Question
Define bottleneckswith reference from the novel, The Goal. How did they optimize the
bottlenecks?
-
7/23/2019 Bottleneck the Goal
3/15
%hat is Bott&eneck'
A (oint o) con+estion in a system thatoccurs "hen "ork&oads arrive at a +iven(oint more ,uick&y than that (oint can
hand&e them .he ine/ciencies !rou+hta!out !y the !ott&eneck o)ten create a,ueue and a &on+er overa&& cyc&e time
.he term is used to descri!e (oints o)con+estion in everythin+ )rom com(uter
net"orks to a )actory assem!&y &ine
-
7/23/2019 Bottleneck the Goal
4/15
Bottleneck According to Jonah
A manufacturing firmshould distinguishbetween bottleneck andnon-bottleneck resources
Bottleneck are resourceswhose capacities areequal to or less than the
demand placed upon it
The bottleneck resourcesdetermine the flow of
product through the plant
-
7/23/2019 Bottleneck the Goal
5/15
-
7/23/2019 Bottleneck the Goal
6/15
Is Bottleneck Good for a manufacturingplant?
An hour lost on the bottleneck is an hour lost
for the entire plant
An hour lost on a non-bottleneck is a
mirage
Manage the plant by the bottlenecks
-
7/23/2019 Bottleneck the Goal
7/15
(timisin+ the Bott&enecks
-
7/23/2019 Bottleneck the Goal
8/15
Jonah: Bottleneck has no slack capacity
Solution:Alex organized the bottlenecks to work only on overdue
orders from the most overdue to the least
In order to keep the bottlenecks constantly busy, the teamformed a new system to inform the workers what materials
have priority at non bottlenecks.
Answer: Red and Green Tags
Twelve Orders got shipped
Problem No.
Does Bottleneck has a slack capacity?
-
7/23/2019 Bottleneck the Goal
9/15
Materia&s
TAG TAG
Bottleneck Parts
1on-Bott&eneck
2arts
-
7/23/2019 Bottleneck the Goal
10/15
Increasing the Production Capacity and Efficiency of the plant
Solution:
The production Manager fixed some of the old machines tocomplement what one of the bottlenecks did, thus increasing
the capacity
More Workers: One foreman for each location all the time.
Increasing the Efficiency: Mixing and Matching orders bypriority to process more parts, increasing efficiency by 10%.
Problem No. 2
-
7/23/2019 Bottleneck the Goal
11/15
3o"er4nventory More
Bott&enecks
evea&ed
Problem No. 3
-
7/23/2019 Bottleneck the Goal
12/15
What actually had happened was a result of some old thinking.Working non-bottlenecks to maximum capacity on bottleneckparts had caused the problem. All parts were stacked up in frontof the bottlenecks and others were awaiting non-bottleneck parts
for final assembly.
.here needs to !e !a&ance
.he red and +reen ta+s need to !e modied
Observation
-
7/23/2019 Bottleneck the Goal
13/15
Solution
Schedule for the bottleneck parts can bemade in order to decide when they should bereleased, leading to alleviation of any excessinventory
For non-bottlenecks: Out of the data for thebottleneck parts to the final assembly, non-
bottleneck parts can be predicted.
-
7/23/2019 Bottleneck the Goal
14/15
Conc&usion
ee( !ott&eneck runnin+ su!ject the rest to the !ott&eneck
Batch si8es: 3on+ on !ott&eneck short e&se"here
9ive ste(s o) !ott&eneck mana+ement
4denti)y the systems !ott&enecks
;ecide ho" to e
-
7/23/2019 Bottleneck the Goal
15/15