    VDB Willow Farm

    A CIVIL AND ALLIED WORKS

    1 MASONRY WORKS

    2 PLASTERING WORKS

    3 FLOORING AND CLADDING WORKS

    4 DOORS & WINDOWS

    5 PAINTING WORKS

    6 MISCELLANEOUS WORKS

    7 STRUCTURAL

    8 PODIUM

    9 INFRASTRUCTURE

    SUB TOTAL -

    ABSTARCT COST

    Remarks

    Sl

    No

    .

    ITEM DESCRIPTION Amount

  • 7/29/2019 BOQ Appartment

    2/78

    Professional Consultants

    1.00 MASONRY

    1.01

    Providing and constructing 200mm thick Solid concrete

    block work in walls, piers and architectural features at all

    levels using approved Solid blocks of minimum strength 50

    kgs/sqcm in cement mortar 1:6 including curing, steel scaffolding, steel staging, leads and lifts. Cost to include

    drilling the column and fixing 200mm long, 50 x 4mm thk.

    MS Flat, bent to shape with anchor bolts, at every fifth

    course. GI Expanded Metal mesh shall be placed and tied in

    position between masonry and MS Flat, bent to shape, with

    anchor bolts at every fifth course. The rate is inclusive of

    cost of fabrication of reinforcement steel with all leads and

    lifts and as directed by Architect/Engineer in charge.

    1.02

    Providing and constructing 150mm thick Solid concrete

    block work in walls, piers and architectural features at all

    levels using approved Solid blocks of minimum strength 50

    kgs/sqcm in cement mortar 1:6 including curing, steel

    scaffolding, steel staging, leads and lifts. Cost to include

    drilling the column and fixing 200mm long, 50 x 4mm thk.MS Flat, bent to shape with anchor bolts, at every fifth

    course. GI Expanded Metal mesh shall be placed and tied in

    position between masonry and MS Flat, bent to shape, with

    anchor bolts at every fifth course. The rate is inclusive of

    cost of fabrication of reinforcement steel with all leads and

    lifts and as directed by Architect/Engineer in charge.

    # DESCRIPTION

    Page 2 of 78

  • 7/29/2019 BOQ Appartment

    3/78

    Professional Consultants

    1.03

    Providing and constructing 100mm thick Solid block work at

    all levels in walls, piers and architectural features using

    approved solid blocks of minimum strength 50 kgs/sqcm in

    cement mortar 1:4 including curing, steel scaffolding, steel

    staging, leads and lifts and a concrete band 75mm thick.

    with 2nos. Tor 8 longitudinal bars and Tor 8 at 200c/c

    transverse reinforcement. at every fifth course with M15

    grade concrete mix including steel shuttering, steel staging,

    curing etc., complete, including drilling the column & fixing

    200mm long 50 x 4mm thick MS flat bent to shape, with

    anchor bolts at every fifth course, with all leads and lifts

    and as directed by Architect/Engineer in charge. The rate is

    inclusive of reinforcement steel and cost of steel fabrication

    of reinforcement steel with all leads and lifts and as

    directed by Architect/Engineer in charge.

    MASONRY WORKS Sub-total -1 : -

    2.00 PLASTERING WORKS

    2.01

    Prepare the surface and plaster the ceiling, soffit of

    staircase etc., in cement mortar 1:4, 12 mm thick with

    smooth finish to line and level with lime rendering at all

    levels including lead and lift of materials, hydrating the lime

    24 hours before starting of work with necessary scaffolding

    , curing , etc., complete.

    Page 3 of 78

  • 7/29/2019 BOQ Appartment

    4/78

    Professional Consultants

    2.02

    Prepare the surface and plaster all internal RCC / Masonry

    surface, walls, etc., in cement mortar 1:5 , 15 mm thick ,

    smooth finished to line and plumb with lime rendering at all

    levels rounding of corners wherever required complete with

    necessary scaffolding, curing etc, complete.including lead

    and lifts hydrating the lime for 24 hours before starting of

    work.at all levels rounding of corners wherever required

    complete with necessary scaffolding, curing etc,

    complete..Cost to include supplying and Fixing Plaster

    Mesh/Corner Bead made out of galvanized iron of nominal

    thickness 0.35mm with a zinc coating of 120 gms / Sqm of

    Arpitha make at the concrete and masonryjunctions,Column corners, wall corners, with Galvanised

    nails etc., wherever called for required size.

