boulder, oct. 2011 challenges in operational nowcasting in beijing jianjie wang beijing...

35
Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology, CMA Oct 24, 2011

Upload: desirae-game

Post on 16-Dec-2015

217 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Challenges in Operational Nowcasting in Beijing

Jianjie Wang

Beijing Meteorological Bureau, CMA

Mingxuan Chen

Institute of Urban Meteorology, CMA

Oct 24, 2011

Page 2: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Impacts of sever weather to Beijing city1

2

Contents

Concluding remarks3

Performances of existing operational systems(BJ-ANC and BJ-RUC)

Page 3: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Impacts of severe weather to Beijing city1

2

Contents

Concluding remarks3

Performances of existing operational systems(BJ-ANC and BJ-RUC)

Page 4: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

C波段(已建)

S波段(在建)

C 波段

S 波段

Complicated terrain over Beijing

Mountainous area is 62% of total territory (16800 km2)

Down townTime series on total numbers of heavy rain (R24h > 50mm) stations in May to Sep during 2008-2011(surface stations + AWS)

date

Station no.

Page 5: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Gust windLightningHeavy rain

High Urban Density + Large Population + Multi-Transportation Ways+ Rapid Development

Increased Vulnerability to Weather Disasters

Due to rapid development of the city, severe weather induced hazards can trigger derivative disasters on the society and the economy of the city.

Heavy rain: —— Traffic jam on urban road and highway—— Delay of airplanes and trains—— Water logging in the low-lying places of urban area—— Mud slides in the northwestern mountainous area

Hail

Page 6: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Eager demands for SW nowcasting from usersEager demands for SW nowcasting from users

Requiring accurate & reliable SW nowcasting in terms of:

Weather types (i.e., torrential rain, lightning, hail, gust wind etc) Starting time and ending time Specific location Strength (e.g., hourly rainfall amount, gust wind speed etc) Lead time (at least 3-6h ahead) …

Page 7: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Impacts of severe weather to Beijing city1

2

Contents

Concluding remarks3

Performances of existing operational systems(BJ-ANC and BJ-RUC)

Page 8: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Data ingest

Algorithms

Fuzzy logic

Dat QC

CINRAD radars (4 S-band & 2 C-band), AWS in 5-min, satellites (FY2D/E), rawinsondes, NWP (BJRUC)

3D reflectivity mosaic

Storm tracking

Reflectivity TREC Storm trend nowcasts Storm reflectivity nowcasts

QPE

QPF

Retrieval of low-level thermo-dynamical fields

BJANC: Bei-Jing AutoNowCasting system—developed through the cooperation of BMB and NCAR—be installed in BMB & provincial weather offices of northern China

Page 9: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Used radars:

•Beijing S-band (BJRS)

•Tianjin S-band (TJRS)

•Shijiazhuang S-band (SJZRS)

•Qinhuangdao S-band (QHDRS) – added since B08

•Zhangbei C-band (ZBRC)

•Chengde C-band (CDRC) – added since B08

B08: 500km×500km

Now: 700km×700km

BJANC domain

Page 10: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Statistic verification on 0-1h forecasts of QPF,and storm cell tracking from BJANC (2007-2011 summertime averaged)

Page 11: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

12:00 15:00 18:00 21:00 00:00 03:00 06:00 09:00

Cold start, 24h forecastCold start, 24h forecast

Warm start, 24h or 36h forecastWarm start, 24h or 36h forecast

12:00 15:00 18:00 21:00 00:00 03:00 06:00 09:00

Initiation (Initiation (UTCUTC))

3DVAR3DVAR assimilation (assimilation (UTCUTC))

rawinsondes, surface OBS, ship/buoy, AWS, AMDAR, ground based GPS_MET

BJRUC: Bei-Jing Rupid Updating Cycle system—Developed on the basis of WRF model system

D1

D3

D1

D2D3

3km, 37 level, Ptop=50hPa

Page 12: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 201112

SYNOP

AMDAR

SOUND

SHIP&BUOY

Data assimilated by BJ-RUC

AWS

Ground-based GPS

Page 13: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Point verification on R1h forecasts within 24h range(15 surface stations, data of 2008/06/01-2009/05/31,

referenced from Wei Dong etc.)

