breaker protection terminal reb 551*2€¦ · breaker pole position discordance can occur on the...

29
Page 1 Features Protection functionality such as; - breaker failure protection - pole discordance protection - fuse failure and current transformer circuit supervision - fast interbay communication of binary signals - single- or multi-pole tripping Control; - command control - autoreclosing and synchro-check with phasing and energising check Monitoring; - event recorder - disturbance recorder - trip value recorder - status indication of all input and internal binary signals - presentation of measured mean values of line current, voltage, active power, reactive power and frequency with accu- racy up to 0.25% Metering; - pulse counter logic Remote-end data communication alternatives; - multiplexed, dedicated fibre and galvanic channel - allows for remote-end binary signal transfer - communication channel supervision Serial communication; - SPA or IEC 870-5-103 port (monitoring) - LON port (control) Extensive configuration possibilities by use of internal logical gates, timers and user configurable connections between differ- ent functions, binary inputs and outputs Several input/output module options includ- ing measuring mA input module (for trans- ducers) Extensive software ’tool-box’ for monitor- ing, evaluation and user configuration of the terminal Flexible software and hardware Selected processor design guarantees high availability together with excellent possibilities for extensive combination of different functions without prolonging the operation time Numerical filtering and measuring tech- niques ensuring correct performance dur- ing transient conditions (SE 95 02 14) Breaker protection terminal REB 551*2.0 1MRK 606 008-BEN Issued May 2002 Changed since October 1998 Data subject to change without notice

Upload: others

Post on 24-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Page 1

(SE 95 02 14)

Breaker protection terminal REB 551*2.0

1MRK 606 008-BEN

Issued May 2002Changed since October 1998

Data subject to change without notice

Features • Protection functionality such as;

- breaker failure protection

- pole discordance protection

- fuse failure and current transformer circuit supervision

- fast interbay communication of binary signals

- single- or multi-pole tripping

• Control;

- command control

- autoreclosing and synchro-check with phasing and energising check

• Monitoring;

- event recorder

- disturbance recorder

- trip value recorder

- status indication of all input and internal binary signals

- presentation of measured mean values of line current, voltage, active power, reactive power and frequency with accu-racy up to 0.25%

• Metering;

- pulse counter logic

• Remote-end data communication alternatives;

- multiplexed, dedicated fibre and galvanic channel

- allows for remote-end binary signal transfer

- communication channel supervision

• Serial communication;

- SPA or IEC 870-5-103 port (monitoring)

- LON port (control)

• Extensive configuration possibilities by use of internal logical gates, timers and user configurable connections between differ-ent functions, binary inputs and outputs

• Several input/output module options includ-ing measuring mA input module (for trans-ducers)

• Extensive software ’tool-box’ for monitor-ing, evaluation and user configuration of the terminal

• Flexible software and hardware

• Selected processor design guarantees high availability together with excellent possibilities for extensive combination of different functions without prolonging the operation time

• Numerical filtering and measuring tech-niques ensuring correct performance dur-ing transient conditions

Page 2: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 2

Features (cont’d) • Versatile local human-machine interface (HMI) from the front panel

• Various local HMI language options

• Extensive self-supervision with fault diagnostics

General The REB 551 breaker protection terminal is the basic unit for sub-transmission and trans-mission line breaker related applications and forms a part of a PANORAMA Station Automation. The PANORAMA Station Automation concept includes a complete range of single-function units and multi-

functional terminals, Substation Monitoring System (SMS) and Substation Control Sys-tem (SCS). The units in the PANORAMA concept are available as stand alone relays/terminals or as building blocks in a total power network management system.

Functions Current, phase wise

Pole discordance protection, current and contact based (PD)

ApplicationBreaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The reason may be an interruption in the closing or trip coil circuit, or a mechanical failure resulting in a stuck breaker pole. A discor-dance caused by one pole failing to close or open can be tolerated for a limited time, for instance during a single-phase trip-reclosing cycle.

DesignThe operation of the pole discordance protec-tion is based on checking the position of the breaker auxiliary contacts. Three parallel nor-mally-open contacts in series with three nor-mally-closed contacts in parallel of the respective breaker poles form a condition of pole disagreement, connected to a binary input dedicated for the purpose. In addition, there is a parallel detection criterion based on current comparison in the breaker poles. This function is enabled for just a few seconds after closing or trip commands to the breaker in order to avoid unwanted operation in unsymmetrical load conditions.

Breaker failure protection (BFP)

ApplicationThe breaker failure protection provides back-up protection in case of failure of the breaker to trip and clear the fault as requested by the object protection. It is obtained by checking that fault current persists after a brief time from the operation of the object protection.

DesignThe breaker failure protection is initiated by the trip commands from the protection func-tions, either internal to the terminal or from external commands through binary inputs. The start can be single-phase or three-phase.

The operate values of the three current mea-suring elements are settable within a wide setting range. The measurement is stabilised against the dc-transient that can cause unwanted operation with saturated current transformers. Time measurement is individ-ual for each phase. Two independent timers are available, T1 for repeated tripping of ‘own’ breaker and T2 which operates trip logic for adjacent breakers.

Power system supervision

Loss of voltage check (LOV)

ApplicationThe loss-of-voltage function is suitable for use in networks with automatic restoration function. The LOV function initiates a three-pole tripping of a circuit breaker, if all three phase voltages fall below the set value for longer than 7 seconds. The operation of the function is supervised by the fuse-failure function and the information about the closed position of an associated circuit breaker.

Overload supervision (OVLD)

ApplicationThe overload protection prevents excessive loading of power lines. Its operation is based on the measurement of the maximum phase current and its duration, which must not exceed the pre-set values. The operate current and the operate time are settable within a wide range.

Page 3: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 3

Secondary system supervision

Current circuit supervision (CTSU)

ApplicationWrong information on current flowing in a protected element might influence the security (line differential protection) or dependability (line distance protection) of a complete protection system. The current cir-cuit supervision function, as built in REx 5xx terminals, detects different types of faults in CT secondary circuits and influence the oper-ation of corresponding main protection func-tions.

DesignThe function compares the 3I0 secondary currents from two different sets of current instrument transformers or different cores of the same instrument transformer. The func-tion issues an output signal when the differ-ence is greater than set value. The signal can be configured to block different protection functions or initiate the alarm.

Fuse failure supervision (FUSE)

ApplicationThe fuse-failure-supervision function contin-uously supervises the ac voltage measuring circuits between the voltage transformers and the terminal. Different output signals can be used to block, in the case of faults in the ac voltage secondary circuits, the operation of the distance protection and other voltage-dependent functions, such as the synchro-check function, the undervoltage protection function, etc.

Negative-sequence based measurement is recommended in isolated or high-impedance earthed systems.

