buckskin mining company 12/02/2012 ambient air …deq.wyoming.gov/media/attachments/air...
TRANSCRIPT
Buckskin Mining Company
12/02/2012
Ambient Air Exceedance
Documentation
12/02/2012
AIR QUALITY ALERT MESSAGENATIONAL WEATHER SERVICE RAPID CITY SD325 AM MST SUN DEC 2 2012
...BLOWING DUST HEALTH ALERT IN EFFECT FOR THE ENTIRE POWDER RIVERBASEST OF NORTHEASTERN WYOMING FROM 1000 AM MST THIS MORNING UNTIL800 PM MST THIS EVENING...
SOUTHWESTERLY WINDS WILL INCREASE THIS MORNING ACROSS CAMPBELLCOUNTY. SUSTAINED WINDS OF 25 TO 35 MPH...WITH GUSTS TO NEAR 50MPH...ARE EXPECTED FROM LATE THIS MORNING THROUGH EARLY THISEVENING.
THE WYOMING AIR QUALITY DIVISION RECOMMENDS THE ELDERLY...YOUNGCHILDREN...AND INDFVIDUALS WITH RESPIRATORY PROBLEMS AVOIDEXCESSIVEPHYSICAL EXERTION AND MINIMIZE OUTDOOR ACTIVITIES DURING THIS TIME.ALTHOUGH THESE PEOPLE ARE MOST SUSCEPTIBLE TO HEALTH IMPACTS...THE
AIR QUALITY DIVISION ALSO ADVISES THAT EVERYONE SHOULD AVOIDPROLONGED EXPOSURE TO THE POOR AIR QUALITY CONDITIONS.
:)
Tanner B. ShattoDistrict 3 EngineerWyoming Department of Environmental QualityAir Quality DivisionDirect: (307)675-5626Office: (307)673-9337 >
Fax: (307)672-2213tanner. shatto(%wyo_aoy
12/11/2012
1
Landon.Smith
From: Landon.SmithSent: Tuesday, December 11, 2012 11:34 AMTo: Tanner Shatto ([email protected])Cc: Kirk Billings ([email protected]); Greg Passini ([email protected]);
Rick.Comer; Matt.Young; Conan.MullaneySubject: Buckskin Mine December 2, 2012 PM 10 Exceedance
TrackingTracking: Recipient Read
Tanner Shatto ([email protected])
Kirk Billings ([email protected])
Greg Passini ([email protected])
Rick.Comer Read: 12/11/2012 12:06 PM
Matt.Young Read: 12/11/2012 1:59 PM
Conan.Mullaney Read: 12/11/2012 11:34 AM
Mr. Shatto,
On December, 2nd 2012 Buckskin Mine exceeded the 24 hour particulate matter (PM10) concentration on the North TEOM. Preliminary data shows a concentration of 167.8 µg/m3 for the before listed date. Buckskin is requesting that this data be flagged due to exceptionally high winds that day. Buckskin is currently gathering data, and will send a report in a timely manner.
If you have any questions please do not hesitate to contact myself or Greg Passini ([email protected]).
Thank you
Landon A. Smith Environmental Coordinator BUCKSKIN MINING COMPANY PO Box 3027, Gillette, WY 82716 Office: (307) 686‐5404 Fax: (307)‐686‐5445
12/21/2012
Decembe
Cara KeslaWyomingAir Qualit112 WestCheyenne RE: RequeNatural HBuckskin Dear Cara
Oconcentrato be flagBuckskin’s
Throughowere coupcontrol duaccordancMeasuresin the attawould stil
Buckskin
If there ar
Sincerely,
Landon SmEnvironmLandon.SmPhone: (3 cc: Greg Pa
r 21, 2012
ar g Departmenty Division 25th Street
e, WY 82002
est for use ofHigh Wind and
Mine, Air Qu
a,
On December ations on our ged due to a s TEOM’s we
out the 24hr ppled with susust levels in tce with the Ns). Along withached data. Hll have been o
is hereby req
re any questio
mith ental Coordinmith@Kiewit07) 686-5404
assini, Tanner S
BUCKBU
of Environm
f Natural Evend Blowing Du
uality Permit #
2, 2012 the BNorth TEOMnatural high wre being impa
period, as thetained windshe air. In this EAP for Coal (3.4.2 Categ
However, eveover allowabl
questing this
ons, please d
nator .com
4
Shatto, Kirk Bil
KSKIN MUCKSKIN MINE, P
ental Quality
nts Action Plaust Event on 1#MD-11186
Buckskin Mine. With the attwind event thacted from th
attached doc as high as 41particular sitMines in the ory 2: Addition if the mine e limits.
exceedance
o not hesitate
lings
MINING
PO BOX 3027 ~ GILL
an (NEAP) fo12-02-2012.
e experiencedtached documhat was widehe regional ar
cumentation 1.6 mph. In thtuation, alteraPowder Rive
onal Best Conhad complet
be flagged as
e to contact m
COMPALETTE, WY 82717
r variance on
d an exceedamentation, Buspread throu
rea as well as
indicates, wihose situationations in prod
er Basin (3.4.3ntrol Measuretely shut dow
s an exceptio
me
ANY 7
n Air Quality E
nce of allowauckskin is req
ughout northefrom mining
ind gusts peans, very little duction were3 Category 3: es) that will be
wn operations
onal event.
Exceedance d
able particulaquesting this eeastern Wyomoperations.
ked at 63.3 mcan be done made in Reactionary
e discussed fus, the dust lev
due to
ate event ming.
