Broadway IMPROVEMENT PROJECT EUCLID TO COUNTRY CLUB Public Review Draft Design Concept Report December 8, 2015 Broadwayboulevard.info

Upload: others

Post on 12-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Broadwaybroadwayboulevard.info/pdf/0-Broadway-DCR-Public... · Broadway IMPROVEMENT PROJECT EUCLID TO COUNTRY CLUB Public Review Draft Design Concept Report December’8,’2015’!!!!

 

   

Broadway IMPROVEMENT PROJECT EUCLID TO COUNTRY CLUB

Public Review Draft Design Concept Report December  8,  2015    

 

 

 

Broadwayboulevard.info    

 

Page 2: Broadwaybroadwayboulevard.info/pdf/0-Broadway-DCR-Public... · Broadway IMPROVEMENT PROJECT EUCLID TO COUNTRY CLUB Public Review Draft Design Concept Report December’8,’2015’!!!!

 

   

 

 

 

 

 

 

 

 

 

 

 

THIS  PAGE  INTENTIONALLY  LEFT  BLANK  

 

Page 3: Broadwaybroadwayboulevard.info/pdf/0-Broadway-DCR-Public... · Broadway IMPROVEMENT PROJECT EUCLID TO COUNTRY CLUB Public Review Draft Design Concept Report December’8,’2015’!!!!

 

 

December  8,  2015   Public  Review  Draft            |            i.i  

Broadway IMPROVEMENT PROJECT

 

ACKNOWLEDGEMENTS    

The  Tucson  Department  of  Transportation  and  the  Broadway  Boulevard  Planning/Design  Team  wish  to  thank  the  members  of  the  Broadway  Boulevard  Citizen  Task  Force  for  their  ongoing  commitment,  participation,  and  guidance  during  the  of  the  preliminary  design  phase  of  the  project  which  led  to  the  production  of  this  Design  Concept  Report  and  the  pending  30  percent  

Construction  Plans.    

Current  Citizens  Task  Force  Members  Bob  Belman  –  Transportation  Director  Appointee  Representing  Business  Interests  

Michael  Butterbrodt  –  Regional  Transportation  Authority  (RTA)  Appointee  Representing  Regional  Interests  Dale  Calvert  –  Citizens  Transportation  Advisory  Committee  (CTAC)  Appointee  

Anthony  “Rocco”  DiGrazia  –  Transportation  Director  Appointee  Representing  Business  Interests  Mary  Durham-­‐Pflibsen,  Chairperson  –  Transportation  Director  Appointee  Representing  Neighborhoods  Bruce  Fairchild,  Vice  Chairperson  –  Transportation  Director  Appointee  Representing  Business  Interests  

Colby  Henley  –  Transportation  Director  Appointee  Representing  Neighborhoods  Jon  Howe  –  Transportation  Director  Appointee  Representing  Special  Needs  

Shannon  McBride-­‐Olson  –  Transportation  Director  Appointee  Representing  the  Planning  Commission  Anne  Padias,  Ph.D.  –  Tucson-­‐Pima  County  Bicycle  Advisory  Committee  Appointee  Representing  Alternative  Modes  of  Transportation  

Shirley  Papuga,  Ph.D.  –  Transportation  Director  Appointee  Representing  Neighborhoods  Diane  Robles,  MBA  –  Transportation  Director  Appointee  Representing  Business  Interests  Michael  Jamey  Sumner  –  Transportation  Director  Appointee  Representing  Neighborhoods  

 Former  Citizens  Task  Force  Members  

Steven  Eddy,  AICP  –  Transportation  Director  Appointee  Representing  the  Planning  Commission    Farhad  Moghimi  –  Citizens  Transportation  Advisory  Committee  (CTAC)  Appointee  

Joseph  Maher,  Jr.,  AIA    –  Transportation  Director  Appointee  Representing  the  Planning  Commission  Naomi  McIsaac  –  Tucson-­‐Pima  County  Bicycle  Advisory  Committee  Appointee  Representing  Alternative  Modes  of  Transportation  

Elizabeth  A.  Scott,  MLA  –  Tucson-­‐Pima  County  Bicycle  Advisory  Committee  Appointee  Representing  Alternative  Modes  of  Transportation    

SPECIAL  THANKS  Special  thanks  are  extended  to  representatives  of  Broadway  Boulevard  neighborhoods  and  Broadway  Boulevard  businesses,  and  to  the  community  for  participating  and  providing  thoughtful  

input  at  Broadway  Boulevard  workshops,  open  houses,  and  community  conversations.      

Page 4: Broadwaybroadwayboulevard.info/pdf/0-Broadway-DCR-Public... · Broadway IMPROVEMENT PROJECT EUCLID TO COUNTRY CLUB Public Review Draft Design Concept Report December’8,’2015’!!!!

 

   

 i.ii            |            Public  Review  Draft   December  8,  2015  

Broadway IMPROVEMENT PROJECT

 

Broadway  Boulevard  Improvement  Project:  Euclid  to  Country  Club    

Public  Review  Draft  Design  Concept  Report  

   

December  8,  2015      

Prepared  for    

City  of  Tucson,  Department  of  Transportation  

   

Prepared  by    

HDR  Engineering,  Inc.    

