BRPP U-2 Dropped Load
Near-Miss Incident September 29, 2012
Investigation Results and Lessons Learned
An example of a new Secondary Superheater
tube pendent
1
NOTE: the access door cut in the side of
Unit 2 Boiler
2
3
Tugger/load
transfer
begins here
The tugger hook used. Note the broken safety
latch and side load distortion of the hook….
4
5
The boiler access door from the inside, looking
west. Contractors ran toward the west
6
Mangled scaffold planks laying in the east
bottom ash hopper
7
Superheater tube bundle slid through the bull nose
into the bottom ash (landed on the east apex)
8
9
10
11
12
An eye swivel replaced the hook
13