millennium minerals Limited:Millennium Minerals Limited Continues Fast Rising Gold ProductionBuilding on immense momentum and significant productivity from Nullagine Gold Project Written by: Andrew Rossillo Produced by: James Hayes

Page 3: Brochure - Millennium Minerals

1 4 9 A u g u s t 2 0 1 4 www.mi l lenn iumminera ls .com.au 1 5 0

Millennium Minerals Limited is an emerging metals company focused on the exploration and development of a large tenement portfolio in the East Pilbara region of Western Australia.

“We are a greenfield organisation and we sit on gold fields that we control completely. And these gold fields are seriously underexplored, so we have a lot of organic growth potential. We’re making some money in this type of environment,”

says Millennium’s CEO Brian Rear.The Company’s gold project

contains a 1.91 million ounce gold Mineral Resource situated within nine deposits on granted mining leases. The largest deposit is Golden Eagle, located approximately 10 kilometres south of the township of Nullagine and contains 42 percent of the total Mineral Resource inventory. Mine construction commenced in July 2011 with first gold poured 30 September 2012. Commercial

The Company produced approximately 64,000 ounces gold in 2013.

production was declared from 1 January 2013. The Company produced approximately 64,000 ounces gold in 2013. The current Ore Reserve as of March 2014 contains 464,000 ounces gold.

Nullagine Gold Project Millennium Minerals owns and operates the Nullagine Gold Project in West Australia’s East Pilbara region. Results from initial feasibility studies of the operation indicated

the following: A stage one reserve of 10.45 Mt at 1.7g/t containing 567,000 ounces, using a cut-off grade of 0.5g/t, a mine life of seven years, producing 504,000 ounces from the process plant, and an ore reserve estimate totalling 16.3 million tons at 1.4 grams per ton for 741,000 ounces of gold.

The Nullagine Gold Project has just come off its first full year of gold production. “We commissioned late September of

Page 4: Brochure - Millennium Minerals

miLLennium mineraLs L imited M i N i N G

www.mi l lenn iumminera ls .com.au 1 5 2

the previous year, so we ramped up very rapidly. January of last year, we went to commercial production and we had a good run,” says Rear.

Mine design and scheduling is driven to maximise gold production for an annual throughput of around 70,000 ounces. Millennium aims to maximise gold recovery closer to 100,000 ounces per annum.

“We invested about $30 million

dollars of cash into the operation. We also raised approximately $7 million for that as well. We also put about $19 million back into the continuing development of the project. We paid about 25 percent of our debt as well. Our official profit was around $41 million,” says Rear.

Treatment Plant The ore treatment plant is located

Unit 2/23 Dillington PassLandsdale WA 6065Phone: (08) 9303 4687Fax: (08) 9303 4354Email: [email protected]

SAFETY • QUALITY • SERVICE

In our “pursuit of excellence” Redline Drill & Blast offers both the experience and diversity, to provide individually tailored Drill and Blast services to meet with jobsite

production and environmental requirements.

• Experience and ability to service both large and small scale operations.

• Safe, efficient and cost effective Drill and Blast services

•• Multi-skilled personnel base able to meet with evolving site specific requirements

• A well maintained fleet of drill rigs, vehicles and ancillary equipment

•• Controlled storage, transport and safe use of explosives

supplier profile Redline dRill & Blasty Pty ltd

Employees: 22Established: 2005industry: Drilling & Blasting Contractor - Mining & CivilServices: Delivering Drilling & Blasting Services to Mining & Construction industry.We tailor services specific to the project requirements, including;Project Management Drill & Blast, Drilling, Shot firing, Labour hireField Service Technicians, Freight (Hotshots)A quality service focused on Safety Goals, Production Schedules, Completion Deadlines and Budget Constraints on every project we undertake.Ongoing Projects: Millennium Minerals Limited - Nullagine Gold ProjectMidwest Vanadium Pty Ltd - Windimurra Vanadium ProjectManagement: Kurt Kjellgren - DirectorRon Sutton - DirectorPaul Pendlebury - Operations Manager

Website: www.redlinedb.com

Page 5: Brochure - Millennium Minerals

miLLennium mineraLs L imited M i N i N G

www.mi l lenn iumminera ls .com.au 1 5 4

approximately 10 kilometres south of the Nullagine gold mining operations. As the area is one of the hottest in Australia, work areas and equipment conditions are designed to take into account these adverse climatic issues.

