Sources of Electricity
BUILDING | SERVICES | TWO (BLD60503)
BUILDING | SERVICES | TWO (BLD60503)
BUILDING | SERVICES | TWO (BLD60503)
BUILDING | SERVICES | TWO (BLD60503)
BUILDING | SERVICES | TWO (BLD60503)
BUILDING | SERVICES | TWO (BLD60503)
BUILDING | SERVICES | TWO (BLD60503)
3 major classifications for power production in reasonably large scale are :-
1) Thermal power generation 2) Nuclear power generation. 3) Hydro-electric power generation.
BUILDING | SERVICES | TWO (BLD60503)
BUILDING | SERVICES | TWO (BLD60503)
BUILDING | SERVICES | TWO (BLD60503)
BUILDING | SERVICES | TWO (BLD60503)
BUILDING | SERVICES | TWO (BLD60503)
Electrical supply and distribution
•Fuel converted to steam at high temperature and pressure, to drive turbines which generate electricity at 25kV alternating current.•AC changes polarity from positive to negative at 50 cycles per second (50 hertz)
BUILDING | SERVICES | TWO (BLD60503)
Electrical supply and distribution
BUILDING | SERVICES | TWO (BLD60503)
Electrical supply and distribution
Reasons power is supplied in Alternating Current (AC) at 50 Hertz:
•Facility of generating machines•Ease of transformation•Use of electricity powered AC motors
BUILDING | SERVICES | TWO (BLD60503)
Electrical supply and distribution132, 275 or 400 kV: National transmission
33 000 V: Large/Heavy industries, cities, towns and railways
11 000 V: Light Industries, hospitals, towns and villages
400 V: Small industries, offices, farms etc
230 V: Housing, schools, small commercial premises.
BUILDING | SERVICES | TWO (BLD60503)
Electrical supply and distribution
• All but 230 V is supplied with 3 phases: domestic appliances and standard office equipment are designed to operate from only one phase.
• 33 000 V, three phase supply to railway operators via sub-station where it is transformed to 25 000 V DC
BUILDING | SERVICES | TWO (BLD60503)
Local distribution-Three phase and single phase supply
BUILDING | SERVICES | TWO (BLD60503)
Local distribution-Three phase & single phase
Generators at power station are wound with three conductors.•Each generate one phase•Three phases into 3 wires
Called ‘three phase three wire’ supply
BUILDING | SERVICES | TWO (BLD60503)
Local distribution-Three phase form
At secondary side of transformer at sub-station:•Any pair of three wire is 415 volts•Any of three conductors is 240 volts
Called ‘three phase four wire; supply
BUILDING | SERVICES | TWO (BLD60503)
Local distribution
Service cable supply to external meter cupboard
BUILDING | SERVICES | TWO (BLD60503)
Local distribution
Incoming cable
BUILDING | SERVICES | TWO (BLD60503)
Local distribution Overhead cable
BUILDING | SERVICES | TWO (BLD60503)
Local distribution -TT System
BUILDING | SERVICES | TWO (BLD60503)
TT System• Supplied overhead without earth terminal• Consumer to provide earth electrode.• Residual current circuit breaker (or trip switch) provided
between meter & consumer unit.• RCCB operate on imbalance between the phase or live
conductor and the neutral.• A fault will energise the core coil to effect the
electromagnetic trip.
BUILDING | SERVICES | TWO (BLD60503)
TN-S System
BUILDING | SERVICES | TWO (BLD60503)
TN-S System• Applied to underground supplies • Metal sheathed and/or armoured cable.• Consumer’s terminal connected to metal sheath
BUILDING | SERVICES | TWO (BLD60503)
TN-C System• Earth and neutral
conductors combine to provide a protective earth and neutral (PEN) or Protective multi earthing(PME)
BUILDING | SERVICES | TWO (BLD60503)
Consumer unit
BUILDING | SERVICES | TWO (BLD60503)
Electrical Meter
• One rate (tariff) – domestic consumers
• Off peak & on peak meters
BUILDING | SERVICES | TWO (BLD60503)
Electrical Meter•Two coils: current coil connect to phase and & voltage coil across phase & neutral•Interaction of two energises a dics which rotates at speeds proportional to power consumed•Gears driven disc effect a digital display of energy consumed in KWh
BUILDING | SERVICES | TWO (BLD60503)
Overload Protection
• Need to prevent current leaks from electrical installation due to insulation failure in the electrical circuit.
• Earth Leakage circuit breaker detects earth leakage current and makes the power supply off by opening the associated circuit breaker.
BUILDING | SERVICES | TWO (BLD60503)
Overload Protection
This can be provided by:
1. Semi-enclosed rewirable fuses2. Cartridge fuses3. Miniature circuit breakers (MCB)
BUILDING | SERVICES | TWO (BLD60503)
Overload protection
BUILDING | SERVICES | TWO (BLD60503)
Overload protection
BUILDING | SERVICES | TWO (BLD60503)
BUILDING | SERVICES | TWO (BLD60503)
BUILDING | SERVICES | TWO (BLD60503)
1. Semi-enclosed rewirable fuses
• Advantages • Low capital cost• Cheap to replace element• Simple in concept• No moving parts
BUILDING | SERVICES | TWO (BLD60503)
Disadvantages
•Prone to abuse. Incorrect wire can be used•Deterioration with age•Reliability can vary, with temperature & fixing method.•Cannot be tested•Cannot be replaced quickly•Fusing factor higher than current rating
BUILDING | SERVICES | TWO (BLD60503)
2. Cartridge fuses
Advantages•Small and compact•No moving parts•Accurate and consistent to declared rating•Will not deteriorate in protective tube
BUILDING | SERVICES | TWO (BLD60503)
2. Cartridge fuses
Disadvantages•Cannot be repaired or reset, must be replaced•Prone to abuse (with metal foil)•Much more expensive than fuse wire
BUILDING | SERVICES | TWO (BLD60503)
3. Miniature Circuit breaker
Advantages•No moving parts•Accurate and consistent to declared rating•Durable•Can be reset
BUILDING | SERVICES | TWO (BLD60503)
3. Miniature Circuit Breaker
Disadvantages•Cannot be repaired, must be replaced•Much more expensive than fuse wire
BUILDING | SERVICES | TWO (BLD60503)