bp sdeis vegetated viewshed max turbine layout 85 wtgs_fig_2.14-1 cape vincent

2
L a k e O n t a r i o S t .  L a w r e n c e R i v e r U N I T E D   S T A T E S   O F   A M E R I C A C A N A D A 5  M i l e s 4  M i l e s 3  M i l e s 2  M i l e s 1 Mile  Mud Bay Wilson Bay Fuller Bay Chaumont Bay Three Mile Bay Duck Bay S a w m ill B a y Chaumont 9 8 7 6 5 4 1 2A 86 85 84 83 82 81 80 78 77 76 75 74 73 72 71 70 69 68 67 65 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 87 66 ¯ 0 2.5 5 1.25 Miles Cape Vincent Wind Energy Project Figure 2 Vegetated Viewshed* Maximum Turbine Layout 85 WTGs (Layout 10/28/2010) This map is computer generated using data acquired by Saratoga Associ ates from various sources and is intended only for reference, conceptual planning and presentation purposes.  This map is not intended for and should not be used to establish boundaries, property lines, location of objects or to p rovide any other information typically needed for construction or any other purpose when engineered plans or land surveys are required. PROJECT # 2007 - 083.50M Copyright  © 2010 Saratoga Associates.  All Rights Reserved. File Location:  B:\2007\07083\Maps\Viewshed_Veg101112_Bladetip.mxd December 2010 Village Of Cape Vincent " " " " " " " " " " " " " " " " " " " " " " " 69 " 78 " 77 " 61 " 71 " 84 " 83 " 81 " 82 " 80 " 67 " 65 " 64 " 63 " 74 " 73 " 72 " 70 " 68 " 66 " 76 " 75 Broadway Joseph St R e a l  S t Kelsey Ln P o i n t  S t Gouvello St E s s e l t y n e  S t M u r r a y S t K a n a d y  S t Ainsworth Ln V i n c e n t  S t Kent Ln Lake St Village Of Cape Vincent 0 1,000 2,000 500 Feet *Assumes uniform tree height of 40' (12.192 m) in forested areas. Key No. of Turbines Visible 1 - 5 6 - 10 11 - 15 16 - 20 21 - 30 31 - 50 51 - 70 71 - 84 " Receptor ! Proposed Turbine Locations Seaway Trail (Scenic Highway) Snowmobile Trail Municipal Boundary River / Stream / Creek State Park Waterway Access Wildlife Management Area 1 1 32

Upload: pandorasboxofrocks

Post on 08-Apr-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

8/7/2019 BP SDEIS Vegetated Viewshed Max Turbine Layout 85 WTGS_Fig_2.14-1 Cape Vincent

http://slidepdf.com/reader/full/bp-sdeis-vegetated-viewshed-max-turbine-layout-85-wtgsfig214-1-cape-vincent 1/1