Zero-sequence based measurement is recom-mended in directly- or low-impedance earthed systems.

DesignThe function continuously measures the zero-sequence and/or the negative-sequence volt-age and current in three-phase ac voltage cir-cuits. It operates if the measured zero and/or negative-sequence voltage increases over the

pre-set operate value, and if the measured zero and/or negative-sequence current remains below the pre-set operate value.

Two function output signals are available. The first depends directly on the voltage and current measurement. The second depends on the operation of the dead-line detection func-tion, to prevent unwanted operation of the distance protection if the line has been de-energised and energised under fuse-failure conditions. A special function input serves the connection to the auxiliary contact of the MCB (when used), to secure correct opera-tion of the function on simultaneous interrup-tion of all three measured phase voltages.

Control

Command control (16 signals)

ApplicationThe terminals may be provided with 16 out-put functions that can be controlled either from a Substation Automation system or from the built-in HMI. The output functions can be used, for example, to control high-voltage apparatuses in switchyards. For local control functions, the built-in HMI can be used. Together with the configuration logic circuits, the user can govern pulses or steady output signals for control purposes within the terminal or via binary outputs.

Synchro-check and energising check (SYNX)

ApplicationThe synchro-check function is used for con-trolled interconnection of a line in an already interconnected network. When used, the function gives an enable signal at satisfactory voltage conditions across the breaker that is to be closed. The synchro-check function measures the voltages on the busbar side and the line side. It operates and permits closing of the circuit-breaker when the set conditions are met, with respect to the voltage difference (UDiff), the phase-angle difference (PhaseDiff), and the frequency difference (FreqDiff).

The energising condition can be set to allow energising in one, or the other, or both direc-tions, e.g. live busbar and dead line. It is pos-sible to have different energising settings for a manual close command and an autoreclose command.

Page 4: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 4

Functions (cont’d)Functions (cont’d) DesignThe synchro-check for double busbar and 1½-breaker arrangements includes the volt-age selection function. From the auxiliary contacts of the breakers and disconnectors, the terminal can select the right voltage for the synchronism and energising function. The function is also designed to allow manual closing when both sides of the breaker are dead.

PhasingNote: This function is not separately avail-able. It is an addition to the Synchro-check and energising check described above.

ApplicationPhasing of network breakers is to be per-formed, together with synchro-check, when two asynchronous systems are going to be connected in order to avoid stress on the net-work and its components. The phasing func-tion compensates for measured slip frequency as well as the circuit-breaker closing delay.

DesignThe phasing function also includes the synchro-check function. The phasing func-tion is used when the difference in frequency is less than the set value of the frequency difference for phasing and larger than the set value for synchro-check.

Autoreclosing (ARxx)

ApplicationThe reclosing function can be selected to perform single-, two- and/or three-phase reclosing from eight single-shot or multi-shot reclosing programs. The three-phase auto-reclose open time can be selected to give either high-speed autoreclosing or delayed autoreclosing. Three-phase autoreclosing can be performed with or without the use of the synchronism check or energising function.

DesignThe autoreclosing function co-operates with the line protection functions, the trip function, the circuit breaker and the synchro-check function. It can also be influenced by other protection functions through binary input sig-nals.The autoreclosing is a logical function built up by logical elements.

Logic

Single- or two-pole trip logic (TRIP)

ApplicationTRIP operates in single-pole trip mode for single-phase faults, in two-pole operating mode for two-phase faults (with or without earth) and in three-pole trip mode for three-phase faults. It is also possible to achieve three-pole tripping for both one-phase and two-phase faults.

The function is applicable for all terminals which have built-in phase selection function-ality and is used in applications where single-pole tripping is required for single-phase faults due to system stability reasons. The two-pole operating mode can be used on double-circuit parallel lines with single-pole breakers.

DesignSpecial functional inputs are provided for the initiation of a single, two and three-pole trip command. Decision to initiate outgoing trip signals in different phases depends on a pres-ence of corresponding phase selective signals on specially provided functional inputs. Additional logic circuits secure a three-pole final trip command in the absence of the required phase selection signals.

The function is equipped with logic circuits, which secure correct operation on evolving faults as well as after the reclosing on persis-tent faults. Special function inputs are pro-vided to override the internal conditions and initiate an instantaneous three-pole trip com-mand. These inputs could be initiated by dif-ferent external functions, such as station breaker failure protection, transfer trip from the remote end line terminal, etc.

Additional configurable logic

ApplicationConfigurable logic is included in basic. Addi-tional logic circuits including more AND/OR gates are also available as an option. With this logic the user can configure different logical functions in the terminals to suit special requirements for different applications.

Page 5: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 5

Communication channel test logic (CCHT)

ApplicationMany applications in secondary systems require testing of some functionality with confirmed information about the result of the test. Channel test function perform testing of communication (power line carrier) channels in applications, where it is not possible to monitor them continuously by some other means.

DesignThe logic initiates the sending of an impulse (carrier send signal), which starts the opera-tion of different external functions and checks the feedback from the external function. It reports the successful or non-successful response on initiated test. It is also possible to abort the test with an external signal, which overrules all internal process.

Binary signal transfer to remote end (RTC)

ApplicationThe binary signal transfer function is prefera-bly used for sending communication scheme related signals, transfer trip and/or other binary signals required at the remote end. Up to 32 freely selectable binary signals, internal or external to the terminals, can be transmit-ted in both directions over a protected line.

DesignTogether with the binary signals internal to the terminal, the function is utilising binary inputs and outputs. The function can be pro-vided with various 56/64 kbit/s communica-tion modules for fibreoptic or galvanic connection. For more information about the available communication alternatives, see ‘Remote end data communication’.

Binary signal interbay communication

ApplicationOne receiving function block for 16 binary signals and with fast execution time is used to receive information over the LON bus from other REx 5xx terminals. The other terminals must have a corresponding Event function block to send the information. Additional 79 receiving blocks with slower execution time are also available as an option.

Monitoring

Disturbance recorder (DREP)

ApplicationThe disturbance recording function is an important part of a station monitoring system, which enables the evaluation of different events within the power system. The high-performance disturbance recorder can memo-rise up to 10 analogue channels and 48 binary signals (internal signals to the terminal and/or external signals connected to the binary inputs of the terminal). Any of the recorded analogue channels and binary signals can be programmed to start a recording.

Furthermore, analogue channels are program-mable for over- and under-functions and the binary signals can start recording on transi-tion from a logical 0 to a logical 1 and vice versa. Pre-fault, post-fault and limit time can be set in wide ranges. Collection of distur-bance records is possible locally as well as remotely, using HMI software. Evaluation of the disturbances can be done in the program, type REVAL.

