bridge # 27a34 81(enchanted lane) over channel81(enchanted lane) over channel minnesota structure...
TRANSCRIPT
2016 UNDERWATER
BRIDGE INSPECTION REPORT
BRIDGE #
DISTRICT: COUNTY: CITY/TOWNSHIP:
Date of Inspection:
Equipment Used:
Inspected By:
Report Written By:
Report Reviewed By:
Final Report Date:
27A34
81(ENCHANTED LANE) over CHANNEL
Metro Hennepin Shorewood
09/07/2016
Stuber, Cory
Cory Stuber
City or Municipal Highway AgencyOwner:
MinnesotaSTATE:
UNDERWATER SUMMARY 3
UNDERWATER INSPECTION 4
UNDERWATER INSPECTION PROCEDURES 6
STRUCTURE INVENTORY 7
ELEMENTS 8
PICTURES 11
DRAWINGS 14
TABLE OF CONTENTS
PAGE NUMBER
Contractor:
(A) Reinspect the submerged substructure units at the normal maximum recommended (NBIS) interval of sixty (60) months.
Collins Engineers Inc.
9687Contractor Job Number:
RECOMMENDATIONS
REPORT SUMMARY
UNDERWATER INSPECTION
The substructure units inspected at Bridge No. 27A34, Piers 1 and 2, were found to be in good condition with no defects of structural significance observed. The channel bottom material consisted primarily of sand infill and large riprap. The channel bottom appeared stable with no significant scour.
(A) The channel bottom material consisted of cobble with sand infill with up to 2 inch penetration
(B) The timber piles were generally sound and in good condition with negligible deterioration.
(C) Riprap, up to 2 feet diameter, protected both banks in the vicinity of the structure.
INSPECTION FINDINGS
Page 3 of 15
Top of cap at the north end of Pier 1; assumed elevation of 100.0 feet.Water Level Reference:
WATERLINE DATUM
Waterline Elevation (feet):
Approximately 3.7 feet below reference.Description:
96.3
4.
Piers 1 and 2Substructure(s) Inspected:
SUBSTRUCTURE INSPECTION DATA
General Shape:
6.2Maximum Water Depth at Substructure(s) Inspected (feet):
Piers 1 and 2 each consist of eight timber piles driven to bearing into the channel bottom.
Code:Item 62: Culvert:
8
Y 48 09/2016Code:Item 92B: Underwater Inspection:
Code:
(Minnesota specific codes are used for 92B and 113)
NBIS CODING INFORMATION5.
Item 60: Substructure:
Item 61: Channel and Channel Protection:
8Code:
MetroDistrict:
81(ENCHANTED LANE)
County:
The bridge superstructure consists of three spans of multiple timber beams. The superstructure is supported by two timber pile abutments and two timber pile bent piers. The piers are numbered 1 and 2 starting from the west end of the bridge.
Bridge Description:
027 - Hennepin
Facility Carried:
BRIDGE DATA1.
UNDERWATER INSPECTION
Bridge #:
CHANNELFeature Intersected:
27A34
Underwater Visibility (feet):
Cloudy, 75°FWeather Conditions:
5.0
3.
NegligibleWaterway Velocity (ft/sec):
09/07/2016
Professional Engineer/Team Leader:
INSPECTION DATA2.
Garrett Owens P.E.
Date of Underwater Inspection:
Cory Stuber P.E.Inspection Diver:
Page 4 of 15
885 Scour 1 EA 1
STRUCTURAL ELEMENT CONDITION RATING
Conditions
6.
I
Bridge is scour critical because abutment or pier foundation is rated as unstable due to observed scour at bridge site.
Item 113: Scour Critical Bridge: Code:
No (Mark your selection with an X)Yes X
228
CS3 CS4
Timber Pilings 1616 EA
CS2ELEM # Unit CS1Element Description Quantity
Page 5 of 15
The routine underwater inspection of Bridge 27A34 (Enchanted Lane over a channel) was completed on September 7, 2016. The underwater inspection was conducted from shore. The inspection was conducted by a team consisting of a PE-Diver with a valid MnDOT Team Leader certification, a backup diver and a dive tender. Due to waterway conditions at the time of inspection, the inspection could be accomplished by wading in accordance with OSHA regulations. Profiles were taken along the upstream and downstream faces of the bridge and around the periphery of substructure units to determine the presence, location and area of scour.