    2.03

    Prepare the surface and plaster all internal RCC / Masonry

    surface, walls to receive dadoo backing, in cement mortar1:5 , 15 mm thick , rough finished to line and plumb at all

    levels rounding of corners wherever required complete with

    necessary scaffolding, curing etc, complete.including lead

    and lifts hydrating the lime for 24 hours before starting of

    work.at all levels rounding of corners wherever required

    complete with necessary scaffolding, curing etc,

    complete.Cost to include supplying and Fixing Plaster

    Mesh/Corner Bead made out of galvanized iron of nominal

    thickness 0.35mm with a zinc coating of 120 gms / Sqm of

    Arpitha make at the concrete and masonry

    junctions,Column corners, wall corners, with Galvanised

    nails etc., wherever called for required size.

    Page 4 of 78

  • 7/29/2019 BOQ Appartment

    5/78

    Professional Consultants

    2.04

    Providing rough plastering 15mm thick in CM 1:6 on wallsat all levels & lifts, including rough finishing to line and

    plumb, cost of scaffolding, curing, etc., complete, with all

    leads and lifts and as directed by Architect/Engineer in

    charge. ( In ducts , shafts) with water proofing compound

    (using approved waterproofing compound added as per

    manufacturers instructions. Cost to include supplying and

    Fixing Plaster Mesh/Corner Bead made out of galvanized

    iron of nominal thickness 0.35mm with a zinc coating of

    120 gms / Sqm of Arpitha make at the concrete and

    masonry junctions,Column corners, wall corners, with

    Galvanised nails etc., wherever called for required size.

    Page 5 of 78

  • 7/29/2019 BOQ Appartment

    6/78

    Professional Consultants

    2.05

    Providing waterproof plaster to external walls, columns,

    etc. in waterproof cement mortar 1:4 (using approved

    waterproofing compound added as per manufacturers

    instructions) for over all thickness 20mm but applied in twocoats, first coat of 14mm thick, second coat of 6mm with

    water proof compound to be applied after application of

    first coat, finished to line and level to approved texture,

    including all leads, lifts, scaffolding and curing complete.

    The rate is inclusive of forming of drip moulds &

    architectural grooves of size 25x10mm as per the detailed

    drawing and directions of the Architect/Engineer-in-

    charge.Cost to include supplying and Fixing Plaster

    Mesh/Corner Bead made out of galvanized iron of nominal

    thickness 0.35mm with a zinc coating of 120 gms / Sqm of

    Arpitha make at the concrete and masonry

    junctions,Column corners, wall corners, with Galvanised

    nails etc., wherever called for required size.

    3.00 FLOORING AND CLADDING WORKS

    3.00 IPS FLOORING-TERRACEProviding and laying 50mm thick Indian patent stone

    monolithic flooring (at all levels) 50mm thick of 1 portion of

    cement, 2 parts of coarse sand and 4 parts of stone

    aggregate by volume grading of aggregate The floor shall

    be completed with 1:1 cement sand mortar 12mm thick and

    cement slurry 2.2kg/sqm including Glass divider strips45/50x4mm thick set in the flooring including necessary

    levelling, setting, etc.,. Rate to include curing & protection

    etc complete., with all lead and lift and as directed

    Architect En ineer in char e includin necessar Floora) For average thickness of 50~55 mm.

    b) For average thickness of 70~75 mm.

    FLOORING AND CLADDING WORKS Sub-total -3 :

    PLASTERING WORKS Sub-total -2 :

    Page 6 of 78

  • 7/29/2019 BOQ Appartment

    7/78

    Professional Consultants

    Page 7 of 78

  • 7/29/2019 BOQ Appartment

    8/78

    Professional Consultants

    Page 8 of 78

  • 7/29/2019 BOQ Appartment

    9/78

    Professional Consultants

    Page 9 of 78

  • 7/29/2019 BOQ Appartment

    10/78

    Professional Consultants

    Page 10 of 78

  • 7/29/2019 BOQ Appartment

    11/78

    Professional Consultants

    Page 11 of 78

  • 7/29/2019 BOQ Appartment

    12/78

    Professional Consultants

    Page 12 of 78

  • 7/29/2019 BOQ Appartment

    13/78

    Professional Consultants

    Rate /Unit

    QTY.

