Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward
AwardAmount
MWBEAmount
SubContractor
Sub AwardAmount
Sub MWBEAmount
Projected BptWorkers %
Projected
MinorityWorkers %
COB1309A -Wentfield ParkProject
IWAConstruction(WBE) 01/15/09 $99,000.00 $99,000.00
EngineersWelding (AAMBE) $14,800.00 $14,800.00 100.00%
NationwideElectric (AA MBE) $9,160.00 $9,160.00 33.00% 100.00%
Jack Goncalves $16,000.00 100.00% 0.00%D & DConstruction (AAMBE) $18,000.00 $18,000.00
CDB2329B -New SidewalksPhase 4
DiCoccoConstruction(WBE) 03/24/09 $61,634.00 $61,634.00
D & DConstruction (AAMBE) $4,000.00 $4,000.00 100.00% 100.00%
Aquaculture
School
Addition 1.01
Site & Piles
PJ'sConstruction(MBE) 04/22/09 $3,613,300.00 $3,613,300.00 25.00% 37.50%
Elm CityRenovations (AAMBE) $63,532.00 $63,532.00 0.00% 50.00%
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
2/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward
AwardAmount
MWBEAmount
SubContractor
Sub AwardAmount
Sub MWBEAmount
Projected BptWorkers %
Projected
MinorityWorkers %
New EnglandFoundation(WBE) $475,000.00 $475,000.00 0.00% 10.00%
Pro-Teck Unit Prices 0.00% 0.00%
EngineersWelding (AAMBE) $159,803.00 $159,803.00 50.00% 100.00%
COB13492 -
Aquaculture
School
Addition - 1.02
Concrete
WaterburyMasonry &Foundation
(WBE) - MBV 04/24/09 $1,109,000.00 $1,109,000.00 tbd tbd
Capital Masonry(AA MBE) $77,420.00 $77,420.00 0.00% 0.00%
Modern Concrete $18,000.00 0.00% 100.00%CDB23593 -
Scattered Site
Rehab 39-41
McKinley Ave.
IWAConstruction(WBE) 05/12/09 $132,500.00 $132,500.00 44.00% 11.00%
Jesco Builders(AA MBE) $18,500.00 $18,500.00 100.00% 100.00%
NationwideElectric (AA MBE) $13,500.00 $13,500.00 100.00% 100.00%
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
3/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward
AwardAmount
MWBEAmount
SubContractor
Sub AwardAmount
Sub MWBEAmount
Projected BptWorkers %
Projected
MinorityWorkers %
COB13492 -
Aquaculture
School
Addition - 1.12
Plumbing James T. Kay 05/13/09 $1,019,000.00 tbd tbd
Shetucket Supply(WBE) $100,000.00 $100,000.00 n/a n/a
PCC Tech (AAMBE) $153,000.00 $153,000.00 n/a n/a
Grove Systems(WBE) $50,000.00 $50,000.00 n/a n/a
Langan Insulation $178,000.00 33.00% 33.00%COB13492 -
Aquaculture
SchoolAddition - 1.13
Mechanical James T. Kay 05/13/09 $2,423,900.00 tbd tbd
Grove Systems(WBE) $130,000.00 $130,000.00 n/a n/a
Grove Systems(WBE) $244,000.00 $244,000.00 tbd 50.00%
Shetucket Supply
(WBE) $50,000.00 $50,000.00 n/a n/a
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
4/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward
AwardAmount
MWBEAmount
SubContractor
Sub AwardAmount
Sub MWBEAmount
Projected BptWorkers %
Projected
MinorityWorkers %
PCC Tech (AAMBE) $302,800.00 $302,800.00 n/a n/a
Air Tech $490,000.00 tbd tbd
CDB2339C -
Asbestos
Removal &
Demo - 37 &
45 Revere &
309 Carroll
IndustrialWrecking 05/22/09 $61,250.00 66.00% 33.00%
RedTechnologies(WBE) $9,200.00 $9,200.00 0.00% 0.00%
EES (AA MBE) $9,200.00 $9,200.00 33.00% 33.00%COB13592 -
East End
School
CreativeRecreation -
MBV 05/21/09 $113,141.00 14.28% 28.57%CapitalRestoration (AAMBE) $13,000.00 $13,000.00 0.00% 66.00%
Site Specifics(WBE) $57,432.00 $57,432.00 0.00% 0.00%
COB13694 -
Repair &
Replacement -
Columbus
School Holzner Electric 05/29/09 $437,000.00 66.00% 66.00%
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
5/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward
AwardAmount
MWBEAmount
SubContractor
Sub AwardAmount
Sub MWBEAmount
Projected BptWorkers %
Projected
MinorityWorkers %
HE Palmer $6,950.00
Vaz QualityWorks (MBE) $234,000.00 $234,000.00 100.00% 60.00%PremierConstruction (AAMBE) $28,500.00 $28,500.00 66.00% 33.00%
Total Fence(WBE) $17,900.00 $17,900.00 0.00% 33.00%
Pro Iron (WBE) $36,500.00 $36,500.00
Fairfield ElectricSupply (WBE) $25,000.00 $25,000.00 n/a n/a
COB13492 -
Aquacultue
SchoolAddition - 1.05
General
Trades
GennariniConstruction(WBE) 06/11/09 $2,526,400.00 $2,526,400.00 60.00% 40.00%
PremierConstruction (AAMBE) $48,066.00 $48,066.00 100.00% 100.00%
MCM Acoustics(AA MBE) $104,000.00 $104,000.00 33.00% 66.00%
Unity Prevention(AA MBE) $65,000.00 $65,000.00 100.00% 100.00%
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
6/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward
AwardAmount
MWBEAmount
SubContractor
Sub AwardAmount
Sub MWBEAmount
Projected BptWorkers %
Projected
MinorityWorkers %
AdvancedCleaning (AAMBE) $11,800.00 $11,800.00 50.00% 50.00%
Tyssen KruppElevator $58,500.00 0.00% 0.00%
J & G Glass $137,000.00 100.00% 50.00%
Clonial WoodProducts $54,490.00 0.00% 0.00%
CGM Acoustics $600,000.00 50.00% 50.00%
Ford & Ulrich $29,284.00 n/a n/a
InnovativeInstallation
$5,100.000.00% 0.00%
Colony Builders $1,900.00 0.00% 0.00%
R & R Locker $4,865.00 0.00% 0.00%
CRF Inc. $13,283.00 0.00% 0.00%
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
7/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %
Projected
MinorityWorkers %
CDB2339C -
Asbestos
Removal &
Demo - 983
Kossuth St. AMEC 06/09/09 $27,425.00 38.00% 84.00%CPMEnvironmental(AA MBE) $6,500.00 $6,500.00 6.00% 100.00%
CDB23593 -
Rehab 51-55Evers Court -
Phase II C C & L (MBE) 06/11/09 $115,000.00 $115,000.00 50.00% 75.00%
IWA Construction(WBE) $61,182.00 $61,182.00 80.00% 40.00%
NationwideElectric (AA MBE) $11,000.00 $11,000.00 14.00% 50.00%
COB13492 -
Aquaculture
SchoolAddition - 1.04
Steel United Steel 06/17/09 $977,740.00 n/a n/a
Action Steel(WBE) $328,000.00 $328,000.00 13.00% 33.00%EngineersWelding (AAMBE) $147,000.00 $147,000.00 n/a n/a
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
8/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %
Projected
MinorityWorkers %
COB13492 -
Aquaculture
School
Addition - 1.06
Roofing &
Sheetmetal
The ImperialCompany 06/19/09 $932,917.00 10.00% 20.00%
The HartfordLumber Company
(WBE) $140,000.00 $140,000.00 n/a n/a
Jordan Electric(AA MBE) $140,000.00 $140,000.00 n/a n/a
COB13492 -
Aquaculture
School
Addition - 1.14
Electrical ACME Electric 06/25/09 $1,176,273.00 25.00% 25.00%AMCEnvironmental
(AA MBE) $86,000.00 $86,000.00 0.00% 66.00%AndersonElectrical (AAMBE) $87,400.00 $87,400.00 n/a n/a
KND Electric(WBE) $20,000.00 $20,000.00 n/a n/a
Net Services(WBE) $160,000.00 $160,000.00 n/a n/a
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
9/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %
Projected
MinorityWorkers %
CDB2339C -
Asbestos
Removal &
Demo - 480
Clinton Ave.