Event recorder (EVR)

ApplicationAn event recording function is available. It presents in a logical order, starting and trip-ping signals that have occurred in the termi-nal. Up to 150 time-tagged events for each of the last 10 recorded disturbances are stored. Also internal events, such as setting changes, are stored in the event recorder.

Trip value recorder (TRVAL)

ApplicationInformation on the actual primary and secon-dary phasors of the voltages and currents are available in the trip value recorder. The pre-fault and fault values of the applicable volt-ages and currents are recorded with their phase relations for the last 10 disturbances.

Increased measuring accuracy for U, I, P, Q

ApplicationTo reach a high accuracy in the measure-ments, a factory calibration of the five current and the five voltage input transformers is made.

Page 6: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 6

Functions (cont’d)Functions (cont’d) Metering

Pulse counter logic

ApplicationThe pulse counter function provides the Sub-station Automation system with the number of pulses, which have been accumulated in the terminal during a defined period of time, for calculation of, for example, energy val-ues. The pulses are captured on the Binary input module that is read by the Pulse counter function. The number of pulses in the counter is then reported via LON to the station HMI or read via SPA as a service value. The nor-mal use for this function is the counting of energy pulses for kWh and kVarh in both directions from external energy meters.

Miscellaneous

Activation of active setting group (GRP)

ApplicationDifferent system operate conditions require different settings of protection functions used. The 500 series terminals have basically four sets of independent setting groups built-in, which contains all setting parameters for all protection-, control- and monitoring func-tions used. The user can change the active setting group at any time, locally by means of local HMI or a personal computer, or remotely by means of SMS and SCS as well as by activation of the corresponding func-tional inputs to the GRP function. Adaptive changing of the active setting group is possi-ble by means of the GRP and some other functions, available within the 500 series ter-minals.

DesignThe GRP functional block has four functional inputs, each corresponding to one of the set-ting groups stored within the terminal. Acti-vation of any of these inputs changes the active setting group. Four functional output signals are available for the configuration purposes, so that continuous information on active setting groups is available for different purposes.

Dead-line detection (DLD)Note: This function is not separately avail-able. It is an addition to the automatic switch-onto-fault function, the weak-end infeed detection function and the fuse failure func-tion.

ApplicationDifferent protection, control and monitoring functions require for their proper operation information on the condition of a protected element, such as power lines, etc. The DLD function detects the conditions of a protected element, whether or not it is connected to the rest of the power system.

DesignThe function continuously measures all three phase currents and phase voltages of a pro-tected power line. The line is declared as a dead (non-energised) line if all three mea-sured currents and voltages fall below the pre-set values for longer than 200 ms. The function operates on a phase-segregated basis, if single-pole trip logic has been selected for a particular terminal.

Serial communication

ApplicationOne or two optional optical serial interfaces, one with SPA or IEC 870-5-103 and the other with LON protocol, for remote communica-tion, enable the terminal to be part of a Sub-station Control System (SCS) and/or Substation Monitoring System (SMS). These interfaces are located at the rear of the termi-nal.

Two buses can be built up, one independent of another, each of them with different func-tionalities regarding monitoring and setting of the functions in the terminal. Plastic fibres can be used up to a distance of 30 m (90 ft.). Glass fibres for distances up to 500 m (1500 ft.).

An optical network can be used within the SCS system. This enables communication with the terminal through the LON bus from the operator’s workplace and the control centre.

Page 7: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 7

The second bus is used for SMS. It can include different numerical relays/terminals from the PANORAMA range with remote communication possibilities. Connection to a personal computer (PC) can be made directly (if the PC is located in the substation) or by telephone modem through a telephone net-work with CCITT characteristics.

Time synchronisation

ApplicationThe terminal has an internal clock, which can be synchronised by means of a minute pulse through a binary input or via the station bus communication.

Local HMI

ApplicationThe HMI (Human-Machine-Interface) serves as an information unit, presenting in a logical order starting and tripping signals that have appeared during each of the last ten recorded disturbances.

Furthermore, each of the two local HMI pos-sibilities takes over the functionality of the measuring instruments such as the A-meter, V-meter, VAr-meter, W-meter and Hz-meter. The current statuses of all binary input sig-nals and internal logical signals are available too.

Ac/dc measurements

ApplicationThis function provides three-phase or single-phase values of voltage and current. At three-phase measurement, the values of active power (W), reactive power (var), frequency (Hz) and the mean value for voltage (U) and current (I) can be calculated.

Alarm limits to be used as conditions in the configuration logic can be set. Besides the direct inputs of voltage and current, analogue inputs for mA signals are also available.

Self-supervision with internal event recorder

ApplicationThe self-supervision function operates con-tinuously and includes:

- Normal micro-processor watchdog function

- Checking of digitized measuring signals

- Checksum verification of PROM contents

- Checksum verification of types of signal communication

- Read-Write-Read-Write cycling of the memory cells and internal registers

The self-supervision status is available from the local HMI or via a SMS or SCS system.

When an internal fault has occurred, you can retrieve extensive information about the fault from the list of internal events available in the terminal from SMS or SCS. A time-tagged list with the date and time of the last 40 inter-nal events is available here.

Page 8: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 8

Functions (cont’d)Functions (cont’d) Remote end datacommunication

ApplicationThe breaker protection terminal is using the communication facilities below, except the dedicated links, together with the optional function, binary signal transfer to remote end.

The fibre optical module can communicate without additional units over dedicated fibres up to around 30 km. When greater distances are required to be covered, an external FOX 20 system, available from ABB Net-work Partner Ltd. (Switzerland), can be used. The FOX 20 works as a repeater in this case and is optically connected, sending the sig-nals on dedicated fibres. With this configura-tion it is possible to cover distances up to 120 km on single-mode fibres. The FOX 20 can also operate as a multiplexer, in which case a number of 64 kbit/s data channels and RS 232 channel can be transmitted in parallel.

Direct galvanic connection to a multiplexer can be done up to a distance of 100 m. The built-in interface in these modules can sup-port the CCITT standard V.35/36 contra-directional, X.21 64 kbit/s and EIA RS 530/544 contra-directional 56 kbit/s communica-tion modes. V.35/36 and RS 530/544 co-directional communication modes can be sup-plied upon request.

The CCITT G.703 can be connected over an optional RS 530/544 contra-directional to G.703 converter. The distance between the terminal and the converter is limited to 10 meters.

When the distance is too great for direct galvanic connection, a short-range optical modem is used. The distance can be up to 5 km and the optical/galvanic converter can directly support CCITT standard V.35/36 contra-directional as well as X.21 and G.703 communication modes.

Direct galvanic communication over twisted pair cable for distances up to 4 km can be done using the short range galvanic modem.