    1,874.00 930.00 1,742,820.00 1,874.00

    25.00 765 19,125.00 25.00

    Type C 1

    Amount

    TOTAL QTY

    TYPE C2

    TOTAL QTY

    TYPE C1

    United Engineering

    Page 13 of 78

  • 7/29/2019 BOQ Appartment

    14/78

    Professional Consultants

    384.00 690 264,960.00 384.00

    - - -2,026,905.00

    -

    1,251.00 260.00 325,260.00 1,251.00

    Page 14 of 78

  • 7/29/2019 BOQ Appartment

    15/78

    Professional Consultants

    2,930.00 270.00 791,100.00 2,930.00

    - - -

    472.00 260.00 122,720.00 472.00

    Page 15 of 78

  • 7/29/2019 BOQ Appartment

    16/78

    Professional Consultants

    408.00 260.00 106,080.00 408.00

    Page 16 of 78

  • 7/29/2019 BOQ Appartment

    17/78

    Professional Consultants

    - - -

    2,126.00 335.00 712,210.00 2,126.00

    - - - -

    2,057,370.00

    -

    -

    -

    - - - -

    375.00 350.00 131,250.00 375.00

    RATE ONLY - RATE ONLY

    131,250.00Page 17 of 78

  • 7/29/2019 BOQ Appartment

    18/78

    Professional Consultants

    4,215,525.00

    Page 18 of 78

  • 7/29/2019 BOQ Appartment

    19/78

    Professional Consultants

    Page 19 of 78

  • 7/29/2019 BOQ Appartment

    20/78

    Professional Consultants

    Page 20 of 78

  • 7/29/2019 BOQ Appartment

    21/78

    Professional Consultants

    Page 21 of 78

  • 7/29/2019 BOQ Appartment

    22/78

    Professional Consultants

    Page 22 of 78

  • 7/29/2019 BOQ Appartment

    23/78

    Professional Consultants

    Page 23 of 78

  • 7/29/2019 BOQ Appartment

    24/78

    Professional Consultants

    Rate /Unit Rate /Unit

    QTY. QTY.

    930.00 1,742,820.00 11,244.00 930.00

    - -

    765 19,125.00 150.00 765

    Amount

    TOTAL QTY

    TYPE C3 TO C8

    UnitedUnited Engineering

    Type C 2 Type

    Page 24 of 78

  • 7/29/2019 BOQ Appartment

    25/78

    Professional Consultants

    690 264,960.00 2,304.00 690

    - -2,026,905.00

    -

    260.00 325,260.00 7,506.00 260.00

    Page 25 of 78

  • 7/29/2019 BOQ Appartment

    26/78

    Professional Consultants

    270.00 791,100.00 17,580.00 270.00

    - -

    260.00 122,720.00 2,832.00 260.00

    Page 26 of 78

  • 7/29/2019 BOQ Appartment

    27/78

    Professional Consultants

    260.00 106,080.00 2,448.00 260.00

    Page 27 of 78

  • 7/29/2019 BOQ Appartment

    28/78

    Professional Consultants

    - -

    335.00 712,210.00 12,756.00 335.00

    - - - -

    2,057,370.00

    -

    -

    -

    - - - -

    350.00 131,250.00 2,250.00 350.00

    - RATE ONLY

    131,250.00Page 28 of 78

  • 7/29/2019 BOQ Appartment

    29/78

    Professional Consultants

    4,215,525.00

    Page 29 of 78

  • 7/29/2019 BOQ Appartment

    30/78

    Professional Consultants

    Page 30 of 78

  • 7/29/2019 BOQ Appartment

    31/78

    Professional Consultants

    Page 31 of 78

  • 7/29/2019 BOQ Appartment

    32/78

    Professional Consultants

    Page 32 of 78

  • 7/29/2019 BOQ Appartment

    33/78

    Professional Consultants

    Page 33 of 78

  • 7/29/2019 BOQ Appartment

    34/78

    Professional Consultants

    Page 34 of 78

  • 7/29/2019 BOQ Appartment

    35/78

    Professional Consultants

    Rate /Unit

    QTY.