AMEC (thelowest bidderwasdisqualified fornon-compliance) 06/25/09 $19,500.00
F & GConstruction
(WBE) $3,000.00 $3,000.000.00% 100.00%
CPMEnvironmental(AA MBE) $1,170.00 $1,170.00 50.00% 100.00%D & DConstruction (AAMBE) $1,755.00 $1,755.00 100.00% 100.00%
COB13492 -
Aquaculture
School - 1.11
Fire Protection
ProfessionalMechanical 07/09/09 $141,000.00 0.00% 0.00%
R & F Piping (AAMBE) $21,150.00 $21,150.00 n/a n/a
Shetucket Supply(WBE) $21,150.00 $21,150.00 n/a n/a
COB13492 -
Aquaculture
School - 1.07
Flooring
UrbanContractors ofCt. LLC (AAMBE) 07/22/09 $255,770.00 $255,770.00 0.00% 50.00%
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
10/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %
Projected
MinorityWorkers %
COB13492 -
Aquaculture
School
Addition - 1.03
Masonry
ConnecticutMasonContractors
(WBE) - MBV 08/04/09 $830,000.00 $830,000.00 20.00% 40.00%
PremierConstruction (AAMBE) $124,500.00 $124,500.00 100.00% 100.00%
CDB23593 -
Rehab 59-61
Evers Court -
Phase IIC F & V Design 08/05/09 $119,500.00 20.00% 20.00%
PremierConstruction (AAMBE) $15,000.00 $15,000.00
SouthportContracting(WBE) $19,750.00 $19,750.00
BFK Plumbing $33,000.00 0.00% 0.00%
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
11/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %
Projected
MinorityWorkers %
Walter's Electric $11,000.00 0.00% 0.00%
COB13492 -
Aquaculture
School
Addition
MacKenziePainting (WBE) 08/14/09 $98,500.00 $98,500.00 75.00% 75.00%
CunninghamPainting (AAMBE) $14,775.00 $14,775.00
CDB23086 -
HVAC Work -
BAYM
Celco Corp.(Failed toComply withthe MBEOrdinance)
NotAwarded
Project on
2/4/09 Re-bid $23,033.00
CDB23086R -
HVAC - BAYM
Celco Heating& AirConditioning****** Granted15% WBE waiver
only based on
Good Faith Efforts 10/06/09 $23,624.00 25.00% 25.00%
Jordan Electric(AA MBE) $3,543.00 $3,543.00 100.00% 100.00%
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
12/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %
Projected
MinorityWorkers %
MNB106107S -
Wheeler
Fountain
Repair
MerrittContractors****** Granted15% WBE Waiver
based on
Bridgeport
Resident
Exemption 10/14/09 $199,000.00 33.00% 66.00%
EngineersWelding (AAMBE) $13,300.00 $13,300.00 100.00% 100.00%SerranoConstruction(MBE) $23,400.00 $23,400.00
MNB110109 -
Eisenhower
Pool DrainRepair Holzner Electric 10/23/09 $12,985.00
Fathom Solutions(MBE) $2,600.00 $2,600.00 0.00% 0.00%
Premier
Construction (AAMBE) $1,200.00 $1,200.00 100.00% 100.00%
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
13/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %
Projected
MinorityWorkers %
Discovery
Magnet School
- 1.02 Site
Work
K & WConstruction(WBE) 11/05/09 $2,833,198.00 $2,833,198.00 22.00% 22.00%
Onsite Services(WBE) $26,680.00 $26,680.00 28.00% 0.00%Glen TerraceLandscaping
(WBE) $140,650.00 $140,650.00 0.00% 10.00%A & JConstruction(MBE) $189,317.00 $189,317.00 0.00% 100.00%
Massey Trucking(AA MBE) $110,000.00 $110,000.00 0.00% 100.00%
J.A.Q. Concrete(AA MBE) $300,000.00 $300,000.00 0.00% 100.00%
MD Drilling $163,000.00 0.00% 25.00%
Total Fence(WBE) $95,319.00 $95,319.00 0.00% 50.00%
Tremson Corp. $9,800.00 0.00% 50.00%Discovery
Magnet School
- 1.03
Concrete
McDowellBuilding &Foundation
(WBE) 11/24/09 $1,463,000.00 $1,463,000.00 11.00% 22.00%
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
14/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %
Projected
MinorityWorkers %
JFC Construction(AA MBE) $219,500.00 $219,500.00 25.00% 50.00%
Columbus
School
Renovation