Fig. 1 Communication alternatives(not applicable for REC 561)

OpticalfibresREx 5xx 21-15X/16X V.35/36 (15X)

X.21 (16X)G.703 (16X)

< 5 km

RS 530/422REx 5xx ConverterG.703

< 10 m

(X80

039-

2_2)

Opticalfibres

< 30 km

REx 5xx REx 5xx

otherusers

REx 5xx

< 30 km MUX

FOX 20

Opticalfibres

to theother end

Twistedpair cable

< 4 km

REx 5xx REx 5xx

V.35, V.36, X.21, RS53056/64 kbit/s

REx 5xx

< 100 m

otherusers

MUX

Galvanic

to theother end

Dedicated link, fibre optical connection

Multiplexed link, fibre optical connection

(X80

039-

2_5)

Multiplexed link, galvanic connection

Multiplexed link, short-range fibre optical connec-tion

(X80039-2_7)

(X80

039-

2_6)

Dedicated link, short-range galvanic modem

(X80

039-

2_4)

(X80039-2_8)

G.703 con-

Page 9: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 9

Hardwaredesign

The REx 5xx series mechanical packaging and connecting system consist of a case in which printed circuit boards are inserted. The case is available in different sizes (widths) with the height 6U (265.9 mm). REB 551 is normally assembled in a case with the width 3/4x19". The cover is made of preplated steel sheet, with the different details spot welded together. The outside surfaces are painted light beige.

The front plate, which is made of aluminium profile, has a cut-out with a local HMI module.

The degree of protection is IP 40, according to IEC 529, for cases with the widths 1/2x19" and 3/4x19". IP 54, for the front area, can be obtained with accessories for flush and semi-flush mounting.

The REx 5xx series can be flush, 19"-struc-ture or projection mounted with different mounting kits available. Products assembled in the 1/2x19" and 3/4x19" cases can also be semi-flush mounted. Two cases 1/2x19" can be mounted side-by-side for maximum utilis-ing of space in 19" panels. A test switch, type RTXP, and/or COMBIFLEX modules are added in separate cases of the same basic design as the mechanical packaging of the 500 series. These cases, type RHGS, exist in sizes 1/4x19" and 1/2x19" and can be mounted by the side of REx 5xx products smaller than 1/1x19".

All connections are made on the rear of the cases with compression type screw terminal blocks for electrical connections. Serial com-munication connections are made by fibre optic connectors type Hewlett Packard (HFBR) for plastic fibres or bayonet type ST for glass fibres.

Hardware modules

Transformer module;Five current and five voltage input transformers.

Power supply module;– For case size 1/2x19" and 3/4x19", this module includes a regulated DC/DC converter that provides

stabilised auxiliary voltage to all static circuits together with 4 binary inputs and 5 binary outputs.

A/D conversion module;For 10 analogue signals, operating with a sampling frequency of 2000 Hz.

Main processing module;All information is processed or passed through this module, such as configuration, settings and communication.

Signal processing module;Module with up to 12 digital signal processors, performing all measuring functions.

Binary input/output modules;Binary I/O module with 8 inputs, 10 outputs and 2 fast signalling outputs.Binary input module with 16 inputs.Binary output module with 24 single outputs or 12 double-pole command outputs including super-vision function.

Analogue input module;mA input module for 6 analogue channels.

Communication modules;Module for multiplexed link, galvanic connection. Connector type 25 pin D-sub for V35/36, RS 530/422 contra-directional or 15 pin D-sub for X.21.Module for multiplexed link, fibre optical connection. The same module is used for dedicated link, fibre optical connection (≤ 30 km). Connector type FC (FC/PC).Module for multiplexed link, short range fibre optical connection (≤ 5 km). Connector bayonet type ST.Module for dedicated link, short range galvanic connection (≤ 4 km), twisted pair cable. Connection made on screw terminals.

Page 10: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 10

Hardware design (cont’d)Hardware design (cont’d)

Layout and dimensions

C = 4-10 mmD = 16.5 mmE = 187.6 mm without protective cover,

228.6 mm with protective coverF = 106.5 mmG = 97.6 mm without protective cover,

138.6 mm with protective cover

Case size A B C D E F G H I J K

6U x 1/2 223.7 205.7 203.7 – –

6U x 3/4 265.9 336 204.1 245.1 255.8 318 190.5 316 – 227.6 –

(mm)

Protection cover

9600

0310

9600

0309

Mounting angle

9600

0285

Flush mounting Semi-flush mounting

9600

0286

Cut-out dimensions

Case size A ±1 B ±1

6U x 1/2 210.1

6U x 3/4 322.4 259.3

(mm)

Page 11: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 11

Case size A B C D E

6U x 1/2 292 267.1

6U x 3/4 404.3 379.4 272.8 390 247

(mm)

9600

0287

960 0

0288

Wall mounting

Side-by-side mounting

Fixing plate

9600

0311

9600

0312

Page 12: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 12

Hardware design (cont’d)Hardware design (cont’d)

Rear view layout

Fig. 2 Rear view of REB 551 (standard case size, 3/4x19”)

Terminal connections

Fig. 3 Terminal connection without test switch

Page 13: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 13

Fig. 4 Terminal connection with test switch (internal earthing)

Fig. 5 Terminal connection with test switch (external earthing)

Page 14: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 14

Technical dataTable 1: Energising quantities, rated values and limits

Quantity Rated value Nominal range

Current

Operation rangePermissive overload

Burden

Ir = 1 or 5 AIr = 1 or 5 A for I5(0.004-100) × Ir4 × Ir cont.100 × Ir for 1 s *)

< 0.25 VA at Ir

(0.2-30) x Ir

Ac voltage Ph-Ph

Operation rangePermissive overload

Burden

Ur = 100/110/115/120 VUr = 200/220/230/240 V

(0.001-1.5) x Ur1.5 × Ur cont.2.5 × Ur for 1 s< 0.2 VA at Ur

(80-120) % of Ur

Frequency fr = 50/60 Hz ± 5 %

Auxiliary dc voltage EL

power consumptionbasic terminaleach output relay

power dissipationRL24 = (24/30)VRL48 = (48/60)VRL110 = (110/125)VRL220 = (220/250)V

EL = (48-250) V

≤ 16 W≤ 0.15 W

max. 0.05 W/inputmax. 0.1 W/inputmax. 0.2 W/inputmax. 0.4 W/input

± 20 %

Binary input/output moduledc voltage RL

power consumptioneach I/O-moduleeach output relay

power dissipationRL24 = (24/30)VRL48 = (48/60)VRL110 = (110/125)VRL220 = (220/250)V

