bts 2000 bus transfer system
TRANSCRIPT
-
8/10/2019 BTS 2000 Bus Transfer System
1/20
BTS 2000MICROPROCESSOR BASED
FAST BUS TRANSFERSYSTEM
-
8/10/2019 BTS 2000 Bus Transfer System
2/20
18 January2014
Aartech Solonics Ltd. 2
Advantages of aFast Bus Transfer System
Fast Transfer of Load to a HealthyAlternate Source
Faster Unit Recovery after Tripping Improved Plant Load Factor
Reduced Revenue Losses
Reduced Motor Stress and Fatigue
Reduced O&M Costs
-
8/10/2019 BTS 2000 Bus Transfer System
3/20
18 January2014
Aartech Solonics Ltd. 3
inBus Transfer
Systems
25 Years of Rich Experience, R&D 400+ Nos Bus Transfer Systems
Schemes executed all over India Worked with major Engineering
Consultancies, Utilities, EPCContractors, SwitchgearManufacturers in India
Technology Transfer Agreementsigned with Cooper Power Systems,USA for Aartechs BTS 2000
Only Microprocessor Based FastBus Transfer System Manufacturerin India and one of a handfulglobally.
-
8/10/2019 BTS 2000 Bus Transfer System
4/20
18 January2014
Aartech Solonics Ltd. 4
Main-Tie (2 Breaker Scheme)Eg. Thermal Power Station Auxiliaries
Configurations : Station to Unit Transfer
Unit to Station Transfer
Transfer Conditions Manual Transfer
Planned start-ups Planned shut-downs
Protective Transfer Class A Trip
Gen / Transformer Trip
Load Throwoff
Class B Trip Boiler, Turbine Trips
Auto Transfer Self Detection
BTS
MM
GT
GENERATOR
GTB EHV BUS STB
ST
ST I/C
UNIT
BOARD
TIE-1 TIE-2
(NC)
UAT
UAT I/C
STATION
BOARD
Fig. 1. Thermal power plant: Main-Tie BTS configuration.
-
8/10/2019 BTS 2000 Bus Transfer System
5/20
18 January2014
Aartech Solonics Ltd. 5
Unit To Station + Station toStation (4 Breaker Scheme)
Eg. Industrial Process Plant Auxiliaries Configurations :
Normally Closed Tie Breaker
Normally Open Tie Breaker
Transfer Conditions
Manual Transfer
Planned start-ups
Planned shut-downs
Protective Transfer Source equipment failure
Eg, Gen / Transformer Trip
Automatic Transfer
Under Voltage/Frequency/|df/dt|
-
8/10/2019 BTS 2000 Bus Transfer System
6/20
18 January2014
Aartech Solonics Ltd. 6
Main-Tie-Main (3 Breaker Scheme)Eg. Industrial Process Plant
Auxiliaries Configurations :
Normally Closed Tie Breaker
Normally Open Tie Breaker
Transfer Conditions
Manual Transfer
Planned start-ups
Planned shut-downs
Protective Transfer
Source equipment failure
Eg, Gen / Transformer Trip
Automatic Transfer
Under Voltage/Frequency/|df/dt|
BTS
SOURCE I SOURCE II
I/C I
BREAKER
I/C II
BREAKER
BUS I BUS II
TIE
BREAKERM M M M
Fig. 2. Process industry: Main-Tie-Main BTS configuration
-
8/10/2019 BTS 2000 Bus Transfer System
7/20
18 January2014
Aartech Solonics Ltd. 7
BTS 2000A Technology Profile
An Industrially rugged, fastmicroprocessor based universalcommunicable platform
Specially designed for power stations andEHV substations
Flexible Breaker Configurations: UTS: Unit-to-Station / Main-Tie
STS: Station-to-Station / Main-Tie-Main
UTU:Unit-to-Unit / Main-Tie-Main
For Generator Units with GTB Arrangement
Various Other Custom Configurations
-
8/10/2019 BTS 2000 Bus Transfer System
8/20
18 January2014
Aartech Solonics Ltd. 8
BTS 2000A Technology Profile
Manual/Protective/Auto Transfers
Fast/In Phase/Slow/Parallel Modes
Breaker Failure Detection and CorrectiveAction, Breaker Timings
Continuous Readiness Monitoring
Continuous Breaker Circuit Monitoring
