bps-bes submittal # 8 00 passenger elevators shop …...cq: provide color samples for verification...
TRANSCRIPT
SUBMITTAL REVIEW Submittal: No. 008 Spec Section: 14 2010 – Passenger Elevators Reviewed By: Tripp Lewton, Comma-Q Architecture Date: May 17, 2012 Project: BPS – Belgrade Elementary School Location: Belgrade, MT Job Number: 11-03 Copy to: File, Owner
This review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Corrections or comments made on the submittals during this review do not relieve the CONTRACTOR from compliance with the requirements of the plans and specifications. An opinion of equivalence of a specific item shall not be interpreted as an opinion of equivalence of an assembly of which the item is a component. Submittal review comments have been made within this format and not on the submittal sheets according to the following:
NEN No Exceptions Noted GCAN Generally Conforms as Noted RAN Rejected for Reason as Noted IAS Incomplete as Submitted
1. 14 2010 1.05 B Passenger Elevators Shop Drawings GCAN
Notes: 1. See Architect’s comments. 2. Per review comments by Scott Elders (Associated Construction Engineering): The electrical voltage on
the shop drawings needs to CHANGE: FROM: 208V, 3 Phase TO: 480V, 3 Phase
END OF REVIEW
EMAIL TRANSMITTALPROJECT: DATE:
JOB#SUBMITTAL#
TO: Comma-Q ArchitectureADDRESS:
ATTENTION:PHONE:FAX:
TRANSMITTED:
ITEM DATE COPIES1 1
TRANSMITVia:
No. Page: 1
REMARKS:
COPY TO:
(406) 585-1112
DESCRIPTION
(406) 585-5518
TRANSMITTED BY:
5/17/201211011
NM05172012-1
109 N. Rouse Ave., #1
New Belgrade Elementary School
Bozeman, MT. 59715
PDF - Submittal #8 Passenger Elevators Shop Dwgs
Matt Millerfile
Laura Landon
108 West Babcock Street, Bozeman, MT. 59715 Phone: (406) 582-9901 FAX: (406) 582-9992
Prints
Proposal OtherShop Drawings
RFI Response
Field Report
Specifications
CalculationsLetter Sketches
No Exceptions Taken
These are Transmitted as Checked Below:
For Your File
For Your Use
Revise As Noted And Resubmit
Make Corrections Noted
Rejected/Resubmit As Specified
Reviewed For Load To Structure Only
As Requested
Submitted Previously
TRANSMITTAL May 14, 2012
To: Nishkian Monks Attention: Matt Miller
From: Tripp Lewton
Project: BPS – Belgrade Elementary School Location: Bozeman, MT Job Number: 11-03 Copy to: File
we are sending you :Attached
Under separate cover the following:
Shop drawings: Copy of letter: Specification: Prints: Samples: Drawings: Other:
these are transmitted as checked below: Approved: Approved as corrected: Revise and resubmit: Rejected: For your signature: For return : For review & comment:
date qty description
5/14/2012 1 (elec) Submittal 008 – 14 2010 1.05 Passenger Elevators
Remarks:
Matt, please review the attached submittal, please return an electronic version to our office with your comments.
Thanks
TRANSMITTAL
May 14, 2012 To: Associated Construction Engineering Attention: Scott Elders; Andy Hansen From: Tripp Lewton Project: BPS – Belgrade Elementary School Location: Belgrade, MT Job Number: 11-03
Copy to: File
we are sending you : Attached
Under separate cover
the following: Shop drawings: Copy of letter: Specification: Prints: Samples: Drawings: Other:
these are transmitted as checked below: Approved: Approved as corrected: Revise and resubmit: Rejected: For your signature: For return : For review & comment:
date qty description
5/14/2012 1 (elec) Submittal 008 – 14 2010 1.05 Passenger Elevators
Remarks:
Scott, Please review the attached submittal for electrical considerations. Andy, Please review the attached for heat load considerations. Return an electronic version to our office with your comments. If no comments are necessary, please send an email
indicating drawings are approved without exception. Thanks
MARTEL CONSTRUCTION, INC. LETTER OF TRANSMITTAL1203 South Church AvenueBozeman, MT 59715-5801Telephone: (406) 586-8585 Facsimile: (406) 586-8646 DATE 05/14/12 JOB NO. 12-001
TRANSMITTAL/SUBMITTAL NO. 8.00TO: Comma Q Architects RE: 14 2010 Passenger Elevators
109 North Rouse Ave #1Bozeman, MT 59715
ATTENTION: Laura Landon BELGRADE ELEMENTARY SCHOOL
We are hand delivering XWe are sending via Email
ATTACHED UNDER SEPARATE COVER TheThe following items:
X Shop drawings Prints Plans Samples Specifications
Copy of letter Change order Product Data
COPIES DATE DWG NO. DESCRIPTION
1 14 2010 Passenger Elevators - Shop Drawings
THESE ARE TRANSMITTED as checked below:X For approval Approved as Submitted Resubmit Copies for Approval
For your use Approved as Noted Submit Copies for Distribution As requested Returned for Corrections Return Corrected Prints For review and comment
FOR BIDS DUE PRINTS RETURNED AFTER LOAN TO US
REMARKS:
One review hard copy will be delivered by hand today
COPY TO File Matt Miller- Nishkian SIGNED: Mike Wilkinson - Project Engineer
If enclosures are not as noted, kindly notify us at once.