RL24 = (24/30) VRL48 = (48/60) VRL110 = (110/125) VRL220 = (220/250) V

≤ 1.0 W≤ 0.15 W

max. 0.05 W/inputmax. 0.1 W/inputmax. 0.2 W/inputmax. 0.4 W/input

± 20 %± 20 %± 20 %± 20 %

Binary input moduledc voltage RL

power consumptioneach input module

power dissipationRL24 = (24/30)VRL48 = (48/60)VRL110 = (110/125)VRL220 = (220/250)V

RL24 = (24/30) VRL48 = (48/60) VRL110 = (110/125) VRL220 = (220/250) V

≤ 0.5 W

max. 0.05 W/inputmax. 0.1 W/inputmax. 0.2 W/inputmax. 0.4 W/input

± 20 %± 20 %± 20 %± 20 %

Binary output modulepower consumption

each output moduleeach output relay

≤ 1.0W≤ 0.25 W

Page 15: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 15

mA input moduleinput range

input resistance

power consumptioneach mA-moduleeach mA-input

± 20 mA

Rin = 194 Ω

≤ 4 W≤ 0.1 W

Ambient temperature 20 °C -5 °C to +55 °C

Ripple in dc auxiliary voltage max. 2 % max. 12 %

Relative humidity (10-90) % (10-90) %

*) max. 350 A for 1 s when COMBIFLEX test switch included together with the productI2t = 10 kAs

Table 2: Influencing factors, Permissible influence

Dependence on: Within nominal range Within operative range

Ambient temperature 0.01 % / °C Correct function

Ripple in auxiliary dc voltage Negligible Correct function

Interruption in auxiliary dc voltagewithout resettingcorrect functionrestart time

< 50 ms0 - ∞< 100 s

< 50 ms0 - ∞< 100 s

Table 3: Electromagnetic compatibility tests

Test Type test values Reference standards

1 MHz burst disturbanceFor short-range galvanic modemFor galvanic interface *)

- common mode- differential mode

2.5 kV2.5 kV

1 kV0.5 kV

IEC 60255-22-1, Class IIIIEC 60255-22-1, Class III

Class IIClass II

Electrostatic dischargeFor short-range galvanic modemFor galvanic interface *)

8 kV8 kV-

IEC 60255-22-2, Class IIIIEC 60255-22-2, Class III

Fast transient disturbanceFor short-range galvanic modemFor galvanic interface *)

4 kV4 kV1 kV

IEC 60255-22-4, Class IVIEC 60255-22-4, Class IVClass II, level 2

Radiated electromagnetic field disturbance

10 V/m, (25-1000) MHz IEC 60255-22-3, Class IIIIEEE/ANSI C37.90.2

*) For FOX6Plus the following modes are not applicable:- V.36/V11 Co-directional according to CCITT- RS530/RS422 Co-directional according to EIA

Table 4: Insulation tests (reference standard: IEC 60255-5)

Test Type test values

Dielectric testFor short-range galvanic modemFor galvanic interface *)

2.0 kV ac, 1 min2.5 kV ac, 1 min1.0 kV ac, 1 min

Impulse voltage testFor short-range galvanic modemFor galvanic interface *)

For other circuits

5 kV, 1.2/50 µs, 0.5 J1 kV, 1.2/50 µs, 0.5 J5 kV, 1.2/50 µs, 0.5 J

Insulation resistance >100 MΩ at 500 V dc

Table 1: Energising quantities, rated values and limits

Quantity Rated value Nominal range

Page 16: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 16

Technical data (cont’d)Technical data (cont’d)Table 5: CE-mark

Test Type test values

Immunity EN 50082-2

Emissivity EN 50081-2

Low voltage directive EN 50178

Table 6: Mechanical tests

Test Type test values Reference standards

Vibration Class I IEC 60255-21-1

Shock and bump Class I IEC 60255-21-2

Seismic Class I IEC 60255-21-3

Table 7: Contact data (reference standard: IEC 60255)

Function or quantity Trip and Signal relays Fast signal relays

Max system voltage 250 V ac, dc 250 V ac, dc

Test voltage across open contact, 1 min 1000 V rms 800 V dc

Current carrying capacitycontinuous1 s

8 A 10 A

8 A10 A

Making capacity at inductive load with L/R>10 ms

0.2 s1.0 s

30 A10 A

0.4 A0.4 A

Breaking capacity for ac, cos ϕ>0.4 250 V/8.0 A 250 V/8.0 A

Breaking capacity for dc with L/R<40ms 48 V/1 A110 V/0.4 A220 V/0.2 A250 V/0.15 A

48 V/1 A110 V/0.4 A220 V/0.2 A250 V/0.15 A

Maximum capacitive load - 10 nF

Table 8: Additional General Data

Weight approx. 1/2 of 19" rack: ≤ 8.5 kg3/4 of 19" rack: ≤ 11 kg

Dimensionswidth

heightdepth

1/2 of 19" rack: 223.7 mm3/4 of 19" rack: 336 mm

267 mm245 mm

Storage temperature -40 °C to +70 °C

Table 9: Front communication

Function Value

Protocol SPA

Communication speed 300, 1200, 2400, 4800 or 9600 bit/s

Slave number 1 to 899

Remote change of active group allowed yes

Remote changed of settings allowed yes

Connectors special electric/optic cable

Page 17: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 17

Current

Table 10: Serial communication (SPA)

Function Value

Protocol SPA

Communication speed 300, 1200, 2400, 4800, 9600, 19200 or 38400 bit/s

Slave number 1 to 899

Remote change of active group allowed yes/no

Remote changed of settings allowed yes/no

Connectors and optical fibres glass or plastic

Table 11: Serial communication (LON)

Function Value

Protocol LON

Communication speed 1.25 Mbit/s

Connectors and optical fibres glass or plastic

Table 12: Serial communication (IEC 870-5-103)

Function Value

Protocol IEC 870-5-103

Communication speed 9600, 19200 bit/s

Connectors and optical fibres glass or plastic

Table 13: PD - Pole discordance, current and position based

Function Setting range

Operate current 10% of IrTime delay (0-60) s in steps of 1 ms

Auxiliary-contact-based function - time delay

(0-60) s in steps of 1 ms

Table 14: BFP - Breaker failure protection

Function Setting range

Operate current (one measuring element per phase)

