Brisbane | Gold Coast | Maroochydore Unit 1, 35 Limestone Street (PO Box 3063), Darra Q 4076 P (07) 3279 0900 F (07) 3279 0955 ABN 51 009 878 899 www.morrisongeo.com.au Brisbane Office Job No: DL18/312 Ref No: 13977 Author: L. McDowall 26 th October 2018 Golding Contractors Pty Ltd PO Box 1643 Milton Qld 4064 ATTENTION: MR BEN PALMER Email: [email protected] [email protected] Dear Sir, RE: LEVEL ONE COMPLIANCE REPORT FOR BULK EARTHWORKS FILLING OPERATIONS WOODLINKS VILLAGE STAGE 8 COLLINGWOOD PARK Table of Contents 1.0 INTRODUCTION .................................................................................................................................... 2 1.1 General ............................................................................................................................................ 2 1.2 Previous Earthworks ...................................................................................................................... 3 1.3 The Project ...................................................................................................................................... 3 2.0 THE BRIEF .............................................................................................................................................. 3 3.0 METHODOLOGY ................................................................................................................................... 3 3.1 Stripped Surface Assessment ...................................................................................................... 3 3.2 Filling Operations ............................................................................................................................ 4 4.0 STATEMENT OF COMPLIANCE .................................................................................................... 6 5.0 EXCLUSIONS ......................................................................................................................................... 7 6.0 LIMITATIONS.......................................................................................................................................... 7 ATTACHMENTS: ........................................................................................................................ 8 Appendix A Site Plan Showing Test Locations ........................................................................ 8 Appendix B Laboratory Test Results Reports .......................................................................... 8 Brochure ‘Important Information About Your Geotechnical Report’ ......................................... 8

Upload: others

Post on 13-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Brisbane | Gold Coast | Maroochydore

Unit 1, 35 Limestone Street (PO Box 3063), Darra Q 4076 P (07) 3279 0900 F (07) 3279 0955

ABN 51 009 878 899

www.morrisongeo.com.au

Brisbane Office Job No: DL18/312 Ref No: 13977 Author: L. McDowall

26th October 2018

Golding Contractors Pty Ltd PO Box 1643 Milton Qld 4064

ATTENTION: MR BEN PALMER Email: [email protected]

[email protected]

Dear Sir,

RE: LEVEL ONE COMPLIANCE REPORT FOR BULK EARTHWORKS FILLING OPERATIONS WOODLINKS VILLAGE – STAGE 8 COLLINGWOOD PARK

Table of Contents

1.0 INTRODUCTION .................................................................................................................................... 2

1.1 General ............................................................................................................................................ 2

1.2 Previous Earthworks ...................................................................................................................... 3

1.3 The Project ...................................................................................................................................... 3

2.0 THE BRIEF .............................................................................................................................................. 3

3.0 METHODOLOGY ................................................................................................................................... 3

3.1 Stripped Surface Assessment ...................................................................................................... 3

3.2 Filling Operations ............................................................................................................................ 4

4.0 STATEMENT OF COMPLIANCE .................................................................................................... 6

5.0 EXCLUSIONS ......................................................................................................................................... 7

6.0 LIMITATIONS.......................................................................................................................................... 7

ATTACHMENTS: ........................................................................................................................ 8

Appendix A – Site Plan Showing Test Locations ........................................................................ 8

Appendix B – Laboratory Test Results Reports .......................................................................... 8

Brochure – ‘Important Information About Your Geotechnical Report’ ......................................... 8

- 2 - Job No: DL18/312

Ref: 13977 MORRISON GEOTECHNIC Golding Contractors Pty Ltd

1.0 INTRODUCTION

1.1 General This report presents results of Level One Earthworks Inspections and associated Compaction Compliance testing carried out on Earthworks Fill constructed to form residential building platforms and embankments below subgrade at the Woodlinks Village Stage 8 Development, Palaszczuk Avenue, Collingwood Park (The Site). The work was commissioned by Mr. B. Palmer representing Golding Contractors Ltd Pty (The Client), using Purchase Order 4500239124. Earthworks were carried out by The Client. Earthworks filling operations were carried out on 4th October 2018 and 5th October 2018.

Picture 1: Aerial View of the Site (Image Source: Nearmap.com- dated 19th December 2017)

- 3 - Job No: DL18/312

Ref: 13977 MORRISON GEOTECHNIC Golding Contractors Pty Ltd

1.2 Previous Earthworks As far as could be assessed onsite no previous earthworks had been conducted at The Site.

1.3 The Project The Purpose for filling at The Site is to construct a Residential Subdivision which included new pavements, residential building platforms and associated underground services. HDR Consulting Pty Ltd Earthworks Layout Plan, Project Number 1410, Drawing Numbers 1410-08-037 and 1410-08-038, Revision 0 dated December 29th August 2018, indicates the extents and thickness of fill to be constructed at The Site with the following exceptions:

• Minimal cover placed on Lots 151 – 153,204 – 206212, 801 and 800. The extent of filling in

these areas was attributable to Lot dressing using topsoil only.

• Filling operations between CH 480 and CH 540 along Road CL05 had not been completed due to existing sediment basins.

The actual thickness of fill on an individual Lot can be obtained from the Developer as a Lot Disclosure Plan. The Site is bounded by undeveloped land to the North and East and Stages of the Woodlinks development to the South and West. 2.0 THE BRIEF The Brief from the Client was limited to:

• Level One Inspection and Testing of the placement and compaction of fill materials in accordance with AS3798 2007 – “Guidelines on Earthworks for Commercial and Residential Developments”,

• Ipswich City Council Project Specifications.

• Relative Density Control Testing in accordance with AS1289 – Testing of Soils for Engineering Purposes and at frequencies required in AS3798 Table 8.1.

• Notes on Calibre Group Earthworks Drawings. All other design requirements such as CBR and Quality of Materials, site classification, material, settlement assessments and existing filling were not included in the Brief and are therefore excluded from this Report. 3.0 METHODOLOGY Earthworks Inspections and Testing was carried out on the stripped and exposed ground surfaces and during the placement and compaction of fill materials. Field and laboratory testing included a walk over assessments of the existing ground conditions, observation of filling and compaction activities, field density testing using a nuclear soil moisture density gauge and Hilf compactions. All work was carried out in accordance with AS 3798 (Guidelines on Earthworks for Commercial and Residential Developments) and AS1289 (Testing of Soils for Engineering Purposes).

3.1 Stripped Surface Assessment

- 4 - Job No: DL18/312

Ref: 13977 MORRISON GEOTECHNIC Golding Contractors Pty Ltd

The areas to be filled at The Site were observed to be stripped and cleared of all visible organic matter, deleterious, loose and unsuitable materials to depths exposing competent natural ground. The materials forming the natural foundation exposed after the stripping and clearing can be summarised as:

• Silty Sand (SM) – at least medium dense, fine to course sand, low plasticity fines, dark orange brown and moist.

• Sandy Clay (CI-CH) – at least stiff, medium to high plasticity, fine to course sand, light – orange – brown mottled red and moist.

Following the stripped surface assessment of the fill areas, the natural foundation was approved for filling using the following process:

• Walk over assessments confirming that the competent ground was exposed.

• Proof roll testing using large sized and loaded truck confirming no movement of the fill foundation.

On this basis, the compliant assessments in accordance with above indicate that the exposed ground forming the fill foundation is capable of supporting new fill materials.

Picture 2: View of the Stripped Surface Prior to Filling

3.2 Filling Operations

Fill material was sourced from onsite cuts areas, onsite stockpiles and trench excavations.

- 5 - Job No: DL18/312

Ref: 13977 MORRISON GEOTECHNIC Golding Contractors Pty Ltd

Fill materials can be broadly summarised as:

• Sandy Clay (CI) – medium plasticity, fine to coarse grained sand and traces of fine to coarse gravels, orange – red – brown and moist.

• Silty Clay (CI - CH) – medium to high plasticity, fine to coarse grained sand and traces of fine to coarse gravels, orange - red – brown and moist.

Placement and compaction of the fill materials was carried out using the following plant:

• Pad Foot Roller • Excavators • Grader

• Water Truck • Body Trucks

The fill materials were moisture conditioned at the source and during placement to moisture contents suitable for compaction. Deleterious materials such as organics, sticks, roots and over size particles were sorted and removed during placement or were rejected for use. Occasional cobble sized particles may remain in the fill however are not considered to affect the fill as a mass. Placement of the fill materials was carried layers appropriate for the above plant and compacted using the above plant carrying out multiple passes.

Picture 3: View of the Site During Construction

Picture 4: View of the Site During Construction

- 6 - Job No: DL18/312

Ref: 13977 MORRISON GEOTECHNIC Golding Contractors Pty Ltd

Our representative observed the filling process as described above and it was assessed to be consistent for the entire thickness of fill Field density tests and laboratory compactions were carried out on the compacted fill materials in accordance with Table 5.1 and 8.1 of AS3798 2007 (Guidelines on Earthworks for Commercial and Residential Developments) for Type 1 Earthworks and tested to AS1289 test methods (Testing of Soils for Engineering Purposes). Testing achieved the required specification of 95% of the Hilf Density.

Fill placed and compacted at measured density ratios less than 95% were tyned, moisture conditioned and re-compacted until the required specification was achieved. Retesting was carried out using Random Stratified Location methods. The Location of the field density tests are shown on the Site Plan contained in Appendix A. These test locations and levels were not obtained by survey and therefore should only be considered as approximate. 4.0 STATEMENT OF COMPLIANCE Our representative observed all the relevant earthworks operations including the stripped surfaces, filling operations and carried out field density tests in accordance with the required standards (AS 3798 and AS 1289) and specifications. It is confirmed that Level 1 Inspection has been carried out on the bulk earthworks fill used to form the residential lot and embankments below subgrade for this project. Based on observations made by our Geotechnicians and the results of the field and laboratory tests, the placed and compacted fill at the project has, as far as we have been able to assess, has been constructed in general accordance with the intent of AS3798 and the specifications. The fill can be deemed to be “controlled” as defined in AS2870 (Residential Slabs and Footings).

- 7 - Job No: DL18/312

Ref: 13977 MORRISON GEOTECHNIC Golding Contractors Pty Ltd

5.0 EXCLUSIONS This statement does not include any top soil, which may be placed for use as dressing or any other subsequent earthworks after 5th October 2018.

Assessments of material quality such as soaked CBR and site classifications are excluded from this commission.

Our on-site attendance specifically excludes assessments of fill material quality and engineering

properties that are outside the requirements of AS3798 - 2007, including soil or fill reactivity and soaked

CBR values. We note that the fill materials used may result in unfavourable site classifications and low

subgrade design strengths.