mph and to
Control urther vels
Natural E
Bwinds weresulted Data fromthe hourduring ththis perioconcentrmph comstrong w
Discussio
Meteoro
Ogusts rechours of this samereports aexceedaninformat
PM10 Mo
Bsystem cmine. Aloprovides this dataat the TEour TEOMinvolve r
Event Summ
uckskin Minere as high ain an exceed
m the north ly concentra
his period waod with a corations and t
ming from aninds were po
on
ological Infor
On Decembecorded up to10:00 AM ae time at 63an average wnce was the ion please s
onitoring Equ
uckskin Minalled the Noong with amreal time w, a TEOM Ac
EOM, an emaM consultanunning more
BUCKBU
mary
ning Companas 41mph fordance of theTEOM show
ations recordas 699.26 µgncentration time frame wn average azossible that
rmation
r 2, the avero 63.3 mph ond 3:00 PM,.3 mph. Five
wind speed oresult of excee attached
uipment
ning Companorth and the
mbient air moind speed, w
ction Plan waail notificatiot IML. With e water truc
KSKIN MUCKSKIN MINE, P
ny underwenr the 24 hou
e 24 hour airws the majorded from 11g/m3. The higof 980.8 µg
with an averimuth of 200day, and to
rage wind spout of the so, averaging 3
e year historof 10.87 mphceptionally h tables and c
ny has impleWest TEOM
onitoring, a wwind directioas created aon is sent tothese notific
cks, lowering
MINING
PO BOX 3027 ~ GILL
nt a high winur period witr particulate r contributor:00 AM untigh concentr/m3. Wind sage wind sp0 degrees. Otake precau
peed for the uth. Highest
39.37 mph. Tic data provh. This informhigh winds ocharts at the
mented a reMS, based on
weather staton, temperatnd impleme the superincations, a sug backfills, or
COMPALETTE, WY 82717
nd event on th gusts up tconcentrati
r to exceedinil 3:00 PM. Tration for thespeed coincidpeed of 39.37Operations wutions accord
24 hour pert wind speedThe highest ided by the mation suppon Decembee back of thi
eal time contn their geogrtion was plature humidit
ented. Whenntendents, euitable respor shutting do
ANY 7
December 2to 63.3 mph.ion of Bucksng the 24 hoThe average e day was alded with the7 mph and a
were notifiedding to our T
riod was 25.ds were recogust was alsNorth TEOM
ports that Bur 2, 2012. Fos document
tinuous dataraphical placaced by the Nty, and solar
never a bencngineers, m
onse is enactown product
2, 2012. Sust. This event kin’s north T
our standardconcentratiso reached e before listea high gust od at 8:47 AMTEOM action
74 mph, witorded betweso recorded
M’s MET statuckskin’s or additionat.
a monitoringcement at thNorth TEOMr radiation. Wchmark is reaine manageted that coution.
tained
TEOM. d was on during ed
of 63.3 M that n plan.
th een the during
tion
l
g he
M and With ached r and ld
North TE
Ohourly cograduallyTEOM shwinds. Itsdecrease
Operatio
Bmining awas sentto these cautionin3.4.3 catand movtruck to tconcentrrecordedaction pladded. Bwere schwere recand prodmonitorewere beiexceptiothe back
OM (Downw
On Decembeoncentrationy, until the fihowed the sas concentrat
ed to a final 2
ons Reaction
MC has instctivities dur from the TEalerts, a ‘Blo
ng that high egory 3 of thed all backfithat run. Coration level od at 63.3 mpan advises t
BMC usually heduled to b
orded from duction was ed. Superinteng suppressnally high wof this pack
BUCKBU
wind) and W
r 2, the down at 11:00 AMinal 24 hour ame responstion peaked 24 hour con
ary Control
ated a TEOMing periods oEOM at 10:0owing dust hwinds were he Natural Ell operationncentrationsof 27.7 and 3h which elevo use any mbegins luncegin at 10:310:00am – 2at a minimuendents doc
sed by the 2 inds, Bucksk
ket can provi
KSKIN MUCKSKIN MINE, P
West TEOM (U
wnwind NortM of 980.8 µconcentrati
se in terms oat 10:00 AMcentration o
Measures
M Action Plaof high conc
00 am, followhealth alert’
in the forecEvents Actions to the lows at this time34.7 µg/m3 rvated the hoeans to conthes at 11:000am and las2:00am, the m. BMC’s ac
cumented thwater truck
kin would hade visual ref
MINING
PO BOX 3027 ~ GILL
Upwind)
h TEOM Moµg/m3 at whion level wasof times of in
M with a readof 25.3 µg/m
n that providcentrations. Owed by a Hig
email was scast for the dn Plan for thest bench, be, 8:00am-9respectivelyourly concentrol dust. An
0am. With thst through 1:
time at whiction plan rehat dust leves, short hau
ave remainedference.
COMPALETTE, WY 82717
onitoring locaich time cons reached atncreased coding of 130.5
m3.
des structurOn Decemb
gh 1 hour conent to the pday. As suchhe Coal Minebackfill 3, an:41am were. At 9:42am
ntration to 8n additional he condition:00pm. The hich operatioequires that els stemmingls and lowerd under the
ANY 7
ation recordncentration t 170 µg/m3.ncentration 5 µg/m3 and
re for tempoer 2, 2012 ancentration it superinte, superinten
es of the Powd assigned a
e still at an acthe highest 78 µg/m3. A20,000 gal w
ns as they wehighest concns lunches wdust levels i
g from operar backfills, an150 µg/m3
ded a peak inlevels began. The Upwinin response
d gradually
orary alterat high wind aat 10:00 amndents at 8:
ndents referrwder River Ba 30,000gal wcceptable wind gust w
At this time, water truck were, 30min lucentration lewere taking in the pit beations in thend without tlimit. Picture
n n to fall d West
e to the
ion of alert
m. Prior 47am red to
Basin water
was BMC’s was unches evels place
e pit the es in
Timeline
0 0 0 1
1 1 1 1
Photos o
C
Best Ava
-
-
-
- - -
-
-
-
of the Even
5:30- Day Sh8:47- Blowin
SuperAssign
9:42- Highes20,00
0:00- High WHigh C
0:30- Early L1:00- Highes4:00- Last 1
24 ho5:00- 1 hour
f the Event
ontained at
ilable Contro
Areas whafter topsDuring threduce duAt the timconstructBuckskin Long termPads in frthat accusource of When posreplacemTopsoil Cowork areaAll of Bucmagnesiu
BUCKBU
t
hift Begins ng Dust Healrintendents mned a 30,000st Recorded 0gal water t
Wind Alert frConcentratioLunches Starst Concentrahour Conceur concentrar Concentrat
the back of
ol Measures
ere topsoil hsoil replaceme operation
ust emissionme of the eve
ed has no final
m out-of-pit oont of truck mulates on tfugitive dus
ssible, Bucksent concurreontractors, aa. kskin’s perm
um chloride a
KSKIN MUCKSKIN MINE, P
lth Alert Advmoved to on0gal water trWind Gust:
truck added-rom TEOM son Alert fromrted ation Recordntration leveation level ation Levels b
this docume
s
has been repment
of topsoil sts.
ent, all topso
graded backoverburden dumps are
the pads duest. skin schedulently to minand Scoria C
manent roadannually to p
MINING
PO BOX 3027 ~ GILL
visory from Ane low backfruck to BF3 R63.3mph
-operated foent to appro
m TEOM 878
ded 980.8 µgel over 150 µ
alert sent frobelow 150 µg
entation.
placed are ri
tripping, the
oil operation
kfill larger thand topsoil cleaned, tree to spillage
es topsoil reimize open
Contractors a
s and areas prevent dust
COMPALETTE, WY 82717
AQD sent tofill, backfill 3Run-operate
or the rest ofopriate BMC8.8 µg/m3
g/m3 during µg/m3
om TEOM at g/m3 limit at
pped and se
e active oper
ns were com
han 300 contpiles are se
eated, and me from being
emoval, gradareas
are required
around facilt.