(a)(a)

Valid at the same time Valid not at the same time but at the same time range

Page 14: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Sounding/12h

Analysis fields/6h

Surface OBS/3h

Global NWP guidance/12h

BJRUC guidance/3h

AWS OBS/5min

Radar OBS/6min

Wind profile/6min

BJANC guidance/6min

Lightning detection

Satellite OBS/30min

24-12h

6h SW starting0h

Warning issuing

Forecast on SW potential

BJT00 06 12 18 24

4 times in daily weather forecast issuing

Data support for SW forecast issuingData support for SW forecast issuing

Page 15: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Date Ave. Rainfall

(mm)

Max. of R1h

(mm)

Coverage Lasting

(hour)

Synoptic forcing

July 24 73 83.7 Whole area 16 Strong

July 26 19 76.2 Partial area 6 Weak

July 29 43 50.6 Whole area 19 Strong

Aug 9 16 58.1 Partial area 7 Weak

Aug 13 22 80.2 Partial area 6 Weak

Aug 14-15 31 63.9 Whole area 20 Strong

Investigation from forecaster’s perspective(all cases in late July to early Aug of 2011 with R1hmax>50mm)

Page 16: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Lasting 16h

83.7mm/h

Lasting 6h

80.2mm/h

Under strong synoptic forcing

Under weak synoptic forcing

Page 17: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Look into meso-scale features

Under strong

synoptic forcing; Longer lasting

Under weak synoptic forcing; Short lived

R1h, R3h features (time, shape, distribution, amount, movement), cells

BJRUC (0-24h)

8 runs in a day-cycle, and targeting whole raining period

R1h features, cell formation, evolution and reflectivity

BJANC (0-2h)

Every 6 min, and targeting whole raining period

Page 18: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Under strong synoptic forcingThe meso- spatial and temporal features of 1~ 3h

accumulated precipitation over Beijing area could be captured reasonably well within 24h.

QPF products valid at the same time from cycled runs within 24h period provide generally consistent information in terms of the raining time, rainfall location, amount and movement etc.

“spin up” effect has clear impacts to the “cold start” run of the BJRUC.

BJRUC Results-1BJRUC Results-1

Page 19: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Initiation:2011/08/14 08:00 (12-15h)

Initiation: 2011/08/14 14:00 (6-9h)

Initiation: 2011/08/14 20:00 (0-3h)

2011/08/14 20:00-23:00

From the cold start run

R3h of OBS versus that of BJRUC

Page 20: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Under weak synoptic forcing

There are visible bias on QPF products generally.The information of QPF products from cycled runs valid

at the same time tends to diverse run to run. BJRUC could predict quite well the torrential rain induced

by short-lived convections, occasionally, when signals of the local convective potential had occurred in model initial time and was captured by the model properly.

BJRUC Results-2BJRUC Results-2

Page 21: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

2011/08/09 OBS

15:00-16:00 16:00-17:00 17:00-18:00 18:00-19:00 19:00-20:00

Initiation:2011/08/08 20:00

Initiation:2011/08/09 08:00

20h

12h10h8h

22h 24h

Page 22: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

23:00-00:00 00:00-01:00 01:00-02:00 02:00-03:00 03:00-04:00

2011/08/14 OBS

Initiation:2011/08/13 14:00

11h 12h 13h 14h

Page 23: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

hPa

200 1000

185 925

170 850

140 700

120 600

100 500

80 400

60 300

50 250

40 200-80

-80

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

0

0

10

10

20

20

30

30

40

40

-60

-40

-20

0

20

40

60

80

100

120

140

160

180

-60

-40

-20

0

20

4060

8010012

0140160180

0.05 0.1 0.2 0.5 1 1.5 2 3 4 6 8 12 16 2024 30

0℃

-10℃

-20℃

-30℃

LCL

LFC

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 20年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 20年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 20年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 20年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 20年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 20年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 20年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 20年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 20年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 20年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 20年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 20年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 20年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 20年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 20年 月 日 时

hPa

200 1000

185 925

170 850

140 700

120 600

100 500

80 400

60 300

50 250

40 200-80

-80

-70

-70

-60

-60

-50

-50

-40

-40

-30

-30

-20

-20

-10

-10

0

0

10

10

20

20

30

30

40

40

-60

-40

-20

0

20

40

60

80

100

120

140

160

180

-60

-40

-20

0

2040

6080

10012

0140160180

0.05 0.1 0.2 0.5 1 1.5 2 3 4 6 8 12 16 2024 30

0℃

-10℃

-20℃

-30℃

LCL

LFC

EL

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 14年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

EL

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 14年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

EL

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 14年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

EL

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 14年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

EL

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 14年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

EL

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 14年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

EL

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 14年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

EL

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 14年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

EL

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 14年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

EL

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 14年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

EL

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 14年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

EL

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 14年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

EL

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 14年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

EL

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 14年 月 日 时

0℃

-10℃

-20℃

-30℃

LCL

LFC

EL

CCL1km

2km

3km

6km

9km

温度对数压力图54511()测站:

