broadway street viaduct improvement, pre-load testing and geotech report workshop consultant...
Embed Size (px)
TRANSCRIPT

Broadway Street Viaduct Improvement, Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Pre-Load Testing and Geotech Report
WorkshopWorkshop
Consultant PresentationIowa DOT
2nd April 2007

Workshop GoalsWorkshop Goals Agree on recommended bridge and Agree on recommended bridge and
foundation alternative to be carried foundation alternative to be carried forward into preliminary design.forward into preliminary design.
Decide if bridge and geotechnical reports Decide if bridge and geotechnical reports will be combined into one final report.will be combined into one final report.
Discuss level of effort anticipated in Discuss level of effort anticipated in conducting the pre-final design load conducting the pre-final design load testing program for the post-grouted testing program for the post-grouted drilled shafts drilled shafts

Information from February 2006 PIMInformation from February 2006 PIM

Overview of Bridge Replacement OptionsOverview of Bridge Replacement Options
Update to bridge options and schedules Update to bridge options and schedules presented in the June 2006 Draft Bridge presented in the June 2006 Draft Bridge ReportReport
Three bridge replacement optionsThree bridge replacement options
Three bridge lengthening alternativesThree bridge lengthening alternatives
Drilled shafts as foundationsDrilled shafts as foundations

Bridge Construction CostsBridge Construction Costs

Summary of OptionsSummary of Options
OptionOption Estimated Estimated Construction Cost Construction Cost
Estimated Time Estimated Time For CompletionFor Completion
1. Least Cost1. Least Cost $ 10.1 million$ 10.1 million 10 months10 months
2. Shortest 2. Shortest ScheduleSchedule $ 16.5 million$ 16.5 million 7 months7 months
3. Hybrid3. Hybrid $ 10.2 million$ 10.2 million 9 months9 months
Costs do not include approach slabs, demolition and mobilization.Costs do not include approach slabs, demolition and mobilization.

Option 1: Least CostOption 1: Least Cost

Option 1: Least CostOption 1: Least Cost

Option 2: Shortest ScheduleOption 2: Shortest Schedule

Option 2: Shortest ScheduleOption 2: Shortest Schedule

Option 3: Hybrid ConceptOption 3: Hybrid Concept

Option 3: Hybrid ConceptOption 3: Hybrid Concept

Lengthening the BridgeLengthening the Bridge
Construction Cost ImplicationsConstruction Cost Implications
Soil Remediation and Retaining Wall Soil Remediation and Retaining Wall ImplicationsImplications
Lengthening OptionsLengthening Options

Lengthening the BridgeLengthening the Bridge

Lengthening the BridgeLengthening the Bridge Alternate 1Alternate 1
Extend bridge 37’-6” at east endExtend bridge 37’-6” at east end Extend bridge 25’-0” at west endExtend bridge 25’-0” at west end Sloping ground under bridgeSloping ground under bridge MSE walls along sidesMSE walls along sides
Alternate 2Alternate 2 Extend bridge 100’-0” at east endExtend bridge 100’-0” at east end Provides 9’-0” min. vertical clearance under bridgeProvides 9’-0” min. vertical clearance under bridge MSE walls in front of abutmentsMSE walls in front of abutments
Alternate 3Alternate 3 Extend bridge 200’-0” at west endExtend bridge 200’-0” at west end Extend bridge 250’-0” at east endExtend bridge 250’-0” at east end Provides 2’-0” min. vertical clearance under bridgeProvides 2’-0” min. vertical clearance under bridge Soil remediation significantly reducedSoil remediation significantly reduced Cantilevered retaining wall likely used for remaining Cantilevered retaining wall likely used for remaining
short fill heightsshort fill heights

Lengthening the BridgeLengthening the Bridge

Lengthening the BridgeLengthening the Bridge
Alternate 1Alternate 1 Alternate 2Alternate 2 Alternate 3Alternate 3
BridgeBridge $ 500,000$ 500,000 $ 800,000$ 800,000 $ 3,600,000$ 3,600,000
Slope PavingSlope Paving $ 45,000$ 45,000 $ 0$ 0 $ 0$ 0
MSE WallMSE Wall ($ 170,000)($ 170,000) ($ 117,000)($ 117,000) ($ 1,000,000)($ 1,000,000)
Soil Soil RemediationRemediation ($ 40,000)($ 40,000) ($ 75,000)($ 75,000) ($ 600,000)($ 600,000)
Pavement & Pavement & BarrierBarrier ($ 47,000)($ 47,000) ($ 75,000)($ 75,000) ($ 334,000)($ 334,000)
Net CostNet Cost $ 288,000$ 288,000 $ 533,000$ 533,000 $ 1,666,000$ 1,666,000
Average Net Cost for Additional Bridge Length = $ 4,600 / ft.Average Net Cost for Additional Bridge Length = $ 4,600 / ft.

Foundation and Soil Remediation Foundation and Soil Remediation OptionsOptions
Post-grouted Drilled ShaftsPost-grouted Drilled Shafts
Drilled Shafts Socketed in BedrockDrilled Shafts Socketed in Bedrock
CMC Ground Improvements at Bridge CMC Ground Improvements at Bridge ApproachesApproaches
Lightweight Foamed Concrete Fill at Lightweight Foamed Concrete Fill at ApproachesApproaches

Drilled Shaft Load Test Program Drilled Shaft Load Test Program
Expected ScheduleExpected Schedule
Level of Effort Required from Level of Effort Required from CH2M HILLCH2M HILL

Bridge AestheticsBridge Aesthetics
Piers, Abutments, Retaining WallsPiers, Abutments, Retaining Walls
Bridge Railings, Barriers, BeamsBridge Railings, Barriers, Beams
Coloring textures, RusticationsColoring textures, Rustications
LightingLighting