    10,456,920.00 2,675.00 930.00 2,487,750.00

    - - -

    114,750.00 125.00 765 95,625.00

    Engineering

    C 3 TO C 8

    Amount

    TOTAL QTY

    TYPE D1 & D2

    United Engineering

    Type D1 & D2

    Amount

    Page 35 of 78

  • 7/29/2019 BOQ Appartment

    36/78

    Professional Consultants

    1,589,760.00 550.00 690 379,500.00

    - - -12,161,430.00 2,962,875.00

    - -

    1,951,560.00 2,800.00 260.00 728,000.00

    Page 36 of 78

  • 7/29/2019 BOQ Appartment

    37/78

    Professional Consultants

    4,746,600.00 6,025.00 270.00 1,626,750.00

    - - -

    736,320.00 595.00 260.00 154,700.00

    Page 37 of 78

  • 7/29/2019 BOQ Appartment

    38/78

    Professional Consultants

    636,480.00 545.00 260.00 141,700.00

    Page 38 of 78

  • 7/29/2019 BOQ Appartment

    39/78

    Professional Consultants

    - - -

    4,273,260.00 2,560.00 335.00 857,600.00

    - - - -

    12,344,220.00 3,508,750.00

    - -

    - -

    - -

    - - - -

    787,500.00 661.00 350.00 231,350.00

    - RATE ONLY -

    787,500.00 231,350.00Page 39 of 78

  • 7/29/2019 BOQ Appartment

    40/78

    Professional Consultants

    25,293,150.00 6,702,975.00

    60,253,587.03

    Page 40 of 78

  • 7/29/2019 BOQ Appartment

    41/78

    Professional Consultants

    Page 41 of 78

  • 7/29/2019 BOQ Appartment

    42/78

    Professional Consultants

    Page 42 of 78

  • 7/29/2019 BOQ Appartment

    43/78

    Professional Consultants

    Page 43 of 78

  • 7/29/2019 BOQ Appartment

    44/78

    Professional Consultants

    Page 44 of 78

  • 7/29/2019 BOQ Appartment

    45/78

    Professional Consultants

    Page 45 of 78

  • 7/29/2019 BOQ Appartment

    46/78

    Professional Consultants

    Rate /Unit

    QTY.

    3,748.00 930.00 3,485,640.00 21,415.00

    - -

    50.00 765 38,250.00 375.00

    TOTAL QTYTOTAL QTY

    Club house

    United Engineering

    Club House

    Amount

    Page 46 of 78

  • 7/29/2019 BOQ Appartment

    47/78

    Professional Consultants

    768.00 690 529,920.00 4,390.00

    - -4,053,810.00

    -

    2,502.00 260.00 650,520.00 15,310.00

    Page 47 of 78

  • 7/29/2019 BOQ Appartment

    48/78

    Professional Consultants

    5,860.00 270.00 1,582,200.00 35,325.00

    - -

    944.00 260.00 245,440.00 5,315.00

    Page 48 of 78

  • 7/29/2019 BOQ Appartment

    49/78

    Professional Consultants

    816.00 260.00 212,160.00 4,625.00

    Page 49 of 78

  • 7/29/2019 BOQ Appartment

    50/78

    Professional Consultants

    - -

    38,268.00 335.00 12,819,780.00 57,836.00

    - -

    15,510,100.00

    - -

    - -

    - -

    - -

    750.00 350.00 262,500.00 4,411.00

    -

    -262,500.00

    Page 50 of 78

  • 7/29/2019 BOQ Appartment

    51/78

    Professional Consultants

    19,826,410.00 -

    Page 51 of 78

  • 7/29/2019 BOQ Appartment

    52/78

    Professional Consultants

    Page 52 of 78

  • 7/29/2019 BOQ Appartment

    53/78

    Professional Consultants

    Page 53 of 78

  • 7/29/2019 BOQ Appartment

    54/78

    Professional Consultants

    Page 54 of 78

  • 7/29/2019 BOQ Appartment

    55/78

    Professional Consultants

    Page 55 of 78

  • 7/29/2019 BOQ Appartment

    56/78

    Professional Consultants

    Page 56 of 78

  • 7/29/2019 BOQ Appartment

    57/78

    Professional Consultants

    930.00 19,915,950.00

    -

    765.00 286,875.00

    Amount

    Rate

    United Engineering

    Rate Amount QTY.

