brett hondorp alta planning + design. suggested routes to school details primary goals 1.to develop...

23
Brett Hondorp Alta Planning + Design

Upload: jonathan-miles

Post on 27-Dec-2015

217 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

Brett HondorpAlta Planning + Design

Page 2: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

Suggested Routes to School Details

Primary Goals

1. To develop suggested route maps for 18 elementary and middle schools in GIS format.

2. Identify pedestrian and mobility enhancements for future capital projects.

• Total Project Budget: $125,000• Time to Complete: 16 months

Page 3: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

Step 1: Signage and Striping Inventory

• Inventory of:– School area signs– Pavement markings– School crosswalk markings– Curb ramp presence/absence– Traffic Signals– Stop signs

• School signs identified by MUTCD sign code• Color (Yellow vs FYG) and condition (good, fair,

poor) noted

Page 4: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

Step 1: Signage and Striping Inventory

Page 5: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

Step 2: Draft Walking Route Maps

• Based on location of traffic controls, crosswalks, and crossing guards, Suggested Walking Routes maps were prepared

• Walking routes shown from all streets within school enrollment area

• Walking routes field checked at the same time signage/striping inventory conducted

Page 6: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

Step 2: Draft Walking Route Maps

Page 7: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

Step 3: Parent Surveys

• Developed parent survey distributed to all schools– Mode of travel to school– Reasons for not walking– Identified safety concerns in the area– Modifications to the draft walking routes

• Parent survey distributed on back side of Walking Route Map

• Both Spanish and English versions developed

Page 8: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

English Survey

Page 9: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

Spanish Survey

Page 10: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

• Total number of Schools Responded: 13 out of 18

• Total number of responses: 309• Response rates ranged from 0.5% to

12% of enrollment.

Survey Response Language

English63%

Spanish37%

Survey Results: Entire District

Page 11: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

Survey Results: Entire District

Page 12: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

• Responses: 41• Enrollment: 900• Percent Responded: 5%

Survey Responses: Longfellow Elementary

Page 13: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

Longfellow SchoolReasons for Not Walking to or from School

0%

2%

4%

6%

8%

10%

12%

14%

16%

18%

20%

Survey Responses: Longfellow Elementary

Page 14: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

Requested Improvements: Longfellow Elementary

Page 15: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

Step 4: Improvement Recommendations

• Fieldwork at identified hot spots• Citywide Program and Policy

Recommendations– Low-Cost Engineering Tools Matrix– Crosswalk Standard– Signage Plan Recommendations– Education and Encouragement Actions

• Developed Recommended Project List for each School

• Prepared Final Walking Route Maps• Prepared Final Report

Page 16: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

Low-Cost Engineering Tools Matrix

Page 17: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle
Page 18: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle
Page 19: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle
Page 20: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle
Page 21: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

Safe Routes to School Details

• Caltrans SR2S Funds: $396,000

• City Match: $104,000

• Total Project Budget: $500,000

• Components: Sidewalk Repairs and Transit Pads (20+) $40,000 Access Ramp Construction (24) $60,000 In-Roadway Lighted Crosswalks (3) $140,000 Bulb-out Treatments (2) $110,000 Traffic Sign Upgrades (400) $50,000

Page 22: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle
Page 23: Brett Hondorp Alta Planning + Design. Suggested Routes to School Details Primary Goals 1.To develop suggested route maps for 18 elementary and middle

Contact InformationAlta Planning + DesignBerkeley, CaliforniaContact: Brett [email protected]

City of PasadenaDepartment of TransportationPM: Richard Yee, PE, [email protected]

Parisi AssociatesMill Valley, CaliforniaContact: David Parisi, [email protected]