ANY 7
o pit superint3 ed for the re
f shift C Staff.
the time of
153 µg/m3 t 114.7 µg/m
eeded as soo
ration is freq
mplete, and w
tiguous acreeded.
maintained to pulverized a
ding backfill,
to apply wa
lities are tre
tendents
est of shift
limited prod
m3
on as its prac
quently wate
windrows we
es
o prevent mand a poten
, and topsoil
ater around
ated with
duction
ctical
ered to
ere
aterial tial
their
-
-
-
Historica
Obe provid
General
C
News Ac
From: Tanne District 3 E Wyoming D
Buckskin’20,000 toAs a preveRoad alsoStilling shoperation
l Data for th
On electronicded upon re
Data from th
ontained at
counts of th
er B. Shatto ngineer
Department of Env
...BLOWBASIN OF
SOUTHWCOUNMPH.
THE WYCHILDRENPHYSICAALTHOU
AIR QPR
BUCKBU
s operationao 30,000 galloentative me
o receive maeds, bag hou
ns.
he TEOM Site
c file with thquest by oth
he Event
the back of
e Event
vironmental Quali
NAT
WING DUST HNORTHEASTE
WESTERLY WTY. SUSTAINE...ARE EXPECT
YOMING AIR QN...AND INDIVAL EXERTION AUGH THESE PE
QUALITY DIVROLONGED E
KSKIN MUCKSKIN MINE, P
al areas are ons. asure, Bucksgnesium chluses, and pa
es
e WDEQ in ther means a
this docume
ty AIR QUAL
TIONAL WEAT325 AM M
EALTH ALERTERN WYOMIN
800 PM M
WINDS WILL INED WINDS OFTED FROM LA
QUALITY DIVIVIDUALS WITAND MINIMIZ
EOPLE ARE MOISION ALSO AXPOSURE TO
MINING
PO BOX 3027 ~ GILL
watered con
skin ensuresloride treatmassive enclos
the quarterlys well.
entation in t
LITY ALERT MTHER SERVICEMST SUN DEC
T IN EFFECT FONG FROM 100MST THIS EVE
NCREASE THISF 25 TO 35 MPATE THIS MOR
EVENING.
ISION RECOMH RESPIRATOZE OUTDOOROST SUSCEPT
ADVISES THAT THE POOR A
COMPALETTE, WY 82717
ntinually by
s that nearbyment. sure control
y monitoring
the form of t
ESSAGE E RAPID CITY SC 2 2012
OR THE ENTIR00 AM MST TENING...
S MORNING APH...WITH GURNING THROU
MMENDS THE ORY PROBLEMR ACTIVITIES DTIBLE TO HEAT EVERYONE SAIR QUALITY C
ANY 7
water trucks
y Collins Roa
systems are
g reports. Th
tables and g
SD
RE POWDER RHIS MORNIN
ACROSS CAMPUSTS TO NEAUGH EARLY T
ELDERLY...YOMS AVOID EXCDURING THISLTH IMPACTSSHOULD AVOCONDITIONS.
s ranging fro
ad and McGe
e used in pla
his informat
graphs.
RIVER G UNTIL
PBELL R 50
THIS
OUNG CESSIVE TIME. S...THE
OID
om
ee
ant
ion can
Date/Tim
12: 01: 02: 03: 04: 05: 06: 07: 08: 09: 10: 11: 12: 01: 02: 03: 04: 05: 06: 07: 08: 09: 10: 11:
5yr Wind SpeTable 1: Win
me Wind Speed (m/s)
:00 AM 3:00 AM 2.7:00 AM 3:00 AM 3:00 AM 2.3:00 AM 3.5:00 AM 2.1:00 AM 2.6:00 AM 2.8:00 AM 1.8:00 AM 2:00 AM 1.9:00 PM 1.4:00 PM 2.2:00 PM 3.2:00 PM 4.2:00 PM 2.6:00 PM 6.1:00 PM 7.3:00 PM 4.8:00 PM 5.7:00 PM 4.2:00 PM 3.9:00 PM 5.7eed Averagend speed, Wind gu
BUCKBU
Buc
Wind Speed (mi/hr)
WindDirect
(°)
6.716.046.716.715.147.834.705.826.264.034.474.253.134.927.169.405.82
13.6516.3310.7412.75
9.408.72
12.7510.87
ust speeds, hourly
KSKIN MUCKSKIN MINE, P
kskin M12-
d tion Precip
(in)
200 0179 0183 0209 0233 0350 0166 0163 0167 0150 0162 0177 0182 0265 0268 0235 0245 0230 0227 0200 0203 0202 0199 0205 0
N
y PM10 concentatio
MINING
PO BOX 3027 ~ GILL
Mine No-01-201
Gust (m/s)
Gust (mi/Hr
6.2 135.9 134.5 104.6 105.2 115.5 124.5 103.8 84.3 93.6 83.4 7
3 63.4 74.1 95.9 135.7 125.4 129.3 20
10.5 237.7 178.2 18
8 178.1 188.1 18
Table 1North TEOM
1-Dec-12
ons, and 24-hour P
COMPALETTE, WY 82717
orth TEO12
r)Time of
Gust
HPM
(µ
.9 11:05 PM
.2 12:15 AM
.1 01:32 AM
.3 02:42 AM
.6 03:57 AM
.3 04:53 AM
.1 05:00 AM
.5 06:36 AM
.6 07:53 AM
.1 08:34 AM
.6 09:48 AM
.7 10:14 AM
.6 11:36 AM
.2 12:12 PM
.2 01:50 PM
.8 02:21 PM
.1 03:00 PM
.8 04:30 PM
.5 05:08 PM
.2 06:15 PM
.3 07:15 PM
.9 08:27 PM
.1 09:45 PM
.1 10:38 PM
PM10 concentration
ANY 7
OM
Hourly M Conc (STP)
µg/m^3)
HourlyCon(LTP
(µg/m
6.2
6.3
14
7.7
6.5
7.9
6.5
14.5
21.2
22.7
27.3
28.6
8.7
4.8
-0.8
2.1
7.3
1.5
4.8
1.2
3.6
3.9
3.3
5.6
ns on the North TE
y PM nc P)
m^3)
24-houConc (
(µg/m
5.6
5.7
12.7
6.9
5.9
7.2
6
13.4
19.4
20.7
24.9
25.6
7.7
4.2
-0.7
1.9
6.5
1.4
4.3
1.1
3.3
3.5
3
5.1
EOM on Decembe
ur Avg (STP) m^3)
12.1
11.7
11.6
11.2
10.7
10
9.6
9.8
10.2
10.6
11.2
12.1
12.1
11.8
11.4
10.5
10.2
9.8
9.7
9.4
9.3
9.2
9
9
er 1, 2012.