Footings and ground slabs for any structures constructed over natural soils or controlled fill should be designed to accommodate the characteristic ground surface movements and settlement potential. Assessments of these design parameters are beyond the scope of this Report. This report is not to be relied upon for settlement analysis and soft soils engineering advice. This is beyond the scope of this report and outside our engagement. 6.0 LIMITATIONS This Report has been prepared by Morrison Geotechnic Pty Ltd (Morrison Geotechnic), and may include contributions from Morrison Geotechnic’s officers and employees, sub-contractors, sub-consultants or agents (Contributors). This Report is for the sole benefit and use of Golding Contractors Pty Ltd (Client), its designers, clients and relevant statutory authorities for the sole purpose of providing geotechnical advice and recommendations in respect of the Woodlinks Stage 8 Development, Palaszczuk Avenue, Collingwood Park (Project). The Report is only intended to address those issues expressly described in the Brief/ Work Instructions in this Report. This Report should not be used or relied upon for any other purpose without Morrison Geotechnic’s prior written consent. Morrison Geotechnic and the Contributors do not accept any responsibility or liability in any way whatsoever for the use or reliance of this Report by anyone other than the Client, its designers, its clients and relevant statutory authorities or by anyone else for any purpose other than that for which it has been prepared. Except with Morrison Geotechnic’s prior written consent, this Report may not be:

(a) released to any other party, whether in whole or in part (other than to the Client’s officers, employees, advisers, designers, clients and relevant statutory authorities);

(b) used or relied upon by any other party. Morrison Geotechnic and the Contributors, do not accept any liability or responsibility whatsoever for, or in respect of, any use or reliance upon this Report by any other party. Morrison Geotechnic is not obliged to enter into discussions with any third party in respect of this Report. The information (including technical information and information obtained through discussions) on which this report is based has been provided by the Client and third parties. Morrison Geotechnic and the Contributors:

(a) have relied upon and presumed the accuracy of this information;

(b) have not verified the accuracy or reliability of this information (other than as expressly stated in this Report);

(c) have not made any independent investigations or enquiries in respect of those matters of which it has no actual knowledge at the time of giving this Report to the Client; and

- 8 - Job No: DL18/312

Ref: 13977 MORRISON GEOTECHNIC Golding Contractors Pty Ltd

(d) make no warranty or guarantee, expressed or implied, as to the accuracy or reliability of this information.

Morrison Geotechnic and the Contributors do not accept responsibility or liability for any incorrect assumptions related to this Report. For the avoidance of doubt, this Report:

(a) is not an environmental, contamination or hazardous materials assessment; may be invalid, incomplete or inaccurate (including errors in the scope of work, investigation methodology, observations, opinions and advice) where the information provided to Morrison Geotechnic was invalid, incomplete or inaccurate;

(b) is limited to observations of those parts of the site described in Section 1.0. No warranty or guarantee, whether express or implied, is made in respect of the geotechnical data, information, advice, opinions and recommendations present in this Report. If further information becomes available, or additional assumptions need to be made, Morrison Geotechnic reserves its right to amend this Report.

If you have any queries regarding the above, please contact our Brisbane office. Yours faithfully

LIAM McDOWALL For and on behalf of MORRISON GEOTECHNIC PTY LIMITED

ATTACHMENTS:

Appendix A – Site Plan Showing Test Locations

Appendix B – Laboratory Test Results Reports

Brochure – ‘Important Information About Your Geotechnical Report’

APPENDIX A

SITE PLAN

TEST LOCATIONS

Drawing No :

Engineers: D.Riley, J. Daly D.Dragun, & S.WynneGeologists: L.Bexley & R.HowchinLaboratory: M.Morrison

ABN: 51 009 878 899

Unit 1/ 35 Limestone St, Darra 4076 Ph: 3279 0900Email: [email protected] Fax: 3279 0955 Project No :

Client :

WOODLINKS VILLAGE STAGE 8

EARTHWORKS FIELD DENSITY TESTING - Level 1 Inspection

GOLDING CONTACTORS

DL18/312 DL18/312-01

MORRISON GEOTECHNIC PTY LTD Map Description :

Project :

Not to ScaleScale :

LEGEND0.0 - 0.99 Below Final Level

1.0 - 1.99 Below Final Level

2.0 - 2.99 Below Final Level

3.0 - 3.99 Below Final Level

4.0 - 4.99 Below Final Level

Final Level

777777777

888888888

222222222

111111111

666666666

555555555

333333333

444444444

APPENDIX B

Laboratory Test Results Reports

Client : GOLDING CONTRACTORS Report Number: DL18/312 - 1

Address : P O BOX 65, ARUNDEL, BC QLD, 4214 Report Date : 12/10/2018

Project Name : EARTHWORKS SUPERVISION Order Number : 4500239124

Project Number : DL18/312 Test Method : AS1289.5.8.1 & 5.7.1

Location: WOODLINKS VILLAGE , STAGE 8

Sample Number : 253435 253436

Test Number : 1 2

Sampling Method : - -

Date Sampled : 4/10/2018 4/10/2018

Date Tested : 4/10/2018 4/10/2018

Material Type : Fill Fill

Material Source : On Site On Site

Lot Number : - -

Sample Location : E 6242.00 E 6229.28

N 3759.36 N 3746.64

RL 36.01 RL 36.06

Test Depth (mm ) : 150 150

Layer Depth (mm) : 150 -

Maximum Size (mm) : 19 19

Oversize Wet (%) : - -

Oversize Dry (%) : - -

Oversize Density (t/m³) : - -

Field Moisture Content (%) : 16.2 17.9

Hilf MDR Number : 253435 253436

Hilf MDR Method : AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1

Compactive Effort : Standard Standard

Field Density Method : AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1

Moisture Method : AS1289.2.1.1 AS1289.2.1.1

Moisture Ratio (%) : 87 89

Field Wet Density (t/m³) : 1.893 2.046

Optimum Moisture Content (%) : 18.6 20.2

Moisture Variation : 2.4 2.2

Peak Converted Wet Density

(t/m³) :1.974 1.969

Hilf Density Ratio (%) : 96.0 104.0

Minimum Specification : 95 95

Moisture Specification : + or - 2% + or - 2%

Site Selection : - -

Soil Description : Silty CLAY Silty CLAY

Remarks :

Document Code RF89-11

Hilf Density Ratio Report

Page 1 of 1

-

Accredited for compliance with ISO/IEC 17025.

APPROVED SIGNATORY

Liam Mcdowall (Brisbane) - Branch Manager

NATA Accreditation Number

1162 / 1169

Client : GOLDING CONTRACTORS Report Number: DL18/312 - 2

Address : P O BOX 65, ARUNDEL, BC QLD, 4214 Report Date : 12/10/2018

Project Name : EARTHWORKS SUPERVISION Order Number : 4500239124

Project Number : DL18/312 Test Method : AS1289.5.8.1 & 5.7.1

Location: WOODLINKS VILLAGE , STAGE 8

Sample Number : 253513 253514 253515 253516

Test Number : 3 4 5 6

Sampling Method : - - - -

Date Sampled : 5/10/2018 5/10/2018 5/10/2018 5/10/2018

Date Tested : 5/10/2018 5/10/2018 5/10/2018 5/10/2018

Material Type : Fill Fill Fill Fill

Material Source : On Site On Site On Site On Site

Lot Number : - - - -

Sample Location : E 6248.48 E 6241.82 E 6215.06 E 6218.22

N 3762.32 N 3766.27 N 3756.54 N 3770.83

RL 36.29 RL 37.09 RL 37.55 RL 38.30

Test Depth (mm ) : 150 150 150 150

Layer Depth (mm) : 150 150 150 150

Maximum Size (mm) : 19 19 19 19

Oversize Wet (%) : - - - -

Oversize Dry (%) : - - - -

Oversize Density (t/m³) : - - - -

Field Moisture Content (%) : 15.0 16.3 15.1 17.4

Hilf MDR Number : 253513 253514 253515 253516

Hilf MDR Method : AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1

Compactive Effort : Standard Standard Standard Standard

Field Density Method : AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1

Moisture Method : AS1289.2.1.1 AS1289.2.1.1 AS1289.2.1.1 AS1289.2.1.1

Moisture Ratio (%) : 85.5 86.5 86 88

Field Wet Density (t/m³) : 2.011 2.034 1.992 2.041

Optimum Moisture Content (%) : 17.5 18.8 17.6 19.8

Moisture Variation : 2.5 2.5 2.5 2.3

Peak Converted Wet Density

(t/m³) :1.962 1.998 1.924 1.980

Hilf Density Ratio (%) : 102.5 102.0 103.5 103.0

Minimum Specification : 95 95 95 95

Moisture Specification : + or - 2% + or - 2% + or - 2% + or - 2%

Site Selection : - - - -

Soil Description : Silty CLAY Silty CLAY Silty CLAY Silty CLAY

Remarks :

Document Code RF89-11

Hilf Density Ratio Report

Page 1 of 1

-

Accredited for compliance with ISO/IEC 17025.

APPROVED SIGNATORY

Liam Mcdowall (Brisbane) - Branch Manager

NATA Accreditation Number

1162 / 1169

Client : GOLDING CONTRACTORS Report Number: DL18/312 - 3

Address : P O BOX 65, ARUNDEL, BC QLD, 4214 Report Date : 12/10/2018

Project Name : EARTHWORKS SUPERVISION Order Number : 4500239124

Project Number : DL18/312 Test Method : AS1289.5.8.1 & 5.7.1

Location: WOODLINKS VILLAGE , STAGE 8

Sample Number : 253517 253518

Test Number : 7 8

Sampling Method : - -

Date Sampled : 5/10/2018 5/10/2018

Date Tested : 5/10/2018 5/10/2018

Material Type : Fill Fill

Material Source : On Site On Site

Lot Number : - -

Sample Location : E 6209.93 E 6203.43

N 3778.55 N 3762.98

RL 38.76 RL 38.23

Test Depth (mm ) : 150 150

Layer Depth (mm) : 150 150

Maximum Size (mm) : 19 19

Oversize Wet (%) : - -

Oversize Dry (%) : - -

Oversize Density (t/m³) : - -

Field Moisture Content (%) : 17.7 17.5

Hilf MDR Number : 253517 253518

Hilf MDR Method : AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1

Compactive Effort : Standard Standard

Field Density Method : AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1

Moisture Method : AS1289.2.1.1 AS1289.2.1.1

Moisture Ratio (%) : 87.5 87.5

Field Wet Density (t/m³) : 2.040 1.987

Optimum Moisture Content (%) : 20.3 20.0

Moisture Variation : 2.5 2.5

Peak Converted Wet Density

(t/m³) :1.952 1.902

Hilf Density Ratio (%) : 104.5 104.5

Minimum Specification : 95 95

Moisture Specification : + or - 2% + or - 2%

Site Selection : - -

Soil Description : Silty CLAY Silty CLAY

Remarks :

Document Code RF89-11

Hilf Density Ratio Report

Page 1 of 1

-

Accredited for compliance with ISO/IEC 17025.