The bridge elements inspected consisted of two timber piers. According to the bridge inventory, Piers 1 and 2 were founded on timber pile bents, timber bearing piles and a timber cap, with diagonal timber cross bracing. Inspection procedures followed FHWA guidance and the MnDOT Bridge and Structure Inspection Program Manual with channel bottom probing to search for foundations. The routine underwater inspection frequency is recommended to remain at a maximum of 60 months based on those findings and risk factors. Also, inspection procedures should continue to follow the above approach and standard guidance with 100% Level I and 10% Level II intensity efforts.
INSPECTION PROCEDURES
UNDERWATER INSPECTION
Page 6 of 15
Spec. Feat.Pier Foundation (Material/Type)
2 - TIMBERCantilever ID
+ W A T E R W A Y +Number of Spans Historic Status
4 - PILE BENT
Underwater Y 60Culvert Type 4 - PILE BENT
Pinned Asbly.
09/07/2016
Barrel Length
52.0 ft. Navigation Control
Waterway Opening (sf.) 200Structure Length
ft. Year Painted
0 - No nav. control on waterwayDeck Width (Out-to-Out) 24.0
+ P A I N T +
APPR: 0 TOTAL:5 - Not eligible
MAIN: 3
Main Span Length 20.0 ft.Drainage Area (sq. mi.)
B R I D G E D A T A +Main Span Detail
1 - MEETS STANDARDS+ M I S C.
Appr. Span Type Structure Flared
GR Termini 0 - SUBSTANDARD
Appr. Guardrail
Main Span Type 7 - Timber Median Width On Bridge
ft. Bridge Railing 0 - SUBSTANDARD
0 - SUBSTANDARD
Main Span Design 09 - Slab Span
ft. GR Transition
Skew 0
Y/N Freq Date
Abutment Foundation (Material/Type)
2 - TIMBER Frac. Critical
D E P T H I N S P. +Appr. Span Design
0 - No flare+ I N
Appr. Span Detail Field Conn. ID
Parallel Structure N - No parallel structure
Pier Protection
0 - Not Required
Rating Date 07/26/20111044 sq. ft. Traffic
ft. 50B. Rt 0.00Sidewalk Width 50A. Lt 0.00
Roadway Area (Curb-to-Curb)
Posted Load 0 - Not Required
PostingStructure Area (Out-to-Out) 1248 sq. ft.
DBL:VEH: SEMI:
Rt 06 ARail Type Lt 06 C N - N/AN - N/A B N - N/A
N - Not Applicable Overweight Permit CodesCurb Height Lt
ft. Horizontal 0 - Not Required
0.00 ft. Vertical0.00 ft. Rt
Wear Surf Install Year
sq. ft. Nav. Vert. Lift Bridge Clear. (ft.)
I - LOW RISK Year 2001Primer Type MN Scour Code
Painted Area
Unsound Paint % Nav. Clr. (ft.)Deck Material 8 - Wood or Timber 0.0Wear Surf Type 6 - Bituminous
Vert. 0.0 Horiz.
S I G N S +Operating Rating 2 - HS TRUCK
N - Not Applicable (no deck) + B R I D G E
Inventory Rating 2 - HS TRUCK 26.5
36.6Deck Rebars Install Year
Deck Rebars
Finish TypeWear Course/Fill Depth 0.25 ft.
0 - None
Design Load 9 - HS 25 (OR GREATER)
+ C A P A C I T Y R A T I N G S +Deck Membrane
44 ° 54
Inspector Name Stuber, Cory
Latitude Control Section (TH Only) Status' 43.18 ''
2 - 2-way traffic
Routine Inspection Frequency 24
Sect., Twp., Range
TO SHADY ISLAND Level of Service 1 - MAINLINE
- 23W Roadway Type30 - 117N
Detour Length 99.0 mi.R A T I N G S +
Custodian 04 - City or Municipal Highway Agency
Owner 04 - City or Municipal Highway Agency
Deck 8 Unsound Deck %
C O N D I T I O N° 38 '
A - Open
Longitude 93 000+00.000 + N B I 10.87 '' Reference Point
Crew
+ I N S P E C T I O N +
Agency Br. No. 194
District 05
Bridge Match ID (TIS) 0 Userkey
81(ENCHANTED LANE)
over CHANNEL
Minnesota Structure Inventory Report
Bridge ID: 27A34
+ G E N E R A L + + R O A D W A Y +
Date: 01/17/2017
Sufficiency Rating 73.6Roadway Name or Description
81
City Shorewood
Routine Inspection Date 08/20/2015
Desc. Loc.
Township MUN 81
Number
NRoadway O/U Key Route On StructureMaint. Area Structurally Deficient
NRoute Sys 10 - MUNCounty 027 - Hennepin Functionally Obsolete
Lanes
Waterway Adequacy 9Max. Vert. Clear.
ft.Legislative District 33Bft.Potential ABC 2 - N/A ft.
ft.On - Off System Roadway Width 20.00 ft.
