bridge quality management - mndot• quality vs. time vs. cost • never reduced quality (but others...
TRANSCRIPT
![Page 1: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/1.jpg)
Bridge Quality Management
Kevin Western | State Bridge Engineer
May 17, 2017
Bridge Office | mndot.gov/bridge
![Page 2: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/2.jpg)
Outline
5/17/2017 Bridge Office | mndot.gov/bridge 2
• Quality Management
• Design Personnel
• Software
• Drafting of Plans
• Technical Reviews
• Coordination with Roadway Plans
• Time vs. Quality
• Few Last Thoughts
![Page 3: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/3.jpg)
Quality Definitions
5/17/2017 Bridge Office | mndot.gov/bridge 3
• Quality Control (QC)
• Checking of assumptions, plans, and calculations
• Documenting review process
• Quality Assurance (QA)
• Verifying quality control process was followed
![Page 4: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/4.jpg)
Quality Definition
5/17/2017 Bridge Office | mndot.gov/bridge 4
![Page 5: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/5.jpg)
Quality Management
5/17/2017 Bridge Office | mndot.gov/bridge 5
• Why needed?
To assure a consistent, high level of quality in all calculations, plans, and reports generated
• How to Provide:
Quality Management Plan (QMP): Plan of how quality will be integrated and achieved for the specific project
![Page 6: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/6.jpg)
Quality Management
5/17/2017 Bridge Office | mndot.gov/bridge 6
What belongs in a Quality Management Plan:
• Project specific requirements
• Project staff responsibilities
• QC/QA Process
• What are the steps to assure quality
• Who will be filling those roles
• Software usage
• Calculation and plan review process
• Usage and integration of Independent Technical Reviews (ITR) or Constructability Reviews (CR)
![Page 7: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/7.jpg)
QMP‐Design Personnel
5/17/2017 Bridge Office | mndot.gov/bridge 7
People involved and preferred interaction:
• Designer (QC)
• Checker (QC)
• Quality Manager (QA) MnDOT
Project Manager
Design Design QC (Check) Plan Plan QC
Quality Manager
![Page 8: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/8.jpg)
Design Personnel
5/17/2017 Bridge Office | mndot.gov/bridge 8
Checker experience ≥ Designer experience
• Design Calculations
• Can be softened if both people meet minimum experience levels
• Plan preparation
• Experience with component design or drafting
• Include critical expert if needed
![Page 9: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/9.jpg)
Software
5/17/2017 Bridge Office | mndot.gov/bridge 9
• Software must be appropriate for project‐specific circumstances.
• Institutionally understand limitations of software and validation process
• Is software appropriate for my task?
• MnDOT LRFD Bridge Design Manual Section 4.1• Basic
• Intermediate
• Complex
![Page 10: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/10.jpg)
Software – Basic
5/17/2017 Bridge Office | mndot.gov/bridge 10
• Bridge elements• Abutments
• Splices
• Bearings
• Most cases of prestressed concrete beams
• Methods• Independent set of calculations
• Line‐by‐line check of calculations
• Using software that has been validated for a similar situation
![Page 11: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/11.jpg)
Software – Intermediate
5/17/2017 Bridge Office | mndot.gov/bridge 11
• Bridge elements
• Piers
• Straight steel girders
• Prestressed beams – flared or variable overhangs
• Methods
• Independent design and check each using a different software package
• Hand check using moderate simplifications with sound engineering judgment
![Page 12: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/12.jpg)
Software – Complex
5/17/2017 Bridge Office | mndot.gov/bridge 12
• Bridge elements
• Concrete box girders
• Steel box girders
• Curved steel girders
• Methods
• Independent design and check each using a different software package only!
![Page 13: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/13.jpg)
Software – Load Distribution
5/17/2017 Bridge Office | mndot.gov/bridge 13
• Bridge Live Load Distribution
• Needed for some structure types
• Concrete box girders
• Curved steel girders
• Beyond AASHTO parameters
• Structures requiring a soil‐structure interaction model
• Checking Methods
• Compare to simplified AASHTO LLDF if approriate
• Utilize another model
![Page 14: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/14.jpg)
Software – Checking methods
5/17/2017 Bridge Office | mndot.gov/bridge 14
• Validated design software/spreadsheets
• Evaluate all input and assumptions.