11 08 13 14年 月 日 时2011/08/13 14:00 (Initiation time)

2011/08/13 20:00 (3h ahead rain)

Initiation: (6h)2011/08/13 14:00

K SI CAPE LCL

OBS

14:00

29 -0.78 610 913

OBS

20:00

34 -1.18 1157 925

BJRUC

20:00

34 -3.2 1355 884

Page 24: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

2011/08/13 23:00 BJT 2011/08/14 00:00 BJT 2011/08/14 01:00 BJT

2011/08/14 02:00 BJT 2011/08/14 03:00 BJT 2011/08/14 04:00 BJT

BJRUC Initiation: 2011/08/13 14:00 BJT

9h 10h

12h 13h

11h

14h

Page 25: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

0-1h nowcasting products (the track, trend, reflectivity and quantitative precipitation etc) are precise and reliable generally.

Although the nowcasting skill reduces with forecast valid time, 2h nowcasting is still quite valuable under strong synoptic forcing.

Because of the quick update (in 6 min) on radar data, the bias of nowcasting products could be adjusted fast by the system itself so that make less impacts to the proper use of the products in operation in general.

BJANC Results-1BJANC Results-1

Page 26: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

2011/08/14 01:59 BJT 2011/08/14 02:59 BJT

2011/08/14 02:00-03:001h rain OBS

2011/08/14 01:59 BJT 1h rain nowcast valid at

2011/08/14 02:59

2011/08/14 00:59 BJT

After 1h

After 2h

After 1h

Page 27: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Limitations on Identification of the initiation of convective cellsProper prediction on the track/trend/QPF of new cells

in their very early development stage (about 0-18min after initiation)

Reasonable prediction on cell-evolution in the mountainous and transitional areas

BJANC Results-2BJANC Results-2

Page 28: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

2011/07/26

21:06

21:18

21:24 21:30

Rapid development

Rainfall rateMax 10.2mm/5min

Page 29: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

2011/07/26 21:12 BJTCell identification

2011/07/26 21:06 BJTCell formation

2011/07/26 21:06 BJT

Beginning stage

With limitation on identifying & predicting new cells

2011/07/26 21:24 BJTCorrect nowcasting

30min trend

30min rainfall noecast

Bias in early stage but adjusted quickly

Page 30: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

With difficult on predicting cell evolution down to the mountain

2011/08/09 15:36 BJTBias on track

2011/08/09 16:00 BJTDown to the mountain

2011/08/09 16:06 BJTformation of new cell

2011/08/09 16:18 BJTBias on track

2011/08/09 16:36 BJTCorrect track

2011/08/09 17:36 BJTVerification on cell merging

Page 31: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Impacts of sever weather to Beijing city1

2

Contents

Concluding remarks3

Performances of existing operational systems(BJ-ANC and BJ-RUC)

Page 32: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Gaps In SW warning In objective techniques

(BJRUC, BJANC)

In capacity of forecasters

Items

SW type (hail, gust wind) nowcasting without or lack of objective guidanceEarly issuing of SW warning (6h ahead)lack of reliable objective guidance

Inconsistency of BJRUC guidance run to run, mainly under weak synoptic forcing, caused by:deficient initial condition “spin up” in cold start runLimitation on BJANC nowcastingnew cell formation and its very early developmentcell evolution over complex terrain

Limited knowledge and experiences on the new tech:objective nowcast / forecast techniquesremote sensing dataLimited knowledge on the mechanism of convection

Steps

Hybrid approach: (objective methods + high resolution OBS + forecaster’s knowledge & experiences on SW)

Improving the objective methodsDeveloping new techniques

(pay more attention to the causes behind in weak synoptic forcing situation)

Training to forecasters Investigation on SW & performance of BJANC, BJRUC…

Main gaps in operational nowcasting in BMB

Page 33: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Future Development

Blending (BJANC and BJRUC) on QPF Improvement of BJRUC’s initial condition (radar data

assimilation, initialization scheme, etc.) Improvement of BJANC’s key algorithms on identifying

new cells and forecasting storm quick evolution (combining forecaster’s experiences)

Radar QC Product generation (VDRAS, SW type based on

conceptual model, interpretation to BJRUC guidance, etc.)

Page 34: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Acknowledgement

Thanks to my colleagues for their support to this investigation:

Min Chen

Chenyun Sun

Guorong Wang

Xiaoqing Ma

Jisong Sun

et al.

Page 35: Boulder, Oct. 2011 Challenges in Operational Nowcasting in Beijing Jianjie Wang Beijing Meteorological Bureau, CMA Mingxuan Chen Institute of Urban Meteorology,

Boulder, Oct. 2011

Thanks!