booster digital damper status & plans nathan eddy pip meeting 12/21/11

15
1 Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11

Upload: glen

Post on 22-Feb-2016

40 views

Category:

Documents


0 download

DESCRIPTION

Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11. Motivation. Implement a bunch by bunch digital feedback system FPGA, ADC, Digital Signal Processing, DAC Wideband system Flexibility to modify system as needed Essentially an R&D project up to now - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11

1

Booster Digital DamperStatus & Plans

Nathan Eddy

PIP Meeting12/21/11

Page 2: Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11

2

Motivation• Implement a bunch by bunch digital feedback

system FPGA, ADC, Digital Signal Processing, DAC Wideband system Flexibility to modify system as needed

• Essentially an R&D project up to nowDemonstrate transverse system operation Diagnostic capability – tune, studies, etcDevelop plan for longitudinal system

Page 3: Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11

3

Transverse Damper System Overview

Page 4: Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11

4

VME Digital Damper Board

• Large Stratix II FPGA handles signal processing & interfaces on multiple clock domains

• 4 ADC (up to 212MHz) & 4 DAC (up to 636MHz) locked to external RF

• Digital I/O – TCLK, MDAT, BSYNC decoders, fanout, diagnostics

• Up to 1GB on-board RAM• VME front-end speaks ACNET• Used in Recycler – Transverse

Damper, RF Correction, ACBeam Intensity

• Used for MI Anti-proton Injection Damper

Page 5: Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11

5

Current Transverse Setup

Page 6: Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11

6

Logic & Control

Page 7: Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11

7

Initial Testing Results

Page 8: Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11

8

Horizontal Instability Study

Page 9: Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11

9

Tune Monitor

Page 10: Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11

10

Tune Spectra

Page 11: Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11

11

ACNET Config & Control

Page 12: Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11

12

Diagnostic Capability

• Record bunch by bunch data for entire Booster cyclePosition, Intensity, Phase

• Measure Booster revolution frequency1Hz resolution @1ms

Page 13: Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11

13

Issues• Horizontal response is not

optimal due to pickup & kicker locations

• Difficulty exciting beam horizontally after transition Chromaticity Power

• RF Clock Lock Causes PLLs for

ADC/DAC to relock Requires re-phasing

Page 14: Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11

14

The Future• Transverse Damper currently is not needed for

operation – driven largely by R&D right now• Continue to gain operational experience with

Transverse Damper Can we lower Chromaticity? Do we require more power in the horizontal plane?

• Investigate options for moving horizontal pickup & kicker and/or adding additional pickups Ideal scenario is two pickups ~90 degrees apart Is our current stripline pickup ideal? Use BPMs?

• Begin to investigate options for longitudinal damper

Page 15: Booster Digital Damper Status & Plans Nathan Eddy PIP Meeting 12/21/11

15

Budget Estimates?

• Damper Upgrade Parts purchased for 1GS/s high BW proto-type 1 year and $5k to produce prototype Can we go after head/tail effects – kick?

• Possibility for new pickups Pickups & Cables ~$10-20k

• Possibility new amplifiers are required Real dollars ~$100k

• Longitudinal Damper (???)