bridge deck length x width rapid visual assessment · 1bridge * document any potential fish passage...

28
SDDOT Fish Passage Assessment Work Sheet (Attachment A) Revision Date: 10/4/2012 Box Arch 1 Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation & measurements may be required. Refer to section 'Stream Crossing Section' in the Monitoring Protocol for additional measurements and evaluation procedures. Figs 1-4 are included for ease of reference. *** Velocities are to be taken 0.6 times the total depth measured from the water's surface. Refer to Figure 5. Location Left 1/4 Pt 1/2 Pt 3/4 Pt Depth Apron 5. A natural low flow channel exists through the structure or if not the streambed surface within the structure simulates the streambed beyond the structure inlet and outlet similar to design conditions.** 6. Stream is free of channelizing along the surface of the structure.** 7. Up & downstream channel appears stable (no apparent erosion). 1 Bridge Deck Length X Width Rapid Visual Assessment: This item to be completed on initial survey only. 3. Natural streambed material exists throughout structure (i.e. countersunk approximately 1 foot) Observation 4. Stream channel is free of scour activity that may impede fish passage. Y / N N.A. 1. The structure is installed generally in accordance with plans (height, width, elevation, location, etc…) 2. Overall structure width is wider than the average stream widths upstream and downstream . Structure Type Number of Barrels X Width (ft) X Height (ft) Projecting Wing wall Headwall Apron Riprap Pipe Diameter Depth Vel. 7xW DwnStrm Depth Vel. MidStr 7xW UpStrm PCN: Date: Year Constructed: Assessed By: County: PRJ # Structure Location: Stream Name: Right Thalweg Structure Shape Comments Other: Other: Inlet Type Outlet Type* At Stream Grade Cascade over Riprap Free Fall into Pool Free Fall Onto Rip Rap 8. Vegetation is/has reestablished on the stream banks within the construction area. Field Measurements: Describe observations used in making above determinations. Describe whether unusual channelizing exists within the structure or stream. Note other unique site conditions that may/may not warrant corrective actions. Document with additional photographs if needed. Stream Depth and Velocities at Structure*** Depth Vel. Depth Vel. Depth Outlet Vel. Vel. Inlet

Upload: others

Post on 01-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation

SDDOT Fish Passage Assessment Work Sheet (Attachment A)

Revision Date: 10/4/2012

BoxArch

1Bridge

* Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation & measurements may be required. Refer to section 'Stream Crossing Section' in the Monitoring Protocol for additional measurements and evaluation procedures. Figs 1-4 are included for ease of reference. *** Velocities are to be taken 0.6 times the total depth measured from the water's surface. Refer to Figure 5.

Location Left 1/4 Pt 1/2 Pt 3/4 PtDepth

Apron

5. A natural low flow channel exists through the structure or if not the streambed surface within the structure simulates the streambed beyond the structure inlet and outlet similar to design conditions.**6. Stream is free of channelizing along the surface of the structure.**7. Up & downstream channel appears stable (no apparent erosion).

1 Bridge Deck Length X WidthRapid Visual Assessment:

This item to be completed on initial survey only.

3. Natural streambed material exists throughout structure (i.e. countersunk approximately 1 foot)

Observation

4. Stream channel is free of scour activity that may impede fish passage.

Y / N N.A.

1. The structure is installed generally in accordance with plans (height, width, elevation, location, etc…)

2. Overall structure width is wider than the average stream widths upstream and downstream .

Structure TypeNumber of Barrels

X Width (ft) X Height (ft) ProjectingWing wallHeadwallApronRiprap

Pipe Diameter

Depth Vel.

7xW DwnStrm

Depth Vel.

MidStr7xW UpStrm

PCN: Date: Year Constructed:

Assessed By:County:PRJ #

Structure Location:Stream Name:

Right Thalweg

Structure Shape Comments

Other:Other:

Inlet Type Outlet Type*At Stream GradeCascade over RiprapFree Fall into PoolFree Fall Onto Rip Rap

8. Vegetation is/has reestablished on the stream banks within the construction area.Field Measurements:

Describe observations used in making above determinations. Describe whether unusual channelizing exists within the structure or stream. Note other unique site conditions that may/may not warrant corrective actions. Document with additional photographs if needed.