1.16 Electrical Wiremen, Inc. 12/08/09 $280,400.00 0.00% 0.00%
Kerr Electric (AA
MBE) $42,500.00 $42,500.00 n/a n/a
Beacon Electric(WBE) $42,500.00 $42,500.00 n/a n/a
Columbus
School 1.02
Demo &
Abatement
Cherry HillConstruction 12/11/09 $429,190.00 0.00% 50.00%
AMCEnvironmental(AA MBE) $40,000.00 $40,000.00 0.00% 66.00%
Victory Industries(AA MBE) $25,200.00 $25,200.00 0.00% 80.00%
JD Environmental(WBE) $65,000.00 $65,000.00 0.00% 0.00%
Discovery
Magnet 1.05
Steel
SteeltechBuildingProducts 12/11/09 $1,318,000.00 n/a n/a
First ClassConstruction (AA
MBE) $85,000.00 0.00% 0.00%
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
15/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %
Projected
MinorityWorkers %
Bear SteelErectors (WBE) $488,000.00 23.00% 34.00%
COB13910A -
Columbus
School
Renovation
1.06 General
Trades
DiRienzoMechanicalContractors
(WBE) - MBV 12/14/09 $429,166.00 $429,166.00 0.00% 12.50%
JennetteConstruction (AAMBE) $29,900.00 $29,900.00 0.00% 100.00%
Shetucket Supply(WBE) $86,000.00 $86,000.00 n/a n/aKricketMechanical(WBE) $50,000.00 $50,000.00 n/a n/a
Columbus
School 15AFire Protection
HHSMechanical 12/14/09 $266,000.00 0.00% 0.00%
Enterprise FireProtection (AAMBE) $39,900.00 $39,900.00 n/a n/aKricketMechanical(WBE) $39,900.00 $39,900.00 n/a n/a
Columbus
School
Renovation
1.06 GeneralTrades G. Donovan 12/15/09 $1,555,600.00
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
16/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %
Projected
MinorityWorkers %
Major Theater $4,925.00 0.00% 50.00%
Total Fence $3,945.00 50.00%
Division 3 $7,100.00 0.00% 100.00%
Accessory Doors& Hardware $45,870.00 0.00% 0.00%
SchindlerElevator $69,400.00 0.00% 0.00%
GC Signs $13,800.00 0.00% 0.00%New EnglanInteriorSpecialties $3,600.00 0.00% 0.00%AdvancedCleaning (AAMBE) $20,350.00 $20,350.00 100.00% 100.00%
Executive Suites(AA MBE) $12,740.00 $12,740.00 25.00% 100.00%
Logan & Logan(AA MBE) $168,000.00 $168,000.00 n/a n/a
Davis Disposal
(AA MBE) $31,000.00 $31,000.00 100.00% 100.00%
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
17/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %
Projected
MinorityWorkers %
YSR (AA MBE) $2,230.00 $2,230.00 n/a n/a
Gold SealRoofing (WBE) $42,500.00 $42,500.00 0.00% 62.00%
Clay Furniture(WBE) $42,350.00 $42,350.00 0.00% 33.00%
Accurate Door &Windows (WBE) $138,000.00 $138,000.00 0.00% 20.00%
Pro-Tect Inc.(WBE) $20,500.00 $20,500.00 50.00% 50.00%
Discovery
Magnet - 1.06
General
Trades
LeoConstruction(AA MBE) 12/21/09 $1,075,000.00 $1,075,000.00 50.00% 50.00%
UnitedBlackboard $47,000.00 0.00% 0.00%
Thyssen KruppElevator $52,700.00 0.00% 0.00%
CRF $95,000.00 0.00% 0.00%
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
18/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %
Projected
MinorityWorkers %
C & A Distributers $38,630.00 n/a n/a
AmericanOverhead Door $15,850.00 0.00% 0.00%
Tull Brothers $196,000.00 n/a n/a
Sign Lite $16,806.00 0.00% 0.00%
WalkerSpecialties $8,500.00 0.00% 100.00%
R & R Locker $9,400.00 n/a n/a
Draperies Inc. $23,386.00 0.00% 100.00%
Stan-Mar
Cleaning $10,000.00 100.00% 100.00%
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
19/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %
Projected
MinorityWorkers %
AdvancedCleaning (AAMBE) $12,000.00 $12,000.00 50.00% 100.00%
Stuart White $1,702.00 n/a n/aDiscovery
Magnet - 1.09Drywall CGM 12/29/09 $1,100,000.00 55.00% 44.00%
New EnglandConstruction (AAMBE) $172,000.00 $172,000.00 14.00% 28.00%
Green Depot(WBE) $155,000.00 $155,000.00 n/a n/a