BUCKBU
Buc
KSKIN MUCKSKIN MINE, P
kskin M12-
MINING
PO BOX 3027 ~ GILL
Mine No-01-201
COMPALETTE, WY 82717
orth TEO12
ANY 7
OM
Date/Tim
12: 01: 02: 03: 04: 05: 06: 07: 08: 09: 10: 11: 12: 01: 02: 03: 04: 05: 06: 07: 08: 09: 10: 11:
5yr Wind SpeTable 2: Win
me Wind Speed (m/s)
:00 AM 4.2:00 AM 4.3:00 AM 3.7:00 AM 4.6:00 AM 4.5:00 AM 4.1:00 AM 7.3:00 AM 7.7:00 AM 7.8:00 AM 9.3:00 AM 17.1:00 AM 18.6:00 PM 17.5:00 PM 18.1:00 PM 16.7:00 PM 13.7:00 PM 13.4:00 PM 14.4:00 PM 15.4:00 PM 15.3:00 PM 15.6:00 PM 15:00 PM 14.6:00 PM 13.3eed Averagend speed, Wind gu
BUCKBU
Buc
12-02
Wind Speed (mi/hr)
WindDirect
(°)
9.409.628.28
10.2910.07
9.1716.3317.2217.4520.8038.2541.6139.1540.4937.3630.6529.9732.2134.4534.2334.9033.5532.6629.7510.87
ust speeds, hourly
KSKIN MUCKSKIN MINE, P
kskin M
2-2012 H
d tion Precip
(in)
161 0171 0173 0192 0180 0158 0181 0173 0156 0176 0194 0186 0188 0190 0189 0191 0192 0197 0201 0203 0207 0208 0217 0246 0
y PM10 concentatio
N
MINING
PO BOX 3027 ~ GILL
Mine No
HIGH W
Gust (m/s)
Gust (mi/Hr
6.5 146.4 146.5 147.7 177.5 167.8 179.8 21
11.5 2512.4 2715.5 3428.3 6326.1 5825.7 5726.1 5824.5 5421.3 4720.4 4520.5 4521.4 4720.8 4621.3 4721.3 4720.8 4622.7 50
average 39.5
Table 2
2-Dec-12
ons, and 24-hour P
North TEOM
COMPALETTE, WY 82717
orth TEO
WIND EV
r)Time of
Gust
HPM
(µ
4.5 11:17 PM4.3 12:24 AM4.5 01:01 AM
.2 02:45 AM
.8 03:17 AM
.4 04:30 AM
.9 05:26 AM
.7 06:56 AM
.7 07:06 AM4.7 08:40 AM
.3 09:42 AM
.4 10:14 AM
.5 11:53 AM
.4 12:01 PM4.8 01:00 PM
.6 02:43 PM
.6 03:59 PM
.9 04:02 PM
.9 05:42 PM
.5 06:06 PM
.6 07:46 PM
.6 08:59 PM
.5 09:14 PM
.8 10:57 PM52PM10 concentration
ANY 7
OM
VENT
Hourly M Conc (STP)
µg/m^3)
HourlyCon(LTP
(µg/m
9.59.99.24.83.98.6
11.68.3
13.530.6
878.8980.8768.7677.3190.7114.7
95.290.862.531.729.421.720.835.4
ns on the North TE
y PM nc P)
m^3)
24-houConc (
(µg/m
8.69
8.44.33.67.9
10.57.4
12.127.2
776.1861.6670.5589.3165.7
99.582.578.854.427.625.618.918.231.2
EOM on Decembe
ur Avg (STP) m^3)
9.19.3
98.98.88.89.18.98.58.9
44.484.3
116.6144.9
153158
161.9165.4167.5168.8169.6169.9170.3
170
er 2, 2012.
BUCKBU
Buc
12-02
KSKIN MUCKSKIN MINE, P
kskin M
2-2012 H
MINING
PO BOX 3027 ~ GILL
Mine No
HIGH W
COMPALETTE, WY 82717
orth TEO
WIND EV
ANY 7
OM
VENT
Date/Tim
12: 01: 02: 03: 04: 05: 06: 07: 08: 09: 10: 11: 12: 01: 02: 03: 04: 05: 06: 07: 08: 09: 10: 11:
5yr Wind SpeTable 3: Win
me Wind Speed (m/s)
:00 AM 3:00 AM 2.7:00 AM 3:00 AM 3:00 AM 2.3:00 AM 3.5:00 AM 2.1:00 AM 2.6:00 AM 2.8:00 AM 1.8:00 AM 2:00 AM 1.9:00 PM 1.4:00 PM 2.2:00 PM 3.2:00 PM 4.2:00 PM 2.6:00 PM 6.1:00 PM 7.3:00 PM 4.8:00 PM 5.7:00 PM 4.2:00 PM 3.9:00 PM 5.7eed Averagend speed, Wind gu
BUCKBU
Buc
Wind Speed (mi/hr)
WindDirect
(°)
6.716.046.716.715.147.834.705.826.264.034.474.253.134.927.169.405.82
13.6516.3310.7412.75
9.408.72
12.7510.87
ust speeds, hourly
KSKIN MUCKSKIN MINE, P
ckskin M
12-
d tion Precip
(in)
200 0179 0183 0209 0233 0350 0166 0163 0167 0150 0162 0177 0182 0265 0268 0235 0245 0230 0227 0200 0203 0202 0199 0205 0
W
y PM10 concentatio
MINING
PO BOX 3027 ~ GILL
Mine We
-01-201
Gust (m/s)
Gust (mi/Hr
6.2 135.9 134.5 104.6 105.2 115.5 124.5 103.8 84.3 93.6 83.4 7
3 63.4 74.1 95.9 135.7 125.4 129.3 20
10.5 237.7 178.2 18
8 178.1 188.1 18
Table 3 West TEOM
1-Dec-12
ons, and 24-hour P
COMPALETTE, WY 82717
est TEO
12
r)Time of
Gust
HPM
(µ
.9 11:05 PM
.2 12:15 AM
.1 01:32 AM
.3 02:42 AM
.6 03:57 AM
.3 04:53 AM
.1 05:00 AM
.5 06:36 AM
.6 07:53 AM
.1 08:34 AM
.6 09:48 AM
.7 10:14 AM
.6 11:36 AM
.2 12:12 PM
.2 01:50 PM
.8 02:21 PM
.1 03:00 PM
.8 04:30 PM
.5 05:08 PM
.2 06:15 PM
.3 07:15 PM
.9 08:27 PM
.1 09:45 PM
.1 10:38 PM
PM10 concentration
ANY 7
OM
Hourly M Conc (STP)
µg/m^3)
HourlyCon(LTP
(µg/m
6
5.4
7.8
7.5
7.2
7.5
5.3
6.5
8.1
7
7.9
6
2.8
2.6
3.2
3.5
5.5
3.2
4.3
4.1
3.6
4.6
3.3
6.4
ns on the West TE
y PM nc P)
m^3)
24-houConc (
(µg/m
5.3
4.8
7
6.7
6.4
6.8
4.8
6
7.3
6.3
7.1
5.3
2.4
2.3
2.8
3
4.9
2.8
3.8
3.7
3.3
4.1
3
5.8
EOM on Decembe
ur Avg (STP) m^3)
9.2
9.2
9.2
9
9
8.9
8.4
8.1
8
7.9
7.8
7.9
7.6
7.3
7.1
6.9
6.4
6.2
6
5.9
5.7
5.5
5.4
5.3
r 1, 2012.
BUCKBU
Buc
KSKIN MUCKSKIN MINE, P
ckskin M
12
MINING
PO BOX 3027 ~ GILL
Mine We
2-1-2012
COMPALETTE, WY 82717
est TEO
2
ANY 7
OM
Date/Tim
12: 01: 02: 03: 04: 05: 06: 07: 08: 09: 10: 11: 12: 01: 02: 03: 04: 05: 06: 07: 08: 09: 10: 11:
5yr wind speTable 4: W
meWind Spee
d (m/s)
00 AM 4.2
00 AM 4.3
00 AM 3.7
00 AM 4.6
00 AM 4.5
00 AM 4.1
00 AM 7.3
00 AM 7.7
00 AM 7.8
00 AM 9.3
00 AM 17.1
00 AM 18.6
:00 PM 17.5
:00 PM 18.1
:00 PM 16.7
:00 PM 13.7
:00 PM 13.4
:00 PM 14.4
:00 PM 15.4
:00 PM 15.3
:00 PM 15.6
:00 PM 15
:00 PM 14.6
:00 PM 13.3
eed averageWind speed, Wind
BUCKBU
Buc
12-2-
Wind Speed (mi/hr)
WinDirec
n (°
9.409.628.28
10.2910.07
9.1716.3317.2217.4520.8038.2541.6139.1540.4937.3630.6529.9732.2134.4534.2334.9033.5532.6629.7510.87
gust speeds, hour
KSKIN MUCKSKIN MINE, P
ckskin M
-2012 H
nd ctio)
Precip (in)
161 0171 0173 0192 0180 0158 0181 0173 0156 0176 0194 0186 0188 0190 0189 0191 0192 0197 0201 0203 0207 0208 0217 0246 0
W
rly PM10 concentatio
MINING
PO BOX 3027 ~ GILL
Mine We
HIGH W
Gust (m/s)
Gust (mi/Hr
6.5 146.4 146.5 147.7 177.5 167.8 179.8 21
11.5 2512.4 2715.5 3428.3 6326.1 5825.7 5726.1 5824.5 5421.3 4720.4 4520.5 4521.4 4720.8 4621.3 4721.3 4720.8 4622.7 50
average 39.5
Table 4West TEOM
2-Dec-12
ons, and 24-hour P
COMPALETTE, WY 82717
est TEO
IND EV
r)Time of
Gust
H
(µ
4.5 11:17 PM
4.3 12:24 AM
4.5 01:01 AM
7.2 02:45 AM
6.8 03:17 AM
7.4 04:30 AM
1.9 05:26 AM
5.7 06:56 AM
7.7 07:06 AM
4.7 08:40 AM
3.3 09:42 AM
8.4 10:14 AM
7.5 11:53 AM
8.4 12:01 PM
4.8 01:00 PM
7.6 02:43 PM
5.6 03:59 PM
5.9 04:02 PM
7.9 05:42 PM
6.5 06:06 PM
7.6 07:46 PM
7.6 08:59 PM
6.5 09:14 PM
0.8 10:57 PM
52PM10 concentrations
ANY 7
OM
ENT
Hourly PM
Conc (STP)
µg/m^3)
HourlyCon(LTP
(µg/m
6.1
4.9
5.4
3.3
3.4
4.6
5.2
4.3
6.3
8.6
130.5
41.8
57.3
58.4
32.3
37.7
35.1
26.1
27.6
25.5
25.5
19.6
17.5
22.7
s on the West TEO
y PM nc P)
m^3)
24-houConc (
(µg/m
5.5
4.4
4.8
2.9
3.1
4.1
4.7
3.8
5.6
7.5
114.1
36.3
49.5
50.4
27.8
32.4
30.1
22.5
23.8
22
22.1
17
15.2
19.8
M on December 2,
ur Avg (STP) m^3)
5.4
5.3
5.3
5.1
4.9
4.8
4.8
4.7
4.7
4.8
9.9
11.4
13.8
16.1
17.4
18.8
20.1
21
21.9
22.8
23.7
24.2
24.8
25.3
2012.
BUCKBU
Buc
12-2-
KSKIN MUCKSKIN MINE, P
ckskin M
-2012 H
MINING
PO BOX 3027 ~ GILL
Mine We
HIGH W
COMPALETTE, WY 82717
est TEO
IND EV
ANY 7
OM
ENT
Pictures
of the Event
BUCKBU
t
KSKIN MUCKSKIN MINE, P
Main Pit
MINING
PO BOX 3027 ~ GILL
Looking Sou
COMPALETTE, WY 82717
uth East
ANY 7
BUCKBU
KSKIN MUCKSKIN MINE, P
Main
MINING
PO BOX 3027 ~ GILL
Pit Looking E
COMPALETTE, WY 82717
East
ANY 7
BUCKBU
KSKIN MUCKSKIN MINE, P
Water Truck
MINING
PO BOX 3027 ~ GILL
k on the Bac
COMPALETTE, WY 82717
ckfill 3 Run
ANY 7
BUCKBU
KSKIN MUCKSKIN MINE, P
Main Pit L
MINING
PO BOX 3027 ~ GILL
Looking Sout
COMPALETTE, WY 82717
th West
ANY 7
Fug
BUCKBU
itive Dust Co
KSKIN MUCKSKIN MINE, P
oming from
MINING
PO BOX 3027 ~ GILL
Rawhide Mi
COMPALETTE, WY 82717
ine Outside
ANY 7
of Our Permmit
Metrologgical Figures
BUCKBU
KSKIN MUCKSKIN MINE, P
MINING
PO BOX 3027 ~ GILL
COMPALETTE, WY 82717
ANY 7
BUCKBU
KSKIN MUCKSKIN MINE, P
MINING
PO BOX 3027 ~ GILL
COMPALETTE, WY 82717
ANY 7
LOW WATER
CROSSING
LOW WATER
CROSSING
NORTHEAST
LOW-WATER CROSSING
SOUTHWEST
LOW-WATER CROSSING
(Not Constructed as of 05/10)
P
O
S
S
I
B
L
E
F
U
T
U
R
E
P
E
R
I
M
E
T
E
R
R
O
A
D
WATERING
STATION
S
E
D
2
2
R
O
A
D
TS-9
(2001-EOM)
TS-1
(1981-POSTMINING)
TS-13
(2002-EOM)
ARTS-NO.1
ARTS-NO.3
ARTS-NO.6
ARTS-NO.8
ARTS-NO.11
ARTS-NO.15
ARTS-NO.13
ARTS-NO.2
ARTS-NO.4
ARTS-NO.5
ARTS-NO.7
ARTS-NO.9
ARTS-NO.10
ARTS-NO.12
ARTS-NO.14
RRTS-NO.1
RRTS-NO.2
RRTS-NO.3
RRTS-NO.4
RRTS-NO.5
RRTS-NO.8
RRTS-NO.10
RRTS-NO.7
RRTS-NO.12
RRTS-NO.14
RRTS-NO.15
RRTS-NO.16
RRTS-NO.18
RRTS-NO.17
RRTS-NO.19
SARTS
NO-1
TS-10
(1996-EOM)
TS-6
(1991-EOM)
TS-4
(1991-EOM)
TS-21
(2007-EOM)
T
S
-
1
9
(
2
0
0
9
-
E
O
M
)
TS-22
(2010-EOM)
TS-20
(2007-EOM)
TS-17-18
(2004-EOM)
TS-23
(2010-EOM)
TS-2
(1983-EOM)
TS-24
(2010-EOM)
(2005-EOM)