Stream Depth and Velocities at Structure***

Depth Vel. Depth Vel. Depth

Outlet

Vel.Vel.Inlet

trpr13568b
Typewritten Text
trpr13568a
Typewritten Text
BRO 8015(7) 00JK 11/21/12 2009
trpr13568a
Typewritten Text
trpr13568a
Typewritten Text
Codington15-170-026
trpr13568a
Typewritten Text
Kauth/SmithSoo Creek
trpr13568a
Typewritten Text
30'10" X 60'
trpr13568a
Typewritten Text
Y
trpr13568a
Typewritten Text
Y Y Y Y
trpr13568a
Typewritten Text
Y Y Y
trpr13568a
Typewritten Text
-ice present, no flows taken -heavy grazing on west and east sides of bridge
Page 2: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation

SDDOT Fish Passage Assessment Work Sheet (Attachment A)

Revision Date: 10/4/2012

12

34

78

6

Photos Location Description (optional)

Downstream

Latitude Longitude

Figures 1-5

Upstream

Include description of photograph location for future reference. Photos should include: approximately 7xW upstream/downstream from structure in the direction of the structure showing undisturbed channel beyond the construction limits, the upstream/downstream channel disturbed by the project, and the structure inlet and outlet.

Other (optional)5

REPORT FINDINGS

trpr13568a
Typewritten Text
As designed and developed, the bridge does not appear to impede fish passage.
trpr13568
Typewritten Text
Photos attached-RH
trpr13568
Typewritten Text
Flow data should be taken earlier in the year before ice cover.-RH
Page 3: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568a
Typewritten Text
From bridge facing upstream. 45.114072 -97.144192
Page 4: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568a
Typewritten Text
trpr13568a
Typewritten Text
From bridge facing downstream. 45.114057 -97.144343
trpr13568a
Typewritten Text
Page 5: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568a
Typewritten Text
Downstream of bridge facing upstream. 45.114087 -97.1446
Page 6: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568a
Typewritten Text
Downstream of bridge facing downstream. 45.114087 -97.1446
Page 7: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568a
Typewritten Text
Upstream of bridge facing downstream. 45.114216 -97.143817
Page 8: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568a
Typewritten Text
trpr13568a
Typewritten Text
Upstream of bridge facing upstream. 45.114216 -97.143817
trpr13568a
Typewritten Text
Page 9: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation

SDDOT Fish Passage Assessment Work Sheet (Attachment A)

Revision Date: 10/4/2012

BoxArch

1Bridge

* Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation & measurements may be required. Refer to section 'Stream Crossing Section' in the Monitoring Protocol for additional measurements and evaluation procedures. Figs 1-4 are included for ease of reference. *** Velocities are to be taken 0.6 times the total depth measured from the water's surface. Refer to Figure 5.

Location Left 1/4 Pt 1/2 Pt 3/4 PtDepth

Apron

5. A natural low flow channel exists through the structure or if not the streambed surface within the structure simulates the streambed beyond the structure inlet and outlet similar to design conditions.**6. Stream is free of channelizing along the surface of the structure.**7. Up & downstream channel appears stable (no apparent erosion).

1 Bridge Deck Length X WidthRapid Visual Assessment:

This item to be completed on initial survey only.

3. Natural streambed material exists throughout structure (i.e. countersunk approximately 1 foot)

Observation

4. Stream channel is free of scour activity that may impede fish passage.

Y / N N.A.

1. The structure is installed generally in accordance with plans (height, width, elevation, location, etc…)

2. Overall structure width is wider than the average stream widths upstream and downstream .

Structure TypeNumber of Barrels

X Width (ft) X Height (ft) ProjectingWing wallHeadwallApronRiprap

Pipe Diameter

Depth Vel.