Vertical Clearance ft.0 - OFF
Underclearances N
Service On 1 - Highway Appr. Surface Width+ S A F E T Y F E A T U R E S +
5 - Waterway Bridge Roadway Width 20.0
20.0 ft.
Service Under
ft.
ft. Approach Alignment 8Horizontal Clear.
ft.
ft.+ S T R U C T U R E + Lateral Clearance
HCADT ADTT8
Year Built 1997
MN Year Reconstructed Functional Class
%Channel 9
Substructure
0Superstructure 8
ON 2 UNDER
260 YEAR 1988BMU Agreement ADT
Structure Evaluation 8If Divided
D I M E N S I O N S +Bridge Plan Location 1 - CENTRAL
Deck Geometry 4NB-EB SB-WBDate Opened to Traffic
+ R D W Y
FHWA Year Reconstructed
MN Temporary Status
19 - Urban - LocalCulvert N
A P P R A I S A L R A T I N G S ++ N B I
Page 7 of 15
County:
City:
Township:
Township:Section: Range:
Span Type:
NBI Deck: Super: Sub: Chan: Culv:
Appraisal Ratings - Approach: Waterway:
Required Bridge Signs - Load Posting:
Horizntal:
Traffic:
Vertical:
MN Scour Code:
Open, Posted, Closed:
Location:
Route:
Control Section:
Local Agency Bridge Nbr.:
Ref. Pt.:
Maint. Area:
Length:
Deck Width:
Rdwy. Area/ Pct. Unsnd:
Paint Area/ Pct. Unsnd:
Culvert:
Hennepin
Shorewood
117N30 23W
7 - Wood or Timber 1 - Slab
8 8 8 9 N
8 9
0 - Not Required
0 - Not Required
0 - Not Required
N - Not Applicable
I - LOW RISK
TO SHADY ISLAND
10 - MUN 81 000+00.000
52.0
24.0
1044 sq. ft. / %
sq. ft. / %
N/A
A - Open
ft.
ft.
Postings:List:
MINNESOTA BRIDGE INSPECTION REPORT
01/18/2017
BRIDGE 27A34 81(ENCHANTED LANE) OVER CHANNEL
Unofficial Structurally Deficient N
NUnofficial Functionally Obsolete
Unofficial Sufficiency Rating 73.6
ELEMNBR ELEMENT NAME INSP. DATE QUANTITY
QTYCS 1
QTYCS 2
QTYCS 3
QTYCS 4REPORT TYPE
Timber Slab 09/07/2016 1248 SF 1248 0 0 054 Underwater
1248 SF 1248 0 0 0Migrated Values
Notes: [2016] Migrator assumed CS1.
510 - Wearing Surfaces 1044 SF 1044 0 0 0
Notes: [08/20/15] Roadway field measures 20'-3" + (2) 11" rub rails, OTO width = 22'-1". OTO bridge field measures 52'-0". Slab Area = 1148sf.
Underwater 09/07/2016
1044 SF 1044 0 0 0Migrated Values
Timber Floor Beam 09/07/2016 124 LF 124 0 0 0156 Underwater
124 LF 124 0 0 0Migrated Values
Notes: [08/20/15] Element added. 12x6 timber section; (1) stiffener beam in each approach span & (2) stiffener beams in the main span.Same quantity as timber cap, 124 LF, all in Condition State 1
Timber Abutment 09/07/2016 102 LF 102 0 0 0216 Underwater
102 LF 102 0 0 0Migrated Values
Notes: [2016] Migrator added 40 LF to abutment quantity to account for wingwalls (CS1:40 CS2:0 CS3:0 CS4:0).[08/20/15] Slight quantity change for field measured dimensions, no condition state change.
Wingwall notes:[08/20/15] No change.
Timber Pile 09/07/2016 36 EA 36 0 0 0228 Underwater
36 EA 36 0 0 0Migrated Values
Notes: [08/20/15] Remove timber column quantity, coded incorrectly. 10 piles at each abutment/ww + 8 piles at each pier, total = 36, all inCondition State 1
Timber Pier Cap 09/07/2016 124 LF 124 0 0 0235 Underwater
124 LF 124 0 0 0Migrated Values
Notes: [08/20/15] Slight quantity change for field measured dimensions, no condition state change.
Timber Bridge Railing 09/07/2016 104 LF 104 0 0 0332 Underwater
104 LF 104 0 0 0Migrated Values
Notes: [08/20/15] No change.
