bub project

19
BUB Project Trav-Lg

Upload: claudio-argento

Post on 03-Jul-2015

108 views

Category:

Education


2 download

TRANSCRIPT

Page 1: BUB project

BUB ProjectTrav-Lg

Page 2: BUB project

Our team

Fredéric SalmonProject Manager

Calogero CaruanaProposal Manager

Arnaud SchoonbroodtSales Representative

Yves KoschnickeFinancial Controller

Maxime MathySupplier Subcontractor

Georges CechagiasQuality Controller

Raphael Vega ArredondasSolution Architect

Simon BrouwersSolution Architect

Claudio ArgentoProposal Editor

Page 3: BUB project

Overview

11223344

Deliverables

ConstraintsConstraints

Solution DescriptionSolution Description

Financial Aspects & TermsFinancial Aspects & Terms

Page 4: BUB project

11223344

Deliverables

Constraints

Solution DescriptionSolution Description

Financial Aspects & TermsFinancial Aspects & Terms

Overview

Page 5: BUB project

11223344

Deliverables

ConstraintsConstraints

Solution Description

Financial Aspects & TermsFinancial Aspects & Terms

Overview

Page 6: BUB project

Overview

11223344

Deliverables

ConstraintsConstraints

Solution DescriptionSolution Description

Financial Aspects & Terms

Page 7: BUB project

Deliverables

‣ Proposal document‣ Proposal presentation‣ Contract

Trav-Lg

Page 8: BUB project

Constraints‣ Exclusive formula‣ No kids. No pets.‣ Gastronomic level meals (Vegetarian, Halal, Kosher options)‣ Internet connection everywhere‣ Sunny weather‣ At most 6 hours transportation time

‣ Sport, entertainment, visits, concerts‣ 2 half-a-day free time (for tax reasons)‣ A one-day seminar‣ One “dîner de gala“ for the 30th BUB Anniversary‣ Free cancellation for every participant. At any time.

Page 9: BUB project

Solution Description

‣ Main advantages of Tuscany‣ Transportation‣ Accomodation‣ Day to day description

Page 10: BUB project

• Sunny weather

• Short flight time

• Many cities to enjoy

• One of the richest places in the world in terms of Culture, Architecture

Main advantages of Tuscany

• Gastronomic level restaurants

• Wine tours

• Beautiful landscapes

• Many Universities

• Part of the Euro zone

Page 11: BUB project

Transportation

‣ Meeting at the station (Bruxelles-Centrale), 6.30 pm

‣ Train to Charleroi Airport, 7.02 pm

‣ Take-off at 10.15 pm

‣ Landing at Pisa, 11.55 pm

‣ Welcomed by 3 buses. 1 hour 30 minutes road to Florence‣ Settling down at the Hotel

Page 12: BUB project

Accomodation - N H An g lo

Am e ri can

‣ Quiet yet central location in Florence‣ Classically-styled hotel‣ Antique furniture and impressive paintings of the Florentine school of 1800‣ Close to the railway station and bus terminal‣ The rooms offer satellite TV, air conditioning, mini bars, and Wi-Fi access, with plenty of room to relax‣ Buffet breakfast, with typical Florentine pastries, or Tuscan savories  

Page 13: BUB project

Day 1

‣ Seminar‣ Lunch at the Hotel‣ Case-study and debate

Page 14: BUB project

Day 2

‣ Breakfast at the Hotel‣ Bus to Volterra. Free time.‣ Lunch in a typical restaurant‣ Bus to the charming village of San Gimignano. Accompanied by a guide.‣ Back to Florence for dinner

Page 15: BUB project

Day 3

‣ Visit of Florence and the main historical and cultural places (the Uffizzi Gallery, the Ponte Vecchio, the University of Florence...)‣ Lunch in the city center‣ Afternoon : free time in the streets of Florence and meeting at the Hotel‣ At night : Gala dinner in the finest restaurant

Page 16: BUB project

Day 4

‣ Visit of Siena and its medieval center‣ A professional will guide us through the city‣ We will have lunch and dinner there‣ Back to Florence at night

Page 17: BUB project

Day 5

‣ Pack up, breakfast then check-out‣ Bus to Pisa‣ Visit of the famous Field of Miracles and its tower‣ Free walk in the streets the city‣ Meeting at the buses‣ Departure: Flight at 8pm - Arrival at 9.50pm

Page 18: BUB project

The Purple comparison

Purple comparisonPurple comparison

Name Fonctionality 1 Fonctionality 2 Fonctionality 3 Fonctionality 4 Fonctionality 5

Product A Yes Yes Yes

Product B Yes Yes Yes

Product C Yes Yes Yes

Product D Yes Yes Yes

Nice to haveNice to have

Page 19: BUB project

Any question?

Thank You