APPROVED SIGNATORY

Liam Mcdowall (Brisbane) - Branch Manager

NATA Accreditation Number

1162 / 1169

Brisbane | Gold Coast | Maroochydore

Unit 1, 35 Limestone Street (PO Box 3063), Darra Q 4076 P (07) 3279 0900 F (07) 3279 0955

ABN 51 009 878 899

www.morrisongeo.com.au

Brisbane Office Job No: DL18/312 Ref No: 14011 Author: L. McDowall

1st November 2018

Golding Contractors Pty Ltd PO Box 1643 Milton Qld 4064

ATTENTION: MR BEN PALMER Email: [email protected]

[email protected]

Dear Sir,

RE: LOT 173 LEVEL ONE COMPLIANCE REPORT FOR BULK EARTHWORKS FILLING OPERATIONS WOODLINKS ESTATE – STAGE 8 COLLINGWOOD PARK

Earthworks filling operations were carried out on Lot 173 at the above Development to form a working platform to support a future residential building.

Earthworks were constructed by Golding Contactors (The Client) between 4th October 2018 and 5th October 2018.

This report should be read in conjunction with Morrison Geotechnic Report “13977 – DL18/312 – Goldings – Woodlinks Village, Stage 8 – Level One Report” Dated 26th October 2018.

The Brief from the Client was limited to:

• Level One Inspection of the placement and compaction of fill materials in accordancewith AS3798 2007 – “Guidelines on Earthworks for Commercial and ResidentialDevelopments”;

• Relative Density Control Testing in accordance with AS1289 – Testing of Soils forEngineering Purposes and at frequencies required in AS3798 Table 8.

• Ipswich City Council Specifications.

• HDR Consulting Pty Ltd Earthworks Layout Plan, Project Number 1410,Drawing Numbers 1410-08-037 and 1410-08-038, Revision 0 datedDecember 29th August 2018

Level One Inspections and Testing was carried out on the stripped ground surfaces and during the placement and compaction of fill materials. Field and laboratory testing included proof roll testing of the stripped surface, field density testing using the nuclear soil moisture density gauge and standard Compactions.

Compaction testing at the Woodlinks Estate, Stage 8 Development was carried out at a frequency of 1 test per 500m3 of placed and compacted fill as defined in AS3798 Table 8.1. Test locations were selected using Random Stratified methods. Compaction testing was carried out at frequencies

- 2 - Job No: DL18/312

Ref: 14011 MORRISON GEOTECHNIC Golding Contractors

representative of the fill volume as a mass. On this basis, compaction testing was not required on each individual Lot. Test performed on filling operations near Lot 173 are representative of the fill constructed on Lot 173. The closest test to Lot 173 was performed on Lot 174.A summary of tests representative of the fill constructed on Lot 173 are presented in Table 1 below.

Table 1: Summary of Testing

Lot Number Test Number Date Tested Density Ratio Achieved %

174 7 5th October 2018 104.5

Note: Laboratory Standard Test Methods Used: AS1289.5.8.1, 5.7.1, 2.1.1.

Fill constructed on Lot 173 has been observed to be placed and compacted in accordance with the Brief. The fill on Lot 173 can be termed as “Controlled Fill” in accordance with AS 2870-2011 “Residential Slabs and Footings”. This statement does not include any top soil, which may have been placed for use as Lot dressing or any other subsequent earthworks after 5th October 2018 If there are any queries concerning the above please do not hesitate to contact this office, or alternatively send to my email at: [email protected]

Yours faithfully,

L. McDOWALL

For and on behalf of

MORRISON GEOTECHNIC PTY LIMITED

Encl: Laboratory Test Report DL18/312 - 3 Brochure: Important Information About Your Geotechnical Engineering Report

Client : GOLDING CONTRACTORS Report Number: DL18/312 - 3

Address : P O BOX 65, ARUNDEL, BC QLD, 4214 Report Date : 12/10/2018

Project Name : EARTHWORKS SUPERVISION Order Number : 4500239124

Project Number : DL18/312 Test Method : AS1289.5.8.1 & 5.7.1

Location: WOODLINKS VILLAGE , STAGE 8

Sample Number : 253517 253518

Test Number : 7 8

Sampling Method : - -

Date Sampled : 5/10/2018 5/10/2018

Date Tested : 5/10/2018 5/10/2018

Material Type : Fill Fill

Material Source : On Site On Site

Lot Number : - -

Sample Location : E 6209.93 E 6203.43

N 3778.55 N 3762.98

RL 38.76 RL 38.23

Test Depth (mm ) : 150 150

Layer Depth (mm) : 150 150

Maximum Size (mm) : 19 19

Oversize Wet (%) : - -

Oversize Dry (%) : - -

Oversize Density (t/m³) : - -

Field Moisture Content (%) : 17.7 17.5

Hilf MDR Number : 253517 253518

Hilf MDR Method : AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1

Compactive Effort : Standard Standard

Field Density Method : AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1

Moisture Method : AS1289.2.1.1 AS1289.2.1.1

Moisture Ratio (%) : 87.5 87.5

Field Wet Density (t/m³) : 2.040 1.987

Optimum Moisture Content (%) : 20.3 20.0

Moisture Variation : 2.5 2.5

Peak Converted Wet Density

(t/m³) :1.952 1.902

Hilf Density Ratio (%) : 104.5 104.5

Minimum Specification : 95 95

Moisture Specification : + or - 2% + or - 2%

Site Selection : - -

Soil Description : Silty CLAY Silty CLAY

Remarks :

Document Code RF89-11

Hilf Density Ratio Report

Page 1 of 1

-

Accredited for compliance with ISO/IEC 17025.

APPROVED SIGNATORY

Liam Mcdowall (Brisbane) - Branch Manager

NATA Accreditation Number

1162 / 1169

Brisbane | Gold Coast | Maroochydore

Unit 1, 35 Limestone Street (PO Box 3063), Darra Q 4076 P (07) 3279 0900 F (07) 3279 0955

ABN 51 009 878 899

www.morrisongeo.com.au

Brisbane Office Job No: DL18/312 Ref No: 14012 Author: L. McDowall

1st November 2018

Golding Contractors Pty Ltd PO Box 1643 Milton Qld 4064 ATTENTION: MR BEN PALMER Email: [email protected] [email protected] Dear Sir, RE: LOT 174

LEVEL ONE COMPLIANCE REPORT FOR BULK EARTHWORKS FILLING OPERATIONS WOODLINKS ESTATE – STAGE 8 COLLINGWOOD PARK

Earthworks filling operations were carried out on Lot 174 at the above Development to form a working platform to support a future residential building. Earthworks were constructed by Golding Contactors (The Client) between 4th October 2018 and 5th October 2018. This report should be read in conjunction with Morrison Geotechnic Report “13977 – DL18/312 – Goldings – Woodlinks Village, Stage 8 – Level One Report” Dated 26th October 2018. The Brief from the Client was limited to:

• Level One Inspection of the placement and compaction of fill materials in accordance with AS3798 2007 – “Guidelines on Earthworks for Commercial and Residential Developments”;

• Relative Density Control Testing in accordance with AS1289 – Testing of Soils for Engineering Purposes and at frequencies required in AS3798 Table 8.

• Ipswich City Council Specifications.

• HDR Consulting Pty Ltd Earthworks Layout Plan, Project Number 1410, Drawing Numbers 1410-08-037 and 1410-08-038, Revision 0 dated December 29th August 2018

Level One Inspections and Testing was carried out on the stripped ground surfaces and during the placement and compaction of fill materials. Field and laboratory testing included proof roll testing of the stripped surface, field density testing using the nuclear soil moisture density gauge and standard Compactions. Compaction testing at the Woodlinks Estate, Stage 8 Development was carried out at a frequency of 1 test per 500m3 of placed and compacted fill as defined in AS3798 Table 8.1. Test locations were selected using Random Stratified methods. Compaction testing was carried out at frequencies

- 2 - Job No: DL18/312

Ref: 14012 MORRISON GEOTECHNIC Golding Contractors

representative of the fill volume as a mass. On this basis, compaction testing was not required on each individual Lot. A summary of tests representative of the fill constructed on Lot 174 are presented in Table 1 below.

Table 1: Summary of Testing

Lot Number Test Number Date Tested Density Ratio Achieved %

174 7 5th October 2018 104.5

Note: Laboratory Standard Test Methods Used: AS1289.5.8.1, 5.7.1, 2.1.1.

Fill constructed on Lot 174 has been observed to be placed and compacted in accordance with the Brief. The fill on Lot 174 can be termed as “Controlled Fill” in accordance with AS 2870-2011 “Residential Slabs and Footings”. This statement does not include any top soil, which may have been placed for use as Lot dressing or any other subsequent earthworks after 5th October 2018 If there are any queries concerning the above please do not hesitate to contact this office, or alternatively send to my email at: [email protected]

Yours faithfully,

L. McDOWALL

For and on behalf of

MORRISON GEOTECHNIC PTY LIMITED

Encl: Laboratory Test Report DL18/312 - 3 Brochure: Important Information About Your Geotechnical Engineering Report

Client : GOLDING CONTRACTORS Report Number: DL18/312 - 3

Address : P O BOX 65, ARUNDEL, BC QLD, 4214 Report Date : 12/10/2018

Project Name : EARTHWORKS SUPERVISION Order Number : 4500239124

Project Number : DL18/312 Test Method : AS1289.5.8.1 & 5.7.1

Location: WOODLINKS VILLAGE , STAGE 8

Sample Number : 253517 253518

Test Number : 7 8

Sampling Method : - -

Date Sampled : 5/10/2018 5/10/2018

Date Tested : 5/10/2018 5/10/2018

Material Type : Fill Fill

Material Source : On Site On Site

Lot Number : - -

Sample Location : E 6209.93 E 6203.43

N 3778.55 N 3762.98

RL 38.76 RL 38.23

Test Depth (mm ) : 150 150

Layer Depth (mm) : 150 150

Maximum Size (mm) : 19 19

Oversize Wet (%) : - -

Oversize Dry (%) : - -

Oversize Density (t/m³) : - -

Field Moisture Content (%) : 17.7 17.5

Hilf MDR Number : 253517 253518

Hilf MDR Method : AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1

Compactive Effort : Standard Standard

Field Density Method : AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1

Moisture Method : AS1289.2.1.1 AS1289.2.1.1

Moisture Ratio (%) : 87.5 87.5

Field Wet Density (t/m³) : 2.040 1.987

Optimum Moisture Content (%) : 20.3 20.0

Moisture Variation : 2.5 2.5

Peak Converted Wet Density

(t/m³) :1.952 1.902

Hilf Density Ratio (%) : 104.5 104.5

Minimum Specification : 95 95

Moisture Specification : + or - 2% + or - 2%

Site Selection : - -

Soil Description : Silty CLAY Silty CLAY

Remarks :

Document Code RF89-11

Hilf Density Ratio Report

Page 1 of 1

-

Accredited for compliance with ISO/IEC 17025.