StoningtonServices (WBE) $13,500.00 $13,500.00
Discovery
Magnet - 1.07
Roofing
GreenwoodIndustries 12/29/09 $1,577,000.00 52.00% 40.00%
Leo Construction(AA MBE) $292,150.00 $292,150.00 25.00% 50.00%
Hartford Lumber(WBE) $236,550.00 $236,550.00 n/a n/a
Discovery
Magnet - 1.16
Electrical Rizzo Electric 12/30/09 $2,076,503.00 13.00% 13.00%
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
20/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
ofAward AwardAmount MWBEAmount SubContractor Sub AwardAmount Sub MWBEAmountProjected BptWorkers %
Projected
MinorityWorkers %
Kerr Electric (AAMBE) $315,000.00 $315,000.00 0.00% 0.00%
NY-Conn (WBE) $315,000.00 $315,000.00 n/a n/a
Award
Total $30,951,449.00 Sub Contractor Total $10,594,510.00
Prime MWBE
Award Totals $14,641,468.00 Sub MWBE Totals $7,527,724.00
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
21/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Dateof
Award
Award
Amount
MWBE
Amount
Sub
Contractor
Sub Award
Amount
Sub MWBE
AmountProjected Bpt
Workers %
Proje
Mino
Worker
Calculated on
9/07/11 Prime MWBE % 47.31%
Sub MWBE % of
the Total Sub
Contracts 71.05%
(# 10) WBE Amount $9,582,398.00
Sub MWBE % of
the Total Prime
Awards 24.33%
(# 4) MBE Amount $5,059,070.00
Sub WBE Total
Amounts $3,945,563.00
(2) AA MBE Amount $1,330,770.00
Sub WBE % of the
Total Sub
Contracts 37.25%
Sub WBE % of the
Total Prime
Awards 12.75%
Sub MBE Totals
Amounts $4,155,161.00
Sub MBE % of the
Total Sub
Contracts 39.22%
Sub MBE % of the
Total Prime
Awards 13.42%
Sub AA MBE Total
Amounts $3,403,954.00
Sub AA MBE % of
the Total Sub
Contracts 32.13%
Sub AA MBE % of
the Total PrimeAwards 11.00%
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
22/44
Awarded Physical Development Projects - Prime & Sub - 2009 (Rev. 9/07/11)
Project Contractor
Date
of
Award
Award
Amount
MWBE
Amount
Sub
Contractor
Sub Award
Amount
Sub MWBE
AmountProjected BptWorkers %
Projected
MinorityWorkers %
keys:
Not awarded to low
bidder, because they
failed to comply with
the City's MBE
Ordinance
*****Grantedwaiver throughGood FaithEfforts
WBE = CertifiedWoman OwnedBusiness
MBE = CertifiedMinority OwnedBusiness
AA MBE =
Certified AfricanAmericanOwned Business
MBV = MinorityBusinessViolation
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
23/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
24/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
25/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
26/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
27/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
28/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
29/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
30/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
31/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
32/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
33/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
34/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
35/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
36/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
37/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
38/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
39/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
40/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
41/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
42/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
43/44
-
8/4/2019 Bridgeport CT Awarded Projects - Prime and Sub - 2009
44/44