OBJECTIVES
GOALS
• Efficient use
• Equitable access
GOALS
• Efficient use
• Equitable access
UNDERUSED SPECTRUM/ORBITAL POSITION
• Multiple filings submission
• Fictitious recorded assignments
UNDERUSED SPECTRUM/ORBITAL POSITION
• Multiple filings submission
• Fictitious recorded assignments
WRC 2012
• Definition of the bringing into use for GSO
WRC 2012
• Definition of the bringing into use for GSO
2
![Page 3: BRINGING INTO USE (Non planned services) · with No. 11.44B (Statement of a continuous period of 90 days and DBIU within 120 days from the date of receipt) Modification of the date](https://reader033.vdocuments.net/reader033/viewer/2022050609/5fb0b84135496e28cd61d846/html5/thumbnails/3.jpg)
LIFE SPAN OF A SATELLITE NETWORK
API/ Coordination
Notification
Bringing in into use
Resolution 49
7-year limit under No. 11.44
Continuous use
3
• Period of validity (Resolution 4)
• Suspension (NO. 11.49)
CONTINUOUS USE
![Page 4: BRINGING INTO USE (Non planned services) · with No. 11.44B (Statement of a continuous period of 90 days and DBIU within 120 days from the date of receipt) Modification of the date](https://reader033.vdocuments.net/reader033/viewer/2022050609/5fb0b84135496e28cd61d846/html5/thumbnails/4.jpg)
BRINGING INTO USE
NOTIFICATION OF THE BRINGING INTO USE
• Information has to be provided by correspondence to the Bureau (Telefax)
• No later than 7 years from the date of receipt of the API (No. 11.44)
• Notice already submitted under Article 11
NOTIFICATION OF THE BRINGING INTO USE
• Information has to be provided by correspondence to the Bureau (Telefax)
• No later than 7 years from the date of receipt of the API (No. 11.44)
• Notice already submitted under Article 11
DEFINITION (GSO) – No. 11.44B
• when a space station in the geostationary-satellite orbit with the capability of transmitting or receiving that frequency assignment has been deployed and maintained at the notified orbital position for a continuous period of 90 days.
DEFINITION (GSO) – No. 11.44B
• when a space station in the geostationary-satellite orbit with the capability of transmitting or receiving that frequency assignment has been deployed and maintained at the notified orbital position for a continuous period of 90 days.
CONFIRMATION OF THE BRINGING INTO USE (GSO)
• Shall inform the BR of a continuous period of 90 days
•Within 30 days from the end of the continuous period of 90 days
•Advisable to provide information like the commercial name of the space station
CONFIRMATION OF THE BRINGING INTO USE (GSO)
• Shall inform the BR of a continuous period of 90 days
•Within 30 days from the end of the continuous period of 90 days
•Advisable to provide information like the commercial name of the space station
4
![Page 5: BRINGING INTO USE (Non planned services) · with No. 11.44B (Statement of a continuous period of 90 days and DBIU within 120 days from the date of receipt) Modification of the date](https://reader033.vdocuments.net/reader033/viewer/2022050609/5fb0b84135496e28cd61d846/html5/thumbnails/5.jpg)
TIME FRAME
7 years
120 days
90 days
NOTIFICATION DBIU CONFIRMATION
OF THE DBIU
Deadline for confirmation (No. 11.44B)
Deadline for bringing into use
(No. 11.44)
API
![Page 6: BRINGING INTO USE (Non planned services) · with No. 11.44B (Statement of a continuous period of 90 days and DBIU within 120 days from the date of receipt) Modification of the date](https://reader033.vdocuments.net/reader033/viewer/2022050609/5fb0b84135496e28cd61d846/html5/thumbnails/6.jpg)
EXAMPLE 1: LATE CONFIRMATION (GSO)
120 days
90 days
Launch 12.06.2014
Confirmation of 12.06.2014 as DBIU
to BR 12.12.2014
Deadline for confirmation (No. 11.44B) 10.10.2014
Proposed date of bringing into
use by BR 14.08.2014
120 days
![Page 7: BRINGING INTO USE (Non planned services) · with No. 11.44B (Statement of a continuous period of 90 days and DBIU within 120 days from the date of receipt) Modification of the date](https://reader033.vdocuments.net/reader033/viewer/2022050609/5fb0b84135496e28cd61d846/html5/thumbnails/7.jpg)
NOTIFICATION OF THE BRINGING INTO USE
Notification in advance of the bringing into use
•Will be provisionally recorded in the Master Register
•Not earlier than 3 years before the bringing into use
• Shall be brought into use no later than the end of the period provided under No. 11.44 and inform the Bureau of the DBIU within 30 days following the limit (No. 11.47): publication in a PART II-S
Notification in advance of the bringing into use
•Will be provisionally recorded in the Master Register
•Not earlier than 3 years before the bringing into use
• Shall be brought into use no later than the end of the period provided under No. 11.44 and inform the Bureau of the DBIU within 30 days following the limit (No. 11.47): publication in a PART II-S
Confirmation of the bringing to use (GSO)
• The DBIU has to be confirmed under 11.44B (90-day period of use): publication in PART II-S