APPROVED SIGNATORY

Liam Mcdowall (Brisbane) - Branch Manager

NATA Accreditation Number

1162 / 1169

Brisbane | Gold Coast | Maroochydore

Unit 1, 35 Limestone Street (PO Box 3063), Darra Q 4076 P (07) 3279 0900 F (07) 3279 0955

ABN 51 009 878 899

www.morrisongeo.com.au

Brisbane Office Job No: DL18/312 Ref No: 14013 Author: L. McDowall

1st November 2018

Golding Contractors Pty Ltd PO Box 1643 Milton Qld 4064 ATTENTION: MR BEN PALMER Email: [email protected] [email protected] Dear Sir, RE: LOT 175

LEVEL ONE COMPLIANCE REPORT FOR BULK EARTHWORKS FILLING OPERATIONS WOODLINKS ESTATE – STAGE 8 COLLINGWOOD PARK

Earthworks filling operations were carried out on Lot 175 at the above Development to form a working platform to support a future residential building. Earthworks were constructed by Golding Contactors (The Client) between 4th October 2018 and 5th October 2018. This report should be read in conjunction with Morrison Geotechnic Report “13977 – DL18/312 – Goldings – Woodlinks Village, Stage 8 – Level One Report” Dated 26th October 2018. The Brief from the Client was limited to:

• Level One Inspection of the placement and compaction of fill materials in accordance with AS3798 2007 – “Guidelines on Earthworks for Commercial and Residential Developments”;

• Relative Density Control Testing in accordance with AS1289 – Testing of Soils for Engineering Purposes and at frequencies required in AS3798 Table 8.

• Ipswich City Council Specifications.

• HDR Consulting Pty Ltd Earthworks Layout Plan, Project Number 1410, Drawing Numbers 1410-08-037 and 1410-08-038, Revision 0 dated December 29th August 2018

Level One Inspections and Testing was carried out on the stripped ground surfaces and during the placement and compaction of fill materials. Field and laboratory testing included proof roll testing of the stripped surface, field density testing using the nuclear soil moisture density gauge and standard Compactions. Compaction testing at the Woodlinks Estate, Stage 8 Development was carried out at a frequency of 1 test per 500m3 of placed and compacted fill as defined in AS3798 Table 8.1. Test locations were selected using Random Stratified methods. Compaction testing was carried out at frequencies

- 2 - Job No: DL18/312

Ref: 14013 MORRISON GEOTECHNIC Golding Contractors

representative of the fill volume as a mass. On this basis, compaction testing was not required on each individual Lot. Test performed on filling operations near Lot 175 are representative of the fill constructed on Lot 175. The closest test to Lot 175 was performed on Lot 174. A summary of tests representative of the fill constructed on Lot 175 are presented in Table 1 below.

Table 1: Summary of Testing

Lot Number Test Number Date Tested Density Ratio Achieved %

174 7 5th October 2018 104.5

Note: Laboratory Standard Test Methods Used: AS1289.5.8.1, 5.7.1, 2.1.1.

Fill constructed on Lot 175 has been observed to be placed and compacted in accordance with the Brief. The fill on Lot 175 can be termed as “Controlled Fill” in accordance with AS 2870-2011 “Residential Slabs and Footings”. This statement does not include any top soil, which may have been placed for use as Lot dressing or any other subsequent earthworks after 5th October 2018 If there are any queries concerning the above please do not hesitate to contact this office, or alternatively send to my email at: [email protected]

Yours faithfully,

L. McDOWALL

For and on behalf of

MORRISON GEOTECHNIC PTY LIMITED

Encl: Laboratory Test Report DL18/312 - 3 Brochure: Important Information About Your Geotechnical Engineering Report

Client : GOLDING CONTRACTORS Report Number: DL18/312 - 3

Address : P O BOX 65, ARUNDEL, BC QLD, 4214 Report Date : 12/10/2018

Project Name : EARTHWORKS SUPERVISION Order Number : 4500239124

Project Number : DL18/312 Test Method : AS1289.5.8.1 & 5.7.1

Location: WOODLINKS VILLAGE , STAGE 8

Sample Number : 253517 253518

Test Number : 7 8

Sampling Method : - -

Date Sampled : 5/10/2018 5/10/2018

Date Tested : 5/10/2018 5/10/2018

Material Type : Fill Fill

Material Source : On Site On Site

Lot Number : - -

Sample Location : E 6209.93 E 6203.43

N 3778.55 N 3762.98

RL 38.76 RL 38.23

Test Depth (mm ) : 150 150

Layer Depth (mm) : 150 150

Maximum Size (mm) : 19 19

Oversize Wet (%) : - -

Oversize Dry (%) : - -

Oversize Density (t/m³) : - -

Field Moisture Content (%) : 17.7 17.5

Hilf MDR Number : 253517 253518

Hilf MDR Method : AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1

Compactive Effort : Standard Standard

Field Density Method : AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1

Moisture Method : AS1289.2.1.1 AS1289.2.1.1

Moisture Ratio (%) : 87.5 87.5

Field Wet Density (t/m³) : 2.040 1.987

Optimum Moisture Content (%) : 20.3 20.0

Moisture Variation : 2.5 2.5

Peak Converted Wet Density

(t/m³) :1.952 1.902

Hilf Density Ratio (%) : 104.5 104.5

Minimum Specification : 95 95

Moisture Specification : + or - 2% + or - 2%

Site Selection : - -

Soil Description : Silty CLAY Silty CLAY

Remarks :

Document Code RF89-11

Hilf Density Ratio Report

Page 1 of 1

-

Accredited for compliance with ISO/IEC 17025.

APPROVED SIGNATORY

Liam Mcdowall (Brisbane) - Branch Manager

NATA Accreditation Number

1162 / 1169

Brisbane | Gold Coast | Maroochydore

Unit 1, 35 Limestone Street (PO Box 3063), Darra Q 4076 P (07) 3279 0900 F (07) 3279 0955

ABN 51 009 878 899

www.morrisongeo.com.au

Brisbane Office Job No: DL18/312 Ref No: 14014 Author: L. McDowall

1st November 2018

Golding Contractors Pty Ltd PO Box 1643 Milton Qld 4064 ATTENTION: MR BEN PALMER Email: [email protected] [email protected] Dear Sir, RE: LOT 187

LEVEL ONE COMPLIANCE REPORT FOR BULK EARTHWORKS FILLING OPERATIONS WOODLINKS ESTATE – STAGE 8 COLLINGWOOD PARK

Earthworks filling operations were carried out on Lot 187 at the above Development to form a working platform to support a future residential building. Earthworks were constructed by Golding Contactors (The Client) between 4th October 2018 and 5th October 2018. This report should be read in conjunction with Morrison Geotechnic Report “13977 – DL18/312 – Goldings – Woodlinks Village, Stage 8 – Level One Report” Dated 26th October 2018. The Brief from the Client was limited to:

• Level One Inspection of the placement and compaction of fill materials in accordance with AS3798 2007 – “Guidelines on Earthworks for Commercial and Residential Developments”;

• Relative Density Control Testing in accordance with AS1289 – Testing of Soils for Engineering Purposes and at frequencies required in AS3798 Table 8.

• Ipswich City Council Specifications.

• HDR Consulting Pty Ltd Earthworks Layout Plan, Project Number 1410, Drawing Numbers 1410-08-037 and 1410-08-038, Revision 0 dated December 29th August 2018

Level One Inspections and Testing was carried out on the stripped ground surfaces and during the placement and compaction of fill materials. Field and laboratory testing included proof roll testing of the stripped surface, field density testing using the nuclear soil moisture density gauge and standard Compactions. Compaction testing at the Woodlinks Estate, Stage 8 Development was carried out at a frequency of 1 test per 500m3 of placed and compacted fill as defined in AS3798 Table 8.1. Test locations were selected using Random Stratified methods. Compaction testing was carried out at frequencies

- 2 - Job No: DL18/312

Ref: 14014 MORRISON GEOTECHNIC Golding Contractors

representative of the fill volume as a mass. On this basis, compaction testing was not required on each individual Lot. Test performed on filling operations near Lot 187 are representative of the fill constructed on Lot 187. The closest test to Lot 187 was performed on Road CL05, CH 475. A summary of tests representative of the fill constructed on Lot 187 are presented in Table 1 below.

Table 1: Summary of Testing

Test Location Test Number Date Tested Density Ratio Achieved %

Road CL05 CH 475

2 4th October 2018 104.0

Note: Laboratory Standard Test Methods Used: AS1289.5.8.1, 5.7.1, 2.1.1.

Fill constructed on Lot 187 has been observed to be placed and compacted in accordance with the Brief. The fill on Lot 187 can be termed as “Controlled Fill” in accordance with AS 2870-2011 “Residential Slabs and Footings”. This statement does not include any top soil, which may have been placed for use as Lot dressing or any other subsequent earthworks after 5th October 2018 If there are any queries concerning the above please do not hesitate to contact this office, or alternatively send to my email at: [email protected]

Yours faithfully,

L. McDOWALL

For and on behalf of

MORRISON GEOTECHNIC PTY LIMITED

Encl: Laboratory Test Report DL18/312 - 1 Brochure: Important Information About Your Geotechnical Engineering Report

Client : GOLDING CONTRACTORS Report Number: DL18/312 - 1

Address : P O BOX 65, ARUNDEL, BC QLD, 4214 Report Date : 12/10/2018

Project Name : EARTHWORKS SUPERVISION Order Number : 4500239124

Project Number : DL18/312 Test Method : AS1289.5.8.1 & 5.7.1

Location: WOODLINKS VILLAGE , STAGE 8

Sample Number : 253435 253436

Test Number : 1 2

Sampling Method : - -

Date Sampled : 4/10/2018 4/10/2018

Date Tested : 4/10/2018 4/10/2018

Material Type : Fill Fill

Material Source : On Site On Site

Lot Number : - -

Sample Location : E 6242.00 E 6229.28

N 3759.36 N 3746.64

RL 36.01 RL 36.06

Test Depth (mm ) : 150 150

Layer Depth (mm) : 150 -

Maximum Size (mm) : 19 19

Oversize Wet (%) : - -

Oversize Dry (%) : - -

Oversize Density (t/m³) : - -

Field Moisture Content (%) : 16.2 17.9

Hilf MDR Number : 253435 253436

Hilf MDR Method : AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1

Compactive Effort : Standard Standard

Field Density Method : AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1

Moisture Method : AS1289.2.1.1 AS1289.2.1.1

Moisture Ratio (%) : 87 89

Field Wet Density (t/m³) : 1.893 2.046

Optimum Moisture Content (%) : 18.6 20.2

Moisture Variation : 2.4 2.2

Peak Converted Wet Density

(t/m³) :1.974 1.969

Hilf Density Ratio (%) : 96.0 104.0

Minimum Specification : 95 95

Moisture Specification : + or - 2% + or - 2%

Site Selection : - -

Soil Description : Silty CLAY Silty CLAY

Remarks :

Document Code RF89-11

Hilf Density Ratio Report

Page 1 of 1

-

Accredited for compliance with ISO/IEC 17025.