TS-16
(2004-EOM)
T
S
-
1
2
(
2
0
0
5
-
E
O
M
)
BUCKSKIN MINE
ACCESS ROAD
MAIN
FUELING
STATION
WATER
FILLING
STATION
PUMP
MCC ROOM
MCC ROOM
LOADOUT SILOS
MCC ROOM
MCC ROOM
SEWAGE SYSTEM NO. 2
MAIN
FUELING
STATION
HOPPER
EXPANSION SILOS
TRANSFER TOWER 3
MAIN SUBSTATION
ENCOAL RAW COAL SILO
STORAGE AREA
PLANT OFFICE / LAB
OLD ENCOAL TANK FARM
OLD ENCOAL FACILITY
SHOP/OFFICE
Land Farm #1
Kiewit
Mining
Ranch
House
SEDIMENTATION
NO. 33 RESERVOIR
SEDIMENTATION
NO. 34
RESERVOIR
SEDIMENTATION
NO. 30
RESERVOIR
TCO SUMP
PANEL B
STORAGE POND
WA
TE
R S
TO
RA
GE
SEDIMENTATION
No. 14 RESERVOIR
W
A
S
T
E
W
A
T
E
R
CONVEYOR
SUMP
INPIT HOPPER
SUMP
SEDIMENTATION
TRAP OB-5E
SEDIMENTATION
No. 3 RESERVOIR
SEDIMENTATION
TRAP OB-5W
SEDIMENTATION
TRAP OB-5S
SEDIMENTATION
No. 1
RESERVOIR
SEDIMENTATION
No. 13
RESERVOIR
HAY
CREEK
DIVERSION
BLOCKING
DIKE
HAY CREEK DIVERSION
BACKFILL 3
SUMP
Steve
Barbour
Tom
Barbour
KMG
Hunting
Trailer
Tom
Barbour
Cecle
Cook
Byron
Oedekoven
RENTAL
C
E
L
L
1
C
E
L
L
2
POWDER RIVER
ENERGY CORP.
SEDIMENTATION
No. 22 RESERVOIR
SHUNTING SUMP
(2011-EOM)
SUMP CELL
BF 5
(2012-EOM)
SUMP CELL
BF 6
(2012-EOM)
TS-2
(2012-EOM)
9 10
8 9
7 812 7
9 10
16 15
8 9
17 16
7 8
18 17
12 7
13 18
28 27
33 34
16 15
21 22
21 22
28 27
33 34
4 3
18 17
19 20
19 20
30 29
31 32
6 5
13 18
24 19
24 19
25 30
25 30
36 31
30 29
31 32
20 21
29 28
17 16
20 21
29 28
32 33
32 33
5 4
36 31
1 6
Backfill 3
Location
Overburden &
Coal Operations
B
a
c
k
f
i
l
l
3
H
a
u
l
R
a
o
d
BUCKSKIN MINING COMPANY
Mine Facilities Overview
MAP # 1Revision:
Design: 12-2-2012 NEAP
Spec:
Plot:
Date: 12-21-2012Drawn By: Landon Smith Checked by: Landon Smith
BUCKSKIN MINING COMPANYPO Box 3027Campbell CountyGillette, WY 82717307-686-5439
N
02/21/2013
02/27/2013
BUCKSKIN MINING COMPANY
BUCKSKIN MINE, PO BOX 3027 ~ GILLETTE, WY 82717
February 27, 2013 Cara Keslar Wyoming Department of Environmental Quality Air Quality Division 112 West 25th Street Cheyenne, WY 82002 RE: Request for Flag under the Exceptional Event Rule for PM10 December 02, 2012 Exceedance Dear Cara,
Included are Buckskin Mining Company’s responses to Air Quality Division’s questions concerning
the December 02, 2012 PM10 exceedance.
Sincerely,
Landon Smith Environmental Coordinator Email: [email protected] Phone: (307) 686-5404 cc: Greg Passini
BUCKSKIN MINING COMPANY
BUCKSKIN MINE, PO BOX 3027 ~ GILLETTE, WY 82717
Page2
Comment: A timeline for the day noting equipment idled and/ or moved in reaction to the high
readings. Response: 05:30- Day shift begins 08:47- Blowing Dust Health Alert Advisory from AQD was sent to pit superintendents. - Superintendents took action by moving the two overburden hauls to the lowest
backfill dump, Backfill three, and assigned a 30,000 gallon water truck to that backfill 3 haul route for the rest of shift.
09:42- Highest recorded wind gust: 63.3mph - Superintendents added a 20,000 gallon water truck to assist in dust suppression on backfill and overburden benches. 10:00- High Wind Alert was sent from the TEOM to appropriate BMC Staff. - At the same time, a High Concentration Alert of 878.8µg/m3 was received from the TEOM - BMC reacted by taking early lunches in order to idle production during the event. 10:30- Early Lunches were started.
-Coal operations were first. Equipment idled at this time were 10-2766 shovel, 10-2936 Back Hoe, 10-2765 shovel, nine 240 ton haul trucks, and one 24m caterpillar blade for a total shutdown time of 1 hour. See Map #1 for equipment location.
- Production at this time was reduced by roughly half - Water trucks remained active throughout the entire lunch period, 10:30-13:00. 11:00- Highest one hour concentration was received, 980.8µg/m3 at a time of limited productivity. 11:30- Overburden operations begin lunch
-10-3038 P&H 4100 shovel idled first along with six, 400ton Caterpillar 797 haul trucks and 1 Caterpillar 24m Blade for approximately 30 minutes.
