Imagination, Good Engineering and Saving MoneyImagination, Good Engineering and Saving Money
Keith Kirkwood, P.Eng.Peter Buckland, C.M., P.E.
International Bridge, Tunnel and Turnpike AssociationManaging in an Era of Changing Economic Times2009 April 19-21San Francisco, CA
Innovative Bearing RetrofitsInnovative Bearing Retrofits
A. Murray MacKay Bridge Halifax, NS, Canada
Client: Halifax-Dartmouth Bridge Commission (IBTTA Member)
2
Truss Bearing Retrofit at Main Towers
The Problem: Bearings MalfunctioningThe Challenge: Replace While Minimizing Traffic Disruptions
Main Tower
Side Span Truss
Malfunctioning Bearings
Main Span Truss
Truss Bearing Retrofit at Main TowersTruss Bearing Retrofit at Main Towers
The Solution: Hang Truss From Above on “Pendulum Links”
PendulumLinks
MalfunctioningBearings
3
Truss Bearing Retrofit at Main TowersTruss Bearing Retrofit at Main Towers
The Solution:
Bridge Deck RehabilitationBridge Deck Rehabilitation
Saint John Harbour Bridge,Saint John, NB, Canada
Client: Saint John Harbour Bridge Authority (IBTTA Member)
4
Bridge Deck RehabilitationBridge Deck Rehabilitation
Year 1:
Traffic Construction
Running
Traffic
Running
Construction Construction
NorthApproach
Ramp B
Ramp AMain and Side SpansSouth Approach
Bridge Deck RehabilitationBridge Deck Rehabilitation
Original Concrete
Hydro-Demolition
Cold Milling
New Asphalt
NewConcrete
Original Concrete
Pass 4 Pass 3
Pass 1Pass 2
Existing Deck
Construction Zone
New Asphalt
Existing Deck
NewConcrete
End of Year 1
ConventionalDemolition
5
Bridge Deck Widening
The Problem: Bridge Deck at Capacity(110,000 vehicles/day)
The Challenge: Make four lanes into five,under modern traffic loads
And, oh yeah… Keep Traffic Running!
Port Mann Bridge, Vancouver, B.C.
Bridge Deck WideningBridge Deck Widening
Original:
After Widening:
Approach Spans:
6
Bridge Deck WideningBridge Deck Widening
Work Zone Next to Traffic
Bridge Deck WideningBridge Deck Widening
Work Zone Next to Traffic
7
Bridge Deck Widening
Main Span Improvements:
• New Steel Barriers• Strengthened Hangers• New Maintenance Walkway• Falcon Nest Platform• Painting of Box Girder
Survey and Analysis “Health” Study
• Suspension bridge health can be investigated by “survey and analysis” technique
• Detective work required to explain differences
8
Truss Member Replacement While Traffic Running
Three Nations Bridge Crossing, Canada - USA
Client: Seaway International Bridge Corporation (IBTTA Member)
The Problem: Stiffening truss overloaded by modern traffic
The Solution: Replace chords with high strength steel
13
Suspension Bridge Full Deck Replacement
Lions’ Gate Bridge, Vancouver, BC, Canada
The Challenge:
Replace corroded deck Widen traffic lanes Widen sidewalksProvide barriers Provide pavingProvide drainsReduce maintenanceIncrease load capacity Improve aerodynamic stabilityImprove roadway sightlines
The Constraints:The Constraints:Maintain same weightCarry traffic during constructionReplace each section in 10 hours 20:00 to 06:00Very limited access
The Solution:The Solution:Replacement of Entire Suspended
Span Structure
14
12 200
3 SP'S @ 2900 = 8700 13001300
Original Cross Section
2000
2700
12 192
16 762
2000
27003 LANES @ 3556 = 10 668
ORNAMENTALLIGHTS
HANDSTRANDS
Completed Cross Section
18
Suspension Bridge Strengthening
Hagwilget Bridge, Terrace, British Columbia
Suspension Bridge Strengthening
The Challenge:•Increase loading on bridge from 1 x 16 Ton Truck to 2 x 60 Ton Trucks
The Constraints:•Keep vehicle open during except for 10 hours at night•Bridge always available for ambulance passage.
19
Suspension Bridge Strengthening
The Solution:•Shorten hangers to deflect deck upwards.
Summary
• Innovative engineering can save bridge owners money via:
• Decreased capital costs• Decreased maintenance costs• Minimizing effects on tolls by minimizing disruption to traffic.
20
Acknowledgements
• Halifax-Dartmouth Bridge Commission•Mr. Steve Snider, General Manager and C.E.O.•Mr. Jon Eppell, P.Eng., Bridge Engineer
• Saint John Harbour Bridge Authority•Mr. Ken Anthony, General Manager
• Seaway International Bridge Commission•Mr. Rik Saaltink, General Manager
Thank you!
Presentation OutlinePresentation Outline
• Innovative Bearing Retrofits• Bridge Deck Rehabilitation• Bridge Deck Widening• Suspension Bridge Full Deck Replacement• Truss Member Replacement While Traffic Running• Suspension Bridge “Health” Determination
29
Originally, load factor = 1.75R≥1.75(D+L)
Now0.9R≥1.1Df+1.5Dw+1.7L
For an existing bridge0.9R≥1.1Df+1.2Dw+1.65L
Bridge Deck RehabilitationBridge Deck Rehabilitation
Year 1:
30
Bridge Deck RehabilitationBridge Deck Rehabilitation
Year 2:
Bridge Deck RehabilitationBridge Deck Rehabilitation
Year 2: