Vibration Report for the Month of May 2010 Advanced Monitoring Service 55 Leedham Street Suite 3-6 South Attleboro Ma. 02703 774-219-9947

Upload: eabams

Post on 28-Nov-2014

434 views

Category:

Documents


0 download

DESCRIPTION

Vibration Report CCE

TRANSCRIPT

Page 1: Bottling Report Cce10

Vibration Report

for the

Month of May 2010

Advanced Monitoring Service

55 Leedham Street Suite 3-6 South Attleboro Ma. 02703 774-219-9947

Page 2: Bottling Report Cce10

Enclosed is a current report of the data collected during our visit to CCE Elmsford, NY on June23, 2005. This report will give you an overview of all data collected, the recommended action ,and their priority levels. Please feel free to contact our office with any questions or concernsyou may have regarding this report or the services you received.

June 23, 2005

CCE Bottling Company of New York111 View Park DriveElmsford, NY 10523

Attention : Mr. Michael P. Rose

Subject : Monthly Readings for the PdM Program

Dear Mike,

Sincerely,

Edward A. BartnikowskiReliability Consultant

Advanced Monitoring Service

55 Leedham Street Suite 3-6 South Attleboro Ma. 02703 774-219-9947

Page 3: Bottling Report Cce10

Alarm Priority Codes

Critical

High

Low

Emergency Situation, Immediate Action Needed

Repair within the Month or Next Scheduled Shutdown

Monitor more Frequently

Page 4: Bottling Report Cce10

Alarm Report SummaryMACHINE ALARM PAGE PROBLEM

#3 Line Vacuum Pump CRITICAL 11 Lube

#7 Ammonia Compressor CRITICAL 5 Alignment

#1 Line Booster Pump CRITICAL 7 Balance

#2 Line Vacuum Pump CRITICAL 8 Loose

#3 Line Booster Pump HIGH 9 Lube

#2 Fridge Compressor HIGH 2 Mounting

#1 Air Compressor HIGH 3 Alignment

#3 Line Prod. Pump HIGH 10 Lube

#9 Ammonia Compressor LOW 4 Belt Alignment

#5 Ammonia Compressor LOW 1 Alignment

#1 Line Main Drive LOW 6 Electrical

Page 5: Bottling Report Cce10

DATE :

March 25,2010

COMPANY :

East Hartford

AREA :

Can Line

PRIORITY :

CRITICAL

PROBLEM STATEMENT :

INSPECT INPUT BEARING FOR PROPER MOUNTING AND WEAR

MACHINE NAME :

Seamier

ITEM NUMBER :

MACHINE DRAWING :

FINDINGS :

The spectrum on the motor indicatesan high nonsynchours peaks in the radialposition which is a indication of a bearingproblem.

RECOMMENDATIONS :

Recommend inspecting unit forproper wear and replace or rebuild inputbearing housing as needed. .

PAGE : 7

M1AM1RM1V

M2AM2RM2V

P1AP1RP1V

Page 6: Bottling Report Cce10

Before rebuild

After rebuild

Page 7: Bottling Report Cce10

DATE :

June 23, 2005

COMPANY :

East Hartford

AREA :

Ammonia room

PRIORITY :

LOW

PROBLEM STATEMENT :

INSPECT BELTS FOR PROPER WEAR AND FIT

MACHINE NAME :

#2 Ammonia Compressor

ITEM NUMBER :

MACHINE DRAWING :

FINDINGS :

The spectrum on the motor indicatesan increase in 1x belt with no harmonics,which is a indication of a belt condition.

RECOMMENDATIONS :

Recommend inspecting belt forproper wear and fit, also inspect sheaves forwear and replace as needed.

PAGE : 3

C1AC1RC1V

C2AC2RC2V

M1AM1RM1V

M2AM2RM2V

Page 8: Bottling Report Cce10

Before Belt alignment

After Belt Alignment

Page 9: Bottling Report Cce10

DATE :

Oct. 27, 2006

COMPANY :

East Hartford

AREA :

Ammonia Room

PRIORITY :

HIGH

PROBLEM STATEMENT :

ENSURE PROPER ELECTRICAL

MACHINE NAME :

#2 Ammonia Compressor

ITEM NUMBER :

MACHINE DRAWING :

FINDINGS :

The Spectrums on the motorindicates a high 1940 Hz peak with sidebands, which is a indication of a statorproblem.

RECOMMENDATIONS :

Recommend rewinding motor.

PAGE : 9

C1AC1RC1V

C2AC2RC2V

M1AM1RM1V

M2AM2RM2V

Page 10: Bottling Report Cce10

Before motor was rewound

After motor rewind

Page 11: Bottling Report Cce10

DATE :

June 23, 2005

COMPANY :

ABC Company

AREA :

Line #3

PRIORITY :

CRITICAL

PROBLEM STATEMENT :

ENSURE PROPER UNIT ALIGNMENT

MACHINE NAME :#3 Can Line

Vacuum Pump

ITEM NUMBER :

MACHINE DRAWING :

FINDINGS :

The Spectrum on the pump indicatesa high 1xfr an 2xfr , which is a indication ofa coupling problem.

RECOMMENDATIONS :

Recommend ensuring propercoupling wear replace as needed, realignmotor and pump.

PAGE : 12

M1AM1RM1V

M2AM2RM2V

P1AP1RP1V

P2AP2RP2V

Page 12: Bottling Report Cce10

Spectrum Before Alignment

1xfr

2xfr

1xfr

2xfr

After coupling use replaced and realigned

Page 13: Bottling Report Cce10

Types of equipment canbe tested.

Ammonia Compressor

Washer Pumps

Air Compressors