APPROVED SIGNATORY

Liam Mcdowall (Brisbane) - Branch Manager

NATA Accreditation Number

1162 / 1169

Brisbane | Gold Coast | Maroochydore

Unit 1, 35 Limestone Street (PO Box 3063), Darra Q 4076 P (07) 3279 0900 F (07) 3279 0955

ABN 51 009 878 899

www.morrisongeo.com.au

Brisbane Office Job No: DL18/312 Ref No: 14015 Author: L. McDowall

1st November 2018

Golding Contractors Pty Ltd PO Box 1643 Milton Qld 4064 ATTENTION: MR BEN PALMER Email: [email protected] [email protected] Dear Sir, RE: LOT 188

LEVEL ONE COMPLIANCE REPORT FOR BULK EARTHWORKS FILLING OPERATIONS WOODLINKS ESTATE – STAGE 8 COLLINGWOOD PARK

Earthworks filling operations were carried out on Lot 188 at the above Development to form a working platform to support a future residential building. Earthworks were constructed by Golding Contactors (The Client) between 4th October 2018 and 5th October 2018. This report should be read in conjunction with Morrison Geotechnic Report “13977 – DL18/312 – Goldings – Woodlinks Village, Stage 8 – Level One Report” Dated 26th October 2018. The Brief from the Client was limited to:

• Level One Inspection of the placement and compaction of fill materials in accordance with AS3798 2007 – “Guidelines on Earthworks for Commercial and Residential Developments”;

• Relative Density Control Testing in accordance with AS1289 – Testing of Soils for Engineering Purposes and at frequencies required in AS3798 Table 8.

• Ipswich City Council Specifications.

• HDR Consulting Pty Ltd Earthworks Layout Plan, Project Number 1410, Drawing Numbers 1410-08-037 and 1410-08-038, Revision 0 dated December 29th August 2018

Level One Inspections and Testing was carried out on the stripped ground surfaces and during the placement and compaction of fill materials. Field and laboratory testing included proof roll testing of the stripped surface, field density testing using the nuclear soil moisture density gauge and standard Compactions. Compaction testing at the Woodlinks Estate, Stage 8 Development was carried out at a frequency of 1 test per 500m3 of placed and compacted fill as defined in AS3798 Table 8.1. Test locations were selected using Random Stratified methods. Compaction testing was carried out at frequencies

- 2 - Job No: DL18/312

Ref: 14015 MORRISON GEOTECHNIC Golding Contractors

representative of the fill volume as a mass. On this basis, compaction testing was not required on each individual Lot. Test performed on filling operations near Lot 188 are representative of the fill constructed on Lot 188. The closest test to Lot 188 was performed on Road CL05, CH 490. A summary of tests representative of the fill constructed on Lot 188 are presented in Table 1 below.

Table 1: Summary of Testing

Test Location Test Number Date Tested Density Ratio Achieved %

Road CL05 CH 490

1 4th October 2018 96.0

Note: Laboratory Standard Test Methods Used: AS1289.5.8.1, 5.7.1, 2.1.1.

Fill constructed on Lot 188 has been observed to be placed and compacted in accordance with the Brief. The fill on Lot 188 can be termed as “Controlled Fill” in accordance with AS 2870-2011 “Residential Slabs and Footings”. This statement does not include any top soil, which may have been placed for use as Lot dressing or any other subsequent earthworks after 5th October 2018 If there are any queries concerning the above please do not hesitate to contact this office, or alternatively send to my email at: [email protected]

Yours faithfully,

L. McDOWALL

For and on behalf of

MORRISON GEOTECHNIC PTY LIMITED

Encl: Laboratory Test Report DL18/312 - 1 Brochure: Important Information About Your Geotechnical Engineering Report

Client : GOLDING CONTRACTORS Report Number: DL18/312 - 1

Address : P O BOX 65, ARUNDEL, BC QLD, 4214 Report Date : 12/10/2018

Project Name : EARTHWORKS SUPERVISION Order Number : 4500239124

Project Number : DL18/312 Test Method : AS1289.5.8.1 & 5.7.1

Location: WOODLINKS VILLAGE , STAGE 8

Sample Number : 253435 253436

Test Number : 1 2

Sampling Method : - -

Date Sampled : 4/10/2018 4/10/2018

Date Tested : 4/10/2018 4/10/2018

Material Type : Fill Fill

Material Source : On Site On Site

Lot Number : - -

Sample Location : E 6242.00 E 6229.28

N 3759.36 N 3746.64

RL 36.01 RL 36.06

Test Depth (mm ) : 150 150

Layer Depth (mm) : 150 -

Maximum Size (mm) : 19 19

Oversize Wet (%) : - -

Oversize Dry (%) : - -

Oversize Density (t/m³) : - -

Field Moisture Content (%) : 16.2 17.9

Hilf MDR Number : 253435 253436

Hilf MDR Method : AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1

Compactive Effort : Standard Standard

Field Density Method : AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1

Moisture Method : AS1289.2.1.1 AS1289.2.1.1

Moisture Ratio (%) : 87 89

Field Wet Density (t/m³) : 1.893 2.046

Optimum Moisture Content (%) : 18.6 20.2

Moisture Variation : 2.4 2.2

Peak Converted Wet Density

(t/m³) :1.974 1.969

Hilf Density Ratio (%) : 96.0 104.0

Minimum Specification : 95 95

Moisture Specification : + or - 2% + or - 2%

Site Selection : - -

Soil Description : Silty CLAY Silty CLAY

Remarks :

Document Code RF89-11

Hilf Density Ratio Report

Page 1 of 1

-

Accredited for compliance with ISO/IEC 17025.

APPROVED SIGNATORY

Liam Mcdowall (Brisbane) - Branch Manager

NATA Accreditation Number

1162 / 1169

Brisbane | Gold Coast | Maroochydore

Unit 1, 35 Limestone Street (PO Box 3063), Darra Q 4076 P (07) 3279 0900 F (07) 3279 0955

ABN 51 009 878 899

www.morrisongeo.com.au

Brisbane Office Job No: DL18/312 Ref No: 14016 Author: L. McDowall

1st November 2018

Golding Contractors Pty Ltd PO Box 1643 Milton Qld 4064 ATTENTION: MR BEN PALMER Email: [email protected] [email protected] Dear Sir, RE: LOT 189

LEVEL ONE COMPLIANCE REPORT FOR BULK EARTHWORKS FILLING OPERATIONS WOODLINKS ESTATE – STAGE 8 COLLINGWOOD PARK

Earthworks filling operations were carried out on Lot 189 at the above Development to form a working platform to support a future residential building. Earthworks were constructed by Golding Contactors (The Client) between 4th October 2018 and 5th October 2018. This report should be read in conjunction with Morrison Geotechnic Report “13977 – DL18/312 – Goldings – Woodlinks Village, Stage 8 – Level One Report” Dated 26th October 2018. The Brief from the Client was limited to:

• Level One Inspection of the placement and compaction of fill materials in accordance with AS3798 2007 – “Guidelines on Earthworks for Commercial and Residential Developments”;

• Relative Density Control Testing in accordance with AS1289 – Testing of Soils for Engineering Purposes and at frequencies required in AS3798 Table 8.

• Ipswich City Council Specifications.

• HDR Consulting Pty Ltd Earthworks Layout Plan, Project Number 1410, Drawing Numbers 1410-08-037 and 1410-08-038, Revision 0 dated December 29th August 2018

Level One Inspections and Testing was carried out on the stripped ground surfaces and during the placement and compaction of fill materials. Field and laboratory testing included proof roll testing of the stripped surface, field density testing using the nuclear soil moisture density gauge and standard Compactions. Compaction testing at the Woodlinks Estate, Stage 8 Development was carried out at a frequency of 1 test per 500m3 of placed and compacted fill as defined in AS3798 Table 8.1. Test locations were selected using Random Stratified methods. Compaction testing was carried out at frequencies

- 2 - Job No: DL18/312

Ref: 14016 MORRISON GEOTECHNIC Golding Contractors

representative of the fill volume as a mass. On this basis, compaction testing was not required on each individual Lot. A summary of tests representative of the fill constructed on Lot 189 are presented in Table 1 below.

Table 1: Summary of Testing

Lot Number Test Number Date Tested Density Ratio Achieved %

189 4 5th October 2018 102.0

Note: Laboratory Standard Test Methods Used: AS1289.5.8.1, 5.7.1, 2.1.1.

