br 15 tenant handbook

79

Upload: sunset-development

Post on 30-Mar-2016

220 views

Category:

Documents


2 download

DESCRIPTION

Bishop Ranch Tenant Handbook

TRANSCRIPT

Page 4: BR 15 Tenant Handbook
Page 5: BR 15 Tenant Handbook
Page 6: BR 15 Tenant Handbook
Page 7: BR 15 Tenant Handbook
Page 8: BR 15 Tenant Handbook

USPS

Expre

ss M

ail

UPSFed

Ex

CA Ove

rnig

ht

OnTrac

TBS Cou

rier

Location

Bishop Ranch 1

6111 Bollinger X X X Northwest corner of 6111

Bishop Ranch 2

2680 Bishop Drive X X Between 2678 & 2680 in parking lot

2680 Bishop Drive X Inside Courtyard; next to Stairwell

2682 Bishop Drive X Inside Courtyard; next to stairwell

2694 Bishop Drive X Inside Courtyard; next to Stairwell

Bishop Ranch 3

2633-2623 Camino Ramon X East edge of parking lot on East side of

Cmplx; Between 2633 & 2623

2633-2623 Camino Ramon X Inside 1st floor mailroom

2603-2613 Camino Ramon XEast edge of parking lot on East side of

Cmplx; Between 2603 & 2613

2603-2613 Camino Ramon X Inside 1st floor mailroom

Bishop Ranch 6

2400 Camino Ramon X X Southwest corner between 2400 & 2420

2440 Camino Ramon X X X X Northwest corner between 2420 & 2440

Bishop Ranch 7

2527 Camino Ramon X X Southwest corner of 2527

Bishop Ranch 8

4000 Executive Parkway XX X X Northwest corner of 4000

4000 Executive Parkway X X Northeast corner of 4000

Bishop Ranch 9

Bishop Ranch 11

2301 Camino Ramon X Southeast corner between 2301 & 2303

2303 Camino Ramon X Inside courtyard; next to stairwell

Bishop Ranch 12

One Annabel Lane X Southeast corner of One Annabel

One Annabel Lane X Inside courtyard; next to stairwell

Bishop Ranch 15

12677 Alcosta Blvd. X Inside 1st floor mailroom

12667 Alcosta Blvd. X Northwest corner of 12667

12667 Alcosta Blvd. X X X Inside 1st floor mailroom

12657 Alcosta Blvd. X Southwest corner of 12657

12657 Alcosta Blvd. X Inside 1st floor mailroom

12647 Alcosta Blvd. X X Inside 1st floor mailroom

Page 10: BR 15 Tenant Handbook
Page 11: BR 15 Tenant Handbook
Page 12: BR 15 Tenant Handbook
Page 13: BR 15 Tenant Handbook
Page 14: BR 15 Tenant Handbook
Page 15: BR 15 Tenant Handbook

Power Failure Procedures From time to time, power outages will occur during scheduled outages or due to unforeseen causes. Each tenant within Bishop Ranch must be prepared for power interruptions. In the event of a power failure, the building is not equipped with an emergency generator and will not be operational. For a limited time after an outage, there will be path of egress lighting that is provided by battery backup fixtures to light the path to an exit.

When possible, Bishop Ranch Management will notify tenants of scheduled outages. Should you require assistance please call Bishop Ranch Management at 925.277.1700 any time of day.

During and after a power outage:

All Personnel should gather their belongings and evacuate the building within 30 minutes. The building's fire life safety system and emergency lighting are backed up by battery and will only provide critical safety functions within that window. Entry to the building is prohibited during a power loss.

Tenants can also receive updates by: o Calling 800.PGE.5002 (800.743.5002) for 24-hour power outage information. o Sign up to receive Text Message Alerts:

https://mobilizeus.com/BISHOPRANCH o Check Bishop Ranch's Facebook page for updates:

https://www.facebook.com/BRCommunity

In the absence of a broader natural disaster, once power is restored tenants may re-enter the building assuming no hazards or alarms are present. Lobby lights will re-illuminate to indicate power has been restored to the building.

For businesses under proprietary generator power, the following protocols must be met:

Bishop Ranch does not provide any operational support to critical facility operation. Operation of tenant space under generator power is at the tenant's risk and must be fully coordinated and planned by the tenant and their consultants and engineers in order to assure that operations will be supported and safe without power.

Egress lighting must be provided via the generator in order to assure that a safe egress is maintained at all times. The building will not receive services, elevators will not be available, and all management functions should be assumed to be as if it were after hours.

All powered telecom functions in the MPOE or other common areas will not be powered and may not be on generator circuits.