    Page 57 of 78

  • 7/29/2019 BOQ Appartment

    58/78

    Professional Consultants

    690.00 3,029,100.00

    -23,231,925.00 -

    -

    -

    260.00 3,980,600.00

    Page 58 of 78

  • 7/29/2019 BOQ Appartment

    59/78

    Professional Consultants

    270.00 9,537,750.00

    -

    260.00 1,381,900.00

    Page 59 of 78

  • 7/29/2019 BOQ Appartment

    60/78

    Professional Consultants

    260.00 1,202,500.00

    Page 60 of 78

  • 7/29/2019 BOQ Appartment

    61/78

    Professional Consultants

    -

    335.00 19,375,060.00

    -

    35,477,810.00 -

    -

    -

    -

    -

    350.00 1,543,850.00

    -

    -1,543,850.00 -

    Page 61 of 78

  • 7/29/2019 BOQ Appartment

    62/78

    Professional Consultants

    60,253,585.00 -

    Page 62 of 78

  • 7/29/2019 BOQ Appartment

    63/78

    Professional Consultants

    Page 63 of 78

  • 7/29/2019 BOQ Appartment

    64/78

    Professional Consultants

    Page 64 of 78

  • 7/29/2019 BOQ Appartment

    65/78

    Professional Consultants

    Page 65 of 78

  • 7/29/2019 BOQ Appartment

    66/78

    Professional Consultants

    Page 66 of 78

  • 7/29/2019 BOQ Appartment

    67/78

    Professional Consultants

    Page 67 of 78

  • 7/29/2019 BOQ Appartment

    68/78

    Professional Consultants

    Remarks

    Page 68 of 78

  • 7/29/2019 BOQ Appartment

    69/78

    Professional Consultants

    Page 69 of 78

  • 7/29/2019 BOQ Appartment

    70/78

    Professional Consultants

    Page 70 of 78

  • 7/29/2019 BOQ Appartment

    71/78

    Professional Consultants

    Page 71 of 78

  • 7/29/2019 BOQ Appartment

    72/78

    Professional Consultants

    Page 72 of 78

  • 7/29/2019 BOQ Appartment

    73/78

    Professional Consultants

    Page 73 of 78

  • 7/29/2019 BOQ Appartment

    74/78

    professional consultants

    consulting structural engineers

    I 1 EARTH WORK EXCAVATIONGeneral earthwork excavation in all types of soil for levelling & lowering

    the ground for lowest basement formation level, footings, raft, rc wall

    foundations, lift pits, trenches, sump tanks etc. from natural ground

    level up to the pcc bottom, stacking the excavated earth & disposable

    material where ever indicated in site, Excluding back filling, but

    including filling depressions wherever necessary, watering,

    consolidating, transporting surplus excavated earth / debris away from

    the site, shoring, bailing out water, etc. complete. Contractor shall get

    acquainted with site conditions, nature of soil and adopt suitable

    adequate dewatering system as deemed fit for the nature of soil,

    prevailing water table and water collected by runoff or rain to get the

    surface reasonably dry for laying pcc at the time of execution so that

    execution will not be ham ered or dela ed. The rate shall include0.0m upto 1.5m depth cum

    Cutting of soil up to plinth level:

    from 0 to 1.5mtr depth cum

    0.0 m upto 1.5 m depth

    a) Isolated footing cum

    b) Combined footing cum

    1.5m upto 3.0m depth

    a) Isolated footing cum

    b) Combined footing cum

    ii 1.5m upto 3.0m depth

    a) Combined footing (At Lift) cum

    a) All soils:

    from 0 to 1.5mtr depth cum

    from 1.5 to 3.0mtr depth cum

    b) Cutting of soil up to plinth level:

    from 0 to 1.5mtr depth cum

    from 1.5 to 3.0mtr depth cum

    3.0 m to 4.5 m depth cum

    c) in Hard rocks with controlled blasting:

    from 0 to 1.5mtr depth cum

    from 1.5 to 3.0mtr depth cum

    3.0 m to 4.5 m depth cum

    d) in Hard rocks with Chistelling:

    from 0 to 1.5mtr depth cum

    from 1.5 to 3.0mtr depth cum

    3.0 m to 4.5 m depth cum

    A EARTH WORK FOR ROADS

    1

    Earth work excavation by manual means in ordinary soil involving an

    average horizontal throw upto 0.5m excavated surface levelled and

    sides neatly dressed, the disposed earth to be levelled neatly after

    breaking of clods complete as per specifications.

    2

    Excavation in soft rock without blasting for formation of roads including

    stacking neatly, to uniform line and level with all lead cost of all labour,

    equipment, complete as per specifications.

    3

    Compaction of original ground with maximum of 6 passes of 8 to 10tonnes power roller including filling in depression occuring during rolling

    including cost of all labour, HOM of machinery complete as per

    specification.

    4

    Providing and laying of 250mm thick WBM with 65 to 40mm size

    aggregates with interstices filled with murram jelly with all necessary

    lead lift and placing in position. Complete

    5

    Extra for watering the earth to bring the earth upto required optimum

    misture content manually including cost of all labour complete as per

    specifications.

