“BRIDGING” DESIGN-BUILD
Residential Suites/Residential Residential Suites/Residential Dining ComplexDining Complex
•694 Beds in 8 Student Suites / 2-6
Story Buildings
•732-Seat Dining in
2-Story Building w/Central Plant in Basement
•Completed: 7/01
•Cost: $40 Million
Grade: A+
Issues: Scope Changes Post Award
Parking Structure 6Parking Structure 6
• 2,470 Spaces on 6 Levels
“PURE” DESIGN-BUILD
Grade: A
Issues: Site Conditions
Completed: 11/01
Cost: $17.05 M
COST COMPARISON MODELSSDSU - PARKING STRUCTURE 6
Design-Bid-Build Normal Budget
Design-Build Budget Actual Cost
Process Value Added
PROGRAM:No. of Cars 2000 2000 2470 + 470 CarsA/E SERVICES:Preliminary 279,000 300,000 290,000 -11,000Working Drawings 323,000 Incl. In Constr.Construction Admin. 243,000 Incl. In Constr.
SUB-TOTAL 845,000 300,000 290,000 +555,000CONSTRUCTION: Building 15,000,000 14,000,000 14,292,632 +707,348Road & Utilities 500,000 500,000 +500,000
Contract Mgmt. (7%) 1,085,000 (5%) 740,000 (4.3%) 614,706 +470,294
Contingency (5%) 775,000 (7%) 1,033,348 (1.2%) 179,171 +595,829TOTAL $18,205,000 $16,573,348 $15,376,529 +2,828,471
BUDGETED COST/CAR $9,102 $8,286 $6,225
DESIGN-BUILD
Comparative TimelinesComparative TimelinesSDSU Parking Structure 6SDSU Parking Structure 6
Jan.Jan.20002000
JulyJuly20002000
JulyJuly20012001
Jan.Jan.20012001
Jan.Jan.20022002
Conventional DesignConventional Design--BidBid--Build:Build:Design
Bid-Award
Actual DesignActual Design--Build:Build:Proposal Phase
Award/Foundation Design
Complete Design
Construct
Time Saved:
5 mos.
Construct
DESIGN-BUILD
EVALUATING TECHNICAL PROPOSALS
• Assigning Points
• Assessing Criteria
• Think Like a Contractor
• Tell all you Know – Preconstruction Meetings
• Get What you Want
“BRIDGING” DESIGN-BUILDGateway Addition
Team ID #001
“BRIDGING” DESIGN-BUILDGateway Addition
“BRIDGING” DESIGN-BUILDGateway Addition
Team ID #003
“BRIDGING” DESIGN-BUILDGateway Addition
Team ID #004
“BRIDGING” DESIGN-BUILDGateway Addition
Team ID #005
SUMMARY
• Pick Method that Fits Project
• Understand What it Takes
• Document Each Step – Audit
• Define Roles:
• Procurement
• Facilities
• Verify Performance Post -- Project