Critical Deficiencies or Safety Hazards 09/07/2016 1 EA 1 0 0 0800 Underwater
1 EA 1 0 0 0Migrated Values
Notes: NO CRITICAL FINDINGS OBSERVED DURING THE LAST INSPECTION.[08/20/15] No change.
Page 8 of 15
Bituminous Approach Roadway 09/07/2016 2 EA 2 0 0 0822 Underwater
2 EA 2 0 0 0Migrated Values
Notes: [08/20/15] No change.
Scour 09/07/2016 1 EA 1 0 0 0885 Underwater
Other Bridge Signing 09/07/2016 1 EA 1 0 0 0891 Underwater
1 EA 1 0 0 0Migrated Values
Notes: [08/20/15] Element added. All object markers accounted for and visible. Vegetation growth at SW corner of abutment growing uparound object marker.
Slopes & Slope Protection 09/07/2016 1 EA 1 0 0 0892 Underwater
1 EA 1 0 0 0Migrated Values
Notes: [08/20/15] No change, channel slopes well protected.
Guardrail 09/07/2016 1 EA 1 0 0 0893 Underwater
1 EA 1 0 0 0Migrated Values
Notes: [08/20/15] No change.
Deck & Approach Drainage 09/07/2016 1 EA 1 0 0 0894 Underwater
1 EA 1 0 0 0Migrated Values
Notes: [08/20/15] No change, deck scuppers open, free of debris.
Miscellaneous Items 09/07/2016 1 EA 1 0 0 0899 Underwater
1 EA 1 0 0 0Migrated Values
Notes: [08/20/15] Element added. (3) separate conduits on the south side of the bridge. (1) 3" gas line, marked at east end of bridge; (1) 16"conduit (insulated water main?); & (1) 4" conduit (galvanized?).
Protected Species 09/07/2016 1 EA 1 0 0 0900 Underwater
1 EA 1 0 0 0Migrated Values
Notes: Use this element to track the presence of protected species living on this structure.
General Notes: [08/20/15] Inspection by WSB.[08/20/15] 40" clearance to bottom of spreader beam in Span 2.[08/20/15] 4' water depth in channel under Span 2.[08/20/15] Removed element 206.[08/20/15] Added element 228.[08/20/15] Added element 415.[08/20/15] Added element 981.[08/20/15] Vegetation growing at SW corner of bridge, nearly obstructing object markers, should be removed.
58. Deck NBI:
36A. Brdg Railings NBI:
36B. Transitions NBI:
36C. Appr Guardrail NBI:
36D. Appr GuardrailTerminal NBI:
59. Superstructure NBI:
60. Substructure NBI:
61. Channel NBI:
62. Culvert NBI:
71. Waterway Adeq NBI:
[08/20/15] Timber slab covered by 3.5" bituminous wear course; no change. Measures 2" at the gutter line, 5" at CL bridge.
[08/20/15] Change to substandard.
[08/20/15] No change.
[08/20/15] No change.
[08/20/15] Change to substandard. Approach guardrail ends are turned down.
[08/20/15] Timber slab covered by 3.5" bituminous wear course; bottom of timber slab stringers in very good condition in allspans, no change.
[08/20/15] No change.
[08/20/15] No change. 40" freeboard to Span 2 spreader beam.
[08/20/15] No change.
[08/20/15] No change.
ELEMNBR ELEMENT NAME INSP. DATE QUANTITY
QTYCS 1
QTYCS 2
QTYCS 3
QTYCS 4
BRIDGE 27A34 81(ENCHANTED LANE) OVER CHANNEL
REPORT TYPE
Page 9 of 15
ELEMNBR ELEMENT NAME INSP. DATE QUANTITY
QTYCS 1
QTYCS 2
QTYCS 3
QTYCS 4
BRIDGE 27A34 81(ENCHANTED LANE) OVER CHANNEL
REPORT TYPE
Inspector's Signature Reviewer's Signature
Cory Stuber
71. Waterway Adeq NBI:
72. Appr RoadwayAlignment NBI:
[08/20/15] No change.
[08/20/15] No change.
Page 10 of 15
Photo 1 - South Elevation, Looking North.
Photo 2 - North Elevation, Looking Southwest.
Pictures
Page 11 of 15
Pictures
Photo 3 - Pier 1, Looking East.
Photo 4 - Pier 2, Looking East.
Page 12 of 15
Pictures
Photo 5 - West Abutment, Looking West.
Photo 6 - East Abutment, Looking East.
Page 13 of 15
Page 14 of 15
Page 15 of 15