    SL.

    NO

    .

    Description of items UNIT

    Page 74 of 78

  • 7/29/2019 BOQ Appartment

    75/78

    professional consultants

    consulting structural engineers

    6

    Extra for watering the earth to bring the earth upto required optimum

    moisture content with mechinery including cost of all labour, HOM of

    machineries complete as per specificatons.

    7

    Extra for rolling to specification with the use of vibratory roller when

    earth is at suitable moisture content with desired field density not less

    than 95% of maximum dry density (Modified heavy proctor test)

    including HOM of machineries complete as per specifications.

    8

    Extra for rolling to specification with power roller 8-10 tonne when

    earth is at suitable moisture content with desired field density not less

    than 95% of maximum dry density (Ordinary proctor test) including

    HOM of machineries complete as per sepcifications.

    B SUB BASES - BASES (NON BITUMINOUS) AND SHOULDERS

    1

    rov ng, ay ng, sprea ng an compact on stone aggregates o

    specific sizes to water bound macadam specification including spreading

    in uniform thickness, hand packing rolling with 3 wheeled steel/

    vibratory roller 8-10 tonners in stages to proper grade and camber,

    applying and brooming requisite type of screening/binding materials to

    fill up the interestices of coarse aggregate, watering and compacting to

    -

    2

    Providing, laying, spreading and compacting graded stone aggregate to

    wet mix macadam specification including premixing the Material with

    water at OMC in mechanical mix plant carriage of mixed Material by

    tipper to site, laying in uniform layers with paver in sub-base /base

    course on well prepared surface and compacting with vibratory roller to

    achieve the desired density.

    2 SOIL NAILING

    In addit ion to the general specification in item 1.0, providing and

    stabili zing the slope of earth cut during the excavation process to

    prevent the sliding by driving the rebar's to the required depth in slope

    to the soil surface as per soil consultant /experts recommendations. The

    rate shall include the fee payable to the experts for their design and

    mesh with gunniting.

    Smtr

    3 SHORING

    In addition to the general specification in item 1.0, stabilizing the slope

    of earth during the excavation process to prevent the sliding by

    providing suitable shoring. The design of shoring system based on the

    system and material used. Contractor shall study the soil conditions ,

    depth at which shoring may be required using adequate benching and

    anchoring at base and various levels. The rate shall include making good

    shoring and recovering the materials used while back filling.

    Smtr

    4 BACK FILLING

    4

    Earth back filling for sides of foundations, retaining wall, trenches, lift

    pits, sump tank, above raft slab ( filling upto basement floor finish )and

    else where as directed by engineer in charge including watering and

    consolidating in 150mm thick layers, etc., complete as per detai led

    specification with available earth only and shall be stacked with in the

    site in OSR.

    cum

    III MASONRY

    1 SIZE STONE MASONRY IN CM (1:6)

    Providing and constructing of granite/trap/basalt size stone hammered

    dressed in courses not less than 20cms high,bond stons of 2 m apart in

    each coused including cost of materials , labour, curing complete as per

    specifications.

    cum

    III CONCRETE

    1 PLAIN CEMENT CONCRETE:

    Providing & laying M10 concrete using 20mm downsize aggregates 75

    thick below Footings, Raft, Retaining walls, Sump Tanks, Drains,

    Trenches, D.G.Foundations, HSD Storage Tanks, STP etc.

    cum

    a) Isolated footing cum

    b) Combined footing cumc) Retaining wall cum

    D.P C - Above SSM woks:

    Providing & laying M10 concrete using 20mm downsize aggregates 75

    thick above SSM using water proofing compound.cum

    2 D.P C - Above SSM woks:

    Providing & laying M10 concrete using 20mm downsize aggregates

    75 thick above SSM using water proofing compound.cum

    Page 75 of 78

  • 7/29/2019 BOQ Appartment

    76/78

    professional consultants

    consulting structural engineers

    3 REINFORCED CEMENT CONCRETE

    Important notes in regard to reinforced cement concrete.

    1. All concrete used for reinforced concrete work (structural concrete)

    shall be "Controlled concrete"

    While quoting for structural concrete work contractors are particularly

    advised to study the relevant drawings carefully before quoting.

    Contractors shall submit drawings showing the scheme of form work

    (shuttering) for beams and slabs, areas which project out at various

    levels as indicated in drawings and this shall be obligatory.

    The successful tenderer shall maintain at site, cube testing machine in

    good working order, sieves, slump cone, graduated cylinder and

    weights, scales for material testing.