12:00- The final overburden lunch is started -10-2927 P&H 4100 shovel is idled along with five, 400ton Caterpillar 797 haul trucks for approximately 30 minutes.
12:30- Additional support equipment lunch begins -Equipment idled at this time were two Caterpillar Lube trucks, three Caterpillar rubber tire dozers, and two Caterpillar track dozers for approximately 30 minutes.
14:00- The last 1 hour concentration over 150µg/m3 was recorded. - The first high 24 hour concentration level alert 153µg/m3 was sent from the TEOM 15:00- 1 hour concentration levels fall below the maximum allowable limit to 114.7µg/m3 Comment: A facility map showing equipment location, mining activities, and water distribution
BUCKSKIN MINING COMPANY
BUCKSKIN MINE, PO BOX 3027 ~ GILLETTE, WY 82717
Page3
activities throughout the day. Response: Enclosed with the response packet. Comment: AQD requests that BMC separates the controls required by the permit BACT from those which are continuously employed but not required by the permit BACM Response: Controls required by the permit:
‐ Areas where topsoil has been replaced are ripped and seeded as soon as its practical after topsoil replacement
‐ During the operation of topsoil stripping, the active operation is frequently watered to reduce dust emissions.
At the time of the event, all topsoil operations were complete, and windrows were constructed
‐ Pads in front of truck dumps are cleaned, treated, and maintained to prevent material that accumulates on the pads due to spillage from being pulverized and a potential source of fugitive dust.
‐ All of Buckskin’s permanent roads and areas around facilities are treated with magnesium chloride annually to prevent dust.
‐ Buckskin’s operational areas are watered continually by water trucks ranging from 20,000 to 30,000 gallons.
‐ As a preventative measure, Buckskin ensures that nearby Collins Road and McGee Road also receive magnesium chloride treatment.
‐ Stilling sheds, bag houses, and passive enclosure control systems are used in plant operations.
Continuously Employed Controls ‐ Buckskin has no final graded backfill larger than 300 contiguous acres that need
to be addressed. ‐ Long term out‐of‐pit overburden and topsoil piles are seeded. ‐ When possible, Buckskin schedules topsoil removal, grading backfill, and topsoil
replacement concurrently to minimize open areas ‐ Topsoil Contractors, and Scoria Contractors are required to apply water around
their work area. ‐ As a preventative measure, Buckskin ensures that nearby Collins Road and
McGee Road also receive magnesium chloride treatment.
BUCKSKIN MINING COMPANY
BUCKSKIN MINE, PO BOX 3027 ~ GILLETTE, WY 82717
Page4
Comment: Please discuss the exposed acreage at the mine on the day of the exceedance. Response: On December 02, 2012 approximately 130 acres were exposed due to topsoil salvage
operations. The entire 130 acres were stabilized by windrows and rough grading. BMC inspects these control measures regularly to insure proper control. During the event, these windrows were adequately controlling wind shear at ground level. Windrows were verified and deemed acceptable on an August 28, 2012 WYDEQ Air Quality Inspection. In addition, two topsoil piles, TS-09 and TS-23, that received topsoil from the above stated area were seeded and mulched at the time of the event.
Comment: To minimize confusion please revise the graphs throughout the submission so that the x-
axis uses the same time scale as the table. Response: Revised tables and graphs are contained at the back of this packet.
BUCKSKIN MINING COMPANY
BUCKSKIN MINE, PO BOX 3027 ~ GILLETTE, WY 82717
Page5
Buckskin Mine North TEOM 12‐01‐2012
BUCKSKIN MINING COMPANY
BUCKSKIN MINE, PO BOX 3027 ~ GILLETTE, WY 82717
Page6
Buckskin Mine North TEOM 12‐01‐2012
BUCKSKIN MINING COMPANY
BUCKSKIN MINE, PO BOX 3027 ~ GILLETTE, WY 82717
Page7
Buckskin Mine North TEOM 12‐02‐2012 High Wind Event
Date/Time Wind Speed (m/s)
Wind Speed (mi/hr)
Wind Direction
(°)Precip
(in)Gust (m/s)
Gust (mi/Hr)
Time of Gust
Hourly PM Conc
(STP) (µg/m^3)
Hourly PM Conc (LTP)
(µg/m^3)
24-hour Avg Conc (STP)
(µg/m^3)
12:00 AM 4.2 9.40 161 0 6.5 14.5 11:17 PM 9.5 8.6 9.1
01:00 AM 4.3 9.62 171 0 6.4 14.3 12:24 AM 9.9 9 9.3
02:00 AM 3.7 8.28 173 0 6.5 14.5 01:01 AM 9.2 8.4 9
03:00 AM 4.6 10.29 192 0 7.7 17.2 02:45 AM 4.8 4.3 8.9
04:00 AM 4.5 10.07 180 0 7.5 16.8 03:17 AM 3.9 3.6 8.8
05:00 AM 4.1 9.17 158 0 7.8 17.4 04:30 AM 8.6 7.9 8.8
06:00 AM 7.3 16.33 181 0 9.8 21.9 05:26 AM 11.6 10.5 9.1
07:00 AM 7.7 17.22 173 0 11.5 25.7 06:56 AM 8.3 7.4 8.9
08:00 AM 7.8 17.45 156 0 12.4 27.7 07:06 AM 13.5 12.1 8.5
09:00 AM 9.3 20.80 176 0 15.5 34.7 08:40 AM 30.6 27.2 8.9
10:00 AM 17.1 38.25 194 0 28.3 63.3 09:42 AM 878.8 776.1 44.4
11:00 AM 18.6 41.61 186 0 26.1 58.4 10:14 AM 980.8 861.6 84.3
12:00 PM 17.5 39.15 188 0 25.7 57.5 11:53 AM 768.7 670.5 116.6
01:00 PM 18.1 40.49 190 0 26.1 58.4 12:01 PM 677.3 589.3 144.9
02:00 PM 16.7 37.36 189 0 24.5 54.8 01:00 PM 190.7 165.7 153
03:00 PM 13.7 30.65 191 0 21.3 47.6 02:43 PM 114.7 99.5 158
04:00 PM 13.4 29.97 192 0 20.4 45.6 03:59 PM 95.2 82.5 161.9
05:00 PM 14.4 32.21 197 0 20.5 45.9 04:02 PM 90.8 78.8 165.4
06:00 PM 15.4 34.45 201 0 21.4 47.9 05:42 PM 62.5 54.4 167.5
07:00 PM 15.3 34.23 203 0 20.8 46.5 06:06 PM 31.7 27.6 168.8
08:00 PM 15.6 34.90 207 0 21.3 47.6 07:46 PM 29.4 25.6 169.6
09:00 PM 15 33.55 208 0 21.3 47.6 08:59 PM 21.7 18.9 169.9
10:00 PM 14.6 32.66 217 0 20.8 46.5 09:14 PM 20.8 18.2 170.3
11:00 PM 13.3 29.75 246 0 22.7 50.8 10:57 PM 35.4 31.2 170
5yr Wind Speed Average 10.87 average 39.52
Table 2
2-Dec-12
Table 2: Wind speed, Wind gust speeds, hourly PM10 concentations, and 24-hour PM10 concentrations on the North TEOM on December 2, 2012.