(5-200) % of Ir in steps of 1 %

Retrip time delay t1 (0-60) s in steps of 1 ms

Back-up trip time delay t2 (0-60) s in steps of 1 ms

Value

Trip operate time max 18 ms

Operate time for current detection max 10 ms

Page 18: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 18

Technical data (cont’d)Technical data (cont’d) Power system supervision

Secondary system supervision

Table 15: LOV - Loss of voltage check

Function Setting range

Operate voltage U< (10-100) % of Ur in steps of 1%

Table 16: OVLD - Overload supervision

Function Setting range

Operate current I>Time delay

(20-300) % of Ir in steps of 1 %(0-60) s in steps of 1 ms

Table 17: CTSU - CT supervision

Function Setting range

Operate current I> (5 - 100)% of Ir in steps of 1%

Table 18: FUSE - Fuse failure supervision function

Function Setting range

Zero-sequence quantities:operate voltage 3U0operate current 3I0

(10 - 50)% of Ur in steps of 1%(10 - 50)% of Ir in steps of 1%

Negative-sequence quantities:operate voltage 3U2operate current 3I2

(10 - 50)% of Ur in steps of 1%(10 - 50)% of Ir in steps of 1%

Table 19: DLD - Dead line detection

Function Setting range

Automatic check of dead line conditionoperate phase voltageoperate phase current

(10-100) % of Ur in steps of 1%(5-100) % of Ir in steps of 1%

Page 19: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 19

Control

Table 20: SYNX - Synchro-check with phasing and energising check

Function Setting range

Synchro check frequency difference limitvoltage difference limitphase difference limit

(50-300) mHz in steps of 10 mHz(5-50) % of Ur in steps of 1 %(5-75)° in steps of 1°

Energisingvoltage level highvoltage level lowauto-energising periodmanual energising period

(50-120)% of Ur in steps of 1%(10-100) % of Ur in steps of 1%(0-60) s in steps of 1 ms(0-60) s in steps of 1 ms

Phasingslip frequencybreaker closing pulse durationbreaker closing time

(50-500) mHz in steps of 10mHz(0-60) s in steps of 1ms(0-60) s in steps of 1ms

Phase shift ϕ line - ϕbusVoltage ratio Ubus/Uline

(0-360)° in steps of 5°(0.20-5.00) in steps of 0.01

Operate time Value

For synchro check functionFor energising check function

typical 190 mstypical 80 ms

Table 21: ARxx - Autoreclosing

Function Setting range

Number of autoreclosing shots 1 - 4

Number of autoreclosing programs 6

Auto-reclosing open time:shot 1 - t1 1phshot 1 - t1 2phshot 1 - t1 3phshot 2 - t2 3phshot 3 - t3 3phshot 4 - t4 3ph

(0-60) s in steps of 1 ms(0-60) s in steps of 1 ms(0-60) s in steps of 1 ms(0-9000) s in steps of 0.1 s(0-9000) s in steps of 0.1 s(0-9000) s in steps of 0.1 s

Reclaim time (0-9000) s in steps of 0.1 s

Inhibit reclosing, reset time (0-60) s in steps of 1 ms

Duration of reclosing pulse (0-60) s in steps of 1 ms

Synchro-check/Dead line time limit (0-9000) s in steps of 0.1 s

Breaker closed before start 5 s

Resetting of “AR Started“ after reclosing (0-60) s in steps of 1 ms

Wait for Master release (0-9000) s in steps of 0.1 s

Page 20: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 20

Technical data (cont’d)Technical data (cont’d) Logic

Table 22: Remote end data communication

Function Value

Data communication between the terminals

transmission typedata transfer rate

synchronous56 or 64 kbit/sFor G.703 only 64 kbit/s

Galvanic interface Connection

Interface type V.36/V11 Co-directionalV.36/V11 Contra-directional X.21/X27 RS530/RS422 Co-directional RS530/RS422 Contra-directional G.703

According to CCITTAccording to CCITTAccording to CCITTAccording to EIAAccording to EIAAccording to CCITT

Connector type D-sub 15 or 25 pins (G.703 screw)

Short-range galvanic modem

RangeLine interfaceConnectorIsolation

max 4 kmBalanced symmetrical three-state current loop5-pin divisible connector with screew connectionGalvanic isolation through optocouplers and isolating DC/DC-converter

Optical interface

Type of fibreGraded-index multimode 50/125µm Single mode 9/125 µm

Optical connector

Wave length Optical transmitter

injected power Optical receiver

sensitivityTransmission distance

Type FC e.g. Diamond HFC-13

1300 nmLED-16 dBmPIN diode-40 dBmmax 20 km

Type FC-PC, e.g. Diamond HPC-101300 nmLED-21 dBmPIN diode -40 dBmmax 30 km

Interface type ABB FOX specific protocol

Short-range fibre optical modem

Transmission distanceOptical fibreOptical connectorsOptical budgetInterface type

max 5 km1300 nm, multimode fibreST15dBFiberdata specific protocol

Table 23: Trip logic

Function Setting range

Tripping action 1/3-ph, 1/2/3-ph

Page 21: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 21

Table 24: CCHT - Communication channel test logic

Function Setting range

Time interval for automatic start of testing cycle (0-90000) s in steps of 0.1 s

Time interval available for successful test of an external function

(0-90000) s in steps of 0.1 s

Minimum time interval for repeated tests of an external function

(0-90000) s in steps of 0.1 s

Duration of CCHT-CS functional output signal (0-90000) s in steps of 0.1 s

Duration of a CCHT-CHOK functional output signal

(0-90000) s in steps of 0.1 s

Duration of an inhibit condition after the CCHT-BLOCK input signal resets (0-90000) s in steps of 0.1 s

Table 25: Basic logic

Timers

Function Number Setting range

Timer 10 (0-60) s in steps of 1 ms

Long timer 10 (0-90000) s in steps of 0.1 s

Pulse timer 10 (0-60) s in steps of 1 ms

Pulse long timer 10 (0-90000) s in steps of 0.1 s

Logic

Function Number Description

AND 30 4 inputs (1 inverted),2 outputs (inverted and non-inverted)

OR 60 6 inputs, 2 outputs (inverted and non-inverted)

XOR 39 2 inputs, 2 outputs (inverted and non-inverted)

INV 20

SR 5 2 inputs, 2 outputs (inverted and non-inverted)

Table 26: Additional logic

Timers

Function Number Setting range

Pulse timer 40 (0-60) s in steps of 1 ms

Logic

Function Number Description

AND 239 4 inputs (1 inverted),2 outputs (inverted and non-inverted)

OR 159 6 inputs, 2 outputs (inverted and non-inverted)