    NOTE: A qualified mechanic shall always be available during working

    hours for maintenance of weight batching machines.

    Providing & laying controlled reinforced cement concrete confirming to

    grades as specified in (IS 456 - 2000) as per specifications using 20mm

    down size aggregates at any depth or heights excluding the cost of steel

    rein orcement centrin shutterin sca oldin but inclusive o costFor all structural concrete elements post construction dimension and

    levels shall be documented and submitted

    Note: Construction joints shall be at pre approved locations only shall

    be vertical or stepped. Concrete shall be chipped immediately after final

    setting using mechanical chippers and thoroughly cleaned. Surface shall

    be given

    a. A thick coat of slurry if the joint is less than 3 days old

    b. A thick coat of slurry with latex based admixture if the joint is lessthan 7 days old

    c. A coat of epoxy if it is more than 7 daysonstructon onts n coumns, wa s s a e or zonta an a t e

    latent concrete shall be removed after final setting and shall be given a

    The rates shall also include account for any admixtures (approved by the

    consultants) the contractor may use in order to enhance the workability,

    to achieve accelerated strength, etc. The rate shall include use of

    plasticizers and retarders to limit the water/cement ratio to 0.45 and

    the temperature to 25 degree C at the time of setting. Complete care

    shall be taken to achieve dense and fully watertight concrete.

    A Using RMC from outside

    1

    a) M25 for footings -RMC incl Cement cum

    b) M20 for Isolated footings- RMC incl Cement cum

    c) M20 for Combined footings- RMC incl Cement cum

    RCC COLUMNS :

    4 Columns of different sizes and shapes at various levels/heights.

    a)Below Basement(m-35) cum

    b)Basement ot Ground (m-35) cum

    c) Ground to First floor (m-35) cum

    d) First to Second floor (M-30) cum

    e)Second to third floor (M-30) cum

    f) Second floor to Terrace (M-25) cum

    g) Third floor to Terrace (M-25) cum

    h) Terrace to Staircase head room (M-25) cumi)Terrace to Staircase head room (M-30) cum

    M20 conrete for swimming pool:

    RCC wall cum

    Base slab cum

    # M-20 for R.C. Slabs of different thickness including Sunken slabs, etc.,

    a)Ramp- RMC incl Cement cum

    b)Grade Slab- RMC incl Cement cum

    c) ground floor- RMC incl Cement cum

    d) First floor-RMC incl Cement cum

    e)Second floor- RMC incl Cement cum

    f)Third FloorRMC incl Cement cum

    g)Terrace floor- RMC incl Cement cum

    h) Staircase head room- RMC incl Cement cum

    # M-20 for R.C.Beams (upstand and down stand )

    a)Ramp beam RMC incl Cement cum

    b) ground floor-RMC incl Cement cum

    c) First floor-RMC incl Cement cum

    d)Second floor-RMC incl Cement cum

    e)Third floor- RMC incl Cement cum

    f) Terrace floor- RMC incl Cement cum

    Page 76 of 78

  • 7/29/2019 BOQ Appartment

    77/78

    professional consultants

    consulting structural engineers

    g) Staircase head room -RMC incl Cement cum

    1

    5a

    M-20 for R.C.Beams (At plinth level )- RMC incl Cement cum

    iii M25 conrete for RCC retaining wall: cum

    RCC wall-RMC incl Cement cum

    Base slab-RMC incl Cement cum

    M20 conrete for RCC retaining wall:

    RCC wall-RMC incl Cement cum

    Base slab-RMC incl Cement cum

    viM-20 for R.C.STAIRCASES at all levels including concrete in steps and

    midlanding.a) Basement to Ground cum

    b) Ground to First floor cum

    c) First to Second floor cum

    d) Second floor to Third floor cum

    e) third floor to Terrace cum

    8 Shearwall

    a) Basement to Ground (M-35) cum

    a) Ground to First floor (M-35) cum

    b) First to Second floor (M-30) cum

    c) Second floor to Third floor(M-30) cum

    c) third floor to Terrace(M-25) cum

    # M-20 for Lintel cum

    IV FORMWORK FOR CONCRETE WORKS:

    Scheme of Formwork including casting slabs to gentle slope, special

    staging for casting floors of different heights, roof projections at various

    levels and profiled formwork.

    Contractors shall submit drawings showing the scheme of formwork

    including back propping and proper sequence of removal of formwork

    and back propping so that the structural slab will not be overloaded due

    to construction loads.