Online / Offline Test Mode Feature ANSI C50.41 Criterion Supervision
Prioritized Auxiliary Motor Tripping
-
8/10/2019 BTS 2000 Bus Transfer System
9/20
18 January2014
Aartech Solonics Ltd. 9
BTS 2000A Technology Profile
Self Diagnostics
Serial Communications (RS232C, RS485)
Protocols: ModBus, DNP, UCA, PEERCOMM
SCADA interface for Online View
Event Recording with Oscillography & Playback
Powerful User Friendly Human MachineInterface
Sequence of Event Recording (SOE)
Data Profiler (DP)
-
8/10/2019 BTS 2000 Bus Transfer System
10/20
18 January2014
Aartech Solonics Ltd. 10
Outstanding Features ofBTS 2000
ANSI C50.41 Compliant In Phase Transfer (2ndOrder Taylors Algorithm
for Phase Angle Predictions) Auto Transfer (U/V, Freq, df/dt) Islanded Transfer for Asynchronous Systems Online Test Mode for Enhanced Operator
Confidence prior to Planned Transfers. Communicable Platform with Advanced
Software Features Transfer Event Recording, Step-by-Step Playback, Oscillography,
Online Viewing, Sequence of Events (SOE), Data Profiler (DP),Convenient in-situ scheme/settings updates
-
8/10/2019 BTS 2000 Bus Transfer System
11/20
18 January2014
Aartech Solonics Ltd. 11
Spin Down Characteristics
-
8/10/2019 BTS 2000 Bus Transfer System
12/20
18 January2014
Aartech Solonics Ltd. 12
Spin Down Characteristics
-
8/10/2019 BTS 2000 Bus Transfer System
13/20
18 January2014
Aartech Solonics Ltd. 13
Fast Transfer
-
8/10/2019 BTS 2000 Bus Transfer System
14/20
18 January2014
Aartech Solonics Ltd. 14
In-Phase Transfer
-
8/10/2019 BTS 2000 Bus Transfer System
15/20
18 January2014
Aartech Solonics Ltd. 15
BTS 2000 HMI
-
8/10/2019 BTS 2000 Bus Transfer System
16/20
18 January2014
Aartech Solonics Ltd. 16
Software Interface
-
8/10/2019 BTS 2000 Bus Transfer System
17/20
18 January2014
Aartech Solonics Ltd. 17
Exhibitions & Conferences
PowerGen International
New Orleans, USA, Nov-Dec 1999
3rd Intl R&D Conference (CBIP)
Hosted by MPEB at Jabalpur (MP), Feb 2000
SWICON 2000
Organised by IEEMA in Nov-Dec 2000
PPIC / IEEE Industry Applications (IAS)Toronto, Canada June 2002
Published in IEEE IAS Transactions Jan-Feb 2003
-
8/10/2019 BTS 2000 Bus Transfer System
18/20
18 January2014
Aartech Solonics Ltd. 18
Exhibitions & Conferences
Power Gen Middle East 2008Bahrain, Feb
2008
IEEE Power India POWERCON 2008
New Delhi, India, Dec 2008
National Power System Conference, IIT
Bombay, India, Dec 2008
-
8/10/2019 BTS 2000 Bus Transfer System
19/20
18 January2014
Aartech Solonics Ltd. 19
Approvals & Installations
Customer Approvals:
NPCIL, MSEB (MAHAGENCO), CSEB, GEB, MPEB,GMDC, PSEB, NTPC-SAIL, APGENCO, GIPCL, GSECL,RRVUNL, BALCO, BHAVINI etc
Consultant Approvals:BHEL-PEM, DESEIN, TCE, DCPL, B&W, MOTTMACDONALD, RITE CHOICE etc.
Supply through EPC Contractors:
RELIANCE, SIEMENS EPC, ABB-eBOP, L&T ECC, BGRENERGY etc.
Supply through Switchgear Manufacturers:
BHEL, SIEMENS, AREVA, ABB etc.
-
8/10/2019 BTS 2000 Bus Transfer System
20/20
18 January2014
Aartech Solonics Ltd. 20
Thank You for your Interest & Participation
For Further Details Contact:Aartech Solonics Limited
Regd. Office:E-2/57,
Arera Colony,
Bhopal (MP) 462016
India.
Tel: 91-755-5276335,
2463593
Manufacturing Works:Khasra No. 311,
Sector-1A,
Parwanoo, H.P. 173220
India.
Email: [email protected] [email protected]
mailto:[email protected]:[email protected]:[email protected]:[email protected]:[email protected]