Ore is mined and delivered from open pits to a 150,000 tonne capacity stockpile where a front end loader rehandles the ore into a ROM (run-

of-mine) crusher feed bin. “We’re looking at where we need to tweak the process to make sure we can get our tonnage up into that area,” says Rear. Separate smaller stockpiles account for varying material hardness and grade, allowing for blending and throughput optimisation.

Crushed material is transported using conveyor belts to a coarse ore stockpile.

WPH Plant Hire Crushing ServicesLevel 1, 195 Great Eastern Highway Belmont WA 6104

Phone: 61 8 9437 9911Email: [email protected]

At WPH we deliver innovative turnkey project solutions that match our clients’ specialised needs. Our reputation as an industry leader in the Western Australian mining and civil construction is the result of over 100 years cumulative experience in successfully delivering plant hire, fleet solutions, crushing and screening, and personnel support for our clients across the state.

We operate in a number of sectors which include: • Mining and Minerals • Construction and Civil works

• Industrial • Bulk Haulage

WPH Plant Hire Crushing ServicesA progressive mining services provider

WPH are committed to providing the highest quality service to our clients. Our ability to deliver safe, on time, on budget and innovative turnkey solutions, coupled with our outstanding customer support and world-class equipment sets us apart from other contractors.

WPH has three main business divisions;

1. Plant Hire

2. Crushing and Screening services

3. NEMMS Joint Venture – An indigenous contracting division

Currently underpinned by long term contracts with Rio Tinto and Millennium Minerals, WPH has a demonstrated capability of moving and processing large volumes of material safely and cost effectively.

it comes with great pride that WPH was awarded the Nullagine Gold project for Millennium Minerals. The 5 year contract is a fully maintained solution, consisting of two 80t fleets, one 100t fleet and all ancillary equipment.

Website: www.wph.net.au

supplier profile WPH Plant HiRe CRusHing seRviCes

Page 6: Brochure - Millennium Minerals

M i N i N G

www.mi l lenn iumminera ls .com.au 1 5 6

miLLennium mineraLs L imited

Specialist Support for the World’s Mining Industry

Boliver International in partnership with the Sino Grinding Group of companies promotes our forged steel grinding media for both SAG and ball mills on a global level, providing its clients with regular on-site technical support, whilst proactively carrying out advanced research and development to meet specific milling operations.

Our main product is QUALITY and SERVICE

Boliver InternationalT: +61 8 9317 6177E: [email protected]

Sino Grinding Industries Pty LtdT: +61 3 9545 0199E: [email protected]

Company information

i n d u s t ry

Mining

h e a d q u a rt e r s

West Perth, Western

Australia

e m p L o y e e s

120

r e v e n u e

103 Million

p r o d u c t s /

s e r v i c e s

Millennium Minerals

Limited’s core purpose

is to create a profitable

mid-tier gold producing

company generating

value for shareholders

whilst continually

seeking additional

opportunities to

increase shareholder

value through further

development of organic

growth opportunities.

flows over a vibrating screen and undersized materials report to a concentrator to remove any free gold. The screened oversize is directed back to the mill feed chute, while the concentrator tails are returned to the mill discharge launder. The cyclone overflow from the trash screens passes into a CiL circuit of tanks. The first three tanks are fitted with oxygen injection to accelerate gold absorption.

Moving forward, Rear informed that the Company is looking forward to “improving our margins and generating sufficient cash to get into a position to take advantage of all the potential of our gold fields.”

Two variable spread apron feeds draw from the stockpile feeding the SAG (semi-autogenous) mill, ensuring a constant supply. Slurry from the mill is pumped to a cluster of hydrocyclones where it is split into two streams — overflow and underflow. The overflow feeds onto vibrating trash screens to remove oversized material which is returned to the mill. Undersized material continues into the leach circuit.

The underflow returns to the mill. A proportion of the underflow

Minning site 2014

Page 7: Brochure - Millennium Minerals

miLLennium mineraLs Limited

10 Kings park road

West perth

Western australia

australia

6005

tel. 61 8 9216 9011 www.millenniumminerals.com.au