All OSHA and other occupational compliance requirements must be accounted for and adhered to by the tenant including but not limited to illumination, ADA, and air delivery.

A 24/7 Fire Watch must be established within the first 24 Hours of the building's power failure. Such a fire watch must be comprehensive for the entire building. If the tenant

Page 16: BR 15 Tenant Handbook

occupies part of the building, access and other planning must be coordinated with Sunset in advance of a power failure.

As the manager of Bishop Ranch, Sunset is providing these details as a courtesy. Coordination and management of operations under generator power is a highly specialized trade that requires significant planning and investment that we cannot provide as a landlord and building owner.

Page 19: BR 15 Tenant Handbook
Page 20: BR 15 Tenant Handbook
Page 21: BR 15 Tenant Handbook
Page 22: BR 15 Tenant Handbook
Page 23: BR 15 Tenant Handbook
Page 24: BR 15 Tenant Handbook
Page 25: BR 15 Tenant Handbook
Page 26: BR 15 Tenant Handbook
Page 27: BR 15 Tenant Handbook
Page 28: BR 15 Tenant Handbook
Page 29: BR 15 Tenant Handbook
Page 30: BR 15 Tenant Handbook
Page 31: BR 15 Tenant Handbook
Page 32: BR 15 Tenant Handbook
Page 33: BR 15 Tenant Handbook
Page 34: BR 15 Tenant Handbook
Page 35: BR 15 Tenant Handbook
Page 36: BR 15 Tenant Handbook
Page 37: BR 15 Tenant Handbook
Page 38: BR 15 Tenant Handbook
Page 39: BR 15 Tenant Handbook
Page 40: BR 15 Tenant Handbook
Page 41: BR 15 Tenant Handbook
Page 42: BR 15 Tenant Handbook
Page 43: BR 15 Tenant Handbook
Page 45: BR 15 Tenant Handbook
Page 46: BR 15 Tenant Handbook
Page 47: BR 15 Tenant Handbook
Page 48: BR 15 Tenant Handbook
Page 49: BR 15 Tenant Handbook
Page 50: BR 15 Tenant Handbook
Page 51: BR 15 Tenant Handbook
Page 52: BR 15 Tenant Handbook
Page 53: BR 15 Tenant Handbook
Page 54: BR 15 Tenant Handbook
Page 55: BR 15 Tenant Handbook
Page 56: BR 15 Tenant Handbook
Page 57: BR 15 Tenant Handbook
Page 58: BR 15 Tenant Handbook
Page 59: BR 15 Tenant Handbook

TELEPHONE

COMPANY

ENTRANCE

CABLE

TELEPHONE COMPANY

MPOE

RISER SYSTEM

TERMINATION BLOCKS

(MDF)

Page 60: BR 15 Tenant Handbook

*MDF/MPOE

Tenant Space

Tenant Space

Tenant Space

Tenant Space

ServiceProviders

Service

Providers

Tenant

Cable

TenantCable

Phone Lines

CrossConnect

CrossConnect

CrossConnect

Teleco. Closet

Building Riser

Building Riser

System

Teleco. Closet

Teleco. Closet

Riser System

Landlord’s Telecom utility represented in Red (the building’s riser system). Including all cross-connects and access.

* This area is also commonly referred to as the Net Pop.

Page 61: BR 15 Tenant Handbook

T

E

N

A

N

T

#

1

T

E

N

A

N

T

#

2

T

E

N

A

N

T

#

3

T

E

N

A

N

T

#

4

RISER SYSTEM

TERMINATION BLOCKS 200

PAIRS / 25 PAIRS PER BLOCK

TERMINATION BLOCKS

FOR

INDIVIDUAL TENANTS

1

2526

50

75

51

76

100

101

125126

150151

175176

200

Page 62: BR 15 Tenant Handbook
Page 63: BR 15 Tenant Handbook
Page 64: BR 15 Tenant Handbook
Page 65: BR 15 Tenant Handbook
Page 66: BR 15 Tenant Handbook
Page 67: BR 15 Tenant Handbook
Page 68: BR 15 Tenant Handbook
Page 69: BR 15 Tenant Handbook
Page 71: BR 15 Tenant Handbook
Page 72: BR 15 Tenant Handbook
Page 73: BR 15 Tenant Handbook
Page 74: BR 15 Tenant Handbook
Page 75: BR 15 Tenant Handbook
Page 76: BR 15 Tenant Handbook
Page 77: BR 15 Tenant Handbook
Page 78: BR 15 Tenant Handbook
Page 79: BR 15 Tenant Handbook