Fill constructed on Lot 189 has been observed to be placed and compacted in accordance with the Brief. The fill on Lot 189 can be termed as “Controlled Fill” in accordance with AS 2870-2011 “Residential Slabs and Footings”. This statement does not include any top soil, which may have been placed for use as Lot dressing or any other subsequent earthworks after 5th October 2018 If there are any queries concerning the above please do not hesitate to contact this office, or alternatively send to my email at: [email protected]

Yours faithfully,

L. McDOWALL

For and on behalf of

MORRISON GEOTECHNIC PTY LIMITED

Encl: Laboratory Test Report DL18/312 - 2 Brochure: Important Information About Your Geotechnical Engineering Report

Client : GOLDING CONTRACTORS Report Number: DL18/312 - 2

Address : P O BOX 65, ARUNDEL, BC QLD, 4214 Report Date : 12/10/2018

Project Name : EARTHWORKS SUPERVISION Order Number : 4500239124

Project Number : DL18/312 Test Method : AS1289.5.8.1 & 5.7.1

Location: WOODLINKS VILLAGE , STAGE 8

Sample Number : 253513 253514 253515 253516

Test Number : 3 4 5 6

Sampling Method : - - - -

Date Sampled : 5/10/2018 5/10/2018 5/10/2018 5/10/2018

Date Tested : 5/10/2018 5/10/2018 5/10/2018 5/10/2018

Material Type : Fill Fill Fill Fill

Material Source : On Site On Site On Site On Site

Lot Number : - - - -

Sample Location : E 6248.48 E 6241.82 E 6215.06 E 6218.22

N 3762.32 N 3766.27 N 3756.54 N 3770.83

RL 36.29 RL 37.09 RL 37.55 RL 38.30

Test Depth (mm ) : 150 150 150 150

Layer Depth (mm) : 150 150 150 150

Maximum Size (mm) : 19 19 19 19

Oversize Wet (%) : - - - -

Oversize Dry (%) : - - - -

Oversize Density (t/m³) : - - - -

Field Moisture Content (%) : 15.0 16.3 15.1 17.4

Hilf MDR Number : 253513 253514 253515 253516

Hilf MDR Method : AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1

Compactive Effort : Standard Standard Standard Standard

Field Density Method : AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1

Moisture Method : AS1289.2.1.1 AS1289.2.1.1 AS1289.2.1.1 AS1289.2.1.1

Moisture Ratio (%) : 85.5 86.5 86 88

Field Wet Density (t/m³) : 2.011 2.034 1.992 2.041

Optimum Moisture Content (%) : 17.5 18.8 17.6 19.8

Moisture Variation : 2.5 2.5 2.5 2.3

Peak Converted Wet Density

(t/m³) :1.962 1.998 1.924 1.980

Hilf Density Ratio (%) : 102.5 102.0 103.5 103.0

Minimum Specification : 95 95 95 95

Moisture Specification : + or - 2% + or - 2% + or - 2% + or - 2%

Site Selection : - - - -

Soil Description : Silty CLAY Silty CLAY Silty CLAY Silty CLAY

Remarks :

Document Code RF89-11

Hilf Density Ratio Report

Page 1 of 1

-

Accredited for compliance with ISO/IEC 17025.

APPROVED SIGNATORY

Liam Mcdowall (Brisbane) - Branch Manager

NATA Accreditation Number

1162 / 1169

Brisbane | Gold Coast | Maroochydore

Unit 1, 35 Limestone Street (PO Box 3063), Darra Q 4076 P (07) 3279 0900 F (07) 3279 0955

ABN 51 009 878 899

www.morrisongeo.com.au

Brisbane Office Job No: DL18/312 Ref No: 14017 Author: L. McDowall

1st November 2018

Golding Contractors Pty Ltd PO Box 1643 Milton Qld 4064 ATTENTION: MR BEN PALMER Email: [email protected] [email protected] Dear Sir, RE: LOT 190

LEVEL ONE COMPLIANCE REPORT FOR BULK EARTHWORKS FILLING OPERATIONS WOODLINKS ESTATE – STAGE 8 COLLINGWOOD PARK

Earthworks filling operations were carried out on Lot 190 at the above Development to form a working platform to support a future residential building. Earthworks were constructed by Golding Contactors (The Client) between 4th October 2018 and 5th October 2018. This report should be read in conjunction with Morrison Geotechnic Report “13977 – DL18/312 – Goldings – Woodlinks Village, Stage 8 – Level One Report” Dated 26th October 2018. The Brief from the Client was limited to:

• Level One Inspection of the placement and compaction of fill materials in accordance with AS3798 2007 – “Guidelines on Earthworks for Commercial and Residential Developments”;

• Relative Density Control Testing in accordance with AS1289 – Testing of Soils for Engineering Purposes and at frequencies required in AS3798 Table 8.

• Ipswich City Council Specifications.

• HDR Consulting Pty Ltd Earthworks Layout Plan, Project Number 1410, Drawing Numbers 1410-08-037 and 1410-08-038, Revision 0 dated December 29th August 2018

Level One Inspections and Testing was carried out on the stripped ground surfaces and during the placement and compaction of fill materials. Field and laboratory testing included proof roll testing of the stripped surface, field density testing using the nuclear soil moisture density gauge and standard Compactions. Compaction testing at the Woodlinks Estate, Stage 8 Development was carried out at a frequency of 1 test per 500m3 of placed and compacted fill as defined in AS3798 Table 8.1. Test locations were selected using Random Stratified methods. Compaction testing was carried out at frequencies

- 2 - Job No: DL18/312

Ref: 14017 MORRISON GEOTECHNIC Golding Contractors

representative of the fill volume as a mass. On this basis, compaction testing was not required on each individual Lot. Test performed on filling operations near Lot 190 are representative of the fill constructed on Lot 190. The closest test to Lot 190 was performed on Lot 189. A summary of tests representative of the fill constructed on Lot 190 are presented in Table 1 below.

Table 1: Summary of Testing

Lot Number Test Number Date Tested Density Ratio Achieved %

189 4 5th October 2018 102.0

Note: Laboratory Standard Test Methods Used: AS1289.5.8.1, 5.7.1, 2.1.1.

Fill constructed on Lot 190 has been observed to be placed and compacted in accordance with the Brief. The fill on Lot 190 can be termed as “Controlled Fill” in accordance with AS 2870-2011 “Residential Slabs and Footings”. This statement does not include any top soil, which may have been placed for use as Lot dressing or any other subsequent earthworks after 5th October 2018 If there are any queries concerning the above please do not hesitate to contact this office, or alternatively send to my email at: [email protected]

Yours faithfully,

L. McDOWALL

For and on behalf of

MORRISON GEOTECHNIC PTY LIMITED

Encl: Laboratory Test Report DL18/312 - 2 Brochure: Important Information About Your Geotechnical Engineering Report

Client : GOLDING CONTRACTORS Report Number: DL18/312 - 2

Address : P O BOX 65, ARUNDEL, BC QLD, 4214 Report Date : 12/10/2018

Project Name : EARTHWORKS SUPERVISION Order Number : 4500239124

Project Number : DL18/312 Test Method : AS1289.5.8.1 & 5.7.1

Location: WOODLINKS VILLAGE , STAGE 8

Sample Number : 253513 253514 253515 253516

Test Number : 3 4 5 6

Sampling Method : - - - -

Date Sampled : 5/10/2018 5/10/2018 5/10/2018 5/10/2018

Date Tested : 5/10/2018 5/10/2018 5/10/2018 5/10/2018

Material Type : Fill Fill Fill Fill

Material Source : On Site On Site On Site On Site

Lot Number : - - - -

Sample Location : E 6248.48 E 6241.82 E 6215.06 E 6218.22

N 3762.32 N 3766.27 N 3756.54 N 3770.83

RL 36.29 RL 37.09 RL 37.55 RL 38.30

Test Depth (mm ) : 150 150 150 150

Layer Depth (mm) : 150 150 150 150

Maximum Size (mm) : 19 19 19 19

Oversize Wet (%) : - - - -

Oversize Dry (%) : - - - -

Oversize Density (t/m³) : - - - -

Field Moisture Content (%) : 15.0 16.3 15.1 17.4

Hilf MDR Number : 253513 253514 253515 253516

Hilf MDR Method : AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1

Compactive Effort : Standard Standard Standard Standard

Field Density Method : AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1

Moisture Method : AS1289.2.1.1 AS1289.2.1.1 AS1289.2.1.1 AS1289.2.1.1

Moisture Ratio (%) : 85.5 86.5 86 88

Field Wet Density (t/m³) : 2.011 2.034 1.992 2.041

Optimum Moisture Content (%) : 17.5 18.8 17.6 19.8

Moisture Variation : 2.5 2.5 2.5 2.3

Peak Converted Wet Density

(t/m³) :1.962 1.998 1.924 1.980

Hilf Density Ratio (%) : 102.5 102.0 103.5 103.0

Minimum Specification : 95 95 95 95

Moisture Specification : + or - 2% + or - 2% + or - 2% + or - 2%

Site Selection : - - - -

Soil Description : Silty CLAY Silty CLAY Silty CLAY Silty CLAY

Remarks :

Document Code RF89-11

Hilf Density Ratio Report

Page 1 of 1

-

Accredited for compliance with ISO/IEC 17025.

APPROVED SIGNATORY

Liam Mcdowall (Brisbane) - Branch Manager

NATA Accreditation Number

1162 / 1169

Brisbane | Gold Coast | Maroochydore

Unit 1, 35 Limestone Street (PO Box 3063), Darra Q 4076 P (07) 3279 0900 F (07) 3279 0955

ABN 51 009 878 899

www.morrisongeo.com.au

Brisbane Office Job No: DL18/312 Ref No: 14018 Author: L. McDowall

1st November 2018

Golding Contractors Pty Ltd PO Box 1643 Milton Qld 4064 ATTENTION: MR BEN PALMER Email: [email protected] [email protected] Dear Sir, RE: LOT 191

LEVEL ONE COMPLIANCE REPORT FOR BULK EARTHWORKS FILLING OPERATIONS WOODLINKS ESTATE – STAGE 8 COLLINGWOOD PARK

Earthworks filling operations were carried out on Lot 191 at the above Development to form a working platform to support a future residential building. Earthworks were constructed by Golding Contactors (The Client) between 4th October 2018 and 5th October 2018. This report should be read in conjunction with Morrison Geotechnic Report “13977 – DL18/312 – Goldings – Woodlinks Village, Stage 8 – Level One Report” Dated 26th October 2018. The Brief from the Client was limited to:

• Level One Inspection of the placement and compaction of fill materials in accordance with AS3798 2007 – “Guidelines on Earthworks for Commercial and Residential Developments”;

• Relative Density Control Testing in accordance with AS1289 – Testing of Soils for Engineering Purposes and at frequencies required in AS3798 Table 8.

• Ipswich City Council Specifications.

• HDR Consulting Pty Ltd Earthworks Layout Plan, Project Number 1410, Drawing Numbers 1410-08-037 and 1410-08-038, Revision 0 dated December 29th August 2018

Level One Inspections and Testing was carried out on the stripped ground surfaces and during the placement and compaction of fill materials. Field and laboratory testing included proof roll testing of the stripped surface, field density testing using the nuclear soil moisture density gauge and standard Compactions. Compaction testing at the Woodlinks Estate, Stage 8 Development was carried out at a frequency of 1 test per 500m3 of placed and compacted fill as defined in AS3798 Table 8.1. Test locations were selected using Random Stratified methods. Compaction testing was carried out at frequencies

- 2 - Job No: DL18/312

Ref: 14018 MORRISON GEOTECHNIC Golding Contractors

representative of the fill volume as a mass. On this basis, compaction testing was not required on each individual Lot. Test performed on filling operations near Lot 191 are representative of the fill constructed on Lot 191. The closest test to Lot 191 was performed on Lot 192. A summary of tests representative of the fill constructed on Lot 192 are presented in Table 1 below.

Table 1: Summary of Testing

Lot Number Test Number Date Tested Density Ratio Achieved %

192 6 5th October 2018 103.0

Note: Laboratory Standard Test Methods Used: AS1289.5.8.1, 5.7.1, 2.1.1.