In  association  with    

Community  Design  +  Architecture,  Inc.  

Kaneen  Advertising  &  Public  Relations,  Inc.  

Kittelson  &  Associates,  Inc.  

Swaim  Associates,  Ltd.  

Tierra  Right  of  Way  Services,  Ltd.  

 

Page 5: Broadwaybroadwayboulevard.info/pdf/0-Broadway-DCR-Public... · Broadway IMPROVEMENT PROJECT EUCLID TO COUNTRY CLUB Public Review Draft Design Concept Report December’8,’2015’!!!!

 

 

December  8,  2015   Public  Review  Draft            |            i.iii  

Broadway IMPROVEMENT PROJECT

TABLE OF CONTENTS ACKNOWLEDGEMENTS  ............................................................  i.i  

TITLE  PAGE    ..............................................................................  i.ii  

TABLE  OF  CONTENTS    ...............................................................  i.iii  

EXECUTIVE  SUMMARY  .............................................................  ii.i  

1  INTRODUCTION    ...................................................................  1.1  1.1  Project  Need   1.1  

1.2  Project  Purpose   1.1  

1.3  Study  Area  and  Project  Limits   1.1  

1.4  Funding  Partners   1.2  

1.5  Getting  from  Project  Initiation  to  the  Recommended  Design  Concept   1.2  

2  PROJECT  INITIATION  .............................................................  2.1  2.1  Context  Sensitive  Solutions   2.1  

2.2  Public  Process   2.1  

3  EXISTING  CONDITIONS  .........................................................  3.1  3.1  Community  Character  and  Sense  of  Place   3.1  

3.2  Transportation   3.12  

3.3  Infrastructure   3.14  

3.4  Environmental   3.15  

4  PLANNING  AND  SCOPING  .....................................................  4.1  4.1  Project  Vision  Statement  and  Goals   4.1  

4.2  Performance  Measures   4.2  

4.3  Public  Meeting  #3  September  26,  2013   4.10  

4.4  Initial  Concept  Screening   4.14  

5  PRELIMINARY  DESIGN  DEVELOPMENT  .................................  5.1  5.1  Refined  Corridor  Configuration   5.1  

5.2  Public  Meeting  #4  June  12,  2014   5.9  

5.3  July  2014  Business  and  Property  Owner  Meetings   5.13  

5.4  Moving  Towards  a  Consolidated  Alignment   5.13  

5.5  Tucson  Mayor  and  Council  Study  Session,  October  9,  2014   5.19  

6  RECOMMENDED  DESIGN  CONCEPT  .....................................  6.1  6.1  Identification  of  Recommended  Design  Concept   6.1  

6.2  Base  Alignment  Concept   6.5  

6.3  Mayor  and  Council  Adoption  of  Baseline  Alignment  Concept,  June  9,  2015   6.6  

7  DESIGN  DEVELOPMENT  OF  BASELINE  ALIGNMENT  CONCEPT  ........    7.1  7.1  Alignment  and  Street-­‐Width  Refinements   7.1  

7.2  Intersection  and  Traffic  Signal  Design   7.5  

7.3  Access  Management   7.5  

7.4  Property  Impact  Mitigation   7.6  

7.5  Drainage   7.7  

Page 6: Broadwaybroadwayboulevard.info/pdf/0-Broadway-DCR-Public... · Broadway IMPROVEMENT PROJECT EUCLID TO COUNTRY CLUB Public Review Draft Design Concept Report December’8,’2015’!!!!

 

   

 i.iv            |            Public  Review  Draft   December  8,  2015  

Broadway IMPROVEMENT PROJECT

7.6  Utilities   7.7  

8  DESIGN  CRITERIA  ..................................................................  8.1  8.1  Geometric  Design  Criteria   8.1  

8.2  Pavement  Design  Criteria   8.3  

8.3  Drainage  Design  Criteria   8.3  

8.4  Street  and  Intersection  Lighting  Design  Criteria   8.3  

8.5  Streetscape,  Landscape,  and  Public  Art   8.3  

9  PROJECT  IMPLEMENTATION  ................................................  9.1  9.1  Opinions  of  Construction  Cost   9.1  

9.2  Opinions  of  Property  Acquisition  Cost   9.1  

9.3  Project  Delivery  Phasing  Plan   9.1  

Page 7: Broadwaybroadwayboulevard.info/pdf/0-Broadway-DCR-Public... · Broadway IMPROVEMENT PROJECT EUCLID TO COUNTRY CLUB Public Review Draft Design Concept Report December’8,’2015’!!!!

December 8, 2015 PUBLIC REVIEW DRAFT | ii.i

To be prepared for next draft of Broadway Boulevard Improvement Design Concept Report

Page 8: Broadwaybroadwayboulevard.info/pdf/0-Broadway-DCR-Public... · Broadway IMPROVEMENT PROJECT EUCLID TO COUNTRY CLUB Public Review Draft Design Concept Report December’8,’2015’!!!!

1.2 | PUBLIC REVIEW DRAFT November 13, 2015