• Review output to confirm a reasonable answer.
• Line‐by‐line check
• Every line of calculations must be verified.
• Non‐independent checking methods
• Handwritten initials on each page reviewed
• Not preprinted!
![Page 15: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/15.jpg)
Software – Checking methods
5/17/2017 Bridge Office | mndot.gov/bridge 15
• Independent checks
• Must use different software packages or spreadsheets
• Compare (at a minimum)
• Input
• Intermediate and final output values
• Section properties
• Dead load moments and shears
• Live load moments and shears
• Code checks
![Page 16: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/16.jpg)
Tracking Procedures
5/17/2017 Bridge Office | mndot.gov/bridge 16
![Page 17: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/17.jpg)
Drafting of Plans
5/17/2017 Bridge Office | mndot.gov/bridge 17
• Utilize appropriate procedures:
• Drafting
• Checking
• Modifying
• Checklists2’‐4”
PIER
2’‐0”
![Page 18: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/18.jpg)
Drafting of Plans
5/17/2017 Bridge Office | mndot.gov/bridge 18
• Quantities (with a check)
• Reinforcing Steel• Bends, lengths, and numbers
![Page 19: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/19.jpg)
Independent Technical and Constructability Reviews
5/17/2017 Bridge Office | mndot.gov/bridge 19
• Use Independent Technical Review for complex or unusual details
• Use Constructability Review for access, assumed means and methods, girder installation, congested details
• MnDOT staff involvement:
• Unit Leader
• Regional Construction Engineer
• State Bridge Design Engineer
• Others
![Page 20: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/20.jpg)
Coordination with Roadway Plans
5/17/2017 Bridge Office | mndot.gov/bridge 20
• Retaining Walls
• Standard and non‐standard
• Approach Panels
• Utilities (MnDOT LRFD Bridge Design Manual 2.4.1.6)
• On bridges or near foundations
• Box Culverts
• Special Hydraulic Structures
![Page 21: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/21.jpg)
Time vs. Quality
5/17/2017 Bridge Office | mndot.gov/bridge 21
• At times we are limited on time to deliver plans
• DO NOT skip QC process to save time!
• Use over‐the‐shoulder (OTS) reviews to reduce risk and plan changes at final submittals
• Project manager responsibilities:• Follow the steps in order; if not over‐communicate
• Communicate potential issues with MnDOT ASAP, including personnel changes
• Involve all stakeholders
![Page 22: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/22.jpg)
PM’s – Use the Right Tools
5/17/2017 Bridge Office | mndot.gov/bridge 22
![Page 23: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/23.jpg)
Few Last Thoughts To Consider
5/17/2017 Bridge Office | mndot.gov/bridge 23
• Design / Fabricated Components
• Disc bearings, modular joints, pedestrian truss bridges
• Design and check completed by supplier
• We require a review – focus on assumptions
• MnDOT Reviews
• We will be doing less review of consultant plans
• 95% submittal is a ready to sign plan
• Too many ‘swapped sheets’ after 100% turn in
![Page 24: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/24.jpg)
Few Last Thoughts To Consider
5/17/2017 Bridge Office | mndot.gov/bridge 24
Is this an error and by whom?
![Page 25: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/25.jpg)
Few Last Thoughts To Consider
5/17/2017 Bridge Office | mndot.gov/bridge 25
• Quality vs. Time vs. Cost• Never reduced quality (but others are important too!)
• Efficient design and detailing • Component size
• Number of piling
• Rebar size, detailing, and constructability
• PCB – release strength (and final too)
• If you don’t agree with information provided, question it
![Page 26: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/26.jpg)
Few Last Thoughts To Consider
5/17/2017 Bridge Office | mndot.gov/bridge 26
• Plan quality – we’ve had some issues
• Your focus on quality is better than 5 years ago
• Having a good plan and improving on it is vital
• Over communicate changes and issues
Keep improving!!
![Page 27: Bridge Quality Management - MnDOT• Quality vs. Time vs. Cost • Never reduced quality (but others are important too!) • Efficient design and detailing • Component size • Number](https://reader034.vdocuments.net/reader034/viewer/2022042311/5eda06194e02a025e73dacc6/html5/thumbnails/27.jpg)
5/17/2017 Bridge Office | mndot.gov/bridge 27
ANY QUESTIONS ON