REVIEWEDMARTEL CONSTRUCTION, Inc.
Belgrade Elementary SchoolBY: ���� Mike WilkinsonDATE:SUBMITTAL #
5/14/128.00
Arch to Verify detail7/A7.2
detail 5/A7.2
Arch to Verify Dims
� NO�EXCEPTIONS�TAKEN�
� MAKE�CORRECTIONS�NOTED�
� REVISE�AS�NOTED�AND�RESUBMIT�
� REJECTED/RESUBMIT�AS�SPECIFIED�
� REVIEWED�FOR�LOAD�TO�STRUCTURE�ONLY�
� SUBMITTED�PREVIOUSLY:�� Not�reviewed�� Reviewed,�identified�additional�data�only�
Notations� Do� Not� Authorize� Changes� to� Contract� Sum.��Submittal�was� reviewed� for� structural� design� conformity�and� general� conformance� to� contract� documents� only.��Contractor� is� responsible� for� confirming� and� correlating�dimensions� at� job� sites� for� tolerances,� clearances,�quantities,� fabrication� processes� and� techniques� of�construction,� coordination�of�his�work�with�other� trades�and�full�compliance�with�contract�documents.�
Date:�________________By:�__________________�
NISHKIAN�MONKS�CONSULTING�&�STRUCTURAL�ENGINEERS�
✔
05/17/2012 MTM
CQ RESPONSE:NET VERTICAL DISTANCEFROM LEVEL 2 FINISHFLOOR TO BOTTOM OFSAFTEY BEAM = 12'-6"
CQ RESPONSE: OK
CQ RESPONSE: 2
CQ: 8'-7 1/4" TOFACE OF FRAME
CQ: 8'-2 1/2" TOFACE OF FRAME CQ RESPONSE: OK
CQ RESPONSE: OK
CQ RESPONSE: SEE NOTE# 2 ON SUBMITTALREVIEW FORM
CQ:PROVIDE COLORSAMPLES FORVERIFICATION
CQ: RESILIENT FLOORINGSEE SECTION 14 2010 2.02 A. 2. b. 5.
NO EXCEPTS NOTEDFabrication / installation may be undertaken. Approval does not authorize changes in the Contract Sum or Contract Time unless stated by Change Order of Con-struction Change Directive.
GENERALLY CONFORMSAS NOTED
REVISE AND RESUBMIT
REJECTED FOR REASON AS NOTED
Fabrication / installation MAY NOT. In resubmitting limit cor-rections to the items marked.
Review and approval are only for conformance with the information given and the design concept of the Project as expressed in the Contract Documents. Review and approval of the submittals are not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities or for substantiating instructions for the installation or performace of equipment or systems all of whitch remain the responsibility of the Contractor as required by the Contract Documents. The Architect’s review and approval of the Contractor’s sub-mittal shall not relieve the contractor from any obligation containted in the Contract Documents. The architect’s review and approval shall not constitute approval of any construction means, methods, techniques, sequences or any safety precau-������������� ������������������������������������������������������������approval of an assembly of which the item is a component.
By Date
approval of an
x
Tripp Lewton 5/17/12
Arch verify with ownerthat a new dedicatedPhone line will be set upfor the elevator phone
CQ: NOTED
CQ: VANDAL PROOF PERSECTION 14 2010 2.03 B. 1.
CQ: ACTUAL = 6 5/8"