7xW DwnStrm

Depth Vel.

MidStr7xW UpStrm

PCN: Date: Year Constructed:

Assessed By:County:PRJ #

Structure Location:Stream Name:

Right Thalweg

Structure Shape Comments

Other:Other:

Inlet Type Outlet Type*At Stream GradeCascade over RiprapFree Fall into PoolFree Fall Onto Rip Rap

8. Vegetation is/has reestablished on the stream banks within the construction area.Field Measurements:

Describe observations used in making above determinations. Describe whether unusual channelizing exists within the structure or stream. Note other unique site conditions that may/may not warrant corrective actions. Document with additional photographs if needed.

Stream Depth and Velocities at Structure***

Depth Vel. Depth Vel. Depth

Outlet

Vel.Vel.Inlet

trpr13568b
Typewritten Text
trpr13568a
Typewritten Text
trpr13568a
Typewritten Text
EM-P 4411(01) 00RV 11/21/12 2010
trpr13568a
Typewritten Text
trpr13568a
Typewritten Text
Codington15-196-190
trpr13568a
Typewritten Text
Kauth/SmithBig Sioux River
trpr13568a
Typewritten Text
42' 8" X 370' 4 1/4"
trpr13568a
Typewritten Text
Y
trpr13568a
Typewritten Text
Y Y Y Y
trpr13568a
Typewritten Text
Y Y Y
trpr13568a
Typewritten Text
1.5 4 2.5 1.5 1
trpr13568a
Typewritten Text
0.02 0.15 0.16 0.00 0.06
trpr13568a
Typewritten Text
3 11.5 4 5 11
trpr13568a
Typewritten Text
0.02 0.06 0.53 0.25 0.06
trpr13568a
Typewritten Text
9 16.5 12.5 5.5 11.5
trpr13568a
Typewritten Text
0.36 0.71 0.25 0.50 0.06
trpr13568a
Typewritten Text
trpr13568a
Typewritten Text
8 8.5 10 9 29
trpr13568a
Typewritten Text
0.95 0.43 0.21 0.74 0.12
trpr13568a
Typewritten Text
3 1 2 3 1
trpr13568a
Typewritten Text
0.27 0.02 0.12 0.02 0.02
trpr13568a
Typewritten Text
trpr13568a
Typewritten Text
8 16.5 4 9 29
trpr13568a
Typewritten Text
trpr13568a
Typewritten Text
0.95 0.71 0.53 0.74 0.12
trpr13568a
Typewritten Text
-riparian zone fenced off from cattle -black erosion tarp present -fish present -gravel cut bank present
trpr13568a
Typewritten Text
trpr13568a
Typewritten Text
trpr13568a
Typewritten Text
trpr13568a
Typewritten Text
trpr13568a
Typewritten Text
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
Depth recored in inches; velocity recored as ft/sec
trpr13568b
Typewritten Text
Page 10: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation

SDDOT Fish Passage Assessment Work Sheet (Attachment A)

Revision Date: 10/4/2012

12

34

78

6

Photos Location Description (optional)

Downstream

Latitude Longitude

Figures 1-5

Upstream

Include description of photograph location for future reference. Photos should include: approximately 7xW upstream/downstream from structure in the direction of the structure showing undisturbed channel beyond the construction limits, the upstream/downstream channel disturbed by the project, and the structure inlet and outlet.

Other (optional)5

REPORT FINDINGS

trpr13568a
Typewritten Text
The design and development of this bridge does not appear to be hinder fish passage.
trpr13568
Typewritten Text
Photos attached-RH
trpr13568
Typewritten Text
trpr13568
Typewritten Text
Low water levels affect velocity readings, future readings will be taken earlier in the year. -RH
Page 11: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568a
Typewritten Text
From bridge facing downstream. 44.87648 -97.097962
trpr13568a
Typewritten Text
trpr13568a
Typewritten Text
Page 12: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568a
Typewritten Text
From bridge facing upstream. 44.876601 -97.098268
Page 13: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568a
Typewritten Text
Downstream of bridge facing upstream. 44.87605 -97.096932
Page 14: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568a
Typewritten Text
Upstream of bridge facing downstream. 44.877263 -97.098997
Page 15: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568a
Typewritten Text
Upstream of bridge facing upstream. 44.877263 -97.098997
Page 16: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568a
Typewritten Text
Downstream of bridge facing upstream. 44.875191 -97.096186
Page 17: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568a
Typewritten Text
Downstream of bridge facing downstream. 44.875191 -97.096186
Page 18: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation

SDDOT Fish Passage Assessment Work Sheet (Attachment A)

Revision Date: 10/4/2012

BoxArch

1Bridge

* Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation & measurements may be required. Refer to section 'Stream Crossing Section' in the Monitoring Protocol for additional measurements and evaluation procedures. Figs 1-4 are included for ease of reference. *** Velocities are to be taken 0.6 times the total depth measured from the water's surface. Refer to Figure 5.

Location Left 1/4 Pt 1/2 Pt 3/4 PtDepth

Apron

5. A natural low flow channel exists through the structure or if not the streambed surface within the structure simulates the streambed beyond the structure inlet and outlet similar to design conditions.**6. Stream is free of channelizing along the surface of the structure.**7. Up & downstream channel appears stable (no apparent erosion).

1 Bridge Deck Length X WidthRapid Visual Assessment:

This item to be completed on initial survey only.

3. Natural streambed material exists throughout structure (i.e. countersunk approximately 1 foot)

Observation

4. Stream channel is free of scour activity that may impede fish passage.

Y / N N.A.

1. The structure is installed generally in accordance with plans (height, width, elevation, location, etc…)

2. Overall structure width is wider than the average stream widths upstream and downstream .

Structure TypeNumber of Barrels

X Width (ft) X Height (ft) ProjectingWing wallHeadwallApronRiprap

Pipe Diameter

Depth Vel.

7xW DwnStrm

Depth Vel.

MidStr7xW UpStrm

PCN: Date: Year Constructed:

Assessed By:County:PRJ #

Structure Location:Stream Name:

Right Thalweg

Structure Shape Comments

Other:Other:

Inlet Type Outlet Type*At Stream GradeCascade over RiprapFree Fall into PoolFree Fall Onto Rip Rap

8. Vegetation is/has reestablished on the stream banks within the construction area.Field Measurements:

Describe observations used in making above determinations. Describe whether unusual channelizing exists within the structure or stream. Note other unique site conditions that may/may not warrant corrective actions. Document with additional photographs if needed.

Stream Depth and Velocities at Structure***

Depth Vel. Depth Vel. Depth

Outlet

Vel.Vel.Inlet

trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
EM-P 4411 (01) 00RV 11/21/2012 2010 Codington 15-202-190 Kauth/Smith Willow Creek
trpr13568b
Typewritten Text
42'-8" X 100'
trpr13568b
Typewritten Text
Y Y N* Y
trpr13568b
Typewritten Text
N* Y Y Y
trpr13568b
Typewritten Text
1.00.001.00.065.00.256.00.034.00.015.00.25 3.00.011.00.005.50.086.50.032.00.035.50.08 1.00.062.00.042.50.421.50.021.50.022.50.42
trpr13568b
Typewritten Text
8.00.016.00.046.50.127.00.023.00.016.50.12 7.50.134.50.085.00.094.50.013.50.037.50.13
trpr13568b
Typewritten Text
lot of rip rap in downstream side on bridge (definitely fish impeding situation)* some rip rap directly under bridge in stream vegetation established some cattle presence on upstream along banks, but minimal grazing it appears
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
trpr13568a
Typewritten Text
trpr13568a
Typewritten Text
-depths are measured in inches, velocities measured in feet/second.
Page 19: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation

SDDOT Fish Passage Assessment Work Sheet (Attachment A)

Revision Date: 10/4/2012

12

34

78

6

Photos Location Description (optional)

Downstream

Latitude Longitude

Figures 1-5

Upstream

Include description of photograph location for future reference. Photos should include: approximately 7xW upstream/downstream from structure in the direction of the structure showing undisturbed channel beyond the construction limits, the upstream/downstream channel disturbed by the project, and the structure inlet and outlet.

