    To increase uptime of BTS without

    increasing the energy consumption appears to becontradictory but by better management of

    resources, we can achieve target for both the

    entities.

  • 8/6/2019 BTS Up Time & Energy Managementx

    3/21

    Categorize all the BTS in A,B,C categories.

    A category - 24 hours

    B category - Minimum 20 hours

    C category - Minimum 12 hours

    (Copy of Proposed A,B,C category of BTS

    circulated)

    Make available electricity connections to all sites

    within two months.

    Arrange sufficient & effective watch and ward at

    remote sites.

  • 8/6/2019 BTS Up Time & Energy Managementx

    4/21

    Make availability of a portable DG set in DE(Rural)

    & DE(Datia) areas.

    Keep sufficient spare of SUMA Cards, TRE&

    Combiner etc.

    Prompt action for restoration of optical fiber cable

    in case of damage. Timely escalation of fault to appropriate authorities

    for restoration/co-ordination.

  • 8/6/2019 BTS Up Time & Energy Managementx

    5/21

    Save Diesel.

    Save Electricity.

  • 8/6/2019 BTS Up Time & Energy Managementx

    6/21

    ` Save recurring diesel charges .

    ` Increase profitability of company.

    ` Reduce air &sound pollution.

    ` Save scarce global resource.

  • 8/6/2019 BTS Up Time & Energy Managementx

    7/21

    1. GET MPEB SUPPLY QUICKLY.

    2. GET UNITERRUPTED SUPPLY.

    3. REMOTE SITES ON SOLAR PANEL.

    4. SCRAPE BATTERY SETS & POWER MODULE.

    5. REQUIRMENT TO CIRCLE OFFICE.

    6. ENHANCE BATTERY BACKUP.

    7. MAINTENANCE OF ENGINE ALTERNATOR.

    8. MAINTENANCE OF POWER PLANT.

    9. MAINTENANCE OF VEHICLE.

    10. INSPECTION.

    11. BE VIGILANT.

  • 8/6/2019 BTS Up Time & Energy Managementx

    8/21

    Possibility may be explored the connect remote sites

    on solar panel. Sites may be proposed.

  • 8/6/2019 BTS Up Time & Energy Managementx

    9/21

    ` Life expired batteries to be scrapped.

    ` Battery Set Life:

    ` Scrape RNP power modules.

    S.No. AH of MF Battery Life prescribed in years

    01. 12 volts/120AH 03 Years

    02. Up to 200AH 04 Years

    03. More than 200AH 06 years

  • 8/6/2019 BTS Up Time & Energy Managementx

    10/21

    ` Daily Checkup of batteries to identify weak cell & timely

    replacement of cell.

    ` Preferably replace cell from same MAKE.

    `

    Set proper battery cut off point at power plant to avoiddeep discharge of batteries.

    ` (MM) to ensure lifting of batteries by field units at least

    one month before the lapse of last date of charging.

    Field officer may positively install & charge the sets

    before last date.` Install adequate capacity of batteries.

  • 8/6/2019 BTS Up Time & Energy Managementx

    11/21

    ` servicing, over hauling, air/fuel filter replacement and

    filling of lubricants of all E/A at prescribed intervals.

    ` AMC Agency of engine alternators .

    ` Docket Number of complain may be obtained from .

    ` Timely scrapping and replacement of engine alternator.

    Life of E/A - Up to 50 KVA - 10 years

    - More Than 50 KVA - 15 years

  • 8/6/2019 BTS Up Time & Energy Managementx

    12/21

    ` Check Fuel average.

    ` Follow Dos & Dont.

    ` Follow prescribed logbook & keep proper records.` Entry in the log book by inspecting officials.

  • 8/6/2019 BTS Up Time & Energy Managementx

    13/21

    ` Put adequate power plant module as per load

    requirement.

    ` Timely repair of faulty power plant modules.

    ` For replacement, use module of same MAKE to set up

    cut off point of batteries.

    ` Timely repair front panel of power plant.

    ` Focus on preventive maintenance.

  • 8/6/2019 BTS Up Time & Energy Managementx

    14/21

    ` Timely repairing & overhauling of vehicles as per

    suppliers schedule.

    ` Use of Quality fuel & lubricants.

    ` servicing from authorized dealer.

    ` Identify life expired vehicle & scrape them in due time.

  • 8/6/2019 BTS Up Time & Energy Managementx

    15/21

    ` Regular inspection

  • 8/6/2019 BTS Up Time & Energy Managementx

    16/21

    ` Ensure proper functioning of hour meters of all engine

    alternator.

    ` Frequently compare reading of logbook with hour meter.

    `

    Seal all the hour meter. If seal found broken, then samemay be investigated.

    ` Milometer of Vehicles has to be in working order.

    ` Logbook/history sheet of vehicle has to be

    maintained/checked.

    ` Keep check on fleet card, petrol pump & other points

    regarding quantity of supply.

  • 8/6/2019 BTS Up Time & Energy Managementx

    17/21

    ` General points.

    ` Avoid penalties.

    ` Decommissioning of spare equipments.

    ` Avoid multiple battery sets and power plant.

  • 8/6/2019 BTS Up Time & Energy Managementx

    18/21

    ` officers may keep a watch on electricity expenditure of each

    exchange.

    ` Temporary connection to be converted to permanent

    connection.

    ` All equipments i.e. computers, printers, tube lights, fans,

    Office ACs, warmers must be powered off when not used.

    ` CRT may be replaced by LCD terminal.

    ` For rented building, check whether electricity is used only

    equipments.

    ` Spare equipments may be switched off.

  • 8/6/2019 BTS Up Time & Energy Managementx

    19/21

    ` Bill should be paid well in time to avoid surcharge claim

    by MPEB.

    ` Power factor penalties to be avoided in consultation with

    electric wing.

    ` As per the usage transformer size can be reduced to

    avoid excess minimum charges in consultation with

    electric wing.

  • 8/6/2019 BTS Up Time & Energy Managementx

    20/21

    ` use one battery and power plant system checking the

    load and decommission extra power plant and battery.

    ` Even At combine station of , use of multiple battery and

    power plant is not permitted now.

  • 8/6/2019 BTS Up Time & Energy Managementx

    21/21

    MAKE A DAILY

    HABIT TO SAVEENERGY