BRE: BIM in Wales. Dan Rossiter BIM Team, BRE Wales 26 th of September, 2014. Agenda. About me What is BIM The Origins of BIM Egan, Latham, Construction Strategy BIM Level 2 Requirements BS1192, BS1192-2 and other documents BIM in Wales Welsh Construction Strategy, CLAW Toolkit - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/1.jpg)
Part of the BRE Trust
BRE: BIM in Wales
Dan RossiterBIM Team, BRE Wales26th of September, 2014
![Page 2: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/2.jpg)
– About me
– What is BIM
– The Origins of BIM– Egan, Latham, Construction Strategy
– BIM Level 2 Requirements– BS1192, BS1192-2 and other documents
– BIM in Wales– Welsh Construction Strategy, CLAW Toolkit
– How the BRE can help– Education– Certification– Consultancy
Agenda
![Page 3: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/3.jpg)
About Me
![Page 4: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/4.jpg)
??
Dan Rossiter
![Page 5: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/5.jpg)
What is BIM
![Page 6: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/6.jpg)
BIM (Building Information Modelling)
–It’s not just 3D CAD
–It’s not just a new technology application
–It’s not next generation, it here and now!
BIM is essentially value creating collaboration through the entire life-cycle of an asset, underpinned by the creation, collation and exchange of shared 3D models and intelligent, structured data attached to them.
http://www.bimtaskgroup.org/bim-faqs/
BETTER
INFORMATION
MANAGEMENT
What is BIM
![Page 7: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/7.jpg)
What is BIM?
![Page 8: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/8.jpg)
The Origins of BIM
![Page 9: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/9.jpg)
The Origins of BIM
Latham Report1994
Egan Report1998
Never WasteA Good Crisis
2009
AcceleratingChange
2002
![Page 10: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/10.jpg)
The Origins of BIM
Quiz Time
Based on the last eleven years of KPI’s:
What percentage of projects come in on time and no budget? ~50%
Wolstenholme, 2009
![Page 11: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/11.jpg)
CostThe Origins of BIM
BIM was seen as a way to
Improve:
Carbon
![Page 12: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/12.jpg)
The Origins of BIM
“Production Information is generally, incorrect, incomplete, uncoordinated and ambiguous”
![Page 13: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/13.jpg)
“Information is Uncoordinated…”
![Page 14: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/14.jpg)
“Information is ambiguous… or why we need Standards”
![Page 15: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/15.jpg)
“Information may be incomplete…”
![Page 16: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/16.jpg)
“Information is uncoordinated…”
![Page 17: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/17.jpg)
“Information is also geospatially incorrect…”
![Page 18: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/18.jpg)
The Origins of BIM
– There is a detailed programme of measures Government will take that will reduce costs by up to 20% by the end of this parliament.
– Government will require fully collaborative 3D BIM (with all project and asset information, documentation and data being electronic) as a minimum by 2016. A staged plan will be published with mandated milestones showing measurable progress at the end of each year.
ConstructionStrategy
2011
![Page 19: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/19.jpg)
The Origins of BIM
BIS BIM Strategy2011
– The Government as a client can derive significant improvements in cost, value and carbon performance through the use of open sharable asset information.
![Page 20: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/20.jpg)
BIM Level 2 Requirements
![Page 21: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/21.jpg)
BIM Maturity Levels – Strategy Paper 2011
0 - Unmanaged CAD probably 2D, with paper (or electronic paper) as the most likely data exchange mechanism.
1 - Managed CAD in 2 or 3D format using BS 1192:2007 with a collaboration tool providing a common data environment, possibly some standard data structures and formats. Commercial data managed by standalone finance and cost management packages with no integration.
2 - Managed 3D environment held in separate discipline “BIM” tools with attached data. Commercial data managed by an Enterprise Resource Planning System (ERP). Integration on the basis of proprietary interfaces or bespoke middleware could be regarded as “pBIM” (proprietary). The approach may utilise 4D Programme data and 5D cost elements.