INV 59

Page 22: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 22

Technical data (cont’d)Technical data (cont’d) Monitoring

Table 27: DREP - Disturbance recorder

Function Setting range

Number of binary signals 0 - 48

Number of analogue signals 0 - 10

Sampling rate 2 kHz

Recording bandwidth (5-250) Hz

Overcurrent triggering (0 - 5000) % of Ir in steps of 1 %

Undercurrent triggering (0 - 200) % of Ir in steps of 1 %

Overvoltage triggering (0 - 200) % of Ur in steps of 1 % at 100 V sec

Undervoltage triggering (0 - 110) % of Ur in steps of 1 %

Pre-fault time (10 - 300) ms in steps of 10 ms

Post fault time (100 - 3000) ms in steps of 100 ms

Limit time (500 - 4000) ms in steps of 100 ms

Number of recorded disturbances Max 10 disturbances

Total recording time with 10 analogue and 48 binary signals *) recorded

maximum 40 s

Voltage channelsdynamic range

resolution(0.01-2.0) x Ur at 100 V sec.0.1 % of Ur

Current channelsdynamic range

without dc offsetwith full dc offsetresolution

(0.01-110) x Ir(0.01-60) x Ir0.5 % of Ir

Built-in calendar for 30 years with leap years

*) The amount of harmonics can affect the maximum storage time

Table 28: Event recorder

Function Value

Time tagging resolutionEvent buffering capacity

Max. number of events/disturbance reportMax. number of disturbance reports

Time tagging error with synchronisation once/1sTime tagging error with synchronisation once/10sTime tagging error with synchronisation once/60s

(minute pulse synchronisation)Time tagging error without synchronisation

1 ms

15010± 1.5 ms± 1.5 ms

± 1.5 ms± 3 ms/min

Page 23: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 23

Metering

Table 29: mA measuring function

Function Setting range

mA measuring function ± 5, ± 10, ± 20 mA0-5, 0-10, 0-20, 4-20 mA

Max current of transducer to input (-25 to +25) mA in steps of 0.01

Min current of transducer to input (-25 to +25) mA in steps of 0.01

High alarm level for input (-25 to +25) mA in steps of 0.01

High warning level for input (-25 to +25) mA in steps of 0.01

Low warning level for input (-25 to +25) mA in steps of 0.01

Low alarm level for input (-25 to +25) mA in steps of 0.01

Alarm hysteresis for input (0 - 20) mA in steps of 1

Amplitude dead band for input (0 - 20) mA in steps of 1

Integrating dead band for input (0 - 1000) mA in steps of 0.01

Table 30: Mean values

Function Setting range Accuracy

Frequency (0.95-1.05) x fr ± 0.2 Hz

Voltage (0.1-1.5) x Ur ± 2.5 % of Ur at U ≤ Ur± 2.5 % of U at U > Ur

Current (0.2-4) x Ir ± 2.5 % of Ir at I ≤ Ir± 2.5 % of I at I > Ir

Active power *)

Reactive power *)at |cos ϕ| > 0.9at |cos ϕ| ≤ 0.8

± 5 %± 7.5 %

*) Measured at Ur and 20 % of Ir

Table 31: Mean values with increased accuracy

Function Setting range Accuracy

Frequency (0.95-1.05) x fr ± 0.2 Hz

Voltage (0.8-1.2) x Ur ± 0.25 % of Ur at U ≤Ur± 0.25 % of U at U > Ur

Current (0.2-2) x Ir ± 0.25 % of Ir at I ≤ Ir± 0.25 % of I at I > Ir

Active power *) at |cos ϕ| > 0.90.8 x Ur < U < 1.2 x Ur0.2 x Ir < I < 2 x Ir

± 0.5 % of Pr at P ≤ Pr*)

± 0.5 % of P at P >Pr*)

*) Pr active power at U = Ur , I = Ir and |cos ϕ| = 1

Table 32: Pulse counter for metering

Function Setting range

Cycle time for pulse counter (0.5-60) min in steps of 30 s

Page 24: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 24

Ordering The standard version of REB 551 is a breaker protection terminal with breaker failure, current based pole discordance protection and synchro-check. System supervision functions and event recorder are also included in the standard version.

Basic functions

Self-supervision with internal event recorder

Real-time clock with external time synchronisation

Four groups of setting parameters

Local Human Machine Interface (HMI)

Configurable logic

Service value reading

Monitoring of ac analogue measurements

Monitoring of dc analogue measurementsNote: mA input module required

Ordering Number: 1MRK 002 498-AA Quantity:

Includes basic functions and the selected functions and hardware options below

Basic data:

Frequency, fr 50/60 Hz

Dc voltage, EL 48/60/110/125/220/250 V

Basic data to specify:

Ac inputs

1 A, 110 V 1MRK 000 157-MB

5 A, 110 V 1MRK 000 157-NB

1 A, 220 V 1MRK 000 157-VB

5 A, 220 V 1MRK 000 157-WB

Interface dc voltage

24/30 V 1MRK 000 179-EB

48/60 V 1MRK 000 179-AC

110/125 V 1MRK 000 179-BC

220/250 V 1MRK 000 179-CC

Factory configurations

Standard configuration, single or two pole tripping Quantity:

Customer-specific configuration Quantity:

Page 25: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 25

Functions;

= function always included

Current, phase wise

Pole discordance protection (current and contact based) 1MRK 001 456-PA

Breaker failure protection 1MRK 001 458-AA

Power system supervision

Loss of voltage check 1MRK 001 457-VA

Overload supervision 1MRK 001 457-FA

Secondary system supervision

Current circuit supervision (current-based) 1MRK 001 457-XA

Fuse failure supervision (Negative sequence) 1MRK 001 457-YA

Fuse failure supervision (Zero sequence) 1MRK 001 457-ZA

ControlNote: Only one alternative for Command control, Synch-check and Autorecloser can be selected respectively.

Command control (16 signals) 1MRK 001 458-EA

Synchro-check and energising-check, single CB 1MRK 001 458-GA

Synchro-check and energising-check, double CB 1MRK 001 458-FA

Synchro-check and energising-check, 1½ breaker arrangement (per breaker) 1MRK 001 458-HA

Note: This function requires binary inputs/outputs

Synchro-check with phasing and energising-check, single CB 1MRK 001 458-KA

Synchro-check with phasing and energising-check, double CB 1MRK 001 457-HA

Autorecloser logic, 1 and/or 3 phase, single CB 1MRK 001 458-LA

Autorecloser logic, 1 and/or 3 phase, double CB 1MRK 001 457-KA

Autorecloser logic, 3 phase, single CB 1MRK 001 458-MA

Autorecloser logic, 3 phase, double CB 1MRK 001 457-LA

Logic

Single or two pole tripping logic 1MRK 001 458-XA

Additional configurable logic 1MRK 001 457-MA

Communication channel test logic 1MRK 001 459-NA

Binary signal transfer to remote endNote: See Communication module alternatives for selecting a comm. module

1MRK 001 458-ZA

Binary signal interbay communication, high speed (protection application) 1MRK 001 455-RA

Monitoring

Disturbance recorder, 40 s 1MRK 001 458-NA

Event recorder 1MRK 001 459-KA

Trip value recorder 1MRK 001 458-SA

Increased measuring accuracy for U, I, P, Q 1MRK 000 597-PA

Metering

Pulse counter logic 1MRK 001 458-TA

Page 26: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 26

Ordering (cont’d)Ordering (cont’d)Hardware options;

Casing

Case size 3/4 x 19" (max. 8 I/O)1MRK 000 151-GA

Standard

1/2 x 19" (max. 3 I/O)1MRK 000 151-FA

Optional

Combined binary input/output and output modules (max) 4 3

mA input module (max) 3 1

Note: The communication module option, if selected, occupies one I/O position

I/O modules

8 modules are available in the 3/4 x 19" case and 3 modules are available in the 1/2 x 19" case.

