Page 1: Budget LAL Pixel 2012-2013 R&D  Tracker

Budget LAL Pixel 2012-2013R&D Tracker

A.Lounis , N. Dinu, V. Linhard, A. Bassalat*, Ali Harb, Evangelos-Leonidas Gkougkousis, A. Falou*

Gisèle Martin-Chassard, D. Thienpont, J. Tong Bong, B. Lachasinski Pôle OMEGA

* Permanent at CERN (IBL construction)

Page 2: Budget LAL Pixel 2012-2013 R&D  Tracker

Bilan-2012

R&D Pixel planaires 2012: 10 K€ VTT Edgless detectors (35 x200 um)

Run sensors : received Oct 2012

Page 3: Budget LAL Pixel 2012-2013 R&D  Tracker

Budget 2013

Test card Omegapix2/Edgless (VTT pixel) + Omegapix2/Slim Edge (Cis Pixel)

3 K€

Carte Front-End Omegapix2/Pixel Matrix

3D- ASIC Chartered Tezzaron Via CMP

SENSOR tests 3K€

65 nm electronics : Building block design March 2013(LAL, LPNHE,LAPP, INFN, … CERN) CERN financement

Asic 65 nm Test card 3K€

Page 4: Budget LAL Pixel 2012-2013 R&D  Tracker

Test Card OMEGAPIX

Test Card MemDyn

Pôle OMEGA

Page 5: Budget LAL Pixel 2012-2013 R&D  Tracker

R&D on TCAD and doping profile activities

Synopsis TCAD 3D simulator 1500 € + 900 € (2 licences)

Simulation TCAD : 2.4K€

Doping profile measurements using AFM method (Laboratoire IEF Orsay + CNRS MEUDON) AFM + SIMS : 3 K€

Page 6: Budget LAL Pixel 2012-2013 R&D  Tracker

R&D developments

ASIC Test cards and Front-End test cards 9K€

Planar Pixel sensor Edgless R&D, tests structures LAL, MPI, Dortmund, Glasgow 10 K€

3D Simulator 2.5 K€

Doping profiles evaluation 2K€

Run Omegapix2 Dec 2012 ANR Vitesse (~75 K€)

Inter-connexions ASIC + Pixel Matrix (20 K€)

Inter-connexions Omegapix2 Dec 2013 ANR Vitesse (~XXK€)

43,5 K€

Page 7: Budget LAL Pixel 2012-2013 R&D  Tracker

Futur developments on active edges

EU request Duration: 3-4 years- 500 KEuro, mainly for 4-5 consecutive production runs at VTT comprising sensor productions and interconnection to the read-out chip.- 4 Ph.D. students

Appel d’Offre CAPTINOV Plateforme Capteurs Innovants SESAME / region ILE DE FRANCE (LAL, LLR, CEA, ….)