    Formwork shall be designed for close jointed rigid, durable and shall

    have adequate strength, water tightness and ensure easy removal etc.,

    Props, shoring and bracings shall be all in steel or Aluminium.

    Formwork designed with proposed materials (to be approved prior to

    making) shall be able to retain its shape, line, dimension, level within the

    allowable limits of variations.

    Formwork shall facilitate for making holes / recess for leaving dowels

    embedments etc. at no additional cost and shall be submitted for

    approval.

    Necessary arrangement shall be envisaged to provide camber in beams

    or slabs as per design.

    Formwork shall have adequate openings for cleaning.

    Formwork in following items of work at all level

    1For beam bottoms & sides, Arch beams s lab, ramp beams, racker

    beams etc.

    a)Ramp beam Smt

    b) Plinth Smt c)Ground Floor Smt

    d)First floor Smt

    e) Second floor Smt

    f)Third Floor Smt

    g) Terrace floor Smt

    h) Stair case headroom/Above terrace Smt

    2 M-20 for R.C. Slabs of different thickness including Sunken slabs, etc.,

    a)Ramp Smt

    a)Ground floor Smt

    b)First floor Smt

    c) Second floor Smt

    d) Third fllor Smt

    e)Terrace floor Smt

    f)above terrace floor Smt

    3 For Columns of different sizes and shapes at various levels/heights.

    a)Below basement floor Smt

    b) Basement ot Ground Smt

    c) Ground to First floor Smt

    d) First to Second floor Smt

    e) Second floor to Third floor Smt

    Page 77 of 78

  • 7/29/2019 BOQ Appartment

    78/78

    professional consultants

    consulting structural engineers

    f) Third floor to terrace Smt

    g) Above terrace floor Smt

    4 For R.C.STAIRCASES at all levels including steps & midlanding.

    a)Basement to Ground floor Smtr

    b) Ground to First floor Smtr

    c) First to Second floor Smtr

    d) Second floor Smtr

    e)third floor Smtr

    5 For Shear wall of different sizes and shapes at various levels/heights.

    a) Basement ot Ground Smt

    b) Ground to First floor Smt

    c) First to Second floor Smt

    d) Second floor to Third floor Smt

    e) Third floor to terrace Smt

    6For Retaining wall of different sizes and shapes at various

    levels/heights.

    a)base slab Smt

    b) Wall Smt

    7 For Plinth beam Smtr

    8 For LINTEL AND CHEJJA Smtr

    VI A) REINFORCING STEEL :

    Providing & Fixing steel reinforcement for RCC including material,

    fabricating as per IS-2502, transporting, storing, de-coiling,

    straightening, cutting, bending, spirally hooping and placing in position

    at all levels, including all labour, equipments, supplies, incidentals,

    sampling and testing as prescribed in IS codes including all charges

    thereon for requisite tests, supervision and binding with approved

    quality binding wire. The measurement shall be as per IS 1200 Part- and

    unit weight shall be derived as mentioned in IS 1786. The rolling margin

    shall be on Contractors own cost. The rate shall include cost of cover

    blocks, binding wire, chairs, spacers and pins to be provided as per

    specifications and the same will not be measured separately for

    payment. Quantity of steel as per drawing and with authorized overlaps

    only shall be measured and paid for.

    The quoted rate will include welding of reinforcement with low

    hydrogen low heat welding electrodes for the welding length mentioned

    in the drawings in place of conventional laps of larger diameter bars

    only wherever consultants recommend, for which no extra shall be

    claimed. Replacing conventional laps with welding splices will be

    entirely at consultants discretion. Such unclaimed welding will also

    include welding of reinforcement to already fixed insert plates,

    structural steel members etc. Shear connectors prepared from the

    reinforcing steel welded to structural steel members shall be measured

    in the reinforcement item.

    The rate also includes protecting the reinforcing bars in their virgin

    form or in the fabricated form, or when placed and tied up position or

    as dowels left for future continuation of work or at construction joint

    against corrosion due to exposure to weather if left exposed and un-

    encased for more than three weeks from the date of delivery to the site.

    Cement wash shall be given to such bars if they are likely to be exposed

    for more that three weeks and less than twelve weeks. Process of

    application of cement slurry shall be repeated after every twelve weeks

    if the exposure period is stretched.

    High yield strength deformed bars conforming to IS:1786 with

    Fy=500N/sq.mm

    SUB TOTAL - STEEL WORKS