InterfaceDC voltage

Quantity Ordering number

Binary input module(16 inputs)

24/30 V 1MRK 000 508-DB

48/60 V 1MRK 000 508-AB

110/125 V 1MRK 000 508-BB

220/250 V 1MRK 000 508-CB

Binary input module with enhanced pulse counter capabilities (16 inputs)

Rule: Can only be ordered together with the pulse counter logic optional function

24/30 V 1MRK 000 508-HA

48/60 V 1MRK 000 508-EA

110/125 V 1MRK 000 508-FA

220/250 V 1MRK 000 508-GA

Binary input/output module (8 inputs and 12 outputs)

24/30 V 1MRK 000 173-GB

48/60 V 1MRK 000 173-AC

110/125 V 1MRK 000 173-BC

220/250 V 1MRK 000 173-CC

Binary output module (24 single outputs or 12 command outputs)

1MRK 000 614-AB

mA input module (6 channels) 1MRK 000 284-AB

Note: Three binary input/output modules are required for standard factory configuration.

Remote end data communication module alternativesNote: Applicable only when function Binary signal transfer to remote end is selected. Only one alternative can be selected. Optical fibre or electrical wire is not included.

V.35/V.36 contra-directional galvanic interface 1MRK 000 185-BA

X.21 galvanic interface 1MRK 000 185-CA

RS 530/422 contra-directional galvanic interface 1MRK 000 185-EA

Fibre optical modem 1MRK 000 195-AA

Short range galvanic modem 1MRK 001 370-AA

Short range fibre optical modem 1MRK 001 370-BA

V.35/V.36 and RS 530/422 co-directional galvanic interfaces On Request

Serial communication modules

Serial communication for SMS and SCS; (one alternative per port)

SMS, port SPA/IEC 870-5-103 (location X13)

Plastic/Plastic 1MRK 000 168-FA

Page 27: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 27

Glass/Glass 1MRK 000 168-DA

SCS, port LON (location X15)

Plastic/Plastic 1MRK 000 168-EA

Glass/Glass 1MRK 000 168-DA

Engineering facilities

HMI languageSecond language besides English

German 1MRK 001 459-AA

Russian 1MRK 001 459-BA

French 1MRK 001 459-CA

Spanish 1MRK 001 459-DA

Italian 1MRK 001 459-EA

Customer-specific ordering

Customer-specific order number

Combiflex

COMBITEST test switch module RTXP 24 mounted withthe terminal in RHGS6 case with window door 1MRK 000 371-CA

Internal earthing RK 926 215-BB External earthing RK 926 215-BC

On/Off switch for the dc supply RK 795 017-AA

Mounting details with IP40 degree of protection from the front:

19" rack 1MRK 000 020-BR

Wall mounting 1MRK 000 020-DA

Flush mounting 1MRK 000 020-Y

additional for IP54 (protection terminal only) 1MKC 980 001-2

Semi-flush mounting 1MRK 000 020-BS

additional for IP54 (protection terminal only) 1MKC 980 001-2

Accessories:

User documentation

Technical reference manual, REB 551 Quantity: 1MRK 606 008-UEN

Combiflex

Key switch (for locked Settings) Quantity: 1MRK 000 611-A

Resistor unit for creation of 3Uo voltage (RXTMA 1) Quantity: 1MRK 000 486-AA

Communication (remote terminal communication)

Interface converter (dc voltage 48 V)

RS 530/422 contra-directional to G.703 co-directional converter *) Quantity: 1MRK 001 295-AA

Optical/electrical converters for short-range optical modems (dc voltage 48-110 V)

V.35/V.36 Quantity: 1MRK 001 295-CA

X.21/G.703 / RS 530 Quantity: 1MRK 001 295-DA

Fibre optic repeater and multiplexer (FOX 20) **)available from ABB Network Partner Ltd (Turgi, Switzerland)

*) For dc-supply 110-250 V an extra dc/dc converter type RXTUG 22H is needed, see 1MRK 513 001-BEN.**) Compatible with Fibre optical modem according to 1MRK 000 195-AA.

Page 28: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 28

References Series RE 500Mechanical design and mounting accessories

Technical reference manual, REB 551

Reference list REB 551

LIB 520

SMS 010

CAP 531

1MRK 514 003-BEN

1MRK 606 008-UEN

1MRK 505 001-REN

1MRK 511 057-BEN

1MRK 511 014-BEN

1MRK 511 056-BEN

Configuration and monitoring tools

Front connection cable for PC (Opto/9-pol D-sub) Quantity: 1MKC 950 001-2

CAP 531, Graphical configuration tool (IEC 1131-3) Quantity: 1MRK 000 876-KB

CAP/REx 500, CAP software module Quantity: 1MRK 000 876-PA

LNT 505, LON configuration tool Quantity: 1MRS 151 400

SLDT, LON configuration module REx 500available on our website: www.abb.se/net

1MRK 001 700-4

SMS-BASE, Basic program for all SMS applications Quantity: RS 881 007-AA

SM/REx 500, SMS software module Quantity: 1MRK 000 314-MA

REPORT, program for event and alarm handling in SMS Quantity: RS 881 011-AA

RECOM Disturbance collection program Quantity: 1MRK 000 077-DC

REVAL Disturbance evaluation program, English version Quantity: 1MRK 000 078-AB

MicroSCADA tools

LIB 520, MicroSCADA engineering tool Quantity: On request

For our reference and statistics we would be pleased to be provided with the following application data:

Country: End user:

Station name: Voltage level: kV

Page 29: Breaker protection terminal REB 551*2€¦ · Breaker pole position discordance can occur on the operation of a breaker with indepen-dent operating gears for the three poles. The

Breaker protection terminal REB 551*2.01MRK 606 008-BEN

Page 29

Manufacturer ABB Automation Technology Products ABControl & Force MeasurementSubstation Automation SE-721 59 VästeråsSwedenTel: +46 (0) 21 34 20 00Fax: +46 (0) 21 14 69 18