Fill constructed on Lot 191 has been observed to be placed and compacted in accordance with the Brief. The fill on Lot 191 can be termed as “Controlled Fill” in accordance with AS 2870-2011 “Residential Slabs and Footings”. This statement does not include any top soil, which may have been placed for use as Lot dressing or any other subsequent earthworks after 5th October 2018 If there are any queries concerning the above please do not hesitate to contact this office, or alternatively send to my email at: [email protected]

Yours faithfully,

L. McDOWALL

For and on behalf of

MORRISON GEOTECHNIC PTY LIMITED

Encl: Laboratory Test Report DL18/312 - 2 Brochure: Important Information About Your Geotechnical Engineering Report

Client : GOLDING CONTRACTORS Report Number: DL18/312 - 2

Address : P O BOX 65, ARUNDEL, BC QLD, 4214 Report Date : 12/10/2018

Project Name : EARTHWORKS SUPERVISION Order Number : 4500239124

Project Number : DL18/312 Test Method : AS1289.5.8.1 & 5.7.1

Location: WOODLINKS VILLAGE , STAGE 8

Sample Number : 253513 253514 253515 253516

Test Number : 3 4 5 6

Sampling Method : - - - -

Date Sampled : 5/10/2018 5/10/2018 5/10/2018 5/10/2018

Date Tested : 5/10/2018 5/10/2018 5/10/2018 5/10/2018

Material Type : Fill Fill Fill Fill

Material Source : On Site On Site On Site On Site

Lot Number : - - - -

Sample Location : E 6248.48 E 6241.82 E 6215.06 E 6218.22

N 3762.32 N 3766.27 N 3756.54 N 3770.83

RL 36.29 RL 37.09 RL 37.55 RL 38.30

Test Depth (mm ) : 150 150 150 150

Layer Depth (mm) : 150 150 150 150

Maximum Size (mm) : 19 19 19 19

Oversize Wet (%) : - - - -

Oversize Dry (%) : - - - -

Oversize Density (t/m³) : - - - -

Field Moisture Content (%) : 15.0 16.3 15.1 17.4

Hilf MDR Number : 253513 253514 253515 253516

Hilf MDR Method : AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1

Compactive Effort : Standard Standard Standard Standard

Field Density Method : AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1

Moisture Method : AS1289.2.1.1 AS1289.2.1.1 AS1289.2.1.1 AS1289.2.1.1

Moisture Ratio (%) : 85.5 86.5 86 88

Field Wet Density (t/m³) : 2.011 2.034 1.992 2.041

Optimum Moisture Content (%) : 17.5 18.8 17.6 19.8

Moisture Variation : 2.5 2.5 2.5 2.3

Peak Converted Wet Density

(t/m³) :1.962 1.998 1.924 1.980

Hilf Density Ratio (%) : 102.5 102.0 103.5 103.0

Minimum Specification : 95 95 95 95

Moisture Specification : + or - 2% + or - 2% + or - 2% + or - 2%

Site Selection : - - - -

Soil Description : Silty CLAY Silty CLAY Silty CLAY Silty CLAY

Remarks :

Document Code RF89-11

Hilf Density Ratio Report

Page 1 of 1

-

Accredited for compliance with ISO/IEC 17025.

APPROVED SIGNATORY

Liam Mcdowall (Brisbane) - Branch Manager

NATA Accreditation Number

1162 / 1169

Brisbane | Gold Coast | Maroochydore

Unit 1, 35 Limestone Street (PO Box 3063), Darra Q 4076 P (07) 3279 0900 F (07) 3279 0955

ABN 51 009 878 899

www.morrisongeo.com.au

Brisbane Office Job No: DL18/312 Ref No: 14019 Author: L. McDowall

1st November 2018

Golding Contractors Pty Ltd PO Box 1643 Milton Qld 4064 ATTENTION: MR BEN PALMER Email: [email protected] [email protected] Dear Sir, RE: LOT 192

LEVEL ONE COMPLIANCE REPORT FOR BULK EARTHWORKS FILLING OPERATIONS WOODLINKS ESTATE – STAGE 8 COLLINGWOOD PARK

Earthworks filling operations were carried out on Lot 192 at the above Development to form a working platform to support a future residential building. Earthworks were constructed by Golding Contactors (The Client) between 4th October 2018 and 5th October 2018. This report should be read in conjunction with Morrison Geotechnic Report “13977 – DL18/312 – Goldings – Woodlinks Village, Stage 8 – Level One Report” Dated 26th October 2018. The Brief from the Client was limited to:

• Level One Inspection of the placement and compaction of fill materials in accordance with AS3798 2007 – “Guidelines on Earthworks for Commercial and Residential Developments”;

• Relative Density Control Testing in accordance with AS1289 – Testing of Soils for Engineering Purposes and at frequencies required in AS3798 Table 8.

• Ipswich City Council Specifications.

• HDR Consulting Pty Ltd Earthworks Layout Plan, Project Number 1410, Drawing Numbers 1410-08-037 and 1410-08-038, Revision 0 dated December 29th August 2018

Level One Inspections and Testing was carried out on the stripped ground surfaces and during the placement and compaction of fill materials. Field and laboratory testing included proof roll testing of the stripped surface, field density testing using the nuclear soil moisture density gauge and standard Compactions. Compaction testing at the Woodlinks Estate, Stage 8 Development was carried out at a frequency of 1 test per 500m3 of placed and compacted fill as defined in AS3798 Table 8.1. Test locations were selected using Random Stratified methods. Compaction testing was carried out at frequencies

- 2 - Job No: DL18/312

Ref: 14019 MORRISON GEOTECHNIC Golding Contractors

representative of the fill volume as a mass. On this basis, compaction testing was not required on each individual Lot. A summary of tests representative of the fill constructed on Lot 192 are presented in Table 1 below.

Table 1: Summary of Testing

Lot Number Test Number Date Tested Density Ratio Achieved %

192 6 5th October 2018 103.0

Note: Laboratory Standard Test Methods Used: AS1289.5.8.1, 5.7.1, 2.1.1.

Fill constructed on Lot 192 has been observed to be placed and compacted in accordance with the Brief. The fill on Lot 192 can be termed as “Controlled Fill” in accordance with AS 2870-2011 “Residential Slabs and Footings”. This statement does not include any top soil, which may have been placed for use as Lot dressing or any other subsequent earthworks after 5th October 2018 If there are any queries concerning the above please do not hesitate to contact this office, or alternatively send to my email at: [email protected]

Yours faithfully,

L. McDOWALL

For and on behalf of

MORRISON GEOTECHNIC PTY LIMITED

Encl: Laboratory Test Report DL18/312 - 2 Brochure: Important Information About Your Geotechnical Engineering Report

Client : GOLDING CONTRACTORS Report Number: DL18/312 - 2

Address : P O BOX 65, ARUNDEL, BC QLD, 4214 Report Date : 12/10/2018

Project Name : EARTHWORKS SUPERVISION Order Number : 4500239124

Project Number : DL18/312 Test Method : AS1289.5.8.1 & 5.7.1

Location: WOODLINKS VILLAGE , STAGE 8

Sample Number : 253513 253514 253515 253516

Test Number : 3 4 5 6

Sampling Method : - - - -

Date Sampled : 5/10/2018 5/10/2018 5/10/2018 5/10/2018

Date Tested : 5/10/2018 5/10/2018 5/10/2018 5/10/2018

Material Type : Fill Fill Fill Fill

Material Source : On Site On Site On Site On Site

Lot Number : - - - -

Sample Location : E 6248.48 E 6241.82 E 6215.06 E 6218.22

N 3762.32 N 3766.27 N 3756.54 N 3770.83

RL 36.29 RL 37.09 RL 37.55 RL 38.30

Test Depth (mm ) : 150 150 150 150

Layer Depth (mm) : 150 150 150 150

Maximum Size (mm) : 19 19 19 19

Oversize Wet (%) : - - - -

Oversize Dry (%) : - - - -

Oversize Density (t/m³) : - - - -

Field Moisture Content (%) : 15.0 16.3 15.1 17.4

Hilf MDR Number : 253513 253514 253515 253516

Hilf MDR Method : AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1

Compactive Effort : Standard Standard Standard Standard

Field Density Method : AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1

Moisture Method : AS1289.2.1.1 AS1289.2.1.1 AS1289.2.1.1 AS1289.2.1.1

Moisture Ratio (%) : 85.5 86.5 86 88

Field Wet Density (t/m³) : 2.011 2.034 1.992 2.041

Optimum Moisture Content (%) : 17.5 18.8 17.6 19.8

Moisture Variation : 2.5 2.5 2.5 2.3

Peak Converted Wet Density

(t/m³) :1.962 1.998 1.924 1.980

Hilf Density Ratio (%) : 102.5 102.0 103.5 103.0

Minimum Specification : 95 95 95 95

Moisture Specification : + or - 2% + or - 2% + or - 2% + or - 2%

Site Selection : - - - -

Soil Description : Silty CLAY Silty CLAY Silty CLAY Silty CLAY

Remarks :

Document Code RF89-11

Hilf Density Ratio Report

Page 1 of 1

-

Accredited for compliance with ISO/IEC 17025.

APPROVED SIGNATORY

Liam Mcdowall (Brisbane) - Branch Manager

NATA Accreditation Number

1162 / 1169

Brisbane | Gold Coast | Maroochydore

Unit 1, 35 Limestone Street (PO Box 3063), Darra Q 4076 P (07) 3279 0900 F (07) 3279 0955

ABN 51 009 878 899

www.morrisongeo.com.au

Brisbane Office Job No: DL18/312 Ref No: 14020 Author: L. McDowall

1st November 2018

Golding Contractors Pty Ltd PO Box 1643 Milton Qld 4064 ATTENTION: MR BEN PALMER Email: [email protected] [email protected] Dear Sir, RE: LOT 193

LEVEL ONE COMPLIANCE REPORT FOR BULK EARTHWORKS FILLING OPERATIONS WOODLINKS ESTATE – STAGE 8 COLLINGWOOD PARK

Earthworks filling operations were carried out on Lot 193 at the above Development to form a working platform to support a future residential building. Earthworks were constructed by Golding Contactors (The Client) between 4th October 2018 and 5th October 2018. This report should be read in conjunction with Morrison Geotechnic Report “13977 – DL18/312 – Goldings – Woodlinks Village, Stage 8 – Level One Report” Dated 26th October 2018. The Brief from the Client was limited to:

• Level One Inspection of the placement and compaction of fill materials in accordance with AS3798 2007 – “Guidelines on Earthworks for Commercial and Residential Developments”;

• Relative Density Control Testing in accordance with AS1289 – Testing of Soils for Engineering Purposes and at frequencies required in AS3798 Table 8.

• Ipswich City Council Specifications.