3 - Fully open process and data integration enabled by IFC / IFD. Managed by a collaborative model server. Could be regarded as iBIM or integrated BIM potentially employing concurrent engineering processes.
![Page 22: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/22.jpg)
UK Standards for BIM
BS1192:2007 PAS1192-2:2013 PAS1192-3:2014 BS1192-4:2014(COBie)
BS 8541 Series
![Page 23: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/23.jpg)
BIM Industry Documentation
PI For BIM(CIC)
BIM Protocol(CIC)
Uniclass(CPIC)
Digital Plan of Work(BIM Task Group)
CPIx Online(CPIC)
![Page 24: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/24.jpg)
BIM in Wales
![Page 25: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/25.jpg)
BIM in Wales
CEWales BIM Task Group
Working Paper2012
Recommendations:
–Alignment with UK Government with all Welsh Government funded projects at level 2 by 2016 and all Welsh Government Department Projects to lead at level 2 by 2015.
–A value or threshold for Wales could not be established in the timescales allowed. Collaborative working arrangements and internal business development should still be encouraged until such a value is set. Pilot projects are expected to inform the thresholds based on value and complexity by 2014/15.
–The following improvement areas are proposed: i. Added Value ii. Cost Predictability iii. Carbon Intelligence
![Page 26: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/26.jpg)
BIM in Wales
Welsh Construction Procurement Strategy
2013
Key Objectives and Milestones:
–Alignment with the UK Government Building Information Modelling (BIM) strategy, with all Welsh Government funded projects at level 2 by 2016 and all Welsh Government Department projects to lead at level 2 by 2015.
![Page 27: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/27.jpg)
BIM in WalesContains:–Introduction
–Setting the BIM Scene
–Business Case IT Investment
–Employer Information Requirements Template
–Employer Information Requirements Example
–Glossary of Terms
–Procurement Guide
–BIM and GSL Guide
–Collaborative Maturity Assessment Tool
–Standards and Protocol Reference
The CLAW All Wales BIM Toolkit2014 (Draft)
![Page 28: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/28.jpg)
How BRE Can Help
www.bre.co.uk/BIM
![Page 29: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/29.jpg)
BIM Level 2 Training Course
– BIM Foundation Course (AP)Covering BIM processes, procedures, information models, management and collaboration
– BIM Level 2 PAS1192-2
Project Information Manager (PIM)
Task Information Manager (TIM)
– BIM Level 2 PAS1192-2
Project Delivery Manager (PDM)
![Page 30: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/30.jpg)
BIM Level 2 Certification Schemes
BRE BIM Certificated Professional Schemes– Task Information Manager– Project Information Manager– Project Delivery Manager
BRE BIM Business System Certification Scheme– Audited BIM Capability Assessment
![Page 31: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/31.jpg)
Business Certificate Scheme Benefits
– PAS 91 (Working towards UKAS accreditation )
– BRE Certificated
– Audited Business Evaluation
– Defined Industry Benchmark
– Lean Process– Reduced Employers Effort / Cost– Reduced Supply Chain Effort / Cost
– Checked by Industry Specialist and Supported by BuildingSMART UKI
![Page 32: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/32.jpg)
BIM Checking Service
Documentation
–Employers Information Requirements (EIRs)
–BIM Execution Plans (BEP)
Models (BS 1192:2007. PAS 1192-2:2013, BS 1192-4, BS8541 Series)
–Naming Conventions
–Spatial Co-ordination
–Model Definition
–Volume Strategy
–Level of Definitions
–Data Segregation
–Annotations & symbology
![Page 33: BRE: BIM in Wales](https://reader036.vdocuments.net/reader036/viewer/2022081503/56813691550346895d9e19de/html5/thumbnails/33.jpg)
– About me
– What is BIM
– The Origins of BIM– Egan, Latham, Construction Strategy
– BIM Level 2 Requirements– BS1192, BS1192-2 and other documents
– BIM in Wales– Welsh Construction Strategy, CLAW Toolkit
– How the BRE can help– Education– Certification– Consultancy
Summary