positioning, tramming, and a written exam.
Introduction
NO SMOKING IN LECTURE ROOM
TEA BREAKS BETWEEN OBJECTIVES
NO CELL PHONES ON DURING CLASS
LUNCH @ 11:15 TO 12:05 PM
Course Norms
Introduction
Boltec MC Introduction
Safe RockSafe Rock
Scaling in the tunnel cycle
Boltec MC
Michelin X-Mine D2 12 x 20 Tires Outer Turning Radius: 6250mm Inner Turning Radius: 3800mm Height 3010mm
Boltec MC
Boltec MC
Coverage Area
Boltec MC
Hydraulic rock drill COP 1532
For tunnel height 3.0 -12 m
For bolt length 1.5 - 6.0 m
Magazine 10 bolts
Weight of rig 15 - 20 ton
RCS System
•Distributed computer power. A number of computers control its own part of the process.•Computers connected over a data communication network
•The technique is called Controller Area Network
•Simple Design
•Easy operator interface
•Assisted troubleshooting
•Advanced rockdrill control
Boltec MC
Boltec MC
Boltec MC
Questions?Questions?