• HDR Consulting Pty Ltd Earthworks Layout Plan, Project Number 1410, Drawing Numbers 1410-08-037 and 1410-08-038, Revision 0 dated December 29th August 2018

Level One Inspections and Testing was carried out on the stripped ground surfaces and during the placement and compaction of fill materials. Field and laboratory testing included proof roll testing of the stripped surface, field density testing using the nuclear soil moisture density gauge and standard Compactions. Compaction testing at the Woodlinks Estate, Stage 8 Development was carried out at a frequency of 1 test per 500m3 of placed and compacted fill as defined in AS3798 Table 8.1. Test locations were selected using Random Stratified methods. Compaction testing was carried out at frequencies

- 2 - Job No: DL18/312

Ref: 14020 MORRISON GEOTECHNIC Golding Contractors

representative of the fill volume as a mass. On this basis, compaction testing was not required on each individual Lot. A summary of tests representative of the fill constructed on Lot 193 are presented in Table 1 below.

Table 1: Summary of Testing

Lot Number Test Number Date Tested Density Ratio Achieved %

193 5 5th October 2018 103.5

Note: Laboratory Standard Test Methods Used: AS1289.5.8.1, 5.7.1, 2.1.1.

Fill constructed on Lot 193 has been observed to be placed and compacted in accordance with the Brief. The fill on Lot 193 can be termed as “Controlled Fill” in accordance with AS 2870-2011 “Residential Slabs and Footings”. This statement does not include any top soil, which may have been placed for use as Lot dressing or any other subsequent earthworks after 5th October 2018 If there are any queries concerning the above please do not hesitate to contact this office, or alternatively send to my email at: [email protected]

Yours faithfully,

L. McDOWALL

For and on behalf of

MORRISON GEOTECHNIC PTY LIMITED

Encl: Laboratory Test Report DL18/312 - 2 Brochure: Important Information About Your Geotechnical Engineering Report

Client : GOLDING CONTRACTORS Report Number: DL18/312 - 2

Address : P O BOX 65, ARUNDEL, BC QLD, 4214 Report Date : 12/10/2018

Project Name : EARTHWORKS SUPERVISION Order Number : 4500239124

Project Number : DL18/312 Test Method : AS1289.5.8.1 & 5.7.1

Location: WOODLINKS VILLAGE , STAGE 8

Sample Number : 253513 253514 253515 253516

Test Number : 3 4 5 6

Sampling Method : - - - -

Date Sampled : 5/10/2018 5/10/2018 5/10/2018 5/10/2018

Date Tested : 5/10/2018 5/10/2018 5/10/2018 5/10/2018

Material Type : Fill Fill Fill Fill

Material Source : On Site On Site On Site On Site

Lot Number : - - - -

Sample Location : E 6248.48 E 6241.82 E 6215.06 E 6218.22

N 3762.32 N 3766.27 N 3756.54 N 3770.83

RL 36.29 RL 37.09 RL 37.55 RL 38.30

Test Depth (mm ) : 150 150 150 150

Layer Depth (mm) : 150 150 150 150

Maximum Size (mm) : 19 19 19 19

Oversize Wet (%) : - - - -

Oversize Dry (%) : - - - -

Oversize Density (t/m³) : - - - -

Field Moisture Content (%) : 15.0 16.3 15.1 17.4

Hilf MDR Number : 253513 253514 253515 253516

Hilf MDR Method : AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1

Compactive Effort : Standard Standard Standard Standard

Field Density Method : AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1

Moisture Method : AS1289.2.1.1 AS1289.2.1.1 AS1289.2.1.1 AS1289.2.1.1

Moisture Ratio (%) : 85.5 86.5 86 88

Field Wet Density (t/m³) : 2.011 2.034 1.992 2.041

Optimum Moisture Content (%) : 17.5 18.8 17.6 19.8

Moisture Variation : 2.5 2.5 2.5 2.3

Peak Converted Wet Density

(t/m³) :1.962 1.998 1.924 1.980

Hilf Density Ratio (%) : 102.5 102.0 103.5 103.0

Minimum Specification : 95 95 95 95

Moisture Specification : + or - 2% + or - 2% + or - 2% + or - 2%

Site Selection : - - - -

Soil Description : Silty CLAY Silty CLAY Silty CLAY Silty CLAY

Remarks :

Document Code RF89-11

Hilf Density Ratio Report

Page 1 of 1

-

Accredited for compliance with ISO/IEC 17025.

APPROVED SIGNATORY

Liam Mcdowall (Brisbane) - Branch Manager

NATA Accreditation Number

1162 / 1169

Brisbane | Gold Coast | Maroochydore

Unit 1, 35 Limestone Street (PO Box 3063), Darra Q 4076 P (07) 3279 0900 F (07) 3279 0955

ABN 51 009 878 899

www.morrisongeo.com.au

Brisbane Office Job No: DL18/312 Ref No: 14021 Author: L. McDowall

1st November 2018

Golding Contractors Pty Ltd PO Box 1643 Milton Qld 4064

ATTENTION: MR BEN PALMER Email: [email protected]

[email protected]

Dear Sir,

RE: LOT 194 LEVEL ONE COMPLIANCE REPORT FOR BULK EARTHWORKS FILLING OPERATIONS WOODLINKS ESTATE – STAGE 8 COLLINGWOOD PARK

Earthworks filling operations were carried out on Lot 194 at the above Development to form a working platform to support a future residential building.

Earthworks were constructed by Golding Contactors (The Client) between 4th October 2018 and 5th October 2018.

This report should be read in conjunction with Morrison Geotechnic Report “13977 – DL18/312 – Goldings – Woodlinks Village, Stage 8 – Level One Report” Dated 26th October 2018.

The Brief from the Client was limited to:

• Level One Inspection of the placement and compaction of fill materials in accordancewith AS3798 2007 – “Guidelines on Earthworks for Commercial and ResidentialDevelopments”;

• Relative Density Control Testing in accordance with AS1289 – Testing of Soils forEngineering Purposes and at frequencies required in AS3798 Table 8.

• Ipswich City Council Specifications.

• HDR Consulting Pty Ltd Earthworks Layout Plan, Project Number 1410,Drawing Numbers 1410-08-037 and 1410-08-038, Revision 0 datedDecember 29th August 2018

Level One Inspections and Testing was carried out on the stripped ground surfaces and during the placement and compaction of fill materials. Field and laboratory testing included proof roll testing of the stripped surface, field density testing using the nuclear soil moisture density gauge and standard Compactions.

Compaction testing at the Woodlinks Estate, Stage 8 Development was carried out at a frequency of 1 test per 500m3 of placed and compacted fill as defined in AS3798 Table 8.1. Test locations were selected using Random Stratified methods. Compaction testing was carried out at frequencies

- 2 - Job No: DL18/312

Ref: 14021 MORRISON GEOTECHNIC Golding Contractors

representative of the fill volume as a mass. On this basis, compaction testing was not required on each individual Lot. Test performed on filling operations near Lot 194 are representative of the fill constructed on Lot 194. The closest test to Lot 194 was performed on Lot 193. A summary of tests representative of the fill constructed on Lot 194 are presented in Table 1 below.

Table 1: Summary of Testing

Lot Number Test Number Date Tested Density Ratio Achieved %

193 5 5th October 2018 103.5

Note: Laboratory Standard Test Methods Used: AS1289.5.8.1, 5.7.1, 2.1.1.

Fill constructed on Lot 194 has been observed to be placed and compacted in accordance with the Brief. The fill on Lot 194 can be termed as “Controlled Fill” in accordance with AS 2870-2011 “Residential Slabs and Footings”. This statement does not include any top soil, which may have been placed for use as Lot dressing or any other subsequent earthworks after 5th October 2018 If there are any queries concerning the above please do not hesitate to contact this office, or alternatively send to my email at: [email protected]

Yours faithfully,

L. McDOWALL

For and on behalf of

MORRISON GEOTECHNIC PTY LIMITED

Encl: Laboratory Test Report DL18/312 - 2 Brochure: Important Information About Your Geotechnical Engineering Report

Client : GOLDING CONTRACTORS Report Number: DL18/312 - 2

Address : P O BOX 65, ARUNDEL, BC QLD, 4214 Report Date : 12/10/2018

Project Name : EARTHWORKS SUPERVISION Order Number : 4500239124

Project Number : DL18/312 Test Method : AS1289.5.8.1 & 5.7.1

Location: WOODLINKS VILLAGE , STAGE 8

Sample Number : 253513 253514 253515 253516

Test Number : 3 4 5 6

Sampling Method : - - - -

Date Sampled : 5/10/2018 5/10/2018 5/10/2018 5/10/2018

Date Tested : 5/10/2018 5/10/2018 5/10/2018 5/10/2018

Material Type : Fill Fill Fill Fill

Material Source : On Site On Site On Site On Site

Lot Number : - - - -

Sample Location : E 6248.48 E 6241.82 E 6215.06 E 6218.22

N 3762.32 N 3766.27 N 3756.54 N 3770.83

RL 36.29 RL 37.09 RL 37.55 RL 38.30

Test Depth (mm ) : 150 150 150 150

Layer Depth (mm) : 150 150 150 150

Maximum Size (mm) : 19 19 19 19

Oversize Wet (%) : - - - -

Oversize Dry (%) : - - - -

Oversize Density (t/m³) : - - - -

Field Moisture Content (%) : 15.0 16.3 15.1 17.4

Hilf MDR Number : 253513 253514 253515 253516

Hilf MDR Method : AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1 AS1289.5.1.1 & 5.7.1

Compactive Effort : Standard Standard Standard Standard

Field Density Method : AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1 AS1289.5.8.1 & 5.7.1

Moisture Method : AS1289.2.1.1 AS1289.2.1.1 AS1289.2.1.1 AS1289.2.1.1

Moisture Ratio (%) : 85.5 86.5 86 88

Field Wet Density (t/m³) : 2.011 2.034 1.992 2.041

Optimum Moisture Content (%) : 17.5 18.8 17.6 19.8

Moisture Variation : 2.5 2.5 2.5 2.3

Peak Converted Wet Density

(t/m³) :1.962 1.998 1.924 1.980

Hilf Density Ratio (%) : 102.5 102.0 103.5 103.0

Minimum Specification : 95 95 95 95

Moisture Specification : + or - 2% + or - 2% + or - 2% + or - 2%

Site Selection : - - - -

Soil Description : Silty CLAY Silty CLAY Silty CLAY Silty CLAY

Remarks :

Document Code RF89-11

Hilf Density Ratio Report

Page 1 of 1

-

Accredited for compliance with ISO/IEC 17025.

APPROVED SIGNATORY

Liam Mcdowall (Brisbane) - Branch Manager

NATA Accreditation Number

1162 / 1169