North TEOM
BUCKSKIN MINING COMPANY
BUCKSKIN MINE, PO BOX 3027 ~ GILLETTE, WY 82717
Page8
Buckskin Mine North TEOM 12‐02‐2012 High Wind Event
BUCKSKIN MINING COMPANY
BUCKSKIN MINE, PO BOX 3027 ~ GILLETTE, WY 82717
Page9
Buckskin Mine West TEOM 12‐01‐2012
BUCKSKIN MINING COMPANY
BUCKSKIN MINE, PO BOX 3027 ~ GILLETTE, WY 82717
Page10
Buckskin Mine West TEOM 12‐01‐2012
BUCKSKIN MINING COMPANY
BUCKSKIN MINE, PO BOX 3027 ~ GILLETTE, WY 82717
Page11
Buckskin Mine West TEOM 12‐02‐2012
BUCKSKIN MINING COMPANY
BUCKSKIN MINE, PO BOX 3027 ~ GILLETTE, WY 82717
Page12
Buckskin Mine West TEOM 12‐02‐2012 High Wind Event
LOW WATER
CROSSING
LOW WATER
CROSSING
NORTHEAST
LOW-WATER CROSSING
SOUTHWEST
LOW-WATER CROSSING
(Not Constructed as of 05/10)
P
O
S
S
I
B
L
E
F
U
T
U
R
E
P
E
R
I
M
E
T
E
R
R
O
A
D
WATERING
STATION
S
E
D
2
2
R
O
A
D
TS-9
(2001-EOM)
TS-1
(1981-POSTMINING)
TS-13
(2002-EOM)
ARTS-NO.1
ARTS-NO.3
ARTS-NO.6
ARTS-NO.8
ARTS-NO.11
ARTS-NO.15
ARTS-NO.13
ARTS-NO.2
ARTS-NO.4
ARTS-NO.5
ARTS-NO.7
ARTS-NO.9
ARTS-NO.10
ARTS-NO.12
ARTS-NO.14
RRTS-NO.1
RRTS-NO.2
RRTS-NO.3
RRTS-NO.4
RRTS-NO.5
RRTS-NO.8
RRTS-NO.10
RRTS-NO.7
RRTS-NO.12
RRTS-NO.14
RRTS-NO.15
RRTS-NO.16
RRTS-NO.18
RRTS-NO.17
RRTS-NO.19
SARTS
NO-1
TS-10
(1996-EOM)
TS-6
(1991-EOM)
TS-4
(1991-EOM)
TS-21
(2007-EOM)
T
S
-
1
9
(
2
0
0
9
-
E
O
M
)
TS-22
(2010-EOM)
TS-20
(2007-EOM)
TS-17-18
(2004-EOM)
TS-23
(2010-EOM)
TS-2
(1983-EOM)
TS-24
(2010-EOM)
(2005-EOM)
TS-16
(2004-EOM)
T
S
-
1
2
(
2
0
0
5
-
E
O
M
)
BUCKSKIN MINE
ACCESS ROAD
MAIN
FUELING
STATION
WATER
FILLING
STATION
PUMP
MCC ROOM
MCC ROOM
LOADOUT SILOS
MCC ROOM
MCC ROOM
SEWAGE SYSTEM NO. 2
MAIN
FUELING
STATION
HOPPER
EXPANSION SILOS
TRANSFER TOWER 3
MAIN SUBSTATION
ENCOAL RAW COAL SILO
STORAGE AREA
PLANT OFFICE / LAB
OLD ENCOAL TANK FARM
OLD ENCOAL FACILITY
SHOP/OFFICE
Land Farm #1
Kiewit
Mining
Ranch
House
SEDIMENTATION
NO. 33 RESERVOIR
SEDIMENTATION
NO. 34
RESERVOIR
SEDIMENTATION
NO. 30
RESERVOIR
TCO SUMP
PANEL B
STORAGE POND
WA
TE
R S
TO
RA
GE
SEDIMENTATION
No. 14 RESERVOIR
W
A
S
T
E
W
A
T
E
R
CONVEYOR
SUMP
INPIT HOPPER
SUMP
SEDIMENTATION
TRAP OB-5E
SEDIMENTATION
No. 3 RESERVOIR
SEDIMENTATION
TRAP OB-5W
SEDIMENTATION
TRAP OB-5S
SEDIMENTATION
No. 1
RESERVOIR
SEDIMENTATION
No. 13
RESERVOIR
HAY
CREEK
DIVERSION
BLOCKING
DIKE
HAY CREEK DIVERSION
BACKFILL 3
SUMP
Steve
Barbour
Tom
Barbour
KMG
Hunting
Trailer
Tom
Barbour
Cecle
Cook
Byron
Oedekoven
RENTAL
C
E
L
L
1
C
E
L
L
2
POWDER RIVER
ENERGY CORP.
SEDIMENTATION
No. 22 RESERVOIR
SHUNTING SUMP
(2011-EOM)
SUMP CELL
BF 5
(2012-EOM)
SUMP CELL
BF 6
(2012-EOM)
TS-2
(2012-EOM)
9 10
8 9
7 812 7
9 10
16 15
8 9
17 16
7 8
18 17
12 7
13 18
28 27
33 34
16 15
21 22
21 22
28 27
33 34
4 3
18 17
19 20
19 20
30 29
31 32
6 5
13 18
24 19
24 19
25 30
25 30
36 31
30 29
31 32
20 21
29 28
17 16
20 21
29 28
32 33
32 33
5 4
36 31
1 6
Backfill 3
Location
B
a
c
k
f
i
l
l
3
H
a
u
l
R
a
o
d
10-2766 Shovel
10-2936 Hoe
10-3038 Shovel
10-2927 Shovel
10-2765 Shovel
10-2764 Shovel
Overburden &
Coal Operations
BUCKSKIN MINING COMPANY
Mine Facilities Overview
MAP # 1Revision:
Design: 12-2-2012 NEAP
Spec:
Plot:
Date: 02-26-2013Drawn By: Landon Smith Checked by: Landon Smith
BUCKSKIN MINING COMPANYPO Box 3027Campbell CountyGillette, WY 82717307-686-5439
N
04/29/2013