•Confirmation has to be received within 30 days following the 90-day period (No. 11.44B)
•Confirmation of BIU submitted with the notification of the space station has to be in conformity with No. 11.44B (Statement of a continuous period of 90 days and DBIU within 120 days from the date of receipt)
Confirmation of the bringing to use (GSO)
• The DBIU has to be confirmed under 11.44B (90-day period of use): publication in PART II-S
•Confirmation has to be received within 30 days following the 90-day period (No. 11.44B)
•Confirmation of BIU submitted with the notification of the space station has to be in conformity with No. 11.44B (Statement of a continuous period of 90 days and DBIU within 120 days from the date of receipt)
Modification of the date of bringing into use
• For provisionally recorded network in the Master Register
• Inform the Bureau of a new provisional date of bringing into use: publication in PART I-S
•New date shall be within the period provided under No. 11.44
•Confirmed date of bringing into use has to be provided under No. 11.47 and No. 11.44B
Modification of the date of bringing into use
• For provisionally recorded network in the Master Register
• Inform the Bureau of a new provisional date of bringing into use: publication in PART I-S
•New date shall be within the period provided under No. 11.44
•Confirmed date of bringing into use has to be provided under No. 11.47 and No. 11.44B 7
![Page 8: BRINGING INTO USE (Non planned services) · with No. 11.44B (Statement of a continuous period of 90 days and DBIU within 120 days from the date of receipt) Modification of the date](https://reader033.vdocuments.net/reader033/viewer/2022050609/5fb0b84135496e28cd61d846/html5/thumbnails/8.jpg)
EXAMPLE 2: CONFIRMATION UNDER No. 11.47
7 years + 30 days
7 years
NOTIFICATION DBIU not
confirmed
Deadline to inform the BR of the BIU
(No. 11.47)
Deadline for bringing into use
(No. 11.44)
API
![Page 9: BRINGING INTO USE (Non planned services) · with No. 11.44B (Statement of a continuous period of 90 days and DBIU within 120 days from the date of receipt) Modification of the date](https://reader033.vdocuments.net/reader033/viewer/2022050609/5fb0b84135496e28cd61d846/html5/thumbnails/9.jpg)
EXAMPLE 3: NOTIFICATION(GSO)
120 days
90 days
Launch 12.06.2014
Notification received on 12.12.2014
With a confirmed DBIU of
12.06.2014 Deadline for confirmation (No. 11.44B) 10.10.2014
Proposed date of bringing into use
by BR (Note) 14.08.2014
120 days
![Page 10: BRINGING INTO USE (Non planned services) · with No. 11.44B (Statement of a continuous period of 90 days and DBIU within 120 days from the date of receipt) Modification of the date](https://reader033.vdocuments.net/reader033/viewer/2022050609/5fb0b84135496e28cd61d846/html5/thumbnails/10.jpg)
SUSPENSION OF USE
• Under No. 11.49
• For a period exceeding 6 months
• Inform the BR no later than 6 months from the beginning of the suspension
• Publication in a PART II-S
SUSPENSION
• Under 11.49
• No later than 3 years from suspension
• Confirmation of the date of bringing back into use within 30 days following the 90-day period (No. 11.49.1, GSO)
• Publication in a PART II-S
RESUMPTION
10
![Page 11: BRINGING INTO USE (Non planned services) · with No. 11.44B (Statement of a continuous period of 90 days and DBIU within 120 days from the date of receipt) Modification of the date](https://reader033.vdocuments.net/reader033/viewer/2022050609/5fb0b84135496e28cd61d846/html5/thumbnails/11.jpg)
EXAMPLE 4: SUSPENSION(GSO)
120 days
90 days
Suspension on 01.01.2013
Deadline for confirmation (No. 11.49.1) 30.03.2016
Deadline for resumption 01.01.2016
Resumption on 01.12.2015
3 years
![Page 12: BRINGING INTO USE (Non planned services) · with No. 11.44B (Statement of a continuous period of 90 days and DBIU within 120 days from the date of receipt) Modification of the date](https://reader033.vdocuments.net/reader033/viewer/2022050609/5fb0b84135496e28cd61d846/html5/thumbnails/12.jpg)
INFORMATION ON THE WEB
• Status of the bringing into use
• Planned and non-planned bands • http://www.itu.int/net/ITU-R/space/snl/listinuse/index.asp
BRINGING INTO USE
• List of suspended networks
• History with dates of resumption
• Planned and non-planned • http://www.itu.int/net/ITU-R/space/snl/list1149/index.asp
SUSPENSION
12
Information provided by Administration Official publications only in the BRIFIC
Information provided by Administration Official publications only in the BRIFIC
![Page 13: BRINGING INTO USE (Non planned services) · with No. 11.44B (Statement of a continuous period of 90 days and DBIU within 120 days from the date of receipt) Modification of the date](https://reader033.vdocuments.net/reader033/viewer/2022050609/5fb0b84135496e28cd61d846/html5/thumbnails/13.jpg)
SUMMARY
Continuous use
No. 11.44
No. 11.44B
No. 11.47
No. 11.49
No. 11.49.1
RES 4
RES 49
13
Contact/ Question: [email protected]