Other (optional)5

REPORT FINDINGS

trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
Fish movement and passage under bridge is severely hindered due to large concentration of rip rap downstream of bridge. (pictures 2 & 7). Area office will work with conjunction with the Central Office to have the stream restore to original conditions. Attached email suggests additional rip rap was added based on Bridge inspection recommendation. additional follow-up is required. -RH ** Per 4/11/2013 Monitoring Report Mtg: excess riprap needs to be removed ASAP. - CO
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
trpr13568
Typewritten Text
trpr13568
Typewritten Text
Photos attached -RH
Page 20: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation

From: Brey, MattTo: Huber, RyanCc: Sherman, RonSubject: FW: Topeka Shiner bridgeDate: Thursday, February 21, 2013 11:32:59 AM

Ryan, Not sure how much the response below helps, but this is what happened to the best of ourknowledge. Matthew R. Brey, PEEngineering SupervisorSD DOT, Watertown AreaOffice: (605)882-5166Cell: (605)881-7148Fax: (605)882-5117 

From: Johnson, Matt (DOT-Watertown) Sent: Thursday, February 21, 2013 11:04 AMTo: Brey, MattSubject: RE: Topeka Shiner bridge To be honest I don’t fully remember.  I know when we were placing riprap that there were questionsabout y we were installing riprap across the stream channel and we did have some issues trying topush the rock  down into the stream, but at the time it was totally covered with water when wewere done.  If it was placed at that time I would assume that at that time the water was deepenough and not a problem.  Based on the pictures I would say if came after, maybe when Todd wasdown there doing all the inspection and we added more riprap to the bridges.  From what I gatheredfrom emails when HDR, Todd and Jeff Senst all went out for review the decision was made to addmore Class A rip rap to the four corners of the bridges, I believe this is what caused all the “extra”on the downstream side of the bridge.  

From: Brey, Matt Sent: Friday, February 15, 2013 2:47 PMTo: Johnson, Matt (DOT-Watertown)Subject: FW: Topeka Shiner bridge Matt, Take a look at this report from the Willow Creek bridge on the South Connector PCN 00RV. There isa section of waterway with riprap way too high across the channel. Did we (the Contractor) do this?Or was it done by someone else later? What will probably wind up happening is that we will have to remove some of the riprap to bring thebridge into compliance. 

Page 21: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation

Let me know what you remember. Matthew R. Brey, PEEngineering SupervisorSD DOT, Watertown AreaOffice: (605)882-5166Cell: (605)881-7148Fax: (605)882-5117 

From: Huber, Ryan Sent: Friday, February 15, 2013 2:42 PMTo: Brey, MattSubject: Topeka Shiner bridge  

Page 22: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568b
Typewritten Text
Facing Upstream from Bridge 44.876575,-97.083687
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
1
Page 23: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
Facing Downstream from Bridge 44.876457,-97.083768
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
2
Page 24: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568b
Typewritten Text
Facing Upstream from Upstream 44.877153,-97.083542
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
3
Page 25: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568b
Typewritten Text
Facing Bridge from Upstream 44.877153,-97.083542
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
4
Page 26: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
Facing Bridge from Downstream 44.875959,-97.083542
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
5
Page 27: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568b
Typewritten Text
Facing Downstream from Downstream 44.875959,-97.083542
trpr13568b
Typewritten Text
6
Page 28: Bridge Deck Length X Width Rapid Visual Assessment · 1Bridge * Document any potential fish passage barriers. ** If 'NO' is checked for Observation 5 or 6, additional field observation
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
Downstream of Bridge 44.876381,-97.083